Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

National Bank For Agriculture And Rural Development - NABARD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date25 Apr 2025
Closing Soon12 May 2025
Tender Amount₹ 4,59,55,000 
Notes
Download

AI Insights

Class Of Bidder
Bid Capacity
... View More
The formula for bid capacity is: Assessed Available Bid Capacity = (A x N x 2)-B Where A is Maximum value of construction works executed in any one year during the last five years (updated to the current price level) B is Value at current price level of the existing commitments and ongoing works to be completed during the next 9 months N is Number of years prescribed for completion of the works for which the bids are invited.
Technical Capacity
... View More
The required prior work experience for the bidder includes experience in civil engineering construction, specifically in fields such as road work, bridge work, and mechanized granular pavement construction. The bidder should have experience as a prime contractor, although the exact number of years is not mentioned. The bidder should have completed works of similar value, with a minimum value of 10% of the contract value, which can be taken as 10% of the estimated value of the contract, not less than Rs.45.96 Lakhs. The total estimated cost of the works is Rs. 459.55 Lakhs. The bidder should have achieved an average annual turnover of at least 40% of the value of the contract applied for, over the last five years. The value of the contract applied for is Rs.183.82 Lakhs. The bidder should have successfully completed at least one contract (Highways road and/or Bridge works/Airport contract) of at least 40% of the value of the proposed contract in any one year within the last five years. The bidder should demonstrate experience in similar nature of work, including the following quantities of works completed in any one year during the last five years: - Earthwork: 5072.50 m3 (completed), 2029.00 m3 (required) - Gravel Soling, GSB: 178.70 m3 (completed), 71.48 m3 (required) - WMM, CRM: 3258.90 m3 (completed), 1303.56 m3 (required) - Prime coat, Tack coat: 26335.80 m2 (completed), 10534.32 m2 (required) - BM, DBM: 633.10 m3 (completed), 253.24 m3 (required) - BC, SDBC: 754.90 m3 (completed), 301.96 m3 (required) - CC, VCC, VRCC: 1580.75 m3 (completed), 632.30 m3 (required) - Steel: 22.49 MT (completed), 9.00 MT (required) The bid capacity to execute the work should be greater than Rs.459.55 Lakhs. The bidder is expected to have carried out satisfactorily work of similar size, nature, and complexity. The information uploaded must be sufficient to show that the applicant is capable in all respects to successfully complete the envisaged contract works. The available bid capacity will be calculated based on the maximum value of construction works executed in any one year during the last five years, updated to the current price level, with a rate of inflation taken as 10% per year. The bidder should have a sound financial position, with audited balance sheets for the last five years demonstrating long-term profitability, including an estimated financial projection for the next two years. In terms of specific values and percentages, the bidder should have: - A minimum of 10% of the contract value, which can be taken as 10% of the estimated value of the contract, not less than Rs.45.96 Lakhs. - A total estimated cost of the works of Rs. 459.55 Lakhs. - The available bid capacity will be calculated based on the maximum value of construction works executed in any one year during the last five years, updated to the current price level, with a rate of inflation taken as 10% per year.

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
i) Reconstruction of High level Bridge at Km 3/2 (i) and 3/2 (ii) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge for Formation of Diversion Road.

93.8

2204

206826.19

... More
vi) Reconstruction of High level Bridge at Km 3/2 (i) and 3/2 (ii) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge for Formation of Approach Road.

204

2204

449813.88

... More
Providing and laying Prime Coat over WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 111, 112, 501, 502 & 900 of MORTH Rev-5 for Diversion Road and Approach Road.

11976.9

84

1008095.67

... More
i) Reconstruction of High level Bridge at Km 3/2 (i) and 3/2 (ii) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge for Formation of Diversion Road.

375

84

31563.75

... More
vi) Reconstruction of High level Bridge at Km 3/2 (i) and 3/2 (ii) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge for Formation of Approach Road.

