Ministry Of Road Transport And Highways Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Ministry Of Road Transport And Highways - MORTH Tender

Works
Civil And Construction
Eprocure
Opening Date8 Dec 2018
Closing Date9 Jan 2019
Tender Amount₹ 7,15,50,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Wetmix macadam (Table 400 - 13) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with the water at OMC in machincal mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub - base course on well prepared surface and compacting with vibratory roller to achieve the desired density, complete as per clause 406

4925.68

8157320

1656.08

... More
Prime coat (providing and applying primer coat with bitumen emulsion (SS - 1 type) prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per clause 502 - over Granular surface treated with prime.

19702.68

1242845

63.08

... More
Tack coat - providing and applying tack coat with bitumen emulsion (RS-1 type) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared granular surface cleaned with mechanical broom as per clause 503 - over primed surfaces

19702.68

236629

12.01

... More
Tack coat - providing and applying tack coat with over existing BT surface bitumen emulsion (RS-1 type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom as per clause 503 - over bituminous surfaces

18779.75

296344

15.78

... More
Bituminous Macadam Patches Providing and laying bituminous macadam with mini hot mix plant using crushed aggregates of specified grading premixed with bituminous binder (Viscosity Grade 30), transported to sited, laid over a previsously prepared surface w

105.81

640224

6050.7

... More
Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.35 cum of 26.50-13.20mm,0.21cumof13.20-2.36mm and 0.14cum of 2.36mm & below with 0.01cum. of Filling material sand with 49.50Kgs of bitumen for premixing per 10sqm including cos

1924.14

15437798

8023.22

... More
Bituminous Concrete (Table 500-17) (Providing and laying 40mm thick bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade 30) at percentage specified by JMF of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects) - Grading II

1539.3

13352349

8674.3

... More
Using of cut earth includin removal satisfactory disposal of all materials necessary for construction of roadway in accordance with the specification and the lines and grades and cross sections showing in the drawings or as directed by the engineer for making berms

716.9

11749

16.39

... More
Reconstruction of RCC Box Culvert 2.0x2.0m Two cells at Km.0/6

-

-

-

... More
Dismantling the theexisting Plain Cement Concrete in the existing causeway and clearing away from the works it and carefully stacking the usefull materials for reuse on the roadside as directed by the departmental officers including all labour and incidental charges etc., complete.

16

4032

252

... More
Earth work excavation in all classes of soil except hard rock requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as baling out water shoring shrutting, walling & forming protective bunds wherever necessary etc complete as per relevant standard specification for Foundation of Box culvert & Wing walls

173.58

11039

63.6

... More
Vibrated Cement Concrete of Grade M-15,Nominal Mix1:2:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of formwork, softwater, labour charges for mixing,transporting,layingand curing concrete,working at depths tools and plants and incidental charges such as maintaining of protective bunds,coffer dams,shoring,strutting etc;complete as per relevants standard specification for BASE COURSE OF BOX CULVERT &WING WALLS

25.85

110687

4281.9

... More
Vibrated Reinforced Cement Concrete M-20 Grade Nominal Mix using ISS HBG metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel,including labour charges for mixing,transporting,laying,curing concrete,working at heights,hire charges for tools and plants,including all other incidental chargeas,etc.,complete for BASESLAB,SIDEWALLS AND TOP SLAB OF BOX CULVERT

128.84

968744

7518.97

... More
Vibrated Cement Concrete of Grade M-15,Nominal Mix1:2:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of formwork,softwater,labour charges for mixing,transporting,laying and curing concrete,working at depths tools and plants and incidental charges such as maintaining of protective bunds,coffer dams,shoring,strutting etc;complete as per relevant standard specification for WING WALLS AND PARAPETS

47.13

287629

6102.9

... More
Supply and Fabrication of Fe-500 steel required for all RCC items of works involved in the schedule cost of steel at site fabrication,labour charges for cleaning the rods straightening,cutting,bending,tying grills,including over laping to the required length wherever necessary and placing there in for cement in position as specified in the drawings,including cost of binding wire,provision of spacer bars,cover blocks and all other incidental charges etc, complete, Fe-500 grade-1 MT.For bars upto 16mm dia.

