Hindu Religious Institutions And Charitable Endowments Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Hindu Religious Institutions And Charitable Endowments Tender
Civil And Construction
Building Construction
Eprocure
Opening Date21 Sep 2023
Closing Date11 Oct 2023
Tender Amount₹ 54,78,859
Costs
EMD
₹ 37,400Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Renovation Of All Sannathis In Arulmigu Mariamman Thirukoil Thenper
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_HRCE_372084_1Bid Award Id
ViewTender No
01/20.09.2023Tender Authority
Hindu Religious Institutions And Charitable Endowments ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
For Vimanam
1291
-
-
Plastering with Lime mortar 1:1: 5 (one cement one lime and five sand) 12mm thick finished with neat cement including providing band cornice, ceiling cornice, curing scaffolding etc ., complete in all respects and complying with relevant std specifications.
6
-
-
Plastering with Lime mortar 1:1: 5 (one cement one lime and five sand) 12mm thick finished with neat cement including providing band cornice, ceiling cornice, curing scaffolding etc ., complete in all respects and complying with relevant std specifications.
331.87
-
-
Plastering with Combination mortar 1:1: 5 (one cement one lime and five sand) 12mm thick finished with neat cement including providing band cornice, ceiling cornice, curing scaffolding etc ., complete in all respects and complying with relevant std specifications.
51.38
-
-
Special ceiling plastering and finishing the exposed surface of all RCC items of work such as slabs, beams, sunshades, facia, canopy slab, staircase waist slab, landing slab etc., with Cement Mortar 1:3 (One Cement and Three Plastering Sand) 10mm thick including hacking the surfaces, providing cement mortar nosing, beading for sunshades, staircases, steps, landing slabs and curing, etc., in all floors complying with standard specification and as directed by the departmental officers
167
-
-
Providing new sudhai vigrahams in the vimanams and rajagopurams with copper iron rod Reinforecement of suitable dia with binding wires wherever necessary, shapping the core with broken bricks set in Combination mortor 1:1.3 finishing the same with Combination mortor 1:1.3 bringing to the correct shape (lakshana) in conformist with silpa sastra inclusive of specials ornaments, weapons,peedam etc., complete and providing C.M nayam theervai wherever necessary inclusive of cost and conveyance of all materials, such as cement broken bricks, and copper rods binding wire all labour for working in heights curing lifting of materials including cement painting 2 coats over a primary coat etc complete as per standard specification.
-
-
-
Size of 2'-6" to 3'-6"
8
-
-
Painting two coats over the new plastered surface with water based Egavarnam paint including the labour and materials charges etc complete complying the std speicification.
736
-
-
Weathering course with brick jelly lime concrete using 20mm brick jelly with pure slacked lime over R.C.C. roof slab in the proportion of 32:12.5 and well watering consolidated with wooden beaters to slop including cost and conveyance of materials to site and labour charges etc .,
11
-
-
Finising the top of the roof with one course of pressed tiles of size 20X20X2cm over a bed of Lime mortor 1:1.5 12mm thick mixed with water proof compound at 2% b weight of lime including cost and conveyance of all materials to site and all labour charges etc.,
82
-
-
Paving with cut stone flooring using cut stone of size600x600mm and 100mm thick and all the sides are machine cutting, top surface is neatly dressed and pointing with lime mortar 1:1.5 including all materials and labour charges.
191
-
-
Painting two coats over new wood works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
23
-
-
Painting with multicolour (panchavarnam) good emulsion paints complete for the vimanams/gopurams,including cost and conveyance of all materials , labours charges including artist painter, working in heights, lifting of materials,cost of brushes etc,
2808
-
-
Earth work excavation for foundation (for narrow excavation) in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification.
173
-
-
Refilling with excavated earth other than crushed stone sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15 cm thick well rammed, watered and consolidated etc. complete complying with standard specification
11.4
-
-
Filling with foundation and basement with M sand in 15cm. Thick layers well rammed & consolidated, including watering, complying with std.specification etc complete.
25
-
-
Filling with foundation and basement with M sand in 15cm. Thick layers well rammed & consolidated, including watering, complying with std.specification etc complete.
20
-
-
Cement Concrete 1:5:10 (One Cement, Five sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification
28
-
-
Ornamental Brick work in LIME Mortar 1:2 mix using country bricks 83/4"x43/8"x23/4" all vari vargams,moulds,sthambas,mukapatram,koodu,nasi,and all ornamental brick workcomplete panchavarnam agaraies, karnakoodus etc forming core walls rajagopuram/vimanams complete in cluding cement al labour chagers Ht 15'
70
-
-
Brick work in Lime mortar 1:2 mix using country bricks of size 83/4" x 41/4" x 23/4" including cost and conveyance of all materials and labour charges and all other incidental charges etc complete complying with standard specifiction. (The lime should be sourced from pollachi which is highly iron fortified and suitable for structural and masonry.)
69
-
-
Brick work inCombination mortar 1:1.5 mix using country bricks of size 83/4" x 41/4" x 23/4" including cost and conveyance of all materials and labour charges and all other incidental charges etc complete complying with standard specifiction. (The lime should be sourced from pollachi which is highly iron fortified and suitable for structural and masonry.)
6
-
-
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)
-
-
-
For basement
44
-
-
For plain surface
85
-
-
For Column
67
-
-
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)
-
-
-
For basement
89
-
-
For plain surface
21
-
-
For Column
53
-
-
Providing and laying in position, Standardised Concrete Mix M20 Grade in accordance with IS 456:2000 using 20mm and down graded hard broken granite stone jelly for all rcc works with minimumm cement content 325Kg/m3 and maximum water cement ratio of 0.55, including admixture(plasticiser/super plasticiser) in recommanded proportions as per IS 9103 to acclerate, retard setting of concrete, improve workability with out i paring strength and durability with about (5 cum) 7730 Kg of 20mm machine crushed stone jelly and with about (3.3 Cum) 5156 Kg of 10 12mm machine crushed stone jelly and with about (4.79cum) 7670 Kg of sand, but excluding cost of reinforcement grill and fabrication charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing etc and providing fixtures like fan clamps in RCC floor/ roof slabs wherver necessary without claming extra complete complying std specification and also directed by departmental officers. The coarse and fine aggregates to be used should comply with requirements of IS standards(No Seperate payment will be made by the department for excess usage of materilas).
-
-
-
for Sub structure
42
-
-
for Super structure
33
-
-
Supplying and fixing teak wood temple type door including all materials, labour charges for manufacturing and fixing I position including all furniture fittings etc complete with std specifications.
9
-
-
Supplying and Fabricating and placing in position MS Steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification.,
9.26
-
-
Supplying and fixing in position best approved of BIS quality PVC rain water down fall pipes having a pressure of 4 kg. / sq.cm including cost of necessry PVC shoe, PVC bend, cast iron gratings of required diameter and special clamps, brass screws, nails, etc., and fixing of cast iron gratings at junction of parapet and the RCC roof slab including finishing neatly etc., complete. The rate shall be inclusive of cast of removable cast iron grating. The PVC pipe shall be fixed in wall with special type of "U" clamp at the centre of the pipe line in addition to those for more than 3.0 metre pipe length, etc., complete complying with standard specification.
10
-
-
sub total
-
-
-
GST 18%
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements