Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Indira Gandhi Centre For Atomic Research - IGCAR Tender
Eprocure
Opening Date10 Sep 2024
Closing Date27 Sep 2024
Tender Amount₹ 21,94,900
Costs
EMD
₹ 43,900Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Handling And Maintenance Of Equipments Of Cryogenic Plants And Handling Of Chemicals In Laboratories In Msg.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_IGCAR_824999_1Bid Award Id
ViewTender No
IGC/MSG/SDTD/CK/TR-02/2024Tender Authority
Indira Gandhi Centre For Atomic Research ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Dismantling air cooler/oil cooler assembly of air compressor, cleaning the fins of the above, cleaning of filters, changing of couplings and re-fixing.
12
-
-
Maintenance of PSA bed, changing the springs, cleaning and oiling the system. One PSA bed.
12
-
-
Charging of refrigerant gas to chiller units and daily monitoring the chiller temperature.
12
-
-
Transporting liquid nitrogen dewars from various labs to Nitrogen plant and transporting Nitrogen filled dewars to respective labs in MSG building. (including CMPL, CMPL Ext. & PIF buildings) Eight dewars/month.
110
-
-
Maintenance of Battery operated truck, charging, checking and filling of DM water periodically
12
-
-
Transfer of liquid helium from storage container to user containers approximately 13,000 liters.
15000
-
-
Leak checking of 5 Cylinders banks(total 150 helium Cylinders ) for every two weeks
26
-
-
Leak testing of helium recovery pipe lines which includes couplings and weld joints (total 1200 mts) from various labs to helium plant in with MSG.one leak testing per month .
12
-
-
Handling and carriage of all types of empty and full cylinders from MSG to stores and from stores to MSG approximately 696 cylinders.
710
-
-
Material handling and transporting of helium Dewars from Helium plant to various labs in MSG and back to Plant. The Cryogenic Dewars has to be handled very carefully. The total handling and transfer of Dewar’s with liquid helium for a week will be Approximately in 400 Kgs to 500 kgs/week for 52 week total weight.
30000
-
-
Manual assistance for Dewar preparation for liquid helium transfer like filling liquid nitrogen in the warm Dewar, expelling liquid nitrogen, evacuation and purging with helium gas approximately 6 Dewar’s/2 months
40
-
-
Daily checking and routine maintenance of a 20m³ recovery gas bag. One operation/day.
250
-
-
Weekly once taking inventory of liquid helium Dewar’s in various labs in MSG building. Approximately 6 Dewar’s/52 weeks
312
-
-
Connecting full helium cylinders to the external manifolds and connecting high pressure lines to the helium gas bag and also leak testing the following high pressure lines for any gas leak. Approximately 58 cylinders/month.
700
-
-
Manual assistance in overnight operation of Liquid Helium plant.
46
-
-
Evacuation of FRP liquid helium cryostat
72
-
-
Pre-cooling of the cryostat with liquid nitrogen and expulsion of liquid nitrogen
72
-
-
Liquid helium transfer from storage dewar to the FRP liquid helium cryostat
120
-
-
Assisting the Scientific Officer in calibrating the SQUID sensors for the TDEM measurement.Such as laying transmitter loops,connecting batteries,electronic instruments and filling liquid helium to the cryostat.
120
-
-
Charging the electrical instruments such as Fast FLL electronics, 24V-150AHr power bank, SMARTem24 receiver, Transmitter, Transmitter controller
140
-
-
Shifting the liquid helium cryostat along with the bulky electrical instruments mentioned above to the field by using a battery truck and returning to MSG.
135
-
-
Arrange the equipments with necessary connections for TDEM measurements in the open environment
135
-
-
Laying and removing transmitter coils (size varies from 20 m x 20 m to 100 m X 100 m) at different grids during the TDEM measurements in the open environment.
135
-
-
Assisting the Scientific Officer in operation of TDEM measurement setup during measurement
135
-
-
Cleaning of DPC and LLC chambers of sputtering system
12
-
-
Cleaning of 20 glass and 20 silicon wafers for thin film deposition
60
-
-
Helping the Scientific Officer during Photolithographic patterning
60
-
-
Powder samples by grinding using Mortar / Pestle
700
-
-
Compacting the sample and making pellets
600
-
-
Polishing the single crystals
275
-
-
Polishing Alloy samples
300
-
-
Slicing the samples
150
-
-
Maintenance 4 Nos of Chiller units 50 of times Cleaning (each 75 times hence totally 300).
350
-
-
Refilling the Chiller units
150
-
-
Cleaning and maintaining of fume hood
250
-
-
Preparation of Chemical solutions.
2500
-
-
Careful handling and cleaning of all special types of glass wares for solution preparations.
5075
-
-
Sample preparation which includes stoichiometry mixture followed by calcinations and heat treatment at elevated temperature.
2500
-
-
Operation and maintenance of electrically operated high temperature furnaces.
775
-
-
Maintenance of laminar flow chamber on every alternate day.
185
-
-
Overall rebate (Optional)
-
-
-