816

84

68682.72

... More
Providing and laying Tack Coat over WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 111, 112, 501, 503 & 900 of MORTH Rev-5 for Diversion Road and Approach Road.

11976.9

19

237142.62

... More
i) Reconstruction of High level Bridge at Km 3/2 (i) and 3/2 (ii) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge for Formation of Diversion Road.

375

19

7425

... More
vi) Reconstruction of High level Bridge at Km 3/2 (i) and 3/2 (ii) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge for Formation of Approach Road.

816

19

16156.8

... More
Providing and laying 50mm thick Consolidated thick Bituminous Macadam using 0.20 cum of 26.50-13.20mm 0.430cum of 13.20-2.36mm and 0.08 cum of 2.36mm & below IRC metal with 37 kgs of VG30 grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t, CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plants required, including all other and incidental charges etc., complete as per specification using CMP as per clause 111, 112, 501, 504 & 900 of MORTH Rev-5 for Approach Road.

592.3

9082

5379647.67

... More
vi) Reconstruction of High level Bridge at Km 3/2 (i) and 3/2 (ii) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge for Formation of Approach Road.

40.8

9082

370571.71

... More
Providing and laying Bituminous Concrete to 30mm thick using 0.13cum of 19.00-9.50mm, 0.17cum of 9.50 - 2.36mm and 0.26 cum of 2.36mm and below with 50.30 kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10t Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t, CMP with bitumen boiler, tipper trucks, Paver finisher, Vibratory roller and all other tools and plants required, including all other and incidental charges etc., complete as per specification using CMP as per clause 111, 112, 501, 507 & 900 of MORTH Rev-5 for Approach Road.

355.4

11838

4207385.13

... More
vi) Reconstruction of High level Bridge at Km 3/2 (i) and 3/2 (ii) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge for Formation of Approach Road.

24.5

11838

290042.03

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation backfilling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification for Carted earth for making up berms with conveyance of 5 Km complete as directed by the departmental officers as per clause 111, 112, 301, 305 & 900 of MORT&H Specification (Fifth Revision)

2045.4

237

486457.48

... More
Providing RCC M15 grade precast KM stone of standard design as per IRC 8 - 1980 and fixing in position including painting and printing etc., complete (as per MORTH & H specification no 804).

3

2197

6591

... More
Providing RCC M15 grade precast HM stone of standard design as per IRC 26 -1967 and fixing in position including painting and printing etc., complete (as per MORTH & H specification no 804).

13

574

7470.45

... More
Earthwork excavation in all classes of soil except soft disintegrated rock and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling out water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification as per clause 111, 112 & 304 of MORT&H V Revision for BOXING DIVERION ROAD AND APPROACH ROAD.

-

-

-

... More
i) Reconstruction of High level Bridge at Km 3/2 (i) and 3/2 (ii) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge for Formation of Diversion Road.

102.4

123

12621.82

... More
vi) Reconstruction of High level Bridge at Km 3/2 (i) and 3/2 (ii) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge for Formation of Approach Road.

248.3

123

30605.46

... More
Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling out water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification as per clause 111, 112 & 304 of MORT&H V Revision for Embankment / Sub grade (Lead 5 Km) for Diversion Road and Approach Road.

-

-

-

... More
i) Reconstruction of High level Bridge at Km 3/2 (i) and 3/2 (ii) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge for Formation of Diversion Road. (97 % Compaction)

207.9

393

81737.96

... More
i) Reconstruction of High level Bridge at Km 3/2 (i) and 3/2 (ii) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge for Formation of Diversion Road. (95 % Compaction)

846.1

357

302675.35

... More
vi) Reconstruction of High level Bridge at Km 3/2 (i) and 3/2 (ii) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge for Formation of Approach Road. (97 % Compaction)

508.6

393

199961.18

... More
vi) Reconstruction of High level Bridge at Km 3/2 (i) and 3/2 (ii) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge for Formation of Approach Road. (95 % Compaction)

8.9

357

3183.8

... More
Construction of Granular Sub-base by providing close graded material, mixing in a mechanical mix plant at OMC, carriage of mixed material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 111, 112, 401 & 900 of MORTH Specification for grading-V Material for Diversion Road and Approach Road.

