Ministry Of Road Transport And Highways Tender

... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Ministry Of Road Transport And Highways - MORTH Tender

Works
Eprocure
Opening Date12 Jan 2019
Closing Date30 Jan 2019
Tender Amount₹ 17,36,50,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Prime coat Providing and applying primer coat with bitumen emulsion (SS-I type) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per clause 502 of MORTH Specification over WMM

51601.2

-

63.23

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification- over granular surfaces treated with primer

51601.2

-

12.06

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification - over bituminous surfaces

40065.63

-

15.82

... More
Dense Graded Bituminous Macadam (Table - 500-10) Providing and laying dense bituminous macadam with Hot Mix Plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade- 30) at percentage specified by Job Mix Formula by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolled as per clause 501.6 and 501.7 to achieve the desired compaction, as per clause No.505 of MoRTH specification Grading II

4451

-

8041.76

... More
Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment,rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per clause No. 507 of MORTH Specification complete in all respects - Grading II

3666.7

-

8698.7

... More
Precast Vibrated Reinforced Cement Concrete M25 design mix (1:1.2:2.4), using 20mm & 12mm ISS HBG graded metal including cost of cement including cost and fabrication of steel, including centering and strutting charges, including labour charges for mixing , transporting, laying and curing of concrete, centre median of size 0.610m at bottom 0.250m at middle 0.150 at top and to height of 0.860m from the road level, rendering smoothness over the CC surface with 10kg of cement for 10 sqm area and painting two coats over the CC surfaces with best approved quality of synthetic enamel paint including primer etc. including all labour charges, hire charges for tools and plants including erection and fixing 50mm dia PVC pipes fixing centre median in the road using crane and in accordance with the drawings appended here with and as directed by the departmental officers etc. complete.

100

-

6592.62

... More
Excavation for Roadway and drainage Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer, as per MORTH Specification. using cut earth for making up berms

6750

-

16.39

... More
Conveying and disposing of the surplus earth from box cutting with an average lead of 3Km as directed by the engineer in charge

25719.55

-

28.86

... More
Widening of pipe culvert at Km.0/2, 0/4 & 0/7

-

-

-

... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with intial lead and lifts and all other incidental charges such as shoring, strutting, baling out water, forming protective bunds, coffer dam wherever necessary for dressing the bed below sill level etc., complete for foundation as per SS 20B MORT & H 2903

-

-

-

... More
Km.0/2

6.75

-

127.2

... More
Km.0/4

13.5

-

127.2

... More
Km.0/7

13.5

-

127.2

... More
Cement Concrete M10 Grade using 40mm ISS Size hard broken granite metal including cost and conveyance of all materials to site cost and labour charges for formwork centering, labour charges for laying, compacting curing, all incidental charges complete for Leveling course for below foundation

-

-

-

... More
Km.0/2

0.68

-

3820

... More
Km.0/4

1.35

-

3820

... More
Km.0/7

1.35

-

3820

... More
Vibrated cement concrete M15, 1:2:4 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site., complying to the required standard and specifications including labour for formwork, laying, watering, curing and compacting vibrator charges and all other incidental charges etc., complete for cradle portion concrete below Foundation. MORT & H 2900, 2908 Below sill level

-

-

-

... More
Km.0/2

2.03

-

4540

... More
Km.0/4

4.05

-

4540

... More
Km.0/7

4.05

-

4540

... More
Vibrated cement concrete M15, 1:2:4 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site., complying to the required standard and specifications including labour for formwork, laying, watering, curing and compacting vibrator charges and all other incidental charges etc., complete for cradle portion concrete below and on sides of pipe and parapet wall. MORT & H 2900, 2908 Above sill level

-

-

-

... More
Km.0/2

7.73

-

6176

... More
Km.0/4

15.47

-

6176

... More
Km.0/7

15.47

-

6176

... More
Supply of NP 2 class RCC (1000 & 900mm) dia. pipes supplied by the Contractor at his own cost specified below confirming to IS 458 / 2003 cost of pipe as a finished work including all other incidental charges, testing charges including loading and unloading transport and delivery in good condition at work site as directed by the dapartmental officers etc., complete

-

-

-

... More
Km.0/2

2.5

-

1800

... More
Km.0/4

5

-

1800

... More
Km.0/7

5

-

1800

... More
Hoisting and fixing of pipes to proper gradient including all other incidental chargesd etc complete

-

-

-

... More
Km.0/2

2.5

-

45.35

... More
Km.0/4

5

-

45.35

... More
Km.0/7

5

-

45.35

... More
Filling with clean gritty gravel around the pipes including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc, complete .

-

-

-

... More
Km.0/2

4.7

-

297.76

... More
Km.0/4

9.42

-

297.76

... More
Km.0/7

9.42

-

297.76

... More
Widening of RCC slab culvert at Km.0/6

-

-

-

... More
Earthwork excavation in all calsses of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as providing and maintaining necessary cofferdams, sheeting,shoring, bracing, and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc, complete as per relevant standard specification for FOUNDATIONS FOR ABUTMENTS WING WALL etc., complete

48.99

-

144

... More
Earthwork excavation in Medium rock not requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as providing and maintaining necessary cofferdams, sheeting,shoring, bracing, and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc, complete as per relevant standard specification for FOUNDATIONS FOR ABUTMENTS WING WALL etc., complete

21

-

222

... More
Vibrated cement concrete of grade M15 Nominal Mix 1:2:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of formwork, soft water,labour charges for mixing, transporting, laying and curing concrete, working at depths,Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification for FOOTINGS OF ABUTMENT, WINGS, AND PIERS. 1 Cu.m(Below Sill level)

43.87

-

5079

... More
Vibrated cement concrete M15 grade Nominal Mix 1:2:4 usnig 40 mm ISS size hard granite broken metal including cost and conveyance of all materials to site and cement at site including labour charges for mixing, transporting, laying, curing concrete, working at heights, hire charges for Tools and Plants including all other incidental charges etc, complete for SUBSTRUCTURE OF ABUTMENTS WINGS AND PIERS -1 Cum (Above sill level)

10.35

-

6671

... More
Vibrated Reinforced Cement Concrete M-25 Grade Design Mix using ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel, including labour charges for mixing, transporting, laying, curing concrete, working at heights, hire charges for tools and plants, including all other incidental chargeas, etc., complete for BED BLOCK CUM DIRT WALL OVER ABUTMENTS.

1.58

-

9275

... More
Vibrated Reinforced Cement Concrete M-25 Grade Design Mix using ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel, including labour charges for mixing, transporting, laying, curing concrete, working at heights, hire charges for tools and plants, including all other incidental chargeas, etc., complete for DECK SLAB.

2.79

-

8899

... More
Supply and fabrication of Fe 500 steel required for all RCC items of works involved in the schedule cost of steel at site fabrication,labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc,complete, Fe 500 grade

0.29

-

66395

... More
Providing and fixing kraft paper for full width of seating of deck slab and including cost and conveyance to worksite labour for fixing the same in correct position and all other incidental charges etc. complete.

3.15

-

50

... More
Providing and fixing 20mm thick PVC expansion joint including cost and conveyance of expansion joints, Shalimar pad and joint sealants and fixing them position etc. Complete in deck slab over abutment.

6

-

3000

... More
Providing filter media behind the abutments and wings with clean III graded material 53mm to 5.6mm to 600mm thick and well compacted in layers with smaller sized towards the soil and bigger size towards the wall including cost and conveyance to work site including all labours and other incidental charges including hire charges for tools and plants employed etc., for filter media as per MOST's (Roads Wing) specifications for Roads and Bridges " Fourth Revision Cl. 309-3-2-13 and 305 -4-4 etc., complete- 1Cum.

7.26

-

1164

... More
Providing and fixing seepage pipes of 100mm dia. PVC pipes of requied lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900mm dia. semi-spherical back fill arangements with 100mm size broken ganite chips at the periphery and labour charges for fixing, etc.,to drain of the BACKFILL IN THE ABUTMENTS AND WINGS

32

-

164.6

... More
Filling behind Abutments and wings with clean gritty gravel including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc,complete. -1 Cum

0.45

-

249

... More
Vibrated cement Concrete M30 design mix using ISS size HBG graded metal including cost and conveyance of all materials to worksite and cement at site including all labour charges for ixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges,formwork,cost of premoulded expansion joints and fixing the same in position etc., complete for wearing coat of 75mm uniform thickness over deck slab and approach slab.

5.46

-

459.6

... More
Widening of RCC slab culvert at Km.1/4

-

-

-

... More
Earthwork excavation in all calsses of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as providing and maintaining necessary cofferdams, sheeting,shoring, bracing, and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc, complete as per relevant standard specification for FOUNDATIONS FOR ABUTMENTS WING WALL etc., complete

24.5

-

144

... More
Earthwork excavation in Medium rock not requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as providing and maintaining necessary cofferdams, sheeting,shoring, bracing, and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc, complete as per relevant standard specification for FOUNDATIONS FOR ABUTMENTS WING WALL etc., complete

10.5

-

222

... More
Vibrated cement concrete of grade M15 Nominal Mix 1:2:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of formwork, soft water,labour charges for mixing, transporting, laying and curing concrete, working at depths,Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification for FOOTINGS OF ABUTMENT, WINGS, AND PIERS. 1 Cu.m(Below Sill level)

21.92

-

5076

... More
Vibrated cement concrete M15 grade Nominal Mix 1:2:4 usnig 40 mm ISS size hard granite broken metal including cost and conveyance of all materials to site and cement at site including labour charges for mixing, transporting, laying, curing concrete, working at heights, hire charges for Tools and Plants including all other incidental charges etc, complete for SUBSTRUCTURE OF ABUTMENTS WINGS AND PIERS -1 Cum (Above sill level)

5.672

-

6667

... More
Vibrated Reinforced Cement Concrete M-25 Grade Design Mix using ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel, including labour charges for mixing, transporting, laying, curing concrete, working at heights, hire charges for tools and plants, including all other incidental chargeas, etc., complete for BED BLOCK CUM DIRT WALL OVER ABUTMENTS.

