Hindu Religious Institutions And Charitable Endowments Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Hindu Religious Institutions And Charitable Endowments - HRICE Tender
Civil And Construction
Building Construction
Eprocure
Opening Date30 Jan 2025
Closing Date13 Feb 2025
Tender Amount₹ 2,36,12,742
AI Insights
Technical
Technical
Bid Capacity
... View More
For a contract value of Rs.236.12 Lakhs, the bid capacity required is related to the employment of Technical Assistants, with specific qualifications and numbers: * B.E. Civil Passed – 2 Nos.
* D.C.E. Passed – 3 Nos.
A penalty applies for non-compliance, but no specific formula for calculating bid capacity is provided.
Technical Capacity
... View More
The bidder's previous experience is required, with specifics such as the type of work (e.g., irrigation, buildings, bridges) and the number of years employed. For the unemployed engineer, previous experience details are required, including the type of work and the value of work. However, specific values and percentages of similar works completed are not mentioned. The annual turnover for the last three years is also required. The value of contract is categorized into different ranges: - Rs.1 Lakh and upto Rs.3.00 Lakhs - Rs.above 3.00 lakhs and Upto 10.00 lakhs - Rs. above 10.00 lakhs A penalty and a retention sum are mentioned, with the retention sum being 2.5% of the value of work done.
Costs
EMD
₹ 1,29,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Renovation Works In Arulmigu Sanjivirayar Temple,iyangarkulam,kancheepuram Taluk And District
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_HRCE_521551_1Tender No
01/2025Tender Authority
Hindu Religious Institutions And Charitable Endowments ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Cleaning the stone surfaces by water washing the stone elements like wall, piller, uthiram, pothiyal, pavukkal and etc., including cost of material and labour charges etc,.
4388
-
-
... More
Pointing the cut stone joints with cement mortar 1:3 (one part of cement and three part of sand) 10mm deep including cost of special tiles such brush and watering, curing etc complete, as per standard specifications
1916
-
-
... More
Removing the undulated and dislodged stone flooring from sannathi and stacking it for refixing including cost and conveyance labor, handling and etc., all complete complying with standard specification.
1528
-
-
... More
Refixing the removed stone flooring with single line dressing and lime mortar 1:1.5 (one part of lime and one point five part of sand) pointing as same as it exists that including labour charges for fixing, handling and etc., all complete complying with standard specification.
1528
-
-
... More
Scaffolding charges for Vimanans and gopurams with casurina posts coconut or plam trees wherever necessary for main, form work and providing with Non Flamable Shaded coverings, providing ladder arrangements, country wood plant for working, inspection etc, complete hire charges only for erection, maintenance and removing the same on completion of the work1 sq,ft.
-
-
-
... More
Vimanam/ Gopuram upto 15'-00" ht
521
-
-
... More
Vimanam/ Gopuram upto 25'-00" ht
1200
-
-
... More
Brick masonry lime mortar 1:2 (one part of lime and two part of sand) using Second class ground moulded Chamber bricks size 9" x 43/8" x 23/4" including all varivargams, moulds, sthambams, mukapathrams, koodu, nasi and all ornamental brick work complete, all pancharams, agarais, karnakoodus, etc., forming core walls of Rajagopuram/ Vimanams complete including cost and conveyance of all materials including cement, all the labour charges including marking pathies shaping of the bricks, lifting of all the materials to required heights, curing and all extra for working in heights etc., complete 100 cft for vimanam / gopuram
-
-
-
... More
Vimanam / Gopuram of height up to 15' 0" (excluding kalkaram)
155
-
-
... More
Vimanam / Gopuram of height up to 50' 0" (excluding kalkaram)
63
-
-
... More
Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with Lime Mortar1:1.5 (one part of lime and one point five part of sand) complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plastering with Cement Mortar1:4and finishing with final ornamental plastering and nayam theervani including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete including all extra for folding and including clearing from the vimanams/gopurams 100sft superficial area. for kalkaram
-
-
-
... More
Vimanam / gopuram of ht. Up to 15'0" excluding Kalkaram
431
-
-
... More
Vimanam / gopuram of ht. Up to 50'0" excluding Kalkaram
197
-
-
... More
Plastering with lime mortar 1:1.5 (one part of lime and one point five part of sand), 12mm thick including cost and conveyance of all materials and all labour charges, curing etc,complete complying with standard specifications.
433
-
-
... More
Scraping the decayed lime plaster from the surface of Vimanams and Gopurams, carefully including isolated bricks or brickwork without damaging the vari vargams, racking out the joints, cleaning the surface with water, including all working in heights, hire charges for special tools, brushes complete superficial area including all folds complete compyling standard specifications
111
-
-
... More
Painting two coat with approved water based exterior emulsion over the cement plastered wall surface, ceiling and other new surface including clearing preparing the surface, curing in all floors including brushes etc., complete compyling as per standard specification.
1924
-
-
... More
Supplying & fixing Teak wood temple type door including all materials, labour charges for manufacturing and fixing in position including all furniture fittings etc complete complying with standard specifications.
-
-
-
... More
Door size - 1.34 x 1.96m
3
-
-
... More
Door size - 1.54 x 1.96m
3.5
-
-
... More
Earth work excavation for foundation (for narrow excavation) in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification.
153
-
-
... More
Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
54
-
-
... More
Cement concrete 1:5:10 (One part of cement five part of M-sand and ten part of HBG jelly )for foundation using 40mm gauge HBG jelly inclusive of shoring strutting and baling out water where ever necessary ramming curing etc.,complete as per Std, Specification and as directed by the Dept, Officers
11
-
-
... More
Random Rubble masonry work in lime mortar 1:2 ( One part of lime and two part of sand) Using selected stones and bond stones in foundation and basement including dewatering wherever necessary proper setting, curing etc., complete in all respects complying with relevant standard Specifications for ground floor .
56
-
-
... More
Brick work in lime mortar 1:2 (one part of lime and two part of sand) using sHerritage bricks size 6-3/4" x 4-1/4" x 1-4/4" including cost and conveyance of all materials and labour charges and all other incidental charges etc completc complying with standard specification.
229
-
-
... More
Plastering with lime mortar 1:1.5 (one part of lime and one point five part of sand), 20mm thick including cost and conveyance of all materials and all labour charges, curing etc,complete complying with standard specifications.
809
-
-
... More
Flooring with cut stone slab of size 600mm x 600mm and other sizes suitable for site requirement not less than 100mm thick with machine cut edges and top surface dressed as directed by the departmental officers including cost and conveyance of materials to site and lobour charges for paving and Pointing With lime mortar 1:1.5 (one part of lime and one point five part of sand) & lime mortar 1:1.5 etc complete.
433
-
-
... More
Supplying and fixing mild steel grill gate for windows