National Bank For Agriculture And Rural Development Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

National Bank For Agriculture And Rural Development - NABARD Tender

Eprocure
Opening Date26 Jun 2020
Closing Date24 Jul 2020
Tender Amount₹ 5,12,19,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Road.B

3260

-

4.4

... More
Road.C

3168

-

4.4

... More
Road.D

1970

-

4.4

... More
Construction of Granular sub-base Grade-V 220mm thick by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401

-

-

-

... More
Road.A

1319

-

1356.78

... More
Construction of Granular sub-base Grade-V 200mm thick by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401

-

-

-

... More
Road.B

1697

-

1369.98

... More
Road.C

1416

-

1427.18

... More
Road.D

1714

-

1453.58

... More
Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 250mm. thick in two layers of 125mm each thick specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to the site laying in uniform layers with pavers in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5

-

-

-

... More
Road.A

1499

-

1592.25

... More
Road.B

2122

-

1592.25

... More
Road.C

1770

-

1592.25

... More
Road.D

2143

-

1592.25

... More
Providing and laying of prime coat over WBM/WMM surface using 7 kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc, complete as per clause 502 of MORTH Rev.5

-

-

-

... More
Road.A

5994

-

50.65

... More
Road.B

8485

-

50.64

... More
Road.C

7080

-

50.66

... More
Road.D

8569

-

50.66

... More
Providing and laying Tack Coat over WBM/WMM surface (treated with primer) using 2.50Kg of Bitumen Emulsion(RS1) per 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5.

-

-

-

... More
Road.A

5994

-

10.73

... More
Road.B

8485

-

10.73

... More
Road.C

7080

-

10.73

... More
Road.D

8569

-

10.74

... More
Providing and laying 50mm consolidated thick bituminous macadam using 0.2cum of 26.5-13.2mm, 0.43cum of 13.22-2.36mm and 0.08 cum of 2.36mm and blow size IRC metal with 37 kg of VG30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross section and consolidated by 8-10 tone vibrator roller to the require density etc including labour for attending the paver to site, etc including hire charges and fuel charges for 20-30 ton CMP with bitumen boiler, tipper trucks, paver finisher / vibrator roller and all other tools and plants required including fuel and all other incidental charges etc complete as per specification using CMP as per clause 504 of MORTH.Rev.5

-

-

-

... More
Road.A

300

-

5274.06

... More
Road.B

425

-

5274.06

... More
Road.C

354

-

5274.06

... More
Road.D

429

-

5274.06

... More
Providing and laying Bituminous Concrete to 30mm thick using 0.13cum of 19.00-9.50mm, 0.17cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 30mm with mechanical paver finisher to the specified grades and cross sections and consolidatedby8-10tonne Vibratory/ Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher/9m paver finisher, Vibratory/Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5.

-

-

-

... More
Road.A

180

-

6593.08

... More
Road.B

255

-

6593.08

... More
Road.C

213

-

6593.08

... More
Road.D

258

-

6593.08

... More
Providing and laying of carted Earth SS20B including cost and conveyance of the same to work site with an average lead of 2 km including all labour charges for laying , spreading and consolidation with power roller rolling etc., complete and as directed by the departmental engineer for 100% compaction for side berms as per MORT&H Specificaton No.304 & 305

-

-

-

... More
Road.A

2546

-

124

... More
Road.C

1801

-

124

... More
Road.D

1874

-

124

... More
Providing and laying of carted Earth SS20B including cost and conveyance of the same to work site with an average lead of 1 km including all labour charges for laying , spreading and consolidation with power roller rolling etc., complete and as directed by the departmental engineer for 100% compaction for side berms as per MORT&H Specificaton No.304 & 305

-

-

-

... More
Road.B

3562

-

113

... More
Providing RCC M15 grade precast HM stone of standard design as per IRC 8-1980 and fixing in position including painting and printing etc complete (as per MORT&H specification No.804)

-

-

-

... More
Road.A

7

-

256

... More
Road.B

9

-

256

... More
Road.C

7

-

256

... More
Road.D

9

-

256

... More
Providing RCC M15 grade precast KM stone of standard design as per IRC 8-1980 and fixing in position including painting and printing etc complete (as per MORT&H specification No.804)

