Kamarajar Port Limited Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Kamarajar Port Limited - KPL Tender
Eprocure
Opening Date23 Jul 2019
Closing Date30 Jul 2019
Tender Amount₹ 10,00,000
Costs
EMD
₹ 20,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_MoS_488795_1Bid Award Id
ViewTender No
KPL / OP / 19.09 / A / 2019Tender Authority
Kamarajar Port Limited ViewPurchaser Address
-Website
http://http://www.ennoreport.gov.in/content/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and laying RCC 1:1.5:3 concrete in volumetric proportions ( 1 cement: 3 Fine Aggregate : 1.5 Coarse aggregate of 20 mm nominal size) all as per relevant specifications and as directed including mixing, transporting, placing, compacting, finishing, all as directed, curing including all labour, materials, tools, plants, equipments, scaffolding etc., complete. Note: Providing steel reinforcement and Shuttering will be measured and paid separately under relevant item.
25
-
-
... More
Refilling the available earth inside the port (excluding boulders, rubbish, debris etc.,) in foundation and basement etc., in layers not exceeding 200mm. thick all as per relevant specifications and as directed, consolidating the deposited earth in layers by watering and ramming including all labour, tools, equipment, etc., complete
145
-
-
... More
Supplying, and fabricating TMT Fe 500D bars for reinforcement and placing it in position for all RCC members as shown in the drawing including handling, cutting, bending and tying with 1.25 mm dia black annealed binding wire wherever required including all materials, labour, lifting, tools, equipments, etc., complete.
Note: The rate shall be inclusive of cost of steel, binding wire and fabrication charge etc., complete.
1500
-
-
... More
Supplying, fabricating and fixing in position M.S. Grill gate of approved design to suit the size of the opening made out of MS Members to fix the gate to the existing frame arrangement all as directed including all labour, materials, tools, quipments, scaffolding, transport, fuel etc. complete.
Note: 1. The weighment of the MS Grill and accessories will be done at site using the approved weighing scale in the presence of Engineer’s representative. Necessary chargesfor transport, weighment etc., will be borne by the contractors.
2. The pattern of the gate and MS section to be used should be get approved from the Engineer-in-Charge
800
-
-
... More
Centering and shuttering including strutting, propping, etc and removal of form work, after allowing to contain fresh concrete so as to form it to the required shape and dimensions and to support it until it hardens sufficiently to become self supporting including all labour, materials, equipments, tools, all as per specifications and as directed etc. Complete. – For Foundation, footings, bases of columns, column up to plinth, Plinth beams, columns.
290
-
-
... More
Supplying and laying Hollow concrete block work using block of size 400 x 300 x 200mm first class in Cement mortar 1:3 (1 Cement : 3 Fine Aggregate) for compund wall including punning the same with CM 1:3 as directed at site including all labour, materials, tools, scaffolfing, curing, etc. Complete.
220
-
-
... More
Preparing the surfaces of walls and providing plastering in cement mortar 1:4 (1 cement: 4 Fine Aggregate) 12 mm thick to the required finish, curing etc., all as per relevant specification and as directed including all materials, labour, scaffolding, curing, tools, equipments etc., complete
25
-
-
... More
Painting the newly plastered surface with 2 coats of water proof cement paint over one coat of primer including all labour, materials, tools, equipments, Scaffolding, curing etc. complete.
400
-
-
... More
Painting the MS Gate with two coats of Synthetic enamel paint over one coat of Zinc choromate primer including all labour, materials, tools, equipments etc. complete.
12
-
-
... More
Providing and laying plain cement concrete (M20 grade) Paving blocks of approved quality, design / shape and of 60 mm nominal thick or nearest size as available in the market to correct alignment and required gradient in approved pattern as directed inside the shed area over the cushion of quarry dust and setting the blocks hand tight and compacting using a plate vibrator to bring out joints not more than 5mm wide between the blocks including brushing quarry dust in to the joints to fill the gap wherever required and vibrating again so as to achieve full interlock all as per relevant specifications and as directed at site of work including all materials, labour, tools, equipments etc., complete.
350
-
-
... More
Providing Electrical & Plumbing works to the Compound wall as directed at site, including all labour, materials, tools, equipments, etc., complete.
1
-
-