8.28

549749

66394.82

... More
Filling behind the box culvert with stone dust including cost and conveyance to worksite, laying,handling charges and filling in layers,tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc., complete

63.88

12387

193.92

... More
Sub-Estimate: Re-construction of Box culvert at km 1/10 of Harur Bypass

-

-

-

... More
Earth work excavation in all classes of soil except hard rock requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as baling out water shoring shrutting, walling & forming protective bunds wherever necessary etc complete as per relevant standard specification for FOUNDATION OF BOX CULVERT

146.39

9310

63.6

... More
Vibrated Cement Concrete of Grade M-15, Nominal Mix 1:2:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of form work, soft water,labour charges for mixing, transporting, laying and curing concrete, working at depths tools and plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification for BASE COURSE OF BOX CULVERT

14.09

59966

4255.93

... More
Vibrated Reinforced Cement Concrete M-20 Grade Nominal Mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel, including labour charges for mixing, transporting, laying, curing concrete, working at heights, hire charges for tools and plants, including all other incidental chargeas, etc., complete for BASE SLAB, SIDE AND TOP WALLS OF BOX CULVERT

58.01

439339

7573.51

... More
Vibrated Cement Concrete of Grade M-15, Nominal Mix 1:2:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of form work, soft water,labour charges for mixing, transporting, laying and curing concrete, working at depths tools and plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification for WING WALL AND PARAPET

22.43

106958

4768.54

... More
Supply and Fabrication of Fe 500 steel required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlaping to the required length wherever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc, complete, Fe 500 grade-1 MT. For bars upto 16mm dia.

4.13

274011

66394.82

... More
Filling behind the Box Culvert with Stone Dust including cost and conveyance to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc, complete

69.83

11207

160.5

... More
Sub-Estimate: Re-construction of Box culvert at km 1/6 of Harur Bypass

-

-

-

... More
Earth work excavation in all classes of soil except hard rock requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as baling out water shoring shrutting, walling & forming protective bunds wherever necessary etc complete as per relevant standard specification for FOUNDATION OF BOX CULVERT

146.39

9310

63.6

... More
Vibrated Cement Concrete of Grade M-15, Nominal Mix 1:2:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of form work, soft water,labour charges for mixing, transporting, laying and curing concrete, working at depths tools and plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification for BASE COURSE OF BOX CULVERT

14.09

60148

4268.91

... More
Vibrated Reinforced Cement Concrete M-20 Grade Nominal Mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel, including labour charges for mixing, transporting, laying, curing concrete, working at heights, hire charges for tools and plants, including all other incidental chargeas, etc., complete for BASE SLAB, SIDE AND TOP WALLS OF BOX CULVERT

58.01

442992

7636.49

... More
Vibrated Cement Concrete of Grade M-15, Nominal Mix 1:2:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of form work, soft water,labour charges for mixing, transporting, laying and curing concrete, working at depths tools and plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification for WING WALL AND PARAPET

22.43

107249

4781.52

... More
Supply and Fabrication of Fe 500 steel required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlaping to the required length wherever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc, complete, Fe 500 grade-1 MT. For bars upto 16mm dia.

4.13

274011

66394.82

... More
Filling behind the Box Culvert with Stone Dust including cost and conveyance to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc, complete

69.83

11879

170.12

... More
Sub estimate: Construction of Kerb walls at km 0/0-2/4 of Harur Bypass

-

-

-

... More
Construction of Cement Concrete Kerb with top and bottom width 115 and 165mm respectively 250mm high in M20 grade PCC on M10 grade foundation 150mm thick foundation having 50mm projection end kerb stone laid with kerb laying machine foundation concrete laid manual all completed as per clause 408

3804.8

2736564

719.24

... More
Plain Cement Concrete of Grade M-15, Nominal Mix 1:2:4 using 20mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of form work, soft water,labour charges for mixing, transporting, laying and curing concrete, working at depths tools and plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification for BETWEEN THE KERB WALLS

199.5

946545

4744.59

... More
Sub estimate: Construction of Drain at km 0/0-1/0 (R/S) of Harur Bypass

-

-

-

... More
Earthwork excavation in all classes of soil except hardrock requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as balingout water shoring shrutting,walling & forming protective bunds wherever necessary etc complete as per relevant standard specification for FOUNDATION OF DRAIN

1071

68115

63.6

... More
Vibrated Cement Concrete of Grade M-15,Nominal Mix1:2:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of formwork,softwater,labour charges for mixing,transporting,laying and curing concrete,working at depths tools and plants and incidental charges such as maintaining of protective bunds,coffer dams,shoring,strutting etc;completeasper relevant standard specification for BASE COURSE OF DRAIN

238

1019092

4281.9

... More
Vibrated Cement Concrete of Grade M-15,Nominal Mix1:2:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of formwork,softwater,labour charges for mixing,transporting,laying and curing concrete,working at depths tools and plants and incidental charges such as maintaining of protective bunds,coffer dams,shoring,strutting etc;complete as per relevant standard specification for DRAIN SIDE WALLS

294

2264096

7701.01

... More
Vibrated Reinforced Cement Concrete M-20 Grade Nominal Mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of Steel,including labourcharges for mixing,transporting,laying and curing concrete,working at depths,hire charges for tools and plants and including all other incidental charges etc., for COVER SLAB

117

1032115

8821.5

... More
Supply and Fabrication of Fe-500 steel required for all RCC items of works involved in the schedule cost of steel at site fabrication,labour charges for cleaning the rods straightening,cutting,bending,tying grills,including overlaping to the required length wherever necessary and placing there in forcement in position as specified in the drawings,including cost of binding wire,provision of spacer bars,cover blocks and all other incidental charges etc, complete, Fe-500 grade-1 MT.For bars upto 16mm dia.

7.24

480698

66394.82

... More
Sub estimate: Construction of Drain at km 0/0-1/0 (L/S) of Harur Bypass

-

-

-

... More
Earthwork excavation in all classes of soil except hardrock requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as balingout water shoring shrutting,walling & forming protective bunds wherever necessary etc complete as per relevant standard specification for FOUNDATION OF DRAIN

1071

68115

63.6

... More
Vibrated Cement Concrete of Grade M-15,Nominal Mix1:2:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of formwork,softwater,labour charges for mixing,transporting,laying and curing concrete,working at depths tools and plants and incidental charges such as maintaining of protective bunds,coffer dams,shoring,strutting etc;completeasper relevant standard specification for BASE COURSE OF DRAIN

238

1019092

4281.9

... More
Vibrated Cement Concrete of Grade M-15,Nominal Mix1:2:4 using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of formwork,softwater,labour charges for mixing,transporting,laying and curing concrete,working at depths tools and plants and incidental charges such as maintaining of protective bunds,coffer dams,shoring,strutting etc;complete as per relevant standard specification for DRAIN SIDE WALLS

294

2264096

7701.01

... More
Vibrated Reinforced Cement Concrete M-20 Grade Nominal Mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of Steel,including labourcharges for mixing,transporting,laying and curing concrete,working at depths,hire charges for tools and plants and including all other incidental charges etc., for COVER SLAB

117

1032115

8821.5

... More
Supply and Fabrication of Fe-500 steel required for all RCC items of works involved in the schedule cost of steel at site fabrication,labour charges for cleaning the rods straightening,cutting,bending,tying grills,including overlaping to the required length wherever necessary and placing there in forcement in position as specified in the drawings,including cost of binding wire,provision of spacer bars,cover blocks and all other incidental charges etc, complete, Fe-500 grade-1 MT.For bars upto 16mm dia.

7.24

480698

66394.82

... More
Add 12% for GST

1

7666053

7666053



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.