-

-

-

... More
Road.A

1

-

906

... More
Road.B

2

-

906

... More
Road.C

1

-

906

... More
Road.D

2

-

906

... More
Provision for Scheme Board

-

-

-

... More
Road.A

1

-

9057

... More
Road.B

1

-

9057

... More
Road.C

1

-

9057

... More
Road.D

1

-

9057

... More
SUB WORK

-

-

-

... More
Pipe Culvert

-

-

-

... More
Dismandling the existing plain cement concrete in the existing damaged pipe culvert and clearing aways from the work site and carefully stacking the usefull material for reuse on the road side departmental officer including all labour and incidental charges etc.,complete as per MORT&H Specificaton No.202

-

-

-

... More
Road.A

16.5

-

332

... More
Dismantling the existing Random Ruble Masonry in Cement mortar walls upto 3m height in the existing culvert and clearing away from the work site and carefully stacking the usefull materials for re-use on the road side as directed by the departmental officers including all labour and incidental charges etc., complete as per MORT&H Specificaton No.202

-

-

-

... More
Road.B at Km.2/2 Single row pipe culvert

26

-

193

... More
Road.C at Km.0/2 Single row pipe culvert

26

-

193

... More
Earth work excavation in all classes of soils except soft disintegrated rock and hard roack and depositing on bank as per SS 20 B with all leads and lifts and all other incidental charges such as bailing out of water shoring strutting walling for levelling ground and their subsequent removal of all logs stump grubs and other deleterious matter and obstructions ,trimming bottom of excavation back filling and cleaning the site and disposal of all other surplus materilas etc., complete as per standard specification for Foundation of Body wall of Pipe culvert as per MORT&H Specificaton No.304 & 305

-

-

-

... More
Road.A

43

-

196

... More
Road.B ( Single row pipe culvert at Km.0/6)

43

-

196

... More
Road.B ( Single row pipe culvert at Km.2/2 )

43

-

196

... More
Road.B at Km.1/2 & 1/4 Two row pipe culvert

153

-

196

... More
Road.C at Km.0/2 Single row pipe culvert

45

-

196

... More
Road.C at Km.0/6 Single row pipe culvert

45

-

196

... More
Stone Dust filling including cost and conveyance of Stone dust to worksite including labour charges for filling in layers as specified by the departmental officers including watering with all leads for water including labour charges for compacting, tamping, ramming under optimum moisture content to obtain the maximum density and all other incidental charges etc. complete as per standard specification as per MORT&H Specificaton No.1000

-

-

-

... More
Road.A

13

-

248

... More
Road.B ( Single row pipe culvert at Km.0/6)

13

-

182

... More
Road.B ( Single row pipe culvert at Km.2/2 )

13

-

196

... More
Road.B at Km.1/2 & 1/4 Two row pipe culvert

44

-

189

... More
Road.C at Km.0/2 Single row pipe culvert

13

-

189

... More
Road.C at Km.0/6 Single row pipe culvert

13

-

189

... More
Vibrated cement concrete of grade M15 Nominal Mix 1:2:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of formwork, soft water,labour charges for mixing, transporting, laying and curing concrete, working at depths,Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification for LC for Foundation of Body wall of pipe culvert as per MORT&H Specificaton No.1000, 1500, 1700, 2200, 2300, 2704

-

-

-

... More
Road.A

5

-

5162

... More
Road.B ( Single row pipe culvert at Km.0/6)

5

-

5032

... More
Road.B ( Single row pipe culvert at Km.2/2 )

5

-

5060

... More
Road.B at Km.1/2 & 1/4 Two row pipe culvert

14

-

5046

... More
Road.C at Km.0/2 Single row pipe culvert

5

-

5046

... More
Road.C at Km.0/6 Single row pipe culvert

5

-

5046

... More
Vibrated cement concrete of grade M15 Nominal Mix 1:2:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of formwork, soft water,labour charges for mixing, transporting, laying and curing concrete, working at depths,Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification for Footing of Body wall of pipe culvert as per MORT&H Specificaton No.1000, 1500, 1700, 2200, 2300, 2704

-

-

-

... More
Road.A

14

-

6562

... More
Road.B ( Single row pipe culvert at Km.0/6)

14

-

6431

... More
Road.B ( Single row pipe culvert at Km.2/2 )

14

-

6459

... More
Road.B at Km.1/2 & 1/4 Two row pipe culvert

36

-

6397

... More
Road.C at Km.0/2 Single row pipe culvert

14

-

6445

... More
Road.C at Km.0/6 Single row pipe culvert

14

-

6445

... More
Vibrated cement concrete of grade M15 Nominal Mix 1:2:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of formwork, soft water,labour charges for mixing, transporting, laying and curing concrete, working at depths,Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification for Body wall and parapet of pipe culvert as per MORT&H Specificaton No.1000, 1500, 1700, 2200, 2300, 2704

-

-

-

... More
Road.A

15

-

7768

... More
Road.B ( Single row pipe culvert at Km.0/6)

15

-

7938

... More
Road.B ( Single row pipe culvert at Km.2/2 )

15

-

7966

... More
Road.B at Km.1/2 & 1/4 Two row pipe culvert

36

-

8108

... More
Road.C at Km.0/2 Single row pipe culvert

15

-

7952

... More
Road.C at Km.0/6 Single row pipe culvert

15

-

7952

... More
Supply of 1000mm dia RCC NP3 class pipes confirming to IS 458 specification as directed by the departmental officers including cost and conveyance of pipes to the worksite and all other incidental charges etc., complete as per standard specification as per MORT&H Specificaton No.2900

-

-

-

... More
Road.A

7.5

-

3700

... More
Road.B ( Single row pipe culvert at Km.0/6)

7.5

-

3700

... More
Road.B ( Single row pipe culvert at Km.2/2 )

7.5

-

3700

... More
Road.B at Km.1/2 & 1/4 Two row pipe culvert

30

-

3700

... More
Road.C at Km.0/2 Single row pipe culvert

7.5

-

3700

... More
Road.C at Km.0/6 Single row pipe culvert

7.5

-

3700

... More
Laying and fixing 1000mm dia RCC NP3 pipe in position excluding cost of pipes but including conveyance to work spot and handling charges on both sides including labour charges for hoisting and placing the pipes in position and packing the joints and all other incidental charges etc., complete as per standard specification as per MORT&H Specificaton No.2900

-

-

-

... More
Road.A

7.5

-

238

... More
Road.B ( Single row pipe culvert at Km.0/6)

7.5

-

238

... More
Road.B ( Single row pipe culvert at Km.2/2 )

7.5

-

238

... More
Road.B at Km.1/2 & 1/4 Two row pipe culvert

30

-

238

... More
Road.C at Km.0/2 Single row pipe culvert

7.5

-

238

... More
Road.C at Km.0/6 Single row pipe culvert

7.5

-

238

... More
Box Culvert

-

-

-

... More
Dismantling the existing Random Ruble Masonry in Cement mortar walls upto 3m height in the existing culvert and clearing away from the work site and carefully stacking the usefull materials for re-use on the road side as directed by the departmental officers including all labour and incidental charges etc., complete as per MORT&H Specificaton No.202

-

-

-

... More
Road.C (Two Cell Box culvert)

44

-

193

... More
Dismandling the existing RCC concrete in the existing damaged Slab culvert and clearing aways from the work site and carefully stacking the usefull material for reuse on the road side departmental officer including all labour and incidental charges etc.,complete as per MORT&H Specificaton No.202

-

-

-

... More
Road.C (Two Cell Box culvert)

4.4

-

5045

... More
Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling out water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for Dressing the Bed up to Sill Level as per MORT&H Specificaton No.304 & 305

-

-

-

... More
Road.C (Two Cell Box culvert)

94.4

-

84

... More
Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling out water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF BOX CULVERT as per MORT&H Specificaton No.304 & 305

-

-

-

... More
Road.A (Six Cell Box culvert)

591

-

218

... More
Road.C (Two Cell Box culvert)

186

-

218

... More
Plain Cement Concrete M-15 Grade, Nominal Mix, 1:2:4, using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of form work, lead for soft water, labour charges for mixing , transporting, laying, and curing concrete working in depths and hire charges for tools and plants, and all other incidental charges etc complete as per relevant specification for Leveling course as per MORT&H Specificaton No.1000, 1500, 1700, 2200, 2300

-

-

-

... More
Road.A (Six Cell Box culvert)

69

-

5174

... More
Road.C (Two Cell Box culvert)