-

-

-

... More
i) Reconstruction of High level Bridge at Km 3/2 (i) and 3/2 (ii) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge for Formation of Diversion Road.

56.3

1972

111038.24

... More
vi) Reconstruction of High level Bridge at Km 3/2 (i) and 3/2 (ii) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge for Formation of Approach Road.

122.4

1972

241404.62

... More
Providing laying and rolling of close graded Premix Carpet of compacted 20mm thickness using 0.0162 cum of 13.20-11.20mm, 0.1404 cum of 11.2-5.6mm, 0.0729 cum of 5.60-2.80mm, 0.0405 cum of 2.80mm and below graded HBG metal using 19kg of VG 30 bitumen for 10sqm including premixing at CMP, conveyance by tipper lorry, laying by paver finisher and rolling by Vibratory Roller including cost and conveyance of all materials, hire charges of all T &P all labour charges and all other incidental charges etc complete as per specification using CMP as per clause 508 of MORTH Rev-5 for Diversion Road.

-

-

-

... More
i) Reconstruction of High level Bridge at Km 3/2 (i) and 3/2 (ii) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge for Formation of Diversion Road.

375

213

80223.75

... More
Supply, Hoisting and fixing of NP 3 class RCC 1000 mm dia. pipes supplied by the Contractor at his own cost specified below confirming to IS 458/ 1989 cost of pipe as a finished work including all other incidental charges, testing charges including loading and unloading transport and delivery in good condition at work site as directed by the departmental officers etc., complete for culvert in Diversion Road.

-

-

-

... More
i) Reconstruction of High level Bridge at Km 3/2 (i) and 3/2 (ii) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge for Formation of Diversion Road.

210

4543

954030

... More
Dismantling Culverts, bridges and other structures Dismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc., as per MORTH Specification. a) Dismantling the Brick or stone masonry in cement mortar wall under 3m Height.

-

-

-

... More
ii) Dismantling of Existing bridges at Km 3/2 (i) and 3/2 (ii).

210.2

283

59516.03

... More
Dismantling Culverts, bridges and other structures Dismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc., as per MORTH Specification. b) Dismantling the Reinforced concrete by deploying machineries.

-

-

-

... More
ii) Dismantling of Existing bridges at Km 3/2 (i) and 3/2 (ii).

37

4308

159421.9

... More
Earthwork excavation in Soft disintegrated rock not requiring blasting except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling out water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification as per clause 111, 112 & 304 of MORT&H V Revision for DRESSING THE BED UPTO SILL LEVEL.

-

-

-

... More
iii) Reconstruction of High level Bridge at Km 3/2 (i) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge.

89.3

183

16394.59

... More
iv) Reconstruction of High level Bridge at Km 3/2 (ii) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge.

64.9

183

11914.99

... More
Earthwork excavation in Soft disintegrade rock not requiring blasting except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling out water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification as per clause 111, 112 & 304 of MORT&H V Revision for FOUNDATION OF ABUTMENTS, PIERS AND WINGS.

-

-

-

... More
iii) Reconstruction of High level Bridge at Km 3/2 (i) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge.

72.4

488

35398.53

... More
iv) Reconstruction of High level Bridge at Km 3/2 (ii) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge.

306.3

488

149759.26

... More
Earthwork excavation in hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling out water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification as per clause 111, 112 & 304 of MORT&H V Revision for FOUNDATION OF ABUTMENTS, PIERS AND WINGS.

-

-

-

... More
iii) Reconstruction of High level Bridge at Km 3/2 (i) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge.

202.9

1864

378369.95

... More
iv) Reconstruction of High level Bridge at Km 3/2 (ii) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge.

123.9

1864

231049.96

... More
Providing Fe-500D grade 25mm dowel bars including cost and conveyance of all materials to site drilling 40mm holes in rock and grouting the same with cm 1:2 after placing the 25mm dowel bars etc., complete in the FOUNDATION OF ABUTMENTS AND WING WALLS.

-

-

-

... More
iii) Reconstruction of High level Bridge at Km 3/2 (i) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge.

181

457

82812.93

... More
iv) Reconstruction of High level Bridge at Km 3/2 (ii) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge.

181

457

82812.93

... More
Vibrated Cement Concrete of grade M20 (Nominal mix), using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700 & 2100 of MORT&H Specification (Fifth Revision) for LEVELING COURSE UNDER FOOTINGS.

-

-

-

... More
iii) Reconstruction of High level Bridge at Km 3/2 (i) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge.

17.3

6478

112084.8

... More
iv) Reconstruction of High level Bridge at Km 3/2 (ii) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge.

17.3

6478

112084.8

... More
Vibrated Cement Concrete of grade M20 (Nominal mix), using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700 & 2100 of MORT&H Specification (Fifth Revision) for FOOTING OF ABUTMENT, PIERS AND WINGS. (BELOW SILL LEVEL).

-

-

-

... More
iii) Reconstruction of High level Bridge at Km 3/2 (i) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge.

201.1

7178

1443525.97

... More
iv) Reconstruction of High level Bridge at Km 3/2 (ii) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge.

321.8

7178

2309928.67

... More
Vibrated Cement Concrete of grade M15 (Nominal mix 1:2:4) using 40 mm ISS size HBG metal including Cost and Conveyance of all materials to site including cost of cement at site including cost of form work, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specification etc., for FILLING THE TRENCHES AROUND THE FOUNDATION NOT OCCUPIED BY STRUCTURE IN ABUTMENTS, PIERS AND WINGS BELOW SILL.

-

-

-

... More
iii) Reconstruction of High level Bridge at Km 3/2 (i) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge.

57.1

6366

363526.58

... More
iv) Reconstruction of High level Bridge at Km 3/2 (ii) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge.

7.1

6366

45202.08

... More
Vibrated Cement Concrete of grade M20 (Nominal mix), using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700 & 2100 of MORT&H Specification (Fifth Revision) for SUBSTRUCTURE OF ABUTMENTS, WINGS AND PIERS. (ABOVE SILL LEVEL).

-

-

-

... More
iii) Reconstruction of High level Bridge at Km 3/2 (i) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge.

173.1

8511

1473422.01

... More
iv) Reconstruction of High level Bridge at Km 3/2 (ii) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge.

139.9

8558

1197366.33

... More
Vibrated Reinforced Cement concrete grade M30 Design mix, using 20mm ISS HBG graded metal including cost and conveyance of all materials to site including cost of cement at site but excluding cost and fabrication of steel and including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at heights, and hire charges, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700 & 2200 of MORT&H Specification (Fifth Revision) for DIRT WALL CUM BED BLOCK OVER ABUTMENTS AND BED BLOCK OVER PIERS.

-

-

-

... More
iii) Reconstruction of High level Bridge at Km 3/2 (i) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge.

6.8

11986

81510.58

... More
iv) Reconstruction of High level Bridge at Km 3/2 (ii) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge.

7

12112

84790.58

... More
Providing and fixing KRAFT PAPER for full width of seating of deck slab and including cost and conveyance to work site, labour charges for fixing the same in the correct position and all other incidental charges et., complete.

-

-

-

... More
iii) Reconstruction of High level Bridge at Km 3/2 (i) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge.

17.6

110

1936

... More
iv) Reconstruction of High level Bridge at Km 3/2 (ii) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge.

17.6

110

1936

... More
Vibrated Reinforced Cement concrete grade M30 Design mix, using 20mm ISS HBG graded metal including cost and conveyance of all materials to site including cost of cement at site but excluding cost and fabrication of steel and including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at heights, and hire charges for tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700 & 2300 of MORT&H Specification (Fifth Revision) for DECK SLAB.

-

-

-

... More
iii) Reconstruction of High level Bridge at Km 3/2 (i) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge.

83.3

12969

1080380.18

... More
iv) Reconstruction of High level Bridge at Km 3/2 (ii) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge.

102.9

12704

1307245.72

... More
Providing Filter Media behind the abutments and wings with clean III graded material 53mm to 5.6mm to 600mm thick and well compacted in layers with smaller sized towards the soil and bigger size towards the wall including cost and conveyance to work site including all labours and other incidental charges including hire charges for tools and plants employed etc., for filter media as per MOST's (Roads Wing) specifications for Roads and Bridges " Fifth Revision Cl. 309-3-2-13 and 305 -4-4 etc., complete.

-

-

-

... More
iii) Reconstruction of High level Bridge at Km 3/2 (i) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge.

58.2

1461

85061.05

... More
iv) Reconstruction of High level Bridge at Km 3/2 (ii) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge.

49.2

1461

71907.28

... More
Filling behind Abutment and wings with clean gritty gravel including conveyance of all materials to work site including labour charges for filling in layers compacting by manual labour under optimum moisture content to get the maximum density as layer including all incidental charges etc,. complete.

-

-

-

... More
iii) Reconstruction of High level Bridge at Km 3/2 (i) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge.

99.2

309

30715.3

... More
iv) Reconstruction of High level Bridge at Km 3/2 (ii) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge.

82.5

309

25544.48

... More
Providing and fixing PVC EXPANSION JOINT in between deck slabs over abutment and pier as shown in the drawing including cost and conveyance of expansion joints including shalimar pad and joint sealant etc, complete in deck slab over abutment.

-

-

-

... More
iii) Reconstruction of High level Bridge at Km 3/2 (i) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge.

29.85

653

19503.99

... More
iv) Reconstruction of High level Bridge at Km 3/2 (ii) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge.

29.85

653

19503.99

... More
Supply and fabrication of Fe-500D grade Steel required for all RCC items of works involved in the schedule cost of steel at site and cost of fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length wherever necessary and providing to the reinforcement placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc, complete as per clause 1600 of MORT&H Specifications (Fifth Revision).

-

-

-

... More
iii) Reconstruction of High level Bridge at Km 3/2 (i) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge.

9.01

95609

861439.52

... More
iv) Reconstruction of High level Bridge at Km 3/2 (ii) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge.

10.51

95609

1004853.43

... More
vii) Reconstruction of Steps for the work of Reconstruction of High level Bridge at Km 3/2 (i) and 3/2 (ii) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge.

0.65

95609

62146.03

... More
Supply and fabrication of Fe-240 grade Steel required for all RCC items of works involved in the schedule cost of steel at site and cost of fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length wherever necessary and providing to the reinforcement placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc, complete as per section 1600 of MORT&H Specifications (Fifth Revision).

-

-

-

... More
iii) Reconstruction of High level Bridge at Km 3/2 (i) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge.

1.12

95609

107082.38

... More
iv) Reconstruction of High level Bridge at Km 3/2 (ii) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge.

1.2

95609

114731.12

... More
Vibrated Cement concrete grade M15 Nominal Mix, using 40mm size ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700,2100 & 2704 of MORT&H Specification (Fifth Revision) for BASE COURSE BELOW APPROACH SLAB.

-

-

-

... More
iii) Reconstruction of High level Bridge at Km 3/2 (i) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge.

13

6647

86414.51

... More
iv) Reconstruction of High level Bridge at Km 3/2 (ii) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge.

13

6647

86414.51

... More
Vibrated Reinforced Cement concrete grade M30 Design mix, using ISS HBG graded metal including cost and conveyance of all materials to site including cost of cement at site but excluding cost and fabrication of steel and including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700,2100 & 2704 of MORT&H Specification (Fifth Revision) for APPROACH SLAB.