0.79

-

9265

... More
Vibrated Reinforced Cement Concrete M-25 Grade Design Mix using ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel, including labour charges for mixing, transporting, laying, curing concrete, working at heights, hire charges for tools and plants, including all other incidental chargeas, etc., complete for DECK SLAB.

2.79

-

8889

... More
Supply and fabrication of Fe 500 steel required for all RCC items of works involved in the schedule cost of steel at site fabrication,labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc,complete, Fe 500 grade

0.29

-

66395

... More
Providing and fixing kraft paper for full width of seating of deck slab and including cost and conveyance to worksite labour for fixing the same in correct position and all other incidental charges etc. complete.

3.15

-

50

... More
Providing and fixing 20mm thick PVC expansion joint including cost and conveyance of expansion joints, Shalimar pad and joint sealants and fixing them position etc. Complete in deck slab over abutment.

6

-

3000

... More
Providing filter media behind the abutments and wings with clean III graded material 53mm to 5.6mm to 600mm thick and well compacted in layers with smaller sized towards the soil and bigger size towards the wall including cost and conveyance to work site including all labours and other incidental charges including hire charges for tools and plants employed etc., for filter media as per MOST's (Roads Wing) specifications for Roads and Bridges " Fourth Revision Cl. 309-3-2-13 and 305 -4-4 etc., complete- 1Cum.

3.63

-

1157

... More
Providing and fixing seepage pipes of 100mm dia. PVC pipes of requied lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900mm dia. semi-spherical back fill arangements with 100mm size broken ganite chips at the periphery and labour charges for fixing, etc.,to drain of the BACKFILL IN THE ABUTMENTS AND WINGS

32

-

164.6

... More
Filling behind Abutments and wings with clean gritty gravel including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc,complete. -1 Cum

0.24

-

249

... More
Vibrated cement Concrete M30 design mix using ISS size HBG graded metal including cost and conveyance of all materials to worksite and cement at site including all labour charges for ixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges,formwork,cost of premoulded expansion joints and fixing the same in position etc., complete for wearing coat of 75mm uniform thickness over deck slab and approach slab.

2.73

-

459.6

... More
Widening of pipe culvert at Km.1/10

-

-

-

... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with intial lead and lifts and all other incidental charges such as shoring, strutting, baling out water, forming protective bunds, coffer dam wherever necessary for dressing the bed below sill level etc., complete for foundation as per SS 20B MORT & H 2903

24

-

127.2

... More
Cement Concrete M10 Grade using 40mm ISS Size hard broken granite metal including cost and conveyance of all materials to site cost and labour charges for formwork centering, labour charges for laying, compacting curing, all incidental charges complete for Leveling course for below foundation

2.4

-

3816

... More
Vibrated cement concrete M20 Grade using 40mm ISS HBG metal including cost and conveyance of all materials to site., complying to the required standard and specifications including labour for formwork, laying, watering, curing and compacting vibrator charges and all other incidental charges etc., complete for cradle portion concrete below Foundation. MORT & H 2900, 2908 Below sill level

7.2

-

4537

... More
Vibrated cement concrete M20 Grade using 40mm ISS HBG metal including cost and conveyance of all materials to site., complying to the required standard and specifications including labour for formwork, laying, watering, curing and compacting vibrator charges and all other incidental charges etc., complete for cradle portion concrete below and on sides of pipe and parapet wall. MORT & H 2900, 2908 Above sill level

27.66

-

5996

... More
Supply of NP 2 class RCC (1000 & 900mm) dia. pipes supplied by the Contractor at his own cost specified below confirming to IS 458 / 2003 cost of pipe as a finished work including all other incidental charges, testing charges including loading and unloading transport and delivery in good condition at work site as directed by the dapartmental officers etc., complete

10

-

1800

... More
Hoisting and fixing of pipes to proper gradient including all other incidental chargesd etc complete

10

-

45.35

... More
Filling with clean gritty gravel around the pipes including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc, complete .

23.01

-

292.89

... More
Widening of pipe culvert at Km.2/4,2/8

-

-

-

... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with intial lead and lifts and all other incidental charges such as shoring, strutting, baling out water, forming protective bunds, coffer dam wherever necessary for dressing the bed below sill level etc., complete for foundation as per SS 20B MORT & H 2903

27

-

127.2

... More
Cement Concrete M10 Grade using 40mm ISS Size hard broken granite metal including cost and conveyance of all materials to site cost and labour charges for formwork centering, labour charges for laying, compacting curing, all incidental charges complete for Leveling course for below foundation

2.7

-

3818

... More
Vibrated cement concrete M20 Grade using 40mm ISS HBG metal including cost and conveyance of all materials to site., complying to the required standard and specifications including labour for formwork, laying, watering, curing and compacting vibrator charges and all other incidental charges etc., complete for cradle portion concrete below Foundation. MORT & H 2900, 2908 Below sill level

8.1

-

4539

... More
Vibrated cement concrete M20 Grade using 40mm ISS HBG metal including cost and conveyance of all materials to site., complying to the required standard and specifications including labour for formwork, laying, watering, curing and compacting vibrator charges and all other incidental charges etc., complete for cradle portion concrete below and on sides of pipe and parapet wall. MORT & H 2900, 2908 Above sill level

30.94

-

6175

... More
Supply of NP 2 class RCC (1000 & 900mm) dia. pipes supplied by the Contractor at his own cost specified below confirming to IS 458 / 2003 cost of pipe as a finished work including all other incidental charges, testing charges including loading and unloading transport and delivery in good condition at work site as directed by the dapartmental officers etc., complete

10

-

1800

... More
Hoisting and fixing of pipes to proper gradient including all other incidental chargesd etc complete

10

-

45.35

... More
Filling with clean gritty gravel around the pipes including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc, complete .

18.82

-

292.89

... More
Widening of Box culvert at Km.4/4

-

-

-

... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with intial lead and lifts and all other incidental charges such as shoring, strutting, baling out water, forming protective bunds, coffer dam wherever necessary for dressing the bed below sill level etc., complete for foundation as per SS 20B MORT & H 2903

10.58

-

127.2

... More
Vibrated cement concrete M20 Grade using 40mm ISS HBG metal including cost and conveyance of all materials to site., complying to the required standard and specifications including labour for formwork, laying, watering, curing and compacting vibrator charges and all other incidental charges etc., complete for cradle portion concrete below Foundation. MORT & H 2900, 2908 Below sill level

0.95

-

4538

... More
Vibrated Reinforced Cement Concrete [Design Mix] M25 grade using ISS size HBG graded metal crushed stone including cost and conveyance of all materials to site but excluding cost and fabrication for steel but including cost and labour charges for formwork and centering, labour charges, compacting, finishing and curing, including all incidental charges etc., complete for BASE SLAB, STEM, TOP SLAB OF BOX CULVERT.

3.47

-

9113

... More
Vibrated cement concrete M20 Grade using 40mm ISS HBG metal including cost and conveyance of all materials to site., complying to the required standard and specifications including labour for formwork, laying, watering, curing and compacting vibrator charges and all other incidental charges etc., complete for PARAPET OF BOX CULVERT.

0.63

-

7503

... More
Supply and fabrication of Fe 500 steel required for all RCC items of works involved in the schedule cost of steel at site fabrication,labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc,complete, Fe 500 grade

0.58

-

66395

... More
Reconstruction of Box culvert at Km.4/8

-

-

-

... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with intial lead and lifts and all other incidental charges such as shoring, strutting, baling out water, forming protective bunds, coffer dam wherever necessary for dressing the bed below sill level etc., complete for foundation as per SS 20B MORT & H 2903

44.1

-

127.2

... More
Vibrated cement concrete M20 Grade using 40mm ISS HBG metal including cost and conveyance of all materials to site., complying to the required standard and specifications including labour for formwork, laying, watering, curing and compacting vibrator charges and all other incidental charges etc., complete for cradle portion concrete below Foundation. MORT & H 2900, 2908 Below sill level

3.12

-

4538

... More
Vibrated Reinforced Cement Concrete [Design Mix] M25 grade using ISS size HBG graded metal crushed stone including cost and conveyance of all materials to site but excluding cost and fabrication for steel but including cost and labour charges for formwork and centering, labour charges, compacting, finishing and curing, including all incidental charges etc., complete for BASE SLAB, STEM, TOP SLAB OF BOX CULVERT.

14.44

-

9416

... More
Vibrated cement concrete M20 Grade using 40mm ISS HBG metal including cost and conveyance of all materials to site., complying to the required standard and specifications including labour for formwork, laying, watering, curing and compacting vibrator charges and all other incidental charges etc., complete for PARAPET OF BOX CULVERT.

2.03

-

7000

... More
Supply and fabrication of Fe 500 steel required for all RCC items of works involved in the schedule cost of steel at site fabrication,labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc,complete, Fe 500 grade

3.46

-

66395

... More
Widening of pipe culvert at Km.5/4

-

-

-

... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with intial lead and lifts and all other incidental charges such as shoring, strutting, baling out water, forming protective bunds, coffer dam wherever necessary for dressing the bed below sill level etc., complete for foundation as per SS 20B MORT & H 2903

6.75

-

127.2

... More
Cement Concrete M10 Grade using 40mm ISS Size hard broken granite metal including cost and conveyance of all materials to site cost and labour charges for formwork centering, labour charges for laying, compacting curing, all incidental charges complete for Leveling course for below foundation

0.68

-

3813

... More
Vibrated cement concrete M20 Grade using 40mm ISS HBG metal including cost and conveyance of all materials to site., complying to the required standard and specifications including labour for formwork, laying, watering, curing and compacting vibrator charges and all other incidental charges etc., complete for cradle portion concrete below Foundation. MORT & H 2900, 2908 Below sill level

2.03

-

4534

... More
Vibrated cement concrete M20 Grade using 40mm ISS HBG metal including cost and conveyance of all materials to site., complying to the required standard and specifications including labour for formwork, laying, watering, curing and compacting vibrator charges and all other incidental charges etc., complete for cradle portion concrete below and on sides of pipe and parapet wall. MORT & H 2900, 2908 Above sill level

7.73

-

6170

... More
Supply of NP 2 class RCC (1000 & 900mm) dia. pipes supplied by the Contractor at his own cost specified below confirming to IS 458 / 2003 cost of pipe as a finished work including all other incidental charges, testing charges including loading and unloading transport and delivery in good condition at work site as directed by the dapartmental officers etc., complete

2.5

-

1800

... More
Hoisting and fixing of pipes to proper gradient including all other incidental chargesd etc complete

2.5

-

45.35

... More
Filling with clean gritty gravel around the pipes including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc, complete .

4.7

-

283.15

... More
Widening of RCC slab culvert at Km.5/6

-

-

-

... More
Earthwork excavation in all calsses of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as providing and maintaining necessary cofferdams, sheeting,shoring, bracing, and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc, complete as per relevant standard specification for FOUNDATIONS FOR ABUTMENTS WING WALL etc., complete

24.5

-

144

... More
Earthwork excavation in Medium rock not requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as providing and maintaining necessary cofferdams, sheeting,shoring, bracing, and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc, complete as per relevant standard specification for FOUNDATIONS FOR ABUTMENTS WING WALL etc., complete

10.5

-

222

... More
Vibrated cement concrete of grade M15 Nominal Mix 1:2:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of formwork, soft water,labour charges for mixing, transporting, laying and curing concrete, working at depths,Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification for FOOTINGS OF ABUTMENT, WINGS, AND PIERS. 1 Cu.m(Below Sill level)

21.92

-

5073

... More
Vibrated cement concrete M15 grade Nominal Mix 1:2:4 usnig 40 mm ISS size hard granite broken metal including cost and conveyance of all materials to site and cement at site including labour charges for mixing, transporting, laying, curing concrete, working at heights, hire charges for Tools and Plants including all other incidental charges etc, complete for SUBSTRUCTURE OF ABUTMENTS WINGS AND PIERS -1 Cum (Above sill level)

6.39

-

6664

... More
Vibrated Reinforced Cement Concrete M-25 Grade Design Mix using ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel, including labour charges for mixing, transporting, laying, curing concrete, working at heights, hire charges for tools and plants, including all other incidental chargeas, etc., complete for BED BLOCK CUM DIRT WALL OVER ABUTMENTS.

0.79

-

9268

... More
Vibrated Reinforced Cement Concrete M-25 Grade Design Mix using ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel, including labour charges for mixing, transporting, laying, curing concrete, working at heights, hire charges for tools and plants, including all other incidental chargeas, etc., complete for DECK SLAB.

4.82

-

8892

... More
Supply and fabrication of Fe 500 steel required for all RCC items of works involved in the schedule cost of steel at site fabrication,labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc,complete, Fe 500 grade

0.39

-

66395

... More
Providing and fixing kraft paper for full width of seating of deck slab and including cost and conveyance to worksite labour for fixing the same in correct position and all other incidental charges etc. complete.

3.15

-

50

... More
Providing and fixing 20mm thick PVC expansion joint including cost and conveyance of expansion joints, Shalimar pad and joint sealants and fixing them position etc. Complete in deck slab over abutment.

6

-

3000

... More
Providing filter media behind the abutments and wings with clean III graded material 53mm to 5.6mm to 600mm thick and well compacted in layers with smaller sized towards the soil and bigger size towards the wall including cost and conveyance to work site including all labours and other incidental charges including hire charges for tools and plants employed etc., for filter media as per MOST's (Roads Wing) specifications for Roads and Bridges " Fourth Revision Cl. 309-3-2-13 and 305 -4-4 etc., complete- 1Cum.

3.63

-

1143

... More
Providing and fixing seepage pipes of 100mm dia. PVC pipes of requied lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900mm dia. semi-spherical back fill arangements with 100mm size broken ganite chips at the periphery and labour charges for fixing, etc.,to drain of the BACKFILL IN THE ABUTMENTS AND WINGS

32

-

164.6

... More
Filling behind Abutments and wings with clean gritty gravel including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc,complete. -1 Cum

0.23

-

249

... More
Vibrated cement Concrete M30 design mix using ISS size HBG graded metal including cost and conveyance of all materials to worksite and cement at site including all labour charges for ixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges,formwork,cost of premoulded expansion joints and fixing the same in position etc., complete for wearing coat of 75mm uniform thickness over deck slab and approach slab.