27

-

5060

... More
Vibrated Reinforced Cement Concrete M25 (Design mix) using ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel but including cost of formwork and centering, labour charges for mixing, transporting, laying, curing concrete, Working at heights, soft water, hire charges for tools and Plants, including all other incidental charges, etc., complete for Base Slab, Side walls, Top Slab as per MORT&H Specificaton No.1000, 1500, 1700, 2200, 2300

-

-

-

... More
Road.A (Six Cell Box culvert)

147

-

8993

... More
Road.C (Two Cell Box culvert)

65

-

9070

... More
Vibrated reinforced cement concrete M.25. (Design mix) using HBG graded metal of 20 mm and below ISS size including cost and conveyance of all materials to work site but excluding cost and conveyance and fabrication of steel but including cost and labour charges for formwork and centering, labour charges for compacting curing, including all incidental charges etc. complete for FOR Approach slab as per MORT&H Specificaton No.1000, 1500, 1700, 2200, 2300

-

-

-

... More
Road.A (Six Cell Box culvert)

14

-

7482

... More
Supply and fabrication of Fe.500D steel required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc, complete as per MORT&H Specificaton No.1600

-

-

-

... More
Road.A (Six Cell Box culvert)

14

-

73383

... More
Road.C (Two Cell Box culvert)

4.28

-

73383

... More
Vibrated Cement Concrete M30 design mix using ISS size HBG graded metal including cost and conveyance of all materials to worksite including cost of cement at site including all labour charges for fixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges, form work, cost of pre moulded expansion joints and fixing the same in position etc., complete for wearing coat of 75mm uniform thickness over Box culvert as per MORT&H Specificaton No.2702

-

-

-

... More
Road.A (Six Cell Box culvert)

143

-

613.4

... More
Road.C (Two Cell Box culvert)

18

-

604.6

... More
Vibrated Cement concrete in CC 1:2:4 using 40mm ISS HBG including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing concrete, tools and plants and incidental charges as baling out water, maintaining of protective bunds, cofferdams, shorting, strutting etc., complete as per relevant standard specification for Parapet and Retaining wall as per MORT&H Specificaton No.1000, 1500, 1700, 2200, 2300

-

-

-

... More
Road.A (Six Cell Box culvert)

138

-

6546

... More
Road.C (Two Cell Box culvert)

99

-

6301

... More
Construction of Granular sub-base Grade-V 100mm thick by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401

-

-

-

... More
Road.C (Two Cell Box culvert)

56.3

-

1427.18

... More
Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer - Formation of embankment using carted earth with an average lead of 2 km. for diversion road as per MORT&H Specificaton No.304 & 305

-

-

-

... More
Road.C (Two Cell Box culvert)

180

-

124

... More
Providing and fixing PVC seepage pipes of 100mm dia of required lengths for abutments and wings including costs and conveyance of all materials to work site and labour charges for fixing, etc. complete to drain the backfill in between abutment and wings as per MORT&H No.2702

-

-

-

... More
Road.A (Six Cell Box culvert)

76

-

172.8

... More
Road.C (Two Cell Box culvert)

36

-

172.8

... More
Filling behind Abutment and Wing walls with clean gritty gravel including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers tamping under optimum moisture content to get the maximum density, including watering, with all leads for water and all other incidental charges, etc., complete

-

-

-

... More
Road.A (Six Cell Box culvert)

134

-

254

... More
Road.C (Two Cell Box culvert)

99

-

298

... More
Providing and fixing of G.I. Drainage spouts 100mm dia as per GOI drawing SD/205 with grating arrangements at top as shown in the drawing and 100 mm dia drainage spout projecting atleast 600mm beyond the bottom of deck slab as shown in the drawing, including cost and conveyance of galvanised iron pipes and flats and fixing them in position etc. complete as per MORT&H No.2705

-

-

-

... More
Road.A (Six Cell Box culvert)

12

-

2163

... More
Road.C (Two Cell Box culvert)

4

-

2163

... More
Providing and fixing moulded bitumen joint pad 12mm thick for Expansion joint including cost of sealing compound and priming cost including conveyance and all labour charges for fixing them in position as per the standard specification

-

-

-

... More
Road.A (Six Cell Box culvert)

23

-

100

... More
Calculation of SubTotal, GST and Total carried out by system automatically

-

-

-

... More
Sub Total Amount for above all items (excluding GST)

1

-

45730836.58

... More
GST 12% for above SubTotal Amount

1

-

5487700.39

... More
Total in Figures (SubTotal + GST)

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.