-

-

-

... More
iii) Reconstruction of High level Bridge at Km 3/2 (i) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge.

18.3

9357

171249.57

... More
iv) Reconstruction of High level Bridge at Km 3/2 (ii) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge.

18.3

9357

171249.57

... More
Vibrated Cement concrete grade M30 Design mix, using ISS HBG graded metal including cost and conveyance of all materials to site including cost of cement at site and including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700,2100 & 2704 of MORT&H Specification (Fifth Revision) for WEARING COAT OF 75MM UNIFORM THICKNESS OVER DECK SLAB AND APPROACH SLAB.

-

-

-

... More
iii) Reconstruction of High level Bridge at Km 3/2 (i) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge.

163.5

710

116109.53

... More
iv) Reconstruction of High level Bridge at Km 3/2 (ii) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge.

178.5

710

126761.78

... More
Vibrated Reinforced Cement concrete grade M40 Design mix, using ISS HBG graded metal including cost and conveyance of all materials to site including cost of cement at site but excluding cost and fabrication of steel and including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700,2100 & 2704 of MORT&H Specification (Fifth Revision) for RCC CRASH BARRIERS OVER DECK SLAB.

-

-

-

... More
iii) Reconstruction of High level Bridge at Km 3/2 (i) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge.

8.5

16128

137090.21

... More
iv) Reconstruction of High level Bridge at Km 3/2 (ii) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge.

9.7

16134

156504.84

... More
Vibrated Cement Concrete M20 grade Nominal Mix, using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at sitel including labour charges for mixing, transporting, laying, and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specification, as per clause 1000, 1500, 1700, 2100 & 2704 of MORT&H Specification (Fifth Revision) FOR PCC PARAPET OVER WINGS.

-

-

-

... More
iii) Reconstruction of High level Bridge at Km 3/2 (i) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge.

6.1

10486

63970.46

... More
iv) Reconstruction of High level Bridge at Km 3/2 (ii) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge.

6.1

10486

63970.46

... More
Providing and fixing of GI drainage spouts 100mm dia as per MOST drawing SD/205 with grating arrangements at top as shown in the drawing using 12mm x 25mm flats for grating arrangements, and 100mm dia drainage spout projecting beyond the bottom of deck slab as shown in the drawing including cost and conveyance of cast iron pipes and flats and fixing them in position etc, complete.

-

-

-

... More
iii) Reconstruction of High level Bridge at Km 3/2 (i) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge.

12

2498

29977.2

... More
iv) Reconstruction of High level Bridge at Km 3/2 (ii) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge.

12

2498

29977.2

... More
Supply and fixing of High Quality of PVC pipes of 160mm dia including cost and conveyance of pipes to the site and fixing in position to proper grade and level, including labour charges for fixing and including all other incidental charges etc complete., for proving utility services in footpaths.

-

-

-

... More
iii) Reconstruction of High level Bridge at Km 3/2 (i) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge.

87.2

419

36597.84

... More
iv) Reconstruction of High level Bridge at Km 3/2 (ii) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge.

95.2

419

39955.44

... More
Earthwork excavation in hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling out water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification as per clause 111, 112 & 304 of MORT&H V Revision for FOUNDATION OF RETAINING WALL.

-

-

-

... More
v) Construction of Bund wall at Km 3/2.

91.5

1743

159489.99

... More
Earthwork excavation in Soft disintegrated rock not requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling out water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification as per clause 111, 112 & 304 of MORT&H V Revision for FOUNDATION OF RETAINING WALL.

-

-

-

... More
v) Construction of Bund wall at Km 3/2.

91.5

367

33596.97

... More
Vibrated Cement Concrete of grade M20 Nominal Mix, 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700, 2100 & 2704 of MORT&H Specification (Fifth Revision) for FOOTINGS OF RETAINING WALL. (BELOW SILL).

