Hindu Religious Institutions And Charitable Endowments Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Hindu Religious Institutions And Charitable Endowments - HRICE Tender
Eprocure
Opening Date8 Aug 2023
Closing Date17 Aug 2023
Tender AmountRefer Documents
Costs
EMD
₹ 46,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_HRCE_356300_1Bid Award Id
ViewTender No
40878/2022Tender Authority
Hindu Religious Institutions And Charitable Endowments ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Tender terms and conditions procedure one
BOQ Items
Repainting the old iron work with ready mixed synthetic enamel paint 2 coats including the cost of all materials and all labour charges etc complete.
50
-
-
Dismantling the floor finish dadooing walls with cement mortar with mosaic tiles glazed tiles cuddapah slabs and clearing away the debris inclusive of all charges.
730
-
-
Painting the old wood work ,doors with ready mixed synthetic enamel paint 2 coats over one coat of primer including the cost of all materials and all labour charges etc.
410
-
-
Washing the wall surface and painting with water based exterior emulsion paint 2 coats over one coat of pimer including the cost of all materials and all labour charges etc complete.
1441
-
-
Providing vargapoochu over the core walls of vimanam with cement mortar 1:4 complete including shaping the mugapathram, mahanasi, koodu allornamental works to proper shape by embedding broken bricks or shaped or chiselled bricks rough plastering with cement mortar 1:4 and finishing with final ornamental plastering and cement mortar nayamtheervai including the cost and conveyance of all materials labour therefore lifting of materials all working in heights curing with water etc complete and including all extra for foldings etc complete,
-
-
-
For Thayar and Andal vimanams(upto 15-0 height) & For Thiruvengidamudaiyan sannidhi vimanam( 15 ft to 25 ft)
51
-
-
Scrapping the decayed lime mortar plaster from the surface of vimanam /gopuram carefully including isolated bricks or brickwork without damaging the varivargams racking out the joints cleaning the surfce with water including all working in heights hire charges for special tools brushes, complete superficial area including all folds etc complete
130
-
-
Painting with multicolour water based exterior emulsion paint (panchavarnam)3 coats over one coat of primer including the cost and conveyance of all materials labour charges including artist painter working in heights lifting of materials cost of brushes etc complete which include all extra for folding etc complete.For vimanam over Thiruvengidamudaiyan sannidhi (Perumal sannidhi) & For vimanam upto 15-0 ft height
843
-
-
Finishing the floor with cut stone 4" thick(10cm thick)using cut stone of size 2-0x2-0 or any other device suitable to site requirement dressed to shape and size in all faces and 3 line dressed at top set in cement mortar 1:3 as directed by the departmental officers including pointing the joints of cut stone in combination mortar 1:1:5 to full depth of stone etc all complete
781
-
-
Scaffolding charges for vimanam and gopuram with casurina posts coconut or palm trees wherever necessary for main formwork and providing with net lawn/pvc mesh coverings providing ladder arrangements .country wood ,planks for working inspection etc, complete hire charges only for erection. and maintenance and removing the same on completion of the work.
-
-
-
For vimanam above 15-0 and upto 25-0 feet
528
-
-
Vimanam upto15-0 height(Above terrace only)
215
-
-
Dismantling the one course of terrace bricks roof finish in cement mortar and finishing the top of roof with one course of pressed tiles of size 23cmx23cm 20mm set in cement mortar 1:3 mixed with water proof compound by 2% of the weight of cement used and the joints of tiles pointed in the same motar to full depth of tiles etc all complete
1164
-
-
Providing safety arrangements above terrace by providing grills using brass flats of size 40mm wide and 6mm thick for frame alround and providing same size of brass flats at 15cm centres on the both directions includingthe cost of brass flats and all labour charges for making the grill all welding charges fixing in position etc all complete renovation of four pillered mandabam on the vimanam above (near the temple tank).
35
-
-
Renovation of 4 pillered mandapam on the vimanam above ( near the temp[le tank)
-
-
-
Brickwork in cement mortar 1:4 using II class ground moulded chamber burnt bricks of size 9"x4 3/8"x2 3/4" including all vanivargams, moulds sthambams,mugapathram, koodu, nasi and all ornamental works complete all pancharams agarais, karnakoodu etc forming core walls of vimanam complete including the cost of all materials all labour charges including making pathies shaping of bricks lifting of all materials to required height curing and all extra for working in heights all complete.For vimanam upto 15-0 feet height
5.5
-
-
Providing vargapoochu over the core walls of vimanam to an average thickness of 1" with Cement mortar 1:4 complete including shaping the mugapathram, mahanasi,koodu all ornamental works to proper shape by embedding broken bricks or shaped or chisselled bricks rough plastering with cement mortar 1:4 and finishing with final ornamental plastering and cement mortar nayamtheervai including cost and conveyance of all materials labour therefore lifting of materials all working in heights curing with water etc complete including all extra for folding and including clearing the debris from the site.upto 15 ft excluding Kalkaram
33
-
-
Providing new sudai vigrahams with galvanised iron rod reinforcement of suitable diametre with building wires wherever necessary shaping the core with broken bricks set in cement mortar 1:3 finishing the same in cement mortar 1:3 bringing to the correct shape(lakshan)in confirmity with silpa sastras inclusive of special ornaments, weapons peetam etc complete providing cement mortar nayamtheervai wherever necessary including the cost of all materials and all labour charges etc .complete.vigrahams above 2-6 and upto 3-6 height over peetam
29
-
-
Protecting the temple tank from sanitary waste providing weld mesh 10cmx10cm 10gauge fixed over the steel flats of size 25mmx12mm at 30cm centre width erected in 1.75m centres longitudinally in 3 rows and cross wise at 1.75m for a width of 3.50m with a height of 1.50m at one end and 3.94m on the other end widthwise etc including all painting with synthetic enamel paint for iron 2 coats over a priming coat including the cost of all materials and all labour charges for erection welding charges etc all complete
184
-
-
Renovation and repairs to the Thiruvadikovil
-
-
-
Dismantling the old brick masonar in lime mortar and clearing away the debris outside the sannidhi
36
-
-
Brickwork in cement mortar 1:5 using II class ground moulded chamber burnt bricks of size 9"x4 3/8"x2.75" including the cost of all materials and all labour charges etc complete
28
-
-
Providing weathering course with brickjelly in lime using 20mm brickjelly in pure lime(no sand) in the ratio of brickjelly to lime 32:12.5 duly consolidated by beating with wooden beaters by sprinkling gallnut and jaggery soaked water including the cost of all materials and all labour charges etc complete
4.2
-
-
Plastering with cement mortar 1:5 12mm thick including the cost of all materials and all labour charges etc complete
181
-
-
Plain cement concrete 1:5:10 using HBG metal 40mm size including the cost of all materials and all labour charges etc complete
4
-
-
Sub Total
1
-
-
GST @ 18%
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements