Kamarajar Port Limited Tender
... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Kamarajar Port Limited - KPL Tender
Transportation and Logistics
Eprocure
Opening Date1 Dec 2023
Closing Date16 Dec 2023
Tender Amount₹ 36,93,617
Costs
EMD
₹ 73,873Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_MoS_783440_1Bid Award Id
ViewTender No
2023115060Tender Authority
Kamarajar Port Limited ViewPurchaser Address
-Website
http://http://www.ennoreport.gov.in/content/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Checking and tightening the bolt & nuts of DIPTI Cell fenders (14 Nos fenders) at General Cargo Berth-1 including all fixtures and fittings other than fenders once a month including the hiring of the boat if required including the cost of all labor, tools, and plants scaffolding, fuel, transport etc complete.
-
-
-
... More
First Year
12
-
-
... More
Second Year
12
-
-
... More
Checking and tightening the bolt & nuts of Super Cone fenders at CB -3 & 4 (32 Nos fenders) and V-type fenders at Earth Retaining Structure (ERS) berth (17 Nos fenders) including all fixtures and fittings other than fenders once a month including the hiring of the boat if required including the cost of all labour , tools, and plants scaffolding, fuel, transport etc complete.
-
-
-
... More
First Year
12
-
-
... More
Second Year
12
-
-
... More
Removing and transporting the existing damaged Super arc fenders to the place as shown at the site within a lead of 800 m including lifting loading, transporting unloading, and stacking the damaged fenders as directed at the site including the cost of all labor, machinery, hiring of the boat, Tools & equipment, transport, scaffolding, etc. complete.
-
-
-
... More
First Year
5
-
-
... More
Second Year
5
-
-
... More
Lifting and transporting new/good fenders from the stack within a lead of about 800 m and fixing the same in position at the same place where the damaged fenders were removed as directed at the site including lifting, placing & fixing in position including the cost of all labour, machinery, hiring of the boat, Tools & equipment, transport, scaffolding etc. complete.
-
-
-
... More
First Year
5
-
-
... More
Second Year
5
-
-
... More
Removing the damaged facia pads of fenders at General Cargo Berth - 1, CB -3 & 4 and transporting to the place as shown at the site within a lead of 800 m including lifting loading, transporting unloading, and stacking the damaged fascia pads as directed at the site including the cost of all labour, machinery, hiring of the boat, Tools & equipment, transport, scaffolding platform etc. complete.
-
-
-
... More
First Year
12
-
-
... More
Second Year
12
-
-
... More
Lifting and transporting new/good fascia pads from the stack and fixing the same in position at the same place where the damaged fascia pads were removed as directed at the site including made good by providing bolt& nuts, clamps etc the frontal frame to receive the new facia pad including lifting, placing & fixing in position including the cost of all materials, labour, machinery, hiring of the boat, Tools & equipment, transport, scaffolding, platform etc. complete.
-
-
-
... More
First Year
12
-
-
... More
Second Year
12
-
-
... More
Rectification of frontal frame including removing the frontal frame welding removing the damaged plates around both sides of the frontal frame, bolts, Scraping/rubbing the corrosion on the face of the frontal frame of cell fender, and applying MD MS polymer-based adhesive to receive facia pad including re-fixing the rectified frontal frames in position etc including the cost of all materials, labour transport, scaffolding, etc complete
-
-
-
... More
First year
3
-
-
... More
Second Year
3
-
-
... More
Interchanging the damaged DIPTI cell fender at General Cargo Berth-1/ Super Cone fender at CB 3 & 4/ V-fender at ERS with idle fender including removing and fixing both fenders including transporting of fenders to the place as shown at site within a lead of 800 m including lifting loading, transporting unloading and stacking the damaged fenders as directed at the site including the cost of all labor, machinery, hiring of the boat, Tools & equipment, transport, scaffolding etc. complete.
-
-
-
... More
First Year
5
-
-
... More
Second Year
5
-
-
... More
Retrieving and assembling super arc fenders from the damaged super arc fender units (3 piece unit) including Lifting, and assembling with the available bolts & nets as directed at the site including the cost of all labour, machinery, hiring of the boat, Tools & equipment, transport, scaffolding, etc. complete.
-
-
-
... More
First Year
3
-
-
... More
Second Year
3
-
-
... More
Rectification of corroded /damaged ladders at small craft jetties/ coal wharves, GCB-1 including the cost of GI pipes 50mm dia to a required length, MS rod of 20 mm dia for rungs including the cost of all labour, machinery, hiring of the boat, Tools & equipment, transport, etc complete
-
-
-
... More
First year
3
-
-
... More
Second Year
3
-
-
... More
Welding the creak in the rail of the wharf crane track of coal berths including strengthening the base of the joint with a suitable steel plate as directed at the site including welding the joints as per standard including the cost of all labour, welding rods, tools & plants, fuel, transport etc. complete.
-
-
-
... More
First Year
5
-
-
... More
Second Year
5
-
-
... More
Clearing the coal deposited over the super arc fender at Coal Berths 1&2 once a month including depositing the coal within a lead of 50 m as directed at the site including the cost of all labour, scaffolding, tools and plant, transport, etc complete.
-
-
-
... More
First Year
456
-
-
... More
Second Year
456
-
-
... More
Supplying and painting fittings, bollards, steel fixtures etc in General Cargo Berth / Coal Berths/ Small Craft Jetties with epoxy paint two coats including the cost of paint including the cost of all labour, materials, transport, scaffolding, etc. complete.
-
-
-
... More
First Year
315
-
-
... More
Second Year
315
-
-
... More
Fabricate, Supply, and erect MS Steel ladder in the position of the old damaged/ missed ladder as per the drawing and or as directed at the site in coal berths, GCB, and small craft jetties including the cost of all materials, labour, tools, and plants, equipment etc complete.
-
-
-
... More
First Year
3
-
-
... More
Second Year
3
-
-
... More
Interchanging the damaged "D" type fender with idle fender at small craft jetties as shown at the site including removing and fixing of fender, including the cost of all labor, machinery, hiring of the boat, Tools & equipment, transport, scaffolding, etc. complete.
-
-
-
... More
First Year
5
-
-
... More
Second Year
5
-
-
... More
Supply and fixing of G.I. sleeve rods of 30mm diameter and 400mm length by core cutting in RCC rich mix of 50mm dia,320mm deep for fixing sleeve rods including fixing of G.I. sleeve rods with Hilti –E500 fastener as per instruction of Engineer including the cost of materials, fixing in a position suitable scaffolding, labour, tools & machinery, transport etc complete.
-
-
-
... More
First Year
16
-
-
... More
Second Year
16
-
-
... More
Repairing and fixing the damaged fender chain by welding or providing new chain link as per requirement including the cost for welding, materials, labours, suitable scaffolding, tool and equipment etc required to complete the work
-
-
-
... More
First Year
20
-
-
... More
Second Year
20
-
-
... More
Re-fixing of disturbed bollard including removing old bollarad including cost of stainless steel fasteners, cost of core cutting as per the specification with epoxy grouting including cost of labour, machinery, tools, transport, etc., complete.
-
-
-
... More
First Year
3
-
-
... More
Second Year
3
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements