Municipal Administration And Water Supply Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Municipal Administration And Water Supply Department - MAWS Tender

Works
Civil And Construction
Drainage Work
Eprocure
Opening Date27 Aug 2024
Closing Date28 Aug 2024
Tender Amount₹ 28,50,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Laying, jointing ,testing 800mm C. I / DI pipes 4.00Mt Depth including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10 metres and carting of pipes from any of the Board’s stores to the site of work, lowering into trenches and aligning, etc., complete (Timbering included for Depths 2.50m,3.0m,3.5m,..........upto 8.5m)

55

-

-

... More
Dewatering using diesel Engine 40HP pumpset including Hire charges,cost of Diesel,Engine oil,pump operator,labour charges,conveyance of pumpset and fuel to site and back,loading,unloading and any other incidental charges etc complete

200

-

-

... More
Shoring, and strutting with sheet piles of size width 400 mm x heightof 3m x thickness of 9mm as per IS 2314-1986 by driving on bothsides of the trench from Ground Level up to the required depth andconnecting the above sheet piles by horizontal strutting with sheetpiles at an interval of 1.0m, fixing the sheet piles by connecting thehorizontal strutting with casurina poles of 8cm to 10cm dia. at 1.50minterval and including removing the sheet piles after the pipelines arelaid, jointed, tested, and stacking it safely for other uses. It includesthe cost of sheet piles and casurina poles including labour charges forerecting the sheet piles, driving the sheet piles, removing the sheetpiles, fixing Casurina poles, etc., complete and all other incidentalcharges for the depths 0-4mts.,

55

-

-

... More
Barricading work (Where the lines are in narrow width of municipality area, busy streets like Market, Bus-stand and in the Highways etc.) for laying of pipe line using casurina poles at 1.50m center to center (8cm to 10cm dia.and 1.80m height) vertical with horizontal poles in two rows, painting the vertical poles in the road facing sides with ready mix paint, tying the vertical and horizontal poles with coir rope including supplying, delivery and fixing of GI sheet (0.90m x 0.8mm thick) in the horizontal poles and fixing 75mm dia. reflectors including earth work excavation for fixing vertical posts and finally removing and stacking the materials safely for further use etc., complete and as directed by TWAD Board officers.

55

-

-

... More
Refilling with excavated earth other than sand with an initial head load of 10 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15 cm thick well rammed, watered and consolidated etc. complete complying with standard specification

561

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.