Ministry Of Road Transport And Highways Tender

... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Ministry Of Road Transport And Highways - MORTH Tender

Works
Road Construction
Eprocure
Opening Date13 Mar 2025
Closing Date15 Apr 2025
Tender Amount₹ 15,16,40,000 
Notes
Download

Costs

Summary

Widening From Sl To Il And Strengthening Of Thiyagadurgam-sankarapuram Road At Km 16/0-26/960 (odr) Including Reconstruction Of Culverts, And Construction Of Retaining Wall And Road

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
HGS SS.20.B. Earth work excavation and deposting on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, slags, muram, gravel stoney earth mixed with small size boulders.

13020.16

123

1604864.92

... More
Construction of granular Gr-V sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 401

4411.71

1939

8556158.61

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5

5736.76

2147

12321642.6

... More
Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 502 of MORTH Rev-5

23820.82

83

1989038.47

... More
Providing and laying Tack Coat over WBM/ WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as

23820.82

19

465697.03

... More
Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5

41300.42

27

1141543.61

... More
Providing, laying 75mm consolidated thick Dense Bituminous Macadam using 0.40cum of 37.50-13.20mm, 0.35cum of 13.20-2.36mm and 0.36cum of 2.36mm & below size IRC metal with 71.30kgs of VG30 grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to site, spreading the mix to uniform thickness of 75mm with mechanical paver to the specified grades and cross sections and consolidated by Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 505 of MORTH rev-5. (Grade - I in two layers)

2144.16

9936

21305295.75

... More
Providing, laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50- 13.20mm, 0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required temperature in Central Hot Mix Plant 20 - 30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm using paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire and fuel charges for 20-30ton CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory rollers and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5 (Grade - II)

2072.9

10760

22305274.62

... More
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5

1942.25

11731

22785408.76

... More
Providing compaction for embankment / making up of low berms using the available box cut earth including all hire and fuel charges for power roller for compaction, water sprinkler, including all labour charges for laying, spreading, watering etc., complete and as directed by department engineers.

1764.52

26

46971.52

... More
RCC BOX CULVERTS

-

-

-

... More
Dismantling the existing CC concrete in cement mortar upto 3.0 m height in the existing causeway and clearing away from the work site and carefully stacking the useful materials for reuse on the road side as directed by the Departmental Officers including all labour and incidental charges etc., complete.

1

-

-

... More
at Km 17/6

5.92

486

2878.3

... More
at Km 17/8

5.92

486

2878.3

... More
at Km 17/10 (i) & (ii)

11.44

486

5562.13

... More
at Km 18/2

5.92

486

2878.3

... More
at Km 18/8

0.45

486

218.79

... More
at Km 19/4

0.45

486

218.79

... More
at Km 19/8 (ii)

0.45

486

218.79

... More
at Km 19/10

0.45

486

218.79

... More
at Km 20/6

5.37

486

2610.89

... More
at Km 20/8

0.45

486

218.79

... More
at Km 21/2

0.45

486

218.79

... More
at Km 21/4

0.45

486

218.79

... More
at Km 21/6

11

486

5348.2

... More
at Km 22/10

0.45

486

218.79

... More
at Km 23/6

0.45

486

218.79

... More
at Km 23/10

0.45

486

218.79

... More
at Km 24/2 (i)

5.37

486

2610.89

... More
at Km 24/2 (ii)

0.45

486

218.79

... More
at Km 24/4

0.45

486

218.79

... More
at Km 24/6

5.53

486

2688.69

... More
at Km 25/2

0.45

486

218.79

... More
at Km 25/4

0.68

486

330.62

... More
at Km 25/6

0.45

486

218.79

... More
at Km 25/10

0.45

486

218.79

... More
at Km 26/2

0.45

486

218.79

... More
at Km 26/4

5.37

486

2610.89

... More
at Km 26/6 (ii)

0.45

486

218.79

... More
at Km 26/10

0.45

486

218.79

... More
Dismantling the the existing RR Masonary in the existing causeway / bridge and clearing away from the work site and carefully stacking the usefull materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete.