4.71

-

459.1

... More
Widening of pipe culvert at Km.6/8

-

-

-

... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with intial lead and lifts and all other incidental charges such as shoring, strutting, baling out water, forming protective bunds, coffer dam wherever necessary for dressing the bed below sill level etc., complete for foundation as per SS 20B MORT & H 2903

24

-

127.2

... More
Cement Concrete M10 Grade using 40mm ISS Size hard broken granite metal including cost and conveyance of all materials to site cost and labour charges for formwork centering, labour charges for laying, compacting curing, all incidental charges complete for Leveling course for below foundation

2.4

-

3816

... More
Vibrated cement concrete M20 Grade using 40mm ISS HBG metal including cost and conveyance of all materials to site., complying to the required standard and specifications including labour for formwork, laying, watering, curing and compacting vibrator charges and all other incidental charges etc., complete for cradle portion concrete below Foundation. MORT & H 2900, 2908 Below sill level

7.2

-

4536

... More
Vibrated cement concrete M20 Grade using 40mm ISS HBG metal including cost and conveyance of all materials to site., complying to the required standard and specifications including labour for formwork, laying, watering, curing and compacting vibrator charges and all other incidental charges etc., complete for cradle portion concrete below and on sides of pipe and parapet wall. MORT & H 2900, 2908 Above sill level

27.66

-

5996

... More
Supply of NP 2 class RCC (1000 & 900mm) dia. pipes supplied by the Contractor at his own cost specified below confirming to IS 458 / 2003 cost of pipe as a finished work including all other incidental charges, testing charges including loading and unloading transport and delivery in good condition at work site as directed by the dapartmental officers etc., complete

10

-

1800

... More
Hoisting and fixing of pipes to proper gradient including all other incidental chargesd etc complete

10

-

45.35

... More
Filling with clean gritty gravel around the pipes including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc, complete .

23.01

-

283.15

... More
Widening of pipe culvert at Km.7/4 (i), (ii) 7/10

-

-

-

... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with intial lead and lifts and all other incidental charges such as shoring, strutting, baling out water, forming protective bunds, coffer dam wherever necessary for dressing the bed below sill level etc., complete for foundation as per SS 20B MORT & H 2903

33.75

-

127.2

... More
Cement Concrete M10 Grade using 40mm ISS Size hard broken granite metal including cost and conveyance of all materials to site cost and labour charges for formwork centering, labour charges for laying, compacting curing, all incidental charges complete for Leveling course for below foundation

3.38

-

3818

... More
Vibrated cement concrete M20 Grade using 40mm ISS HBG metal including cost and conveyance of all materials to site., complying to the required standard and specifications including labour for formwork, laying, watering, curing and compacting vibrator charges and all other incidental charges etc., complete for cradle portion concrete below Foundation. MORT & H 2900, 2908 Below sill level

10.13

-

4539

... More
Vibrated cement concrete M20 Grade using 40mm ISS HBG metal including cost and conveyance of all materials to site., complying to the required standard and specifications including labour for formwork, laying, watering, curing and compacting vibrator charges and all other incidental charges etc., complete for cradle portion concrete below and on sides of pipe and parapet wall. MORT & H 2900, 2908 Above sill level

35.49

-

5518

... More
Supply of NP 2 class RCC (1000 & 900mm) dia. pipes supplied by the Contractor at his own cost specified below confirming to IS 458 / 2003 cost of pipe as a finished work including all other incidental charges, testing charges including loading and unloading transport and delivery in good condition at work site as directed by the dapartmental officers etc., complete

22.5

-

1800

... More
Hoisting and fixing of pipes to proper gradient including all other incidental chargesd etc complete

22.5

-

45.35

... More
Filling with clean gritty gravel around the pipes including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc, complete .

17.22

-

283.15

... More
Widening of pipe culvert at Km.9/2

-

-

-

... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with intial lead and lifts and all other incidental charges such as shoring, strutting, baling out water, forming protective bunds, coffer dam wherever necessary for dressing the bed below sill level etc., complete for foundation as per SS 20B MORT & H 2903

6.75

-

127.2

... More
Cement Concrete M10 Grade using 40mm ISS Size hard broken granite metal including cost and conveyance of all materials to site cost and labour charges for formwork centering, labour charges for laying, compacting curing, all incidental charges complete for Leveling course for below foundation

0.68

-

3811

... More
Vibrated cement concrete M20 Grade using 40mm ISS HBG metal including cost and conveyance of all materials to site., complying to the required standard and specifications including labour for formwork, laying, watering, curing and compacting vibrator charges and all other incidental charges etc., complete for cradle portion concrete below Foundation. MORT & H 2900, 2908 Below sill level

2.03

-

4531

... More
Vibrated cement concrete M20 Grade using 40mm ISS HBG metal including cost and conveyance of all materials to site., complying to the required standard and specifications including labour for formwork, laying, watering, curing and compacting vibrator charges and all other incidental charges etc., complete for cradle portion concrete below and on sides of pipe and parapet wall. MORT & H 2900, 2908 Above sill level

7.73

-

6166

... More
Supply of NP 2 class RCC (1000 & 900mm) dia. pipes supplied by the Contractor at his own cost specified below confirming to IS 458 / 2003 cost of pipe as a finished work including all other incidental charges, testing charges including loading and unloading transport and delivery in good condition at work site as directed by the dapartmental officers etc., complete

2.5

-

1800

... More
Hoisting and fixing of pipes to proper gradient including all other incidental chargesd etc complete

2.5

-

45.35

... More
Filling with clean gritty gravel around the pipes including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc, complete .

4.7

-

273.41

... More
Widening of pipe culvert at Km.14/4

-

-

-

... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with intial lead and lifts and all other incidental charges such as shoring, strutting, baling out water, forming protective bunds, coffer dam wherever necessary for dressing the bed below sill level etc., complete for foundation as per SS 20B MORT & H 2903

13.5

-

127.2

... More
Cement Concrete M10 Grade using 40mm ISS Size hard broken granite metal including cost and conveyance of all materials to site cost and labour charges for formwork centering, labour charges for laying, compacting curing, all incidental charges complete for Leveling course for below foundation

1.35

-

3810

... More
Vibrated cement concrete M20 Grade using 40mm ISS HBG metal including cost and conveyance of all materials to site., complying to the required standard and specifications including labour for formwork, laying, watering, curing and compacting vibrator charges and all other incidental charges etc., complete for cradle portion concrete below Foundation. MORT & H 2900, 2908 Below sill level

4.05

-

4531

... More
Vibrated cement concrete M20 Grade using 40mm ISS HBG metal including cost and conveyance of all materials to site., complying to the required standard and specifications including labour for formwork, laying, watering, curing and compacting vibrator charges and all other incidental charges etc., complete for cradle portion concrete below and on sides of pipe and parapet wall. MORT & H 2900, 2908 Above sill level

15.47

-

6167

... More
Supply of NP 2 class RCC (1000 & 900mm) dia. pipes supplied by the Contractor at his own cost specified below confirming to IS 458 / 2003 cost of pipe as a finished work including all other incidental charges, testing charges including loading and unloading transport and delivery in good condition at work site as directed by the dapartmental officers etc., complete

5

-

1800

... More
Hoisting and fixing of pipes to proper gradient including all other incidental chargesd etc complete

5

-

45.35

... More
Filling with clean gritty gravel around the pipes including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc, complete .

9.42

-

263.67

... More
Dip raising, Construction of Retaining Wall and Drain at Km.9/8 - 10/2

-

-

-

... More
Picking the existing BT surface to 50mm deep including levelling and sectioning in hard granite,gneiss quartz etc., complete as directed by the departmental officers.,

585

-

10.83

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 of MORTH Specification- for grading- V Material

456.75

-

1375.09

... More
Wet Mix Macadam (Table 400-13) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, Complete as per clause 406 of MORTH Specification.

656.25

-

1645.21

... More
Prime coat Providing and applying primer coat with bitumen emulsion (SS-I type) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per clause 502 of MORTH Specification over WMM

2625

-

63.37

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification- over granular surfaces treated with primer

2625

-

12.06

... More
Dense Graded Bituminous Macadam (Table - 500-10) Providing and laying dense bituminous macadam with Hot Mix Plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade- 30) at percentage specified by Job Mix Formula by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolled as per clause 501.6 and 501.7 to achieve the desired compaction, as per clause No.505 of MoRTH specification Grading II

157.5

-

8041.76

... More
Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment,rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per clause No. 507 of MORTH Specification complete in all respects - Grading II

105

-

8698.7

... More
Excavation for Roadway and drainage Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer, as per MORTH Specification. using cut earth for making up berms

675

-

16.39

... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with intial lead and lifts and all other incidental charges such as shoring, strutting, baling out water, forming protective bunds, coffer dam wherever necessary for dressing the bed below sill level etc., complete for foundation as per SS 20B MORT & H 2903

428.77

-

127.2

... More
Vibrated Cement Concrete M15 Grade using 40mm ISS Size hard broken granite metal including cost and conveyance of all materials to site cost and labour charges for formwork centering, labour charges for laying, compacting curing, all incidental charges complete for Leveling course for (base course Box Culvert and Drain)

62.06

-

4420

... More
Vibrated cement concrete M15 Grade using 40mm ISS HBG metal including cost and conveyance of all materials to site., complying to the required standard and specifications including labour for formwork, laying, watering, curing and compacting vibrator charges and all other incidental charges etc., complete for DRAIN SIDE WALLS

105

-

7786

... More
Vibrated cement concrete M20 Grade using 40mm ISS HBG metal including cost and conveyance of all materials to site., complying to the required standard and specifications including labour for formwork, laying, watering, curing and compacting vibrator charges and all other incidental charges etc., complete for RETAINING WALL Below sill level

16.8

-

4983

... More
Vibrated cement concrete M20 Grade using 40mm ISS HBG metal including cost and conveyance of all materials to site., complying to the required standard and specifications including labour for formwork, laying, watering, curing and compacting vibrator charges and all other incidental charges etc., complete for RETAINING WALL Above sill level

49.232

-

6523

... More
Providing and fixing seepage pipes of 100mm dia. PVC pipes of requied lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900mm dia. semi-spherical back fill arangements with 100mm size broken ganite chips at the periphery and labour charges for fixing, etc.,to drain of the BACKFILL IN THE RETAINING WALLS

28.8

-

164.6

... More
Vibrated Reinforced Cement Concrete [Design Mix] M25 grade using ISS size HBG graded metal crushed stone including cost and conveyance of all materials to site but excluding cost and fabrication for steel but including cost and labour charges for formwork and centering, labour charges, compacting, finishing and curing, including all incidental charges etc., complete for BASE SLAB, STEM, TOP SLAB OF BOX CULVERT.

48.35

-

7973

... More
Vibrated Reinforced Cement Concrete [Design Mix] M30 grade using ISS size HBG graded metal crushed stone including cost and conveyance of all materials to site but excluding cost and fabrication for steel but including cost and labour charges for formwork and centering, labour charges, compacting, finishing and curing, including all incidental charges etc., complete for WEARING COAT OF BOX CULVERT.

50.76

-

487.75

... More
Supply and fabrication of Fe 500 steel required for all RCC items of works involved in the schedule cost of steel at site fabrication,labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc,complete, Fe 500 grade

3.393

-

66395

... More
Construction of Drain at Km.0/0 to 0/7 L & R sides

-

-

-

... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with intial lead and lifts and all other incidental charges such as shoring, strutting, baling out water, forming protective bunds, coffer dam wherever necessary for dressing the bed below sill level etc., complete for foundation as per SS 20B MORT & H 2903

2173.5

-

127.2

... More
Cement Concrete M10 Grade using 40mm ISS Size hard broken granite metal including cost and conveyance of all materials to site cost and labour charges for formwork centering, labour charges for laying, compacting curing, all incidental charges complete for Leveling course for below of Drain

283.5

-

3850

... More
Vibrated cement concrete M15 Grade using 40mm ISS HBG metal including cost and conveyance of all materials to site., complying to the required standard and specifications including labour for formwork, laying, watering, curing and compacting vibrator charges and all other incidental charges etc., complete for DRAIN SIDE WALLS

560

-

4623

... More
Construction of P.C.C Retaining Wall at Km.0/2, 1/2, 1/4,1/6,1/8

-

-

-

... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with intial lead and lifts and all other incidental charges such as shoring, strutting, baling out water, forming protective bunds, coffer dam wherever necessary for dressing the bed below sill level etc., complete for foundation as per SS 20B MORT & H 2903

1641.48

-

128

... More
Vibrated cement concrete of Grade M15 Nominal Mix 1:2:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site., complying to the required standard and specifications including labour for formwork, laying, watering, curing and compacting vibrator charges and all other incidental charges etc., complete for RETAINING WALL Below sill level

1383.1

-

4752

... More
Vibrated cement concrete of Grade M15 Nominal Mix 1:2:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site., complying to the required standard and specifications including labour for formwork, laying, watering, curing and compacting vibrator charges and all other incidental charges etc., complete for RETAINING WALL Above sill level

1638.04

-

5719.8

... More
Providing and fixing seepage pipes of 100mm dia. PVC pipes of requied lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900mm dia. semi-spherical back fill arangements with 100mm size broken ganite chips at the periphery and labour charges for fixing, etc.,to drain of the BACKFILL IN THE RETAINING WALLS

539

-

164.6

... More
Filling behind Abutments and Returns as per Appendix 6 of IRC: 78 -2000 with clean gritty free draining material including cost and draining material having Phi value more than 35° conveyance of material to worksite , laying, handling charges and filling in layers tamping under optimum moisture content to get the maximum density, including watering, with all leads for water and all other incidental charges, etc., complete

1737.47

-

249

... More
Construction of P.C.C Retaining Wall at Km.5/2, 6/8,7/4, 7/10 & 8/2

-

-

-

... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with intial lead and lifts and all other incidental charges such as shoring, strutting, baling out water, forming protective bunds, coffer dam wherever necessary for dressing the bed below sill level etc., complete for foundation as per SS 20B MORT & H 2903

900.6

-

339

... More
Vibrated cement concrete of Grade M15 Nominal Mix 1:2:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site., complying to the required standard and specifications including labour for formwork, laying, watering, curing and compacting vibrator charges and all other incidental charges etc., complete for RETAINING WALL Below sill level

726.41

-

4842

... More
Vibrated cement concrete of Grade M15 Nominal Mix 1:2:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site., complying to the required standard and specifications including labour for formwork, laying, watering, curing and compacting vibrator charges and all other incidental charges etc., complete for RETAINING WALL Above sill level

567.05

-

6010.87

... More
Providing and fixing seepage pipes of 100mm dia. PVC pipes of requied lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900mm dia. semi-spherical back fill arangements with 100mm size broken ganite chips at the periphery and labour charges for fixing, etc.,to drain of the BACKFILL IN THE RETAINING WALLS

290

-

175

... More
Filling behind Abutments and Returns as per Appendix 6 of IRC: 78 -2000 with clean gritty free draining material including cost and draining material having Phi value more than 35° conveyance of material to worksite , laying, handling charges and filling in layers tamping under optimum moisture content to get the maximum density, including watering, with all leads for water and all other incidental charges, etc., complete

990.89

-

235

... More
Add 12% for GST

1

-

18605170



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.