Indira Gandhi Centre For Atomic Research Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Indira Gandhi Centre For Atomic Research - IGCAR Tender

Works
Housekeeping Services
Eprocure
Opening Date23 Feb 2024
Closing Date7 Mar 2024
Tender Amount₹ 85,47,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Collection, supplying and stacking of Decomposed dry farmyard manure without undesirable materials, stacking the same to at places as shown by Engineer for taking pre measurements including spreading the same at places shown with a lead upto 100metres and filling in pits etc., complete all as per specification and as directed by the Engineer-in-charge.

150

-

-

... More
Maintenance of lawns, flower beds, hedges, trees etc., in garden Non- sprinklers area by watering at regular intervals, cutting and trimming hedges, and the unwanted growth of grasses as and when required including running lawn mover, removing weeds, collecting the cut grass, fallen leaves of trees and disposing the same at dumping yards shown by the department, watering the trees inside the garden area complete all as per specifications and as directed by the Engineer-in-charge. Note: 1. The rate shall include the cost of hire charges of lorry and labour for transporting of cut grass, leaves etc., to the dumping yard. 2. The rate shall also include cost of all tools, plants, water delivery hose required for gardening etc. 3. The rate quoted shall be per Sq.m. area maintained per month. The area not maintained by contractor is deducted then and there. 4. Contractor has to make his own arrangement for Lawn Movers. If departmental lawn movers is available it will be provided by department on chargeable basis. 5. If lawn mover is not used, then recovery at the rate of 20 Paise / Sq.m. will be levied as penalty from RA Bill. 6. The contractor shall engage minimum 1 person for 1500 sq. m /day throughout the month as directed by Engineer-in-charge. Failure to employ the above minimum numbers of labour will attract penal clause as per additional special condition of contract attached with the tender for every default of labour. 7. Cutting plants should be handed over to nursery for sampling by the contractor as directed by the Engineer-in-charge. 8. The contractor shall supply the PPE to the garden labour and they should wear the PPE during their working hours. 9.The contractor should deploy One supervisor for Garden maintenance.

49000

-

-

... More
Maintenance of lawns, flower beds, hedges, trees etc., in garden area by using Department sprinklers (Pop-up) for watering at regular intervals, cutting and trimming hedges, and the unwanted growth of grasses as and when required including running lawn mover, removing weeds, collecting the cut grass, fallen leaves of trees and disposing the same at dumping yards shown by the department, watering the trees inside the garden area complete all as per specifications and as directed by the Engineer-in-charge. Note: 1. The rate shall include the cost of hire charges of lorry and labour for transporting of cut grass, leaves etc., to the dumping yard. 2. The rate shall also include cost of all tools, plants, water delivery hose required for gardening etc. 3. The rate quoted shall be per Sq.m. area maintained per month. The area not maintained by contractor is deducted then and there. 4. Contractor has to make his own arrangement for Lawn Movers. If departmental lawn movers is available it will be provided by department on chargeable basis. 5. If lawn mover is not used, then recovery at the rate of 20 Paise / Sq.m. will be levied as penalty from RA Bill. 6. The contractor shall engage minimum 1 person for 2200 sq. m /day throughout the month as directed by Engineer-in-charge. Failure to employ the above minimum numbers of labour will attract penal clause as per additional special condition of contract attached with the tender for every default of labour. 7. Cutting plants should be handed over to nursery for sampling by the contractor as directed by the Engineer-in-charge 8. The contractor shall supply the PPE to the garden labour and they should wear the PPE during their working hours. 9. The contractor should deploy One supervisor for Garden maintenance.

550000

-

-

... More
Planting the plants / saplings in required site taken from nursery, including formation of pits, spreading & filling of red earth and farm yard manure to an average thickness of 50mm, conveyance from nursery, planting and initial watering all as per specification and as directed by the Engineer-in-Charge. Note: The rate shall be excluding the cost of red earth and farm yard manure used for planting operation.

7500

-

-

... More
Supplying and planting plants / saplings of good quality & healthy appearance with blooming nature etc., including formation of pits, spreading & filling of red earth and farm yard manure to an average thickness of 50mm, conveyance from nursery, planting and initial watering all as per specification and as directed by the Engineer-in-Charge. Note: The rate shall be excluding the cost of red earth and farm yard manure used for planting operation.

-

-

-

... More
Arali (All colours) 2'

100

-

-

... More
Ixora - Hybrid (All colours)

100

-

-

... More
Acalypha

100

-

-

... More
Bougainvillea 1'

50

-

-

... More
Golden Duranta

100

-

-

... More
Lantana (All colours)

100

-

-

... More
Nerium Dwarf

100

-

-

... More
Pentanas

50

-

-

... More
Clerodendron

100

-

-

... More
Furcaria

25

-

-

... More
Heliconia

100

-

-

... More
Supplying and planting Medicinal plants / saplings of good quality & healthy appearance with blooming nature etc., including excavation, transportation, planting and initial watering all as per standard practice and as directed by the Engineer-in-Charge.

-

-

-

... More
Rathapalai (Justicia tranquebariensis)

100

-

-

... More
Sembaruthi (Hibiscus)

100

-

-

... More
Elumbotti (Cochinchinensis)

100

-

-

... More
Karporavalli (Coleus aromaticus)

100

-

-

... More
Kuppaimeani (Acalypha indica)

100

-

-

... More
Adathodai

100

-

-

... More
Krishna Kamalam (Passion Flower plant)

100

-

-

... More
Thippili plant (Long pepper)

100

-

-

... More
Manjanathi (Morinda Citrifolia)

100

-

-

... More
Poonai Meesai (Cat Whiskers Plant)

100

-

-

... More
Supply and planting following flowering plants / sapling (seasonal) of good quality and healthy appearance with blooming nature, including transporting, planting with initial watering all as per standard practice and as directed by the Engineer-in-charge.

-

-

-

... More
Gebera

50

-

-

... More
Barieria

50

-

-

... More
Gladiolus

50

-

-

... More
Marigold

50

-

-

... More
Dahlia

50

-

-

... More
Zinnia

50

-

-

... More
Aster

50

-

-

... More
Chrysanthemum

50

-

-

... More
Verbena

50

-

-

... More
Canna

50

-

-

... More
Trimming road side tree branches, replanting of fallen trees / branches including collecting and disposing the fallen trees / branches at places shown by department all as per specifications and as directed by the Engineer-in-charge. Note: In IGCAR Plant site fallen trees shall be disposed to the disposal yard through the CTS gate.

500

-

-

... More
Collection, supply and spraying of pesticides / fungicides / growth regulators in the lawn area and hedges by sprayer etc., including cost of collection, supply and spraying of pesticides / fungicides /growth regulators etc., all as per specification. Note: The pesticides / fungicides / growth regulators shall be used at the rate of 0.06 ml/sq.m. and as directed by the manufacturer specification.

20000

-

-

... More
Supply and spreading of Fertilizer (urea), neem cake including cost of fertilizer and neem cake etc., all as per specification for Orchard plants / trees at the rate of 0.01kg/Sqm for fertilizer and 0.005kg/Sqm of neem cake, all as directed by the Engineer-in-charge.

20000

-

-

... More
Earthwork excavation by mechanical means (Hydraulic excavator) or manual means for foundation, substructures, plinth beam, cess pits & trenches, all kinds of foundation etc., in all types of soil like hard gravelly soil, sandy soil for the following depth from average ground level upto the required founding level, line and grades in both dry and wet conditions including shoring, strutting, bailing out of water if necessary, levelling and ramming the bottom of trenches, dressing of sides, stacking the excavated materials away from the edge of trenches, refilling the sides of foundation as required with selected excavated earth and depositing / disposing the surplus excavated earth (Disposed soil to be leveled by breaking clods, if any and neatly dressed and leveled) within the lead specified below all complete as per specifications and as directed by the Engineer-in-charge.

-

-

-

... More
All kinds of soil with depth upto 1.5m below average Ground level and disposing surplus excavated earth upto a lead of 50 metres.

400

-

-

... More
Providing and laying the following sizes PVC water supply line with 'Finolex / Varun / Truebore' or approved equivalent make PVC pipes suitable for 6 kg/sq.cm pressure and specials confirming & marked to IS:4985 including jointing with PVC jointing compound, laying and fixing the pipes in the excavated trenches, cost of all types of specials such as tees, reduces, coupler, reducing bushes, threaded adaptor, elbow, tail pieces, caps etc., and testing the line as directed by the Engineer-in-charge.

-

-

-

... More
25mm outer dia PVC pipe

25

-

-

... More
40mm outer dia PVC pipe

50

-

-

... More
50mm outer dia PVC pipe

50

-

-

... More
63mm outer dia PVC pipe

50

-

-

... More
75mm outer dia PVC pipe

50

-

-

... More
90mm outer dia PVC pipe

25

-

-

... More
110mm outer dia PVC pipe

50

-

-

... More
160mm outer dia PVC pipe

25

-

-

... More
Providing and fixing the following sizes of gun metal full way gate valves female ends screwed bonnet integral seat non raising spindle class I, ISI marked to IS:778 tested to 20 kg/sqcm hydraulic pressure etc., complete all as per specification and as directed by the Engineer-in-charge. - 25mm nominal bore

25

-

-

... More
Providing, laying, jointing and fixing medium Class GI screwed pipes bearing with ISI mark conforming to IS:1239, TATA or approved equivalent make of following sizes with specials including cutting to the required length, threading and jointing with white lead joining compound etc., complete for water supply lines, suction and delivery lines of pumps, laying of pipes in the excavated trenches, fixing of pipes masonry walls or RCC columns with wooden plugs and clamps and chasing the walls including cost of all the specials (Such as coupling, nipple, tee, bend, elbow, reducer, union etc.) and testing the line, painting the pipe lines with two coats of synthetic enamel paint of approved colour and make over a coat of primer etc. complete all as per specification and as directed by the Engineer-in-charge. Note: Earthwork excavation and making flanged joints will be paid separately under relevant items.

-

-

-

... More
20mm n/b G.I pipe

15

-

-

... More
25mm n/b G.I pipe

15

-

-

... More
Operation of Garden water supply pumps located in different areas of IGCAR including operating regulation valves and different sector of garden network, monitoring water level in the wells to avoid dry run of motor and cleaning the pumps, pump room, etc., complete.as directed by the Engineer-in-Charge. Note: The Contractor has to engage minimum of 1 operator general shift timing 9.00 to 17.30 hours every day throughout the year excluding Sundays and holidays. If any shortfall found during the contract period, he will be penalised at the rate of 5.0 units/operator/day shall be deducted from the RA bills.

3000

-

-

... More
Rectifying the PVC pipe line burst of the following dia of water line by removing the damaged portion of PVC pipes, replacing with new pipes and restoring the water supply including cutting the damaged pipes, cleaning / scrubbing the surface, fixing the new pipe with necessary solvent cement of approved make etc., all complete as per specification and as directed by the Engineer-in-Charge. (Note: Cost for PVC pipe and specials will be paid separately under relevant item.)

-

-

-

... More
40mm & 50mm OD PVC pipe line burst

20

-

-

... More
63mm OD PVC pipe line burst

30

-

-

... More
90mm & 110mm OD PVC pipe line burst

30

-

-

... More
160mm OD PVC pipe line burst

30

-

-

... More
Supplying and fixing the following dia of PVC specials of make "Finolex / Truebore" or other approved equivalent make with ISI mark suitable for class III PVC pipe (6Kg/Sq.cm) including transporting, unloading at work site etc., all complete as per specification and as directed by the Engineer-in-Charge.

-

-

-

... More
40mm PVC elbow

5

-

-

... More
50mm PVC elbow

5

-

-

... More
63mm PVC elbow

5

-

-

... More
40mm regular PVC Tee

5

-

-

... More
50mm regular PVC Tee

5

-

-

... More
63mm regular PVC Tee

5

-

-

... More
63x40mm PVC reducer

5

-

-

... More
63x50mm PVC reducer

5

-

-

... More
90mm PVC 45/90 degree bend

5

-

-

... More
110mm PVC 45/90 degree bend

5

-

-

... More
90mm PVC elbow

5

-

-

... More
110mm PVC elbow

5

-

-

... More
90mm regular PVC Tee

5

-

-

... More
110mm regular PVC Tee

5

-

-

... More
75x90mm PVC reducer

5

-

-

... More
90x110mm PVC reducer

5

-

-

... More
160mm PVC 45/90 degree bend

5

-

-

... More
160 x 160mm PVC Tee

5

-

-

... More
63 x 20mm PVC saddle

5

-

-

... More
90 x 25mm PVC saddle

10

-

-

... More
110 x 25mm PVC saddle

10

-

-

... More
160 x 25mm PVC saddle

5

-

-

... More
Supplying and fixing the following sizes of Hunter or approved equivalent make spray type popup nozzles including cost of all specials, fixing, aligning, testing, commissioning etc. complete as per standard specification and as directed by the Engineer-in-Charge.

-

-

-

... More
Radius 3m to 5m

15

-

-

... More
Radius 9m to 12m

15

-

-

... More
Conveying and disposing the unwanted surplus excavated earth & debris, boulders and spoil by mechanical means and depositing at places inside DAE installation identified as Dumping yard as per requirement with a lead specified below including loading, unloading, breaking clods, levelling all complete as per specification and as directed by the Engineer-in-Charge. Note: 1) The rates in respect of this Item are applicable for the NET Quantities arrived at after making deductions for voids @ 20% in respect of soil, 30% in respect of debris and dried palm leaves and @ 50% in respect of leaves branches of trees etc. from the corresponding Stack / Truck measurements. 2) The earth shall be dumped well inside the Dumping yard and not over approach pathway road.

-

-

-

... More
Lead charges for lead exceeding 3 kilometre but not exceeding 4 kilometre

500

-

-

... More
Sweeping and cleaning the concrete surfaces daily around the lab area / pathway area in IGCAR complex including collecting and disposing the swept materials etc., complete. and as directed by the Engineer-in-charge. Note: 1. The rate shall include the cost of hire charges of lorry and labour for transporting of sweeping materials to the dumping yard near CTS gate or at PRP compound wall north side. 2. The rate should also include the hire charges for sweeping tools etc. 3. The Contractor shall engage minimum 1 nos. of labourer daily as directed by the Engineer-in-Charge. Failure to employ the above minimum number of labour will attract the penal clause as per additional special condition of contract attached with the tender for every default of labour.

800000

-

-

... More
Supply and spreading of colour pebbles of size vary from 20 to 30mm with white and various colour as directed by the Engineer-in-charge.

100

-

-

... More
Levelling, bull-dozing the heeped/dumped loosened earth/debris etc. by hiring JCB/Bull-dozer etc., including labour if any required as directed by the Engineer-in-Charge.

100

-

-

... More
Cutting and removing trees including cutting of trunks and removing the roots and stacking of serviceable materials, disposal of unserviceable materials including filling the pits and depressions complete for trees of girth above 1.0m, including levelling complete all as directed by the Engineer-in-Charge.

10

-

-

... More
Cutting and removing dry leaves, stem, flower, fruits, etc., or petiole in Palmeriya trees/palm trees and foxtail palm trees including labour charge, cutting removing the leaves, stem or petiole and stacking and disposal of unserviceable materials including depositing at places inside DAE installation identified as Dumping yard as per requirement with a lead specified below including loading, unloading, breaking clods, levelling all complete as per specification and as directed by the Engineer-in-Charge. Note: 1) The rates including loading, unloading, of leaves branches of trees etc. . 2) The debris shall be dumped well inside the Dumping yard and not over approach pathway road.

750

-

-

... More
Renovation of lawn area, wherever damaged etc., to ensure better continuity of the landscape feature, including digging and levelling the surface of the earth upto 150mm including area cleaning, collection, supply and planting of grass of good quality including conveyance, cost of Korean & Mexican grass and plants etc., all as per specification and as directed by the Engineer-in-charge.

-

-

-

... More
With supply of Mexian grass (Turfing method)

100

-

-

... More
With supply of Korean / Stenotaphrum secundatum grass (Dibbling method)

3000

-

-

... More
Supply and Fixing of steel plate coated with ACP sheet and stickering layer of size 0.6 x 0.3 m as directed by the Engineer-in-charge.

10

-

-

... More
Providing, supplying, cutting, bending to shape, welding, fabricating, hoisting, placing and fixing in position structural steel members like MS structural embedment’s/pipe and sleeves/penetration etc. using MS angles, channels, I-sections, plates, tees, flats, rounds, square sections etc. including chamfering and rounding off the edges, applying a coat of Red lead paint primer / Zinc chromate primer of approved make and 2 coats of flat oil paint / synthetic enamel paint of approved colour and make, scaffolding and staging required for fabrication as well as erection complete all as per specifications, drawings and as directed by the Engineer-in-charge. Note: Lifting device arrangements if any required shall also be arranged by the contractor at his own cost.

0.3

-

-

... More
Providing and constructing brick masonry at all lifts using well burnt stock bricks in cement mortar 1:6 using crushed stone sand including scaffolding, raking out joints, curing complete as per specifications and drawings for foundation, superstructure, etc. for the following floors. - for Basement and Ground Floor

3

-

-

... More
Providing and constructing at all floors and lifts 115mm thick brick work in cement mortar 1:4 using crushed stone sand and using well burnt stock bricks including providing and placing in position 2 nos of 8mm dia rods at every 4th layer, scaffolding, curing, racking out the joint on both faces etc. complete all as per specification and as directed by the Engineer-in-charge. - for Basement and Ground Floor

15

-

-

... More
Providing plastering to the external surfaces of brickwork/concrete at all elevations in cement mortar 1:5 using crushed stone sand, 15mm thick including hacking of concrete surfaces with pointed tool, scaffolding, finishing, curing, forming grooves wherever necessary, all as per specifications.

50

-

-

... More
Providing and constructing Random Rubble masonry in cement mortar 1:6 using crushed stone sand and using hard granite stones obtained from approved quarry with bond stones at 2.00 metres apart for foundation, basement and in superstructure, compound/boundary walls, including sizing of stones if required, raking out joints, scaffolding, curing etc., complete all as per drawing, specifications and as directed by the Engineer-in-charge at all lifts.

10

-

-

... More
Providing Flush pointing over the random rubble masonry wall with cement mortar 1:3 using crushed stone sand at all levels including scaffolding, curing, forming grooves wherever necessary all as per specifications, drawings and as directed by the Engineer-in-charge.

50

-

-

... More
Providing and laying cast insitu controlled reinforced cement concrete of specified grade at all levels and lifts mentioned below using 20mm maximum size hard granite machine crushed graded stone aggregates and crushed stone sand including weigh batching, charges for mixing & cost of admixture, mechanical mixing, transporting and placing at all lifts, vibrating, consolidating, curing and finishing smooth of all exposed faces complete for column footings, columns, lintels, sunshades, gutter slabs, beams, slabs, water tank, machine foundation and all other structural elements including dewatering wherever necessary (Formwork and reinforcement will be paid for separately) all as per specification and all as shown in drawings and as directed by the Engineer-in-charge for all insitu item. Note: 1. The rate of concrete shall include all labour, equipment, charges for mixing & cost of admixture. Chemical admixture confirming to IS 9103 shall be mixed in fresh concrete and prior permission from Engineer-in-charge shall be obtained for dosage and compatibility 2. Test certificate of cement, procured from dealer/company to be submitted for all cement related works by the Contractor. 3. The rate shall be quoted on the basis of using minimum cement per cu.m. of concrete mentioned below for relevant grade of concrete. Any upward/downward variation required to obtain the specified strength will be paid for or deducted at the rate of cement specified in Schedule F.

-

-

-

... More
M30 grade with 370 kg. of cement per cu.m. of concrete for all floors

3

-

-

... More
Dismantling of RCC works at all levels by manually / by mechanical means, including cutting and stacking of steel reinforcement bars and disposal of unserviceable materials within 50m lead as per specifications and directed by the Engineer-in-charge.

5

-

-

... More
Dismantling Brick work in cement mortar at all levels by manually / by mechanical means, carefully without damaging adjacent structures including stacking of serviceable materials and disposal of unserviceable materials within 50m lead all as per specifications and directed by the Engineer-in-charge.

5

-

-

... More
Demolishing Stone rubble masonry in cement mortar at all levels by manually / by mechanical means, carefully without damaging adjacent structures including stacking of serviceable materials and disposal of unserviceable materials within 50m lead as per direction of the Engineer-in-charge.

5

-

-

... More
Overall rebate (Optional)

-

-

-

... More
INR Zero Only

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.