1

-

-

... More
at Km 18/8

11.76

283

3329.73

... More
at Km 19/4

13.97

283

3955.47

... More
at Km 19/8 (ii)

11.76

283

3329.73

... More
at Km 19/10

11.76

283

3329.73

... More
at Km 20/8

11.76

283

3329.73

... More
at Km 21/2

11.76

284

3341.49

... More
at Km 21/4

11.76

283

3329.73

... More
at Km 22/10

11.76

283

3329.73

... More
at Km 23/6

9.56

283

2706.82

... More
at Km 23/10

11.76

283

3329.73

... More
at Km 24/2 (ii)

11.76

283

3329.73

... More
at Km 24/4

11.76

283

3329.73

... More
at Km 25/2

11.76

283

3329.73

... More
at Km 25/6

11.76

283

3329.73

... More
at Km 25/10

11.76

283

3329.73

... More
at Km 26/2

11.76

283

3329.73

... More
at Km 26/6 (ii)

11.76

283

3329.73

... More
at Km 26/10

11.76

283

3329.73

... More
Dismantling the existing RCC 600mm dia Pipe including all labour and other incidental charges etc., complete.

1

-

-

... More
at Km 17/4

7.5

486

3646.5

... More
at Km 17/6

7.5

486

3646.5

... More
at Km 17/8

7.5

486

3646.5

... More
at Km 17/10 (i) & (ii)

15

486

7293

... More
at Km 18/2

7.5

486

3646.5

... More
at Km 19/8 (i)

7.5

486

3646.5

... More
Dismantling the existing RCC 1000mm dia Pipe including all labour and other incidental charges etc., complete.

1

-

-

... More
at Km 20/6

7.5

486

3646.5

... More
at Km 24/2 (i)

7.5

486

3646.5

... More
at Km 26/4

7.5

486

3646.5

... More
Dismantling the existing RCC 900mm dia Pipe including all labour and other incidental charges etc., complete.

1

-

-

... More
at Km 21/6

45

486

21879

... More
at Km 24/6

7.5

486

3646.5

... More
Earth work excavation in all classes of soil except hard rock requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as baling out water shoring shrutting, walling & forming protective bunds wherever necessary etc complete as per relevant standard specification for FOUNDATION

1

-

-

... More
at Km 17/4

96.99

290

28127.1

... More
at Km 17/6

91.07

290

26410.3

... More
at Km 17/8

91.07

290

26410.3

... More
at Km 17/10 (i) & (ii)

154.18

290

44712.2

... More
at Km 18/2

91.07

290

26410.3

... More
at Km 18/8

86.9

290

25201

... More
at Km 19/4

84.69

290

24560.1

... More
at Km 19/8 (i)

96.99

290

28127.1

... More
at Km 19/8 (ii)

86.9

290

25201

... More
at Km 19/10

86.9

290

25201

... More
at Km 20/6

87.85

290

25476.5

... More
at Km 20/8

86.9

290

25201

... More
at Km 21/2

86.9

290

25201

... More
at Km 21/4

86.9

290

25201

... More
at Km 21/6

222.98

290

64664.2

... More
at Km 22/10

86.9

290

25201

... More
at Km 23/6

89.1

290

25839

... More
at Km 23/10

239.38

290

69420.2

... More
at Km 24/2 (i)

87.85

290

25476.5

... More
at Km 24/2 (ii)

86.9

290

25201

... More
at Km 24/4

86.9

290

25201

... More
at Km 24/6

88.81

290

25754.9

... More
at Km 25/2

86.9

290

25201

... More
at Km 25/4

75.67

290

21944.3

... More
at Km 25/6

86.9

290

25201

... More
at Km 25/10

86.9

290

25201

... More
at Km 26/2

86.9

290

25201

... More
at Km 26/4

87.85

290

25476.5

... More
at Km 26/6 (ii)

86.9

290

25201

... More
at Km 26/10

86.9

290

25201

... More
Vibrated Cement Concrete of Grade M-15, Nominal Mix 1:2:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of form work, soft water,labour charges for mixing, transporting, laying and curing concrete, working at depths tools and plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification for BASE COURSE OF BOX CULVERT

1

-

-

... More
at Km 17/4

7.73

6208

47987.84

... More
at Km 17/6

7.73

6220

48080.6

... More
at Km 17/8

7.73

6220

48080.6

... More
at Km 17/10 (i) & (ii)

12.02

6220

74764.4

... More
at Km 18/2

7.73

6220

48080.6

... More
at Km 18/8

7.73

6208

47987.84

... More
at Km 19/4

7.73

6208

47987.84

... More
at Km 19/8 (i)

7.73

6197

47902.81

... More
at Km 19/8 (ii)

7.73

6197

47902.81

... More
at Km 19/10

7.73

6197

47902.81

... More
at Km 20/6

7.73

6185

47810.05

... More
at Km 20/8

7.73

6185

47810.05

... More
at Km 21/2

7.73

6185

47810.05

... More
at Km 21/4

7.73

6185

47810.05

... More
at Km 21/6

12.39

6173

76483.47

... More
at Km 22/10

7.73

6160

47616.8

... More
at Km 23/6

7.73

6146

47508.58

... More
at Km 23/10

12.39

6146

76148.94

... More
at Km 24/2 (i)

7.73

6146

47508.58

... More
at Km 24/2 (ii)

7.73

6146

47508.58

... More
at Km 24/4

7.73

6146

47508.58

... More
at Km 24/6

7.73

6132

47400.36

... More
at Km 25/2

7.73

6132

47400.36

... More
at Km 25/4

3.57

6132

21891.24

... More
at Km 25/6

7.73

6119

47299.87

... More
at Km 25/10

7.73

6119

47299.87

... More
at Km 26/2

7.73

6119

47299.87

... More
at Km 26/4

7.73

6119

47299.87

... More
at Km 26/6 (ii)

7.73

6105

47191.65

... More
at Km 26/10

7.73

6105

47191.65

... More
Vibrated Reinforced Cement concrete in M25 using ISS graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for form work, centering, mixing, transporting, laying and curing concrete, tools and plants and incidental charges excluding cost of steel etc., complete as per relevant standard specification for CELL BOX

1

-

-

... More
at Km 17/4

24.96

12215

304886.4

... More
at Km 17/6

24.96

12227

305185.92

... More
at Km 17/8

24.96

12227

305185.92

... More
at Km 17/10 (i) & (ii)

49.91

12227

610249.57

... More
at Km 18/2

24.96

12227

305185.92

... More
at Km 18/8

24.96

12215

304886.4

... More
at Km 19/4

24.96

12215

304886.4

... More
at Km 19/8 (i)

24.96

12203

304586.88

... More
at Km 19/8 (ii)

24.96

12203

304586.88

... More
at Km 19/10

24.96

12203

304586.88

... More
at Km 20/6

24.96

12192

304312.32

... More
at Km 20/8

24.96

12192

304312.32

... More
at Km 21/2

24.96

12192

304312.32

... More
at Km 21/4

24.96

12192

304312.32

... More
at Km 21/6

63.14

11239

709630.46

... More
at Km 22/10

24.96

12166

303663.36

... More
at Km 23/6

24.96

12153

303338.88

... More
at Km 23/10

63.14

11212

707925.68

... More
at Km 24/2 (i)

24.96

12031

300293.76

... More
at Km 24/2 (ii)

24.96

12031

300293.76

... More
at Km 24/4

24.96

12031

300293.76

... More
at Km 24/6

24.96

12017

299944.32

... More
at Km 25/2

24.96

12017

299944.32

... More
at Km 25/4

13.62

12017

163671.54

... More
at Km 25/6

24.96

12003

299594.88

... More
at Km 25/10

24.96

12003

299594.88

... More
at Km 26/2

24.96

12003

299594.88

... More
at Km 26/4

24.96

12003

299594.88

... More
at Km 26/6 (ii)

24.96

11990

299270.4

... More
at Km 26/10

24.96

11990

299270.4

... More
Supply and Fabrication of Fe-500 steel required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlaping to the required length wherever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc, complete, Fe-500 grade-1 MT. For bars upto 16mm dia.

1

-

-

... More
at Km 17/4

2

95610

191220

... More
at Km 17/6

2

95610

191220

... More
at Km 17/8

2

95610

191220

... More
at Km 17/10 (i) & (ii)

4

95610

382440

... More
at Km 18/2

2

95610

191220

... More
at Km 18/8

2

95610

191220

... More
at Km 19/4

2

95610

191220

... More
at Km 19/8 (i)

2

95610

191220

... More
at Km 19/8 (ii)

2

95610

191220

... More
at Km 19/10

2

95610

191220

... More
at Km 20/6

2

95610

191220

... More
at Km 20/8

2

95610

191220

... More
at Km 21/2

2

95610

191220

... More
at Km 21/4

2

95610

191220

... More
at Km 21/6

4.1

95610

392096.61

... More
at Km 22/10

2

95610

191220

... More
at Km 23/6

2

95610

191220

... More
at Km 23/10

4.1

95610

392096.61

... More
at Km 24/2 (i)

2

95610

191220

... More
at Km 24/2 (ii)

2

95610

191220

... More
at Km 24/4

2

95610

191220

... More
at Km 24/6

2

95610

191220

... More
at Km 25/2

2

95610

191220

... More
at Km 25/4

0.91

95610

86909.49

... More
at Km 25/6

2

95610

191220

... More
at Km 25/10

2

95610

191220

... More
at Km 26/2

2

95610

191220

... More
at Km 26/4

2

95610

191220

... More
at Km 26/6 (ii)

