Municipal Administration And Water Supply Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Municipal Administration And Water Supply Department - MAWS Tender
Civil And Construction
Road Construction
Eprocure
Opening Date2 Sep 2023
Closing Date7 Sep 2023
Tender Amount₹ 5,20,000
Costs
EMD
₹ 5,200Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_MAWS_364928_8Bid Award Id
ViewTender No
141/2023/E1Tender Authority
Municipal Administration And Water Supply Department ViewPurchaser Address
-Website
http://https://www.tn.gov.in/maws/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and laying tack coat of 2.5 kgs/10 sqm over the WMM surface treated with binder using 2.5 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev-5 Specifications
390
-
-
... More
Providing and laying BM 50mm compacted thick Dense Bituminous Macadam using 0.24cum of 26.50 – 13.20 mm, 0.25cum of 13.20-2.36 mm and 0.23cum of 2.36mm & below and with 53.20 Kgs of VG30 / VG40 bitumen for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min. required temperature in central hot mix plant 20-30 tonnes capacity, conveying the mix by Tipper trucks to worksite, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20-30 tonnes CMP with bitumen Boiler, Tipper trucks, Paver finisher / 9m Paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 of MORTH Rev-5.
20
-
-
... More
Providing and laying Bituminous Concrete to 30mm thick using 0.13cum of 19.00 – 9.50 mm, 0.17cum of 9.50 - 2.36 mm and 0.26cum of 2.36mm & below with 45.27 Kgs of 60/70 bitumen &50.30kg of plastic waste from garbage collected at free of cost (Total 50.30kg) and for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min. required temperature in central hot mix plant 20-30 tonnes capacity, conveying the mix by Tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes Vibratory / Pneumatic roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20-30 tonnes CMP with bitumen Boiler, Tipper trucks, Paver finisher / 9m Paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 MORTH Rev-5.
12
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements