Indian Institute Of Technology Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Indian Institute Of Technology - IIT Tender

Services
Consultancy Services
Civil And Architectural Services
Eprocure
Opening Date12 Nov 2024
Closing Soon9 Dec 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
3 (a) Shifting and positioning of drilling equipment along with all accessories from one Borehole location to another including assembly and erecting the rig at location, includes equipment etc all complete

10

-

-

... More
3 (b) Drilling 150mm (6”) diameter vertical boreholes in offshore in all types of soils other than rock up to a depth of 20m CD below exisitng ground level (BGL) or upto a hard surface where SPT N values are shown Refusal successively two times, whichever is earlier. Collecting SPT and UDS samples by following IS codal provisions at specified intervals by using casing, rods, pipes, etc and storing in one litr / kg /glass/plastic jars at site serially depthwise, and transporting the same to laboratory immediately for conducting the relevant tests. Samples shall be logged with information such as bore hole no, date of collection, area, bed levels, coordinates etc, and as directed by Engineer in charge, which includes all labour and materials etc.

200

-

-

... More
3 (c) Conducting Standard Penetration Test (SPT) and collecting disturbed Soil sample as per IS code of practice in all bore holes at 1.5 m interval upto a depth of 20m CD or upto a hard surface where SPT N values are shown Refusal successively two times, till the termination depth, whichever is earlier. Collecting disturbed soil samples from SPT samplers, furnishing the field test results, packing, preserving, transporting to the laboratory immediately etc., all complete as directed by the Engineer which includes all labour, tools, and plants. Note: During advancement /drilling of boreholes, incase, Sand layer is encountered and continuing below 5m, drilling shall be continued below 5m with SPTs/UDSs with 1m interval. In this regard the termination of borehole shall 10m or till encountering of sand layer, whichever is earlier.

134

-

-

... More
3 (d) Collecting 100mm diameter Undisturbed Samples in cohesive layers at 1.5m interval or wherever the cohesive strata is encountered. by conforming the specifications as per tender and IS codes of practice at site, and preservation of samples etc., and as directed by the Engineer including all labour, tools, and plants

67

-

-

... More
4. MARINE BOREHOLES - SAND TRAP AREA - 14 Nos

-

-

-

... More
4 (a) Shifting and positioning of Jackup barge/Jackup patform from one Borehole location to another including assembly and erecting the rig at location, mooring the craft, includes equipment etc all complete

14

-

-

... More
4 (b) Shifting and positioning of floating pontoon / Marine crafts from one Borehole location to another including assembly and erecting rig at location, mooring the craft, includes equipment etc all complete

14

-

-

... More
4 (c) Shifting and positioning the staging platform from one Borehole location to another including assembly and erecting the rig at location, mooring the craft, includes equipment etc all complete

14

-

-

... More
4 (d) Drilling 150mm (6”) diameter vertical boreholes in offshore in all types of soils other than rock up to a depth of 10m CD below bed level or upto a hard surface where SPT N values are shown Refusal successively two times, whichever is earlier. Collecting SPT and UDS samples by following IS codal provisions at specified intervals by using casing, rods, pipes, etc and storing in one litr / kg /glass/plastic jars at site serially depthwise, and transporting the same to laboratory immediately for conducting the relevant tests. Samples shall be logged with information such as bore hole no, date of collection, area, bed levels, coordinates etc, and as directed by Engineer in charge, which includes all labour and materials etc

140

-

-

... More
4 (e) Conducting Standard Penetration Test (SPT) and collecting disturbed Soil sample as per IS code of practice in all bore holes at 1.5 m interval upto a depth of 10m CD below bed level or upto a hard surface where SPT N values are shown Refusal successively two times, till the termination depth, whichever is earlier. Collecting disturbed soil samples from SPT samplers, furnishing the field test results, packing, preserving, transporting to the laboratory immediately etc., all complete as directed by the Engineer which includes all labour, tools, and plants

94

-

-

... More
4 (f) Collecting 100mm diameter Undisturbed Samples in cohesive layers at 1.5 m interval or wherever the cohesive strata is encountered. by conforming the specifications as per tender and IS codes of practice at site, and preservation of samples etc., and as directed by the Engineer including all labour, tools, and plants

