Hindu Religious Institutions And Charitable Endowments Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Hindu Religious Institutions And Charitable Endowments - HRICE Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date6 Mar 2024
Closing DateCancelled
Tender AmountRefer Documents
Costs
EMD
₹ 2,78,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_HRCE_442104_1Tender No
2200/2022Tender Authority
Hindu Religious Institutions And Charitable Endowments ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Dismantling and removing the existing cut stone masonry wall including numbering the cut stone members such as Pavukal, Uthiram, Pillar, Pothiyal etc.,and stacking the same at the place as directed by the officers in charge within the temple campus without hindrance for execution of work including all labour charges and hire charges for tools and plants involved to do the work etc complete complying with standard specification. For Outer Vari
-
-
-
Uba peedam, Adhistanam
4578.24
-
-
Prastharam (Uthiram, Kabothagam&Vyalam)
33
-
-
Pillar,Bothial,Uthiram
17
-
-
Pavukal
56
-
-
Cut stone flooring unsized
44
-
-
Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification
20
-
-
Earth work excavation for foundation (for narrow excavation) in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification.
1027
-
-
Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Soft disintegrated rock, laterite, soft rock or kankar, not requiring blasting
1620
-
-
Cement Concrete 1:5:10 (one cement five sand ten aggregate) using 40mm gauge hard granite broken stone jelly for foundation including cost and conveyance of all materials labour for mixinglaying, compacting, curing, dewatering, side shuttering, wherever necessary including curing etc.,complete complying with standard specification and as directedby the departmental officers.
783
-
-
Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
20
-
-
Supplying and filling in foundation, basement, etc with conveyed earth with lead of 5 Km in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
315
-
-
Random Rubble Masonry in Lime mortar 1:2 ( one lime and Two C.S Sand) using new rough stone and bond stone for foundation and basement including simultaneous flush pointing, curing etc complete complying with standard specifications.The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works.
-
-
-
Foundation & Basement
1190
-
-
Ground floor Super Structure
178
-
-
Brick work in Cement mortar 1:5 (One cement and Five sand)using best quality Country bricksof size 8"3/4 x 41/4" x 23/4" for walls incluing cost and convetance of all labour andmaterials including scaffolding curing finishingetc., complete complying with standard specification and as directed.etc., complete complying with standard specification
215
-
-
Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
1134
-
-
Supply of New Cut stone for Pavukal, Uthiram, etc including cost and conveyance of Cut stone, labour charges for loading , unloading and all other incidental charges etc complete complying with standard specification
145.6
-
-
Labour Charges for Refixing the dismantled cutstone wall, Pavukal, Uthiram, Pillar and Pothiyal in correct position as directed and pointing with combination mortar including all labour charges and hire charges for tools and plants imvoived to do the work wct complete as per department instructions. For Outer Vari
-
-
-
Uba peedam,Adhistanam
5016.51
-
-
Prastharam( Uthiram, Kabothagam ,Vyalam&Kodungai )
33
-
-
Pillar,Bothial,Uthiram
141
-
-
Pavukkal
28
-
-
Labour chaeges Dressing and fixing of new pavukal, Uthiram,Kodungai etc as directed and fixing the same in position with Lime mortar including all labour charges for dressing and fixing in posision as directed etc complete complying with standard specification.
-
-
-
New stones for Kodungai
46
-
-
For Uthiram inner
7
-
-
New stones for pavukkal
28
-
-
Supplying and Laying cutstone Flooring using cutstone slab of size 60x60x10cm 3 line dressed as directed and pointing with cement mortar including all labour charges and hire charges for tools and plants imvoived to do the work wct complete as per department instructions.
1995
-
-
Weathering Course Concrete using best quality broken brick jelly of size 20mm uniform gauge in pure Slaked Lime, the proportion of brick jelly to lime being 32(Thirty Two Brick jelly) to 12.5( Tweleve Point Five lime) ( No sand is to be added ) by volume and laid over the R.C.C.roof slab in a single layer and consolidated to the finished thickness by beating the concrete with wooden beaters of approved pattern keeping the surface constantly wet by sprinkling lime jaggery water etc., complete. complying with standard specification.
19
-
-
Finishing the Top of Roof with One course of machine Pressed Tiles of size 230 x 230 x 20mm of approved quality laid in Lime mortar.1 : 3 - 12mm thick mixed with Water Proofing Compound, Red oxide and pointing with Lime mortar 1:3 ( One of Slaked Lime and Three of sand)same mortar mixed with water proof compound and red oxide etc.,etc.,complete as directed by the departmental officers complying with standard specification.
47
-
-
Ornamental Brick masonary L.M1:2 (One Lime and Two sand)using Stock bricks including all varivargams, mould sthambamsmokopathrams, koodu, Nasi and all ornamental brick work complete, all pancharamsAgarais, Karanakoodu, etc., forming core walls of Rajagopuram / Vimanam complete including cost and conveyance of all materials including cement, all the labour charges including marking pathies shaping of the bricks, lifting of all the materials to required heights, curing and all extra for working in heights etc., complete 100 cft for Kalkaram
9.25
-
-
Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with L.M. 1:1.5 ( One Lime and One Point Five plastering Sand) complete including shapping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embdding broken bricks of shaped/chiselled bricks, rough-plastering with L.M. 1:4 ( One Lime and Four plastering Sand) and finishing withfinal ornamental plastering and nayamtheervani including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete inculding all axtra for folding and inculuding clearing from the vimanams/gopurams 100sft superficial area. for kalkaram
23
-
-
Painting with multicolour (Panchavarnam) goodemulsion paints complete for the Vinamans/Gopurams, inculding cost and conveyence of all materials, lobour charges inculdinf Artist painter, working in heights, lifting of material, cost of brushes etc, complete-which including all extra for foldings-100sft, superficial area.
23
-
-
Providing new sudhaivigrahams in the vimanams and Rajagopurams with galvanised iron rod reinforcement of suitable dia with binding wires wherever necessary, shaping the core with broken bricks set in LM 1:3 finishing the same with LM 1:3 (One Lime and Three Plastering sand) bringing to the correct shape (Lakshana) in conformift with silpa sastra inclusive of special ornaments, wiapons, peedam etc., complete and providing C.M. Nayam theervai wherever necessary. inclusive of cost and conveyance of all materials, such as cement broken bricks, and G.I. rods.binding wire all labour for working in heights, curing lifiting of materials etc., complete including cement painting 2 coats over a primary coat (one vigraham is accountable with one head, 4 hands with weapons, ornamental costumes etc., as per prathimalakshans, Vigraham height is measurable from the crown top to the bottom of foot only If peetam is pt\rovided the rate with peetam may be adopted as datailed hereunder) Size -2'6" to 3'6"
20
-
-
Scaffolding charges for Vimanansand gopurams with casuarina posts coconut or plam trees wherever necessary for main, form work and providing with coconut keeth coverings, providing ladder arrangements, country wood pland for working, inpection etc, complete hire charges only for erection, maintainance and removing the same on completion of the work 1 sq,ft. 15 feet height.
61
-
-
Sub total
-
-
-
GST 18%
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements