Indian Institute Of Technology Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Indian Institute Of Technology - IIT Tender

Works
Civil And Construction
Building Construction
Electrical and Electronics
Solar Installation and Products
Eprocure
Opening Date18 Oct 2024
Closing Soon21 Nov 2024
Tender Amount₹ 6,95,02,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
The unit rate for each equipment or materials shall include cost in Rupees for equipment and material including the excise duty, forwarding, freight and insurance upto Contractor’s store at site, storage, installation, testing, commissioning and other works required.

-

-

-

... More
The extension for (total) amounts against each item shall be based on the quantities indicated in this Schedule.

-

-

-

... More
The quantities given in this schedule are provisional, the Owner reserves the right to increase or decrease the quantities or to totally omit any items of work and the Contractor shall not be entitled to claim any extras or damages on these grounds. These variations shall be permitted until such time Contractors shop drawings are approved.

-

-

-

... More
This schedule shall be fully priced and the extensions and totals duly checked. The rates for all items shall be filled in INK

-

-

-

... More
No alteration whatsoever is to be made to the text or quantities of this Schedule unless such alteration is authorized in writing by the Consultants. Any such alterations, notes or additions shall unless authorized in writing be disregarded when tender documents are considered.

-

-

-

... More
In the event of an error occurring in the amount column of the Schedule, as a result of wrong extension of the unit rate and quantity, the unit rate quoted by the tenderer shall be regarded as firm and the extensions shall be amended on the basis of the rates.

-

-

-

... More
Any error in totaling in the amount column and in carrying forwarded totals shall be corrected. Any error, in description or in quantity, or omission of items from this schedule shall not vitiate this contract but shall be corrected and deemed to be a variation required by the Consultants.

-

-

-

... More
Obtaining of lift license and Handing over to client shall be the sole responsibility of Contractor.

-

-

-

... More
Design, manufactures and replacement by supply,installation, testing,commissioning, approvals / laisoning (All local / state/ central statutory bodies) and handing over in satisfactory working conditions of elevators including the cost of providing 2 weeks satisfactory trial operation and testing at full design load and safely checks for sudden breaks, speed, etc. as directed and including the cost of providing free comprehensive maintenance service during Defect Liability Period of 12 months after final completion and satisfactory handing over to Engineer in charge complete as per specifications as required and as below,the cost inclusive of buyback cost of existing Johnson make lift.

-

-

-

... More
Elevators

-

-

-

... More
Location: Central Library

-

-

-

... More
8 Passenger (544 Kg) Passenger Elevator PE 1&2 MR Gearless Type consisting of AC VVVF Panel, 1.5 MPS speed , 6 Nos. Stops, 17.25 m travelling distance, suitable size of car to suit the existing lift shaft , 800 x 1985 door opening with Automatic Centre opening door with AC VVVF Motor Door operator and door monitor / infrared door detector complete all respect as per specification. (duplex operation of PE)-Refer annexure-I

2

-

-

... More
Location: BSB, Chemistry-HSB & CLT

-

-

-

... More
8 Passenger (544 Kg) Passenger Elevator PE-3,4,5&6 MR Gearless Type consisting of ACVVVF Panel, 1.25 MPS speed , 3 Nos. Stops, 6.6-7.0 m travelling distance, suitable size of car to suit the existing lift shaft , 800 x 1985 door opening with Automatic Centre opening door with AC VVVF Motor Door operator and door monitor / infrared door detector complete all respect as per specification. (Simplex operation of PE) - Refer annexure-II

4

-

-

... More
Location: ESB & MSB(2 Nos)

-

-

-

... More
8 Passenger 544 Kg) Passenger Elevator PE 7,8&9 MR Gearless Type consisting of ACVVVF Panel, 1.25 MPS speed , 3 Nos. Stops,9.1 m travelling distance, car size of 1450x 2350, 800 x 1985 door opening with Automatic with Centre opening ACVVVF Motor Door operator with door monitor / infrared sensor door detector complete all respect as per specification. (Simplex operation of PE)-Refer annexure-III

3

-

-

... More
Location: CSD

-

-

-

... More
8 Passenger( 544 Kg) Passenger Elevator PE-10 MR Gearless Type consisting of ACVVVF Panel, 1.25 MPS speed , 4 Nos. Stops, 9.90 m travelling distance, suitable size of car to suit the existing lift shaft , 800 x 1985 door opening with Automatic Centre opening door with AC VVVF Motor Door operator and door monitor / infrared door detector complete all respect as per specification. Simplex operation of PE)-Refer annexure-IV

1

-

-

... More
Location: OED

-

-

-

... More
8 Passenger (544 Kg) Passenger Elevator PE-11 MR Gearless Type consisting of ACVVVF Panel, 1.25 MPS speed , 4 Nos. Stops,10.60 m travelling distance, suitable size of car to suit the existing lift shaft , 800 x 1985 door opening with Automatic Centre opening door with AC VVVF Motor Door operator and door monitor / infrared door detector complete all respect as per specification. Simplex operation of PE)-Refer annexure-V

1

-

-

... More
Location: Structural Lab & MDS-1

-

-

-

... More
8 Passenger (544 Kg) Passenger Elevator PE-12&13 MR Gearless Type consisting of ACVVVF Panel, 1.25 MPS speed , 4 Nos. Stops, 11.6 m travelling distance, suitable size of car to suit the existing lift shaft , 800 x 1985 door opening with Automatic Centre opening door with AC VVVF Motor Door operator and door monitor / infrared door detector complete all respect as per specification. (Simplex operation of PE)-Refer annexure-VI

2

-

-

... More
Location: Biotechnology-I

-

-

-

... More
20 Passenger (1360 Kg) Passenger Elevator PE-14&15 MR Gearless Type consisting of ACVVVF Panel, 1.5 MPS speed , 6 Nos. Stops, 20.75 m travelling distance, suitable size of car to suit the existing lift shaft , 1000 x 1985 door opening with Automatic Centre opening door with AC VVVF Motor Door operator and door monitor / infrared door detector complete all respect as per specification. duplex operation of PE)-Refer annexure-VII

2

-

-

... More
Location: Sindhu(4 Nos), Pamba(4 Nos), Mahanadhi(4 Nos) & Tamiraparani(4 Nos)

-

-

-

... More
13 Passenger( 1088 Kg) Capsule Type Elevator(Hexagonal shape-partly with Glass panel and partly with SS 304) PE-16 to PE-31 MR Gearless Type consisting of ACVVVF Panel, 1.5 MPS speed , 7 Nos. Stops, 17.70 m travelling distance, suitable size of car to suit the existing lift shaft , 900 x 2100 door opening with Automatic Centre opening door with AC VVVF Motor Door operator and door monitor / infrared door detector complete all respect as per specification..(Duplex operation of PE).-Refer annexure-VIII

16

-

-

... More
Location: DoMS

-

-

-

... More
13 Passenger (1088 Kg) Elevator PE -32 MR Gearless Type consisting of ACVVVF Panel, 1.5 MPS speed , 5 Nos. Stops, 10.80 m travelling distance, suitable size of car to suit the existing lift shaft , 900 x 2000 door opening with Automatic Centre opening door with AC VVVF Motor Door operator and door monitor / infrared door detector complete all respect as per specification. (Simplex operation of PE)-Refer annexure-IX

1

-

-

... More
Location: Institute Hospital

-

-

-

... More
16 Passenger (1088 Kg) Elevator PE-33 MR Gearless Type consisting of ACVVVF Panel, 0.5 MPS speed , 2 Nos. Stops, 3.5 m travelling distance, suitable size of car to suit the existing lift shaft , 1000 x 2000 door opening with Automatic Centre opening door with AC VVVF Motor Door operator and door monitor / infrared door detector complete all respect as per specification. (Simplex operation of PE)-Refer annexure-X

1

-

-

... More
Annual Maintenance Contract- Refer detailed scope in technical Specification

-

-

-

... More
Cost of comprehensive maintenance for 8 Passenger Elevators (PE-1&2) that includes routine , preventive & break down maintenance for period of five years including repair / replacement of worn out items including batteries for ARD/Emergency lights, car cabin lights and fans with minimum downtime and warranty & guarantee of repaired/ replaced items after completion. (The amount quoted for this item will not be taken into account for deciding the lowest tender, but will be executed as a separate supplementary contract after the completion of the warrantee period). If the AMC cost exceeded the reasonable rate , the contactor will be called for negotiation to bring down the AMC rate within reasonable rate before award of main work.

-

-

-

... More
1st Year

2

-

-

... More
2nd Year

2

-

-

... More
3rd Year

2

-

-

... More
4th Year

2

-

-

... More
5th Year

2

-

-

... More
Cost of comprehensive maintenance for 8 Passengers Elevator (PE-3,4,5&6)that includes routine , preventive & break down maintenance for period of five years including repair / replacement of worn out items including batteries for ARD/Emergency lights, car cabin lights and fanswith minimum downtime and warranty & guarantee of repaired/ replaced items after completion. (The amount quoted for this item will not be taken into account for deciding the lowest tender, but will be executed as a separate supplementary contract after the completion of the warrantee period).If the AMC cost exceeded the reasonable rate , the contactor will be called for negotiation to bring down the AMC rate within reasonable rate before award of main work.

-

-

-

... More
1st Year

4

-

-

... More
2nd Year

4

-

-

... More
3rd Year

4

-

-

... More
4th Year

4

-

-

... More
5th Year

4

-

-

... More
Cost of comprehensive maintenance for 8 Passengers Elevator (PE-7,8&9)that includes routine , preventive & break down maintenance for period of five years including repair / replacement of worn out items with minimum downtime and warranty & guarantee of repaired/ replaced items after completion. (The amount quoted for this item will not be taken into account for deciding the lowest tender, but will be executed as a separate supplementary contract after the completion of the warrantee period).If the AMC cost exceeded the reasonable rate , the contactor will be called for negotiation to bring down the AMC rate within reasonable rate before award of main work.

-

-

-

... More
1st Year

3

-

-

... More
2nd Year

3

-

-

... More
3rd Year

3

-

-

... More
4th Year

3

-

-

... More
5th Year

3

-

-

... More
Cost of comprehensive maintenance for 8 Passengers Elevator (PE-10)that includes routine , preventive & break down maintenance for period of five years including repair / replacement of worn out items including batteries for ARD/Emergency lights, car cabin lights and fanswith minimum downtime and warranty & guarantee of repaired/ replaced items after completion. (The amount quoted for this item will not be taken into account for deciding the lowest tender, but will be executed as a separate supplementary contract after the completion of the warrantee period)..If the AMC cost exceeded the reasonable rate , the contactor will be called for negotiation to bring down the AMC rate within reasonable rate before award of main work.

-

-

-

... More
1st Year

1

-

-

... More
2nd Year

1

-

-

... More
3rd Year

1

-

-

... More
4th Year

1

-

-

... More
5th Year

1

-

-

... More
Cost of comprehensive maintenance for 8 Passengers Elevator (PE-11)that includes routine , preventive & break down maintenance for period of five years including repair / replacement of worn out items including batteries for ARD/Emergency lights, car cabin lights and fanswith minimum downtime and warranty & guarantee of repaired/ replaced items after completion. (The amount quoted for this item will not be taken into account for deciding the lowest tender, but will be executed as a separate supplementary contract after the completion of the warrantee period)..If the AMC cost exceeded the reasonable rate , the contactor will be called for negotiation to bring down the AMC rate within reasonable rate before award of main work.

-

-

-

... More
1st Year

1

-

-

... More
2nd Year

1

-

-

... More
3rd Year

1

-

-

... More
4th Year

1

-

-

... More
5th Year

1

-

-

... More
Cost of comprehensive maintenance for 8 Passengers Elevator (PE-12&13)that includes routine , preventive & break down maintenance for period of five years including repair / replacement of worn out items including batteries for ARD/Emergency lights, car cabin lights and fanswith minimum downtime and warranty & guarantee of repaired/ replaced items after completion. (The amount quoted for this item will not be taken into account for deciding the lowest tender, but will be executed as a separate supplementary contract after the completion of the warrantee period)..If the AMC cost exceeded the reasonable rate , the contactor will be called for negotiation to bring down the AMC rate within reasonable before award of main work.

-

-

-

... More
1st Year

2

-

-

... More
2nd Year

2

-

-

... More
3rd Year

2

-

-

... More
4th Year

2

-

-

... More
5th Year

2

-

-

... More
Cost of comprehensive maintenance for 20 Passengers Elevator (PE-14&15)that includes routine , preventive & break down maintenance for period of five years including repair / replacement of worn out items including batteries for ARD/Emergency lights, car cabin lights and fanswith minimum downtime and warranty & guarantee of repaired/ replaced items after completion. (The amount quoted for this item will not be taken into account for deciding the lowest tender, but will be executed as a separate supplementary contract after the completion of the warrantee period)..If the AMC cost exceeded the reasonable rate , the contactor will be called for negotiation to bring down the AMC rate within reasonable rate before award of main work.

-

-

-

... More
1st Year

2

-

-

... More
2nd Year

2

-

-

... More
3rd Year

2

-

-

... More
4th Year

2

-

-

... More
5th Year

2

-

-

... More
Cost of comprehensive maintenance for 8 Passengers Elevator (PE-16 to PE-31) that includes routine , preventive & break down maintenance for period of five years including repair / replacement of worn out items including batteries for ARD/Emergency lights, car cabin lights and fanswith minimum downtime and warranty & guarantee of repaired/ replaced items after completion. (The amount quoted for this item will not be taken into account for deciding the lowest tender, but will be executed as a separate supplementary contract after the completion of the warrantee period).If the AMC cost exceeded the reasonable rate , the contactor will be called for negotiation to bring down the AMC rate within reasonable rate before award of main work.

-

-

-

... More
1st Year

16

-

-

... More
2nd Year

16

-

-

... More
3rd Year

16

-

-

... More
4th Year

16

-

-

... More
5th Year

16

-

-

... More
Cost of comprehensive maintenance for 8 Passenger Elevators (PE-32 ) that includes routine , preventive & break down maintenance for period of five years including repair / replacement of worn out items including batteries for ARD/Emergency lights, car cabin lights and fanswith minimum downtime and warranty & guarantee of repaired/ replaced items after completion. (The amount quoted for this item will not be taken into account for deciding the lowest tender, but will be executed as a separate supplementary contract after the completion of the warrantee period)..If the AMC cost exceeded the reasonable rate , the contactor will be called for negotiation to bring down the AMC rate within reasonable rate before award of main work.

-

-

-

... More
1st Year

1

-

-

... More
2nd Year

1

-

-

... More
3rd Year

1

-

-

... More
4th Year

1

-

-

... More
5th Year

1

-

-

... More
Cost of comprehensive maintenance for 16 Passengers Elevator (PE-33)that includes routine , preventive & break down maintenance for period of five years including repair / replacement of worn out items including batteries for ARD/Emergency lights, car cabin lights and fanswith minimum downtime and warranty & guarantee of repaired/ replaced items after completion. (The amount quoted for this item will not be taken into account for deciding the lowest tender, but will be executed as a separate supplementary contract after the completion of the warrantee period)..If the AMC cost exceeded the reasonable rate , the contactor will be called for negotiation to bring down the AMC rate within reasonable rate before award of main work.

-

-

-

... More
1st Year

1

-

-

... More
2nd Year

1

-

-

... More
3rd Year

1

-

-

... More
4th Year

1

-

-

... More
5th Year

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.