-

-

-

... More
v) Construction of Bund wall at Km 3/2.

36.6

6478

237127.37

... More
Vibrated Cement Concrete of grade M20 Nominal Mix, 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700, 2100 & 2704 of MORT&H Specification (Fifth Revision) for STEM OF RETAINING WALL. (BELOW SILL).

-

-

-

... More
v) Construction of Bund wall at Km 3/2.

98.4

7709

758663.02

... More
Vibrated Cement Concrete of grade M20 Nominal Mix, 1:1.5:3 using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700, 2100 & 2704 of MORT&H Specification (Fifth Revision) for STEM OF RETAINING WALL. (ABOVE SILL).

-

-

-

... More
v) Construction of Bund wall at Km 3/2.

73.6

9041

665478.69

... More
Filling behind Retaining wall with clean good side earth including conveyance of all materials to work site including labour charges for filling in layers compacting by manual labour under optimum moisture content to get the maximum density as layer including all incidental charges etc,. complete FOR RETAINING WALL.

-

-

-

... More
v) Construction of Bund wall at Km 3/2.

67.2

219

14772.58

... More
Refilling behind Retaining wall wall with excavated earth including conveyance of all materials to work site including labour charges for filling in layers compacting by manual labour under optimum moisture content to get the maximum density as layer including all incidental charges etc,. complete FOR RETAINING WALL. (Labour Charges only).

-

-

-

... More
v) Construction of Bund wall at Km 3/2.

183

37

6884.46

... More
Earthwork excavation in all classes of soil except hard rock not requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling out water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification as per clause 111, 112 & 304 of MORT&H V Revision for FOUNDATION OF CUT OFF WALL.

-

-

-

... More
vii) Reconstruction of Steps for the work of Reconstruction of High level Bridge at Km 3/2 (i) and 3/2 (ii) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge.

62.2

246

15333.54

... More
Plain Cement Concrete of grade M15 (Nominal mix), using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700, 2100 & 2704 of MORT&H Specification (Fifth Revision) for BASE COURSE OF STEPS.

-

-

-

... More
vii) Reconstruction of Steps for the work of Reconstruction of High level Bridge at Km 3/2 (i) and 3/2 (ii) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge.

16.2

6366

103137.14

... More
Vibrated Reinforced cement concrete of grade M-25 (Design mix) using 20mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel including cost of form work, labour charges for mixing, transporting, laying, curing concrete, potable water, working at heights, hire charges for tools and plants, including all other incidental charges etc., complete as per clause 1000, 1500, 1700, 2100 & 2704 of MORT&H Specification (Fifth Revision) for STEPS.

-

-

-

... More
vii) Reconstruction of Steps for the work of Reconstruction of High level Bridge at Km 3/2 (i) and 3/2 (ii) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge.

31.4

7255

227808.88

... More
Vibrated Cement Concrete of grade M15 Nominal Mix, using 40mm ISS HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per clause 1000, 1500, 1700, 2100 & 2704 of MORT&H Specification (Fifth Revision) for STEPS.

-

-

-

... More
vii) Reconstruction of Steps for the work of Reconstruction of High level Bridge at Km 3/2 (i) and 3/2 (ii) of Ayyarmalai - Vairaperumalpatti (Kanakkapillaiyar) Road in lieu of existing narrow bridge.

71.2

10390

739790.07

... More
Calculation of SubTotal, GST and Total carried out by system automatically

-

-

-

... More
Sub Total Amount for above all items (excluding GST)

1

38941028

-

... More
GST 18% for above SubTotal Amount

1

7009385

7009385

... More
Total Value put to Tender

1

45950413

-

... More
Negotiated Percentage

1

-

-

... More
Final Negotiated Value

1

-

-

... More
Add GST at 12% of Final Negotiated Value

1

-

-

... More
Total Value of Contract Including 12% of GST

1

-

-

... More
Total in Figures (SubTotal + GST)

-

-

45950413

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.