47

-

-

... More
5. MARINE BOREHOLES - HARBOUR BASIN & OUTER CHANNEL AREA - 16 Nos

-

-

-

... More
5 (a) Shifting and positioning of Jackup barge/Jackup patform from one Borehole location to another including assembly and erecting the rig at location, mooring the craft, includes equipment etc all complete

16

-

-

... More
5 (b) Shifting and positioning of floating pontoon / Marine crafts from one Borehole location to another including assembly and erecting rig at location, mooring the craft, includes equipment etc all complete

16

-

-

... More
5 (c) Shifting and positioning the staging platform from one Borehole location to another including assembly and erecting the rig at location, mooring the craft, includes equipment etc all complete

16

-

-

... More
5 (d) Drilling 150mm (6”) diameter vertical boreholes in offshore in all types of soils other than rock up to a depth of 20m CD below bed level or upto a hard surface where SPT N values are shown Refusal successively two times, whichever is earlier. Collecting SPT and UDS samples by following IS codal provisions at specified intervals by using casing, rods, pipes, etc and storing in one litr / kg /glass/plastic jars at site serially depthwise, and transporting the same to laboratory immediately for conducting the relevant tests. Samples shall be logged with information such as bore hole no, date of collection, area, bed levels, coordinates etc, and as directed by Engineer in charge, which includes all labour and materials etc

320

-

-

... More
5 (e) Conducting Standard Penetration Test (SPT) and collecting disturbed Soil sample as per IS code of practice in all bore holes at 1.5 m interval upto a depth of 10m CD below bed level or upto a hard surface where SPT N values are shown Refusal successively two times, till the termination depth, whichever is earlier. Collecting disturbed soil samples from SPT samplers, furnishing the field test results, packing, preserving, transporting to the laboratory immediately etc., all complete as directed by the Engineer which includes all labour, tools, and plants

214

-

-

... More
5 (f) Collecting 100mm diameter Undisturbed Samples in cohesive layers at 1.5 m interval or wherever the cohesive strata is encountered. by conforming the specifications as per tender and IS codes of practice at site, and preservation of samples etc., and as directed by the Engineer including all labour, tools, and plants

107

-

-

... More
6. CONDUCTING LABORATORY TESTS Conducting Laboratory tests as per relevant IS codes of practice on the test samples collected in field, furnishing the test results, etc., complete as directed by the Engineer all includes

-

-

-

... More
(a) Sieve Analysis / Hydrometer analysis and preparation of GSA curves

442

-

-

... More
(b) Natural Moisture content

221

-

-

... More
(c) Bulk density

442

-

-

... More
(d) Relative density

442

-

-

... More
(e) Specific gravity

442

-

-

... More
(f) Consolidation tests

221

-

-

... More
(g) Strength tests ( Triaxial tests / Direct shear)

221

-

-

... More
(h) Chemical analysis on Soil for chloride, Sulphate and pH

221

-

-

... More
7. SUBMISSION OF REPORTS

-

-

-

... More
7 (a) DRAFT REPORT - Preparation and Submission of DRAFT report of geotechnical investigation after analysis, processing and compilation of field and laboratory data/ results and report shall consist of field photographs, field investigation data, laboratory test results, soil sectional profiles, no of layers encountered, recommendations etc including all except GST. The recommendations specifically with layers encountered along with percentages of sand, silt and clay and dredgeability recommendations. 6 hard and 3 soft copies - original

1

-

-

... More
7 (b) FINAL REPORT - After taking in to the observations of Employer and concerned, and by including the clarifications and Preparing and Submission of FINAL report of geotechnical investigation after analysis, processing and compilation of field and laboratory data/ results and report shall consist of field photographs, field investigation data, laboratory test results, soil sectional profiles, no of layers encountered, recommendations etc including all except GST. The recommendations specifically with layers encountered along with percentages of sand, silt and clay and dredgability recommendations. 6 hard and soft copies -original

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.