2

95610

191220

... More
at Km 26/10

2

95610

191220

... More
Providing and fixing of PVC Drainage spouts 100mm dia as per MOST drawing No.SD/205 with grating arrangements at top as shown in the drawing including cost and conveyance of GI pipes and flats and fixing them in position etc., complete

1

-

-

... More
at Km 17/4

1

177

177.5

... More
at Km 17/6

2

177

355

... More
at Km 17/8

2

177

355

... More
at Km 17/10 (i) & (ii)

4

177

710

... More
at Km 18/2

2

177

355

... More
at Km 18/8

2

177

355

... More
at Km 19/4

2

177

355

... More
at Km 19/8 (i)

2

177

355

... More
at Km 19/8 (ii)

2

177

355

... More
at Km 19/10

2

177

355

... More
at Km 20/6

2

177

355

... More
at Km 20/8

2

177

355

... More
at Km 21/2

2

177

355

... More
at Km 21/4

2

177

355

... More
at Km 21/6

2

177

355

... More
at Km 22/10

2

177

355

... More
at Km 23/6

2

177

355

... More
at Km 23/10

2

177

355

... More
at Km 24/2 (i)

2

177

355

... More
at Km 24/2 (ii)

2

177

355

... More
at Km 24/4

2

177

355

... More
at Km 24/6

2

177

355

... More
at Km 25/2

2

177

355

... More
at Km 25/4

1

177

177.5

... More
at Km 25/6

2

177

355

... More
at Km 25/10

2

177

355

... More
at Km 26/2

2

177

355

... More
at Km 26/4

2

177

355

... More
at Km 26/6 (ii)

2

177

355

... More
at Km 26/10

2

177

355

... More
Vibrated Cement Concrete of Grade M-20 Nominal Mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of form work, soft water,labour charges for mixing, transporting, laying and curing concrete, working at depths tools and plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification for WING WALLS AND PARAPETS

1

-

-

... More
at Km 17/4

22.4

8806

197254.4

... More
at Km 17/6

22.4

8817

197500.8

... More
at Km 17/8

22.4

8817

197500.8

... More
at Km 17/10 (i) & (ii)

44.07

8817

388565.19

... More
at Km 18/2

22.4

8817

197500.8

... More
at Km 18/8

22.4

8806

197254.4

... More
at Km 19/4

22.4

8806

197254.4

... More
at Km 19/8 (i)

22.4

8794

196985.6

... More
at Km 19/8 (ii)

22.4

8794

196985.6

... More
at Km 19/10

22.4

8794

196985.6

... More
at Km 20/6

22.4

8817

197500.8

... More
at Km 20/8

22.4

8782

196716.8

... More
at Km 21/2

22.4

8782

196716.8

... More
at Km 21/4

22.4

8782

196716.8

... More
at Km 21/6

37.56

8331

312912.36

... More
at Km 22/10

22.4

8757

196156.8

... More
at Km 23/6

22.4

8743

195843.2

... More
at Km 23/10

37.56

8304

311898.24

... More
at Km 24/2 (i)

22.4

8743

195843.2

... More
at Km 24/2 (ii)

21.75

8743

190160.25

... More
at Km 24/4

22.4

8743

195843.2

... More
at Km 24/6

22.4

8730

195552

... More
at Km 25/2

22.4

8730

195552

... More
at Km 25/4

18.77

8730

163862.1

... More
at Km 25/6

22.4

8716

195238.4

... More
at Km 25/10

22.4

8716

195238.4

... More
at Km 26/2

22.4

8716

195238.4

... More
at Km 26/4

22.4

8716

195238.4

... More
at Km 26/6 (ii)

22.4

8702

194924.8

... More
at Km 26/10

22.4

8702

194924.8

... More
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.30 Kg/sqm on the Concrete surface cleaded with mechanical broom all complete as per Technical Specification MoRTH-503

1

-

-

... More
at Km 17/4

8.8

22

195.1

... More
at Km 17/6

8.8

22

195.1

... More
at Km 17/8

8.8

22

195.1

... More
at Km 17/10 (i) & (ii)

17.6

22

390.19

... More
at Km 18/2

8.8

22

195.1

... More
at Km 18/8

8.8

22

195.1

... More
at Km 19/4

8.8

22

195.1

... More
at Km 19/8 (i)

8.8

22

195.1

... More
at Km 19/8 (ii)

8.8

22

195.1

... More
at Km 19/10

8.8

22

195.1

... More
at Km 20/6

8.8

22

195.1

... More
at Km 20/8

8.8

22

195.1

... More
at Km 21/2

8.8

22

195.1

... More
at Km 21/4

8.8

22

195.1

... More
at Km 21/6

21.12

22

468.23

... More
at Km 22/10

8.8

22

195.1

... More
at Km 23/6

8.8

22

195.1

... More
at Km 23/10

21.12

22

468.23

... More
at Km 24/2 (i)

8.8

22

195.1

... More
at Km 24/2 (ii)

8.8

22

195.1

... More
at Km 24/4

8.8

22

195.1

... More
at Km 24/6

8.8

22

195.1

... More
at Km 25/2

8.8

22

195.1

... More
at Km 25/4

5.95

22

131.91

... More
at Km 25/6

8.8

22

195.1

... More
at Km 25/10

8.8

22

195.1

... More
at Km 26/2

8.8

22

195.1

... More
at Km 26/4

8.8

22

195.1

... More
at Km 26/6 (ii)

8.8

22

195.1

... More
at Km 26/10

8.8

22

195.1

... More
Providing and laying Bituminous concrete using VG-40 with 100 - 120 THP hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder as specified by Job Mix Formula (JMF) by weight of total mix and filler, transporting the hot mix to site, laid over a previously prepared surface with a hydrostatic paver finisher with sensor control to the required grade, level and alignment and rolled with smooth wheeled, vibratory and tandom rollers to acheieve the desired compaction as per clause 507 of MORT & H specifications complete in all respects. Grading I 50mm thik

1

-

-

... More
at Km 17/4

0.44

11557

5085.31

... More
at Km 17/6

0.44

11557

5085.31

... More
at Km 17/8

0.44

11557

5085.31

... More
at Km 17/10 (i) & (ii)

0.88

11557

10170.62

... More
at Km 18/2

0.44

11557

5085.31

... More
at Km 18/8

0.44

11557

5085.31

... More
at Km 19/4

0.44

11557

5085.31

... More
at Km 19/8 (i)

0.44

11557

5085.31

... More
at Km 19/8 (ii)

0.44

11557

5085.31

... More
at Km 19/10

0.44

11557

5085.31

... More
at Km 20/6

0.44

11557

5085.31

... More
at Km 20/8

0.44

11557

5085.31

... More
at Km 21/2

0.44

11557

5085.31

... More
at Km 21/4

0.44

11557

5085.31

... More
at Km 21/6

1.06

11557

12250.97

... More
at Km 22/10

0.44

11557

5085.31

... More
at Km 23/6

0.44

11557

5085.31

... More
at Km 23/10

1.06

11557

12250.97

... More
at Km 24/2 (i)

0.44

11557

5085.31

... More
at Km 24/2 (ii)

0.44

11557

5085.31

... More
at Km 24/4

0.44

11557

5085.31

... More
at Km 24/6

0.44

11557

5085.31

... More
at Km 25/2

0.44

11557

5085.31

... More
at Km 25/4

0.3

11557

3467.26

... More
at Km 25/6

0.44

11557

5085.31

... More
at Km 25/10

0.44

11557

5085.31

... More
at Km 26/2

0.44

11557

5085.31

... More
at Km 26/4

0.44

11557

5085.31

... More
at Km 26/6 (ii)

0.44

11557

5085.31

... More
at Km 26/10

0.44

11557

5085.31

... More
RCC PIPE CULVERTS

-

-

-

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavation back filing,clearing up the site and disposal of all surplus materials etc., complete as per standard specification for foundation of body wall and pipes

1

-

-

... More
at Km 18/4

12.35

246

3044.03

... More
at Km 20/2

5.8

246

1429.82

... More
Plain cement concrete M10 grade using 40mm ISS HBG metal including cost and conveyance of all materials from approved quary to work site including cost of cement including cost and labour charges for mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft portable water, working in all depths including hire, running and fuel charges for all tools and plants employed as per standard specification for levelling course below the body wall.

1

-

-

... More
at Km 18/4

2.06

5545

11422.89

... More
at Km 20/2

0.97

5521

5356.03

... More
Vibrated Reinforced cement concrete of grade M20 grade mix using 40mm ISS size hard broken granite metal including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft portable water, working in all depths including hire, running and fuel charges for all tools and plants employed as per standard specification for levelling course below the body wall

1

-

-

... More
at Km 18/4

19.04

8912

169692.48

... More
at Km 20/2

9.55

9067

86597.97

... More
Supply of 1000mm di aRCC NP3 class pipes confirming to IS 458 specification as directed by the departmental officers including cost and conveyance of pipes to the worksite and all other incidental charges etc., complete as per standard specification.

1

-

-

... More
at Km 18/4

10

4276

42768

... More
at Km 20/2

2.5

4276

10692

... More
Laying and Fixing of 1000mm dia RCC NP3 pipe in position excluding cost of pipes but including conveyance to work spot and handling charges on both sides including labour charges for hoisting and placing the pipes.

1

-

-

... More
at Km 18/4

10

266

2662

... More
at Km 20/2

2.5

266

665.5

... More
Stone dust filling including cost and conveyance of Stone dust to work site including labour charges for filling in layers as specified by the departmental officers including watering with all leads for water including labour charges for compacting, lamping, ramming under optimum moisture content to obtain the maximum density and all other incidental charges etc., complete as per standard specification.

1

-

-

... More
at Km 18/4

21.25

357

7595.81

... More
at Km 20/2

9.99

345

3449.92

... More
Dismantling the existing CC concrete in cement mortar upto 3.0 m height in the existing causeway and clearing away from the work site and carefully stacking the useful materials for reuse on the road side as directed by the Departmental Officers including all labour and incidental charges etc., complete.

1

-

-

... More
at Km 18/4

4.23

486

2054.68

... More
at Km 20/2

0.74

486

357.36

... More
DOUBLE CELL RCC BOX CULVERTS

-

-

-

... More
Dismantling the existing CC concrete in cement mortar upto 3.0 m height in the existing causeway and clearing away from the work site and carefully stacking the useful materials for reuse on the road side as directed by the Departmental Officers including all labour and incidental charges etc., complete.

1

-

-

... More
at Km 19/2

1.13

486

549.41

... More
at Km 21/8

1.13

486

549.41

... More
Earth work excavation in all classes of soil except hard rock requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as baling out water shoring shrutting, walling & forming protective bunds wherever necessary etc complete as per relevant standard specification for FOUNDATION

1

-

-

... More
at Km 19/2

40.84

290

11843.6

... More
at Km 21/8

34.72

290

10068.8

... More
Vibrated Cement Concrete of Grade M-15, Nominal Mix 1:2:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of form work, soft water,labour charges for mixing, transporting, laying and curing concrete, working at depths tools and plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification for BASE COURSE OF BOX CULVERT

1

-

-

... More
at Km 19/2

8.15

6208

50595.2

... More
at Km 21/8

4.6

6173

28395.8

... More
Vibrated Reinforced Cement concrete in M25 using ISS graded HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for form work, centering, mixing, transporting, laying and curing concrete, tools and plants and incidental charges excluding cost of steel etc., complete as per relevant standard specification for CELL BOX

1

-

-

... More
at Km 19/2

23.05

12215

281555.75

... More
at Km 21/8

16.71

11239

187803.69

... More
Supply and Fabrication of Fe-500 steel required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlaping to the required length wherever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc, complete, Fe-500 grade-1 MT. For bars upto 16mm dia.

1

-

-

... More
at Km 19/2

2.03

95610

193610.25

... More
at Km 21/8

1.68

95610

160242.36

... More
Providing and fixing of pvc Drainage spouts 100mm dia as per MOST drawing No.SD/205 with grating arrangements at top as shown in the drawing including cost and conveyance of GI pipes and flats and fixing them in position etc., complete

1

-

-

... More
at Km 19/2

2

177

355

... More
at Km 21/8

2

177

355

... More
Vibrated Cement Concrete of Grade M-20 Nominal Mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of form work, soft water,labour charges for mixing, transporting, laying and curing concrete, working at depths tools and plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification for WING WALLS AND PARAPETS

1

-

-

... More
at Km 19/2

14.52

8806

127863.12

... More
at Km 21/8

13.27

8331

110552.37

... More
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.30 Kg/sqm on the Concrete surface cleaded with mechanical broom all complete as per Technical Specification MoRTH503

1

-

-

... More
at Km 19/2

10.65

22

236.11

... More
at Km 21/8

9.3

22

206.18

... More
Providing and laying Bituminous concrete using CRMB with 100 - 120 THP hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder as specified by Job Mix Formula(JMF) by weight of total mix and filler, trnsporting the hot mix to site, laid over a previously prepared surface with a hydrostatic paver finisher with sensor control to the required grade, level and alignment and rolled with smooth wheeled, vibratory and tandom rollers to acheieve the desired compaction as per clause 507 of MORT & H specifications complete in all respects - Grading II

1

-

-

... More
at Km 19/2

0.53

11557

6125.49

... More
at Km 21/8

0.47

11557

5432.03

... More
RETAINING WALL AT KM 25/10

-

-

-

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavation back filing,clearing up the site and disposal of all surplus materials etc., complete for Foundation of PCC Retaining Walls.

156

246

38457.12

... More
Vibrated Cement Concrete of Grade M20 (Nominal mix 1:1.5:3) using 40 mm ISS size HBG metal including cost and conveyance all materials to site including cost and labour charges for form work and centering, labour charges, compacting , curing and all incidetal charges etc., complete, for Base slab of PCC Retaining wall.

39

6195

241605

... More
Vibrated Cement Concrete of Grade M20 (Nominal mix 1:1.5:3) using 40 mm ISS size HBG metal including cost and conveyance all materials to site including cost and labour charges for form work and centering, labour charges, compacting , curing and all incidetal charges etc., complete, Stem of PCC Retaining wall.(below sill)

80.73

7470

603053.1

... More
Vibrated Cement Concrete of Grade M20 (Nominal mix 1:1.5:3) using 40 mm ISS size HBG metal including cost and conveyance all materials to site including cost and labour charges for form work and centering, labour charges, compacting, curing and all incidetal charges etc., complete, for Stem of Retaining Wall. (Above sill)

98.02

8571

840185.29

... More
Vibrated Cement Concrete of Grade M15 (Nominal mix 1:2:4) using 40 mm ISS size HBG metal including cost and conveyance all materials to site including cost and labour charges for form work and centering, labour charges, compacting, curing and all incidetal charges etc., complete, Parapet Wall.

10.53

7625

80300.31

... More
Providing and fixing PVC seepage pipes of Class I type of 100 mm dia. of required lengths for Retaining Walls including costs and conveyance of all materials to work site and labour charges for fixing etc., complete to drain the backfill in Retaining walls.

52

177

9230

... More
Refilling with excavated soil for Retaining Walls including costs and conveyance of all materials to work site and labour charges for fixing etc., complete to drain the backfill in Retaining walls.

203.3

42

8711.41

... More
ROAD FURNITURE AT KM 16/0 - 26/960

-

-

-

... More
Providing and laying of hot applied Thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes etc., complete as per MoRT8H specification No. 803

575.25

890

511972.5

... More
Providing and fixing reflective road studs of 'category A’ Raised pavement markers made out of poly carbonate / methyl methacrylate/ABS moulded body confirming to ASTM D 788 and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face with retro reflectance and chromaticity Values conforming to ASTM D4280. The reflective raised pavement markers shall also confirm to the MORTH circular No RW/ NH. 33023/10/ 97-DO. III dt 11.06.97. The height, width and length shall not be less than 15 mm, 90 mm and 100 mm and with minimum reflective area of 13 Sq.cm on each side and the slope to the base shall be 35 +/- 5 degree. Each reflector shall have a CIL not less than values specified in Table 2 of said MORTH circular. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kgf. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer. The marker shall support a load of 13635 Kg tested in accordance with ASTM D4280 and confirming to IRC 35 - 2015 guidelines and MoRT&H specification 804 etc., complete

970

480

465600

... More
Providing and erecting of Retro – Reflectorised Cautionary, Mandatory and Informatory signs (Without definition board) made out of High Intensity Prismatic Grade Sheeting confirming to Type-IV standards of IRC-67: 2012 and ASTM D 4956 -09, specification and fixed over 2mm thick Aluminium sheet fixed over a back supporting frame of 25mm x 25mmx3 mm Mild Steel angle and supported on a mild steel angle post 75X75X6mm with a clear height of not less than 2.10m from the ground level to the bottom of the sign board and 0.60m below ground level. The sign post should be painted as per IRC 67-2012 and firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45cmX45cmX60cm size including cost and conveyance of all materials, equipment, Machinery and labour with all leads and lifts, loading charges necessary for satisfactory completion of the work as directed by the engineer-in-charge. High intensity Retro - Reflectro sheet shall consist of minimum coefficient of Retro-reflection as per Table 6.6 of IRC 67-2012. The retro - reflective sheeting shall be covered under 7 year warranty issued for field performance and a certified copy of three years outdoor exposure report shall be obtained as per IRC 67:2012 .( as per MoRT&H Specification No.801)

1

-

-

... More
60 cm equilateral triangle

150

3228

484200

... More
60 cm circular

22

4513

99286

... More
Providing and erecting of Direction and Place Identification Retro-reflectorised Sign made out of High Intensity Prismatic Grade Sheeting confirming to Type-IV standards of IRC-67: 2012 and ASTM D 4956 -09, specification and fixed over 2mm thickAluminium sheet fixed over a back supporting frame of 25mmx 25mmx 3mm Mild Steel angle and supported on a mild steel angle post 75X75X6mm with a clear height of not less than 2.10m from the ground level to the bottom of the sign board and 0.60m below ground level. The sign post should be painted as per IRC 67-2012 and firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45cmX45cmX60cm size including cost and conveyance of all materials, equipment, Machinery and labour with all leads and lifts, loading charges necessary for satisfactory completion of the work as directed by the engineer in charge. High intensity Retro Reflectro sheet shall consist of minimum coefficient of Retro-reflection as per Table 6.6 of IRC 67-2012. The retro- reflective sheeting shall be covered under 7 year warranty issued for field performance and a certified copy of three years outdoor exposure report shall be obtained as per IRC 67:2012. (as per MORT&H Specification No.801) Rate per sqm ( for sign having area upto 0.9 sqm) Type-IV

27

11491

310257

... More
Providing RCC M15 grade precast KM stone of standard design as per IRC 9-1980 and fixing in position including painting printing etc. complete (as per MORTH specification No.804)

11

2197

24167

... More
Providing RCC M15 grade precast HM stone of standard design as per IRC 9-1980 and fixing in position including painting printing etc. complete (as per MORTH specification No.804)

44

574

25284.6

... More
Supply and fixing of RCC guide post of size1.20 x 0.20 x 0.20 m with reflective star stickers with tin M.s sheet with two side packing and top cover of 0.75 inches in RCC 1: 2: 4 Mix using 20 mm HBG ISS metal with 10 mm. dia bars as vertical with 8mm dia Stirrups including 8.25 inches x 4.25 feet mould with star shape of 5 inches and top projection by 0.75 inches x 3 inches including cost and conveyance of materials to worksite etc., complete.,

236

1220

287971.92

... More
RCC DRAIN AT KM 26/6 - 26/10

-

-

-

... More
Earthwork excavation in all classes of soil except hard rock requiring plasting and depositing on bank as per SS 20 B with all leads and lifts and all other incidental charges such as baling out water shoring, strutting, walling and forming protective bunds wherever necessary etf., complete as per relevant standrd specification for storm water drain as per 304 of MORT&H specification.

577.62

289

167145.9

... More
Plain cement concrete M10 (1:4:8 Nominal mix) grade using 20mm. ISS HBG metal including cost and conveyance of all materials to side, including cost of form work and centering, labour charge for mixing, laying, compacting, working in depth including hire and fuel charges for all tools and plants and other incidental charges etc., complete for storm water drain as per 1500, 1700 and 2100 of MORT&H specification (IVth revision).

44.43

5430

241265.12

... More
Vibrated Reinforced cement concrete of grade M25 (Design mix) using 25mm & 6mm ISS HBG metal including cost and conveyance of all materials to site cost and cost of cement at site but excluding cost and fabrication of steel ,including cost of form work soft water labour charges for mixing transporting laying curing concrete ,working at heights for mixing transporting laying curing concrete, working at heights soft water ,hire charges for complete as per 1500, 1600, 1700, 1900, &2200 of MORT&H revision of relevant standard specification for bottom slab, side walls & cover slab.

1

-

-

188.84

11967

2259923.82

77.76

11922

927074.16

... More
Supplying and fabrication of Fe-500 (HYSD BAR) steel required for all RCC items of works involved in the schedule including cost of steel at site and cost of fabrication labour charges for cleaning the rods straightening, cutting bending tying grills, overlapping to the required length including cost of binding wire of spacer bars, cover blocks and all other incidental charges etc complete as per 1600 & 1900 MORT & H IV revision of relevant standard specification

10.27

95610

981914.7

... More
Providinf and fixing 160mm dia PVC PIPES of required length for side wall including grating arrengements including cost and conveyance od all materials to work site and labour charges for fixing etc., complete to drain the back fill as per standard specification. (At 5m interval).

22.22

419

9325.73

... More
Calculation of SubTotal, GST and Total carried out by system automatically

-

-

-

... More
Sub Total Amount for above all items (excluding GST)

1

128508576

-

... More
GST 18% for above SubTotal Amount

1

23131543

23131543.74

... More
Total in Figures (SubTotal + GST)

-

-

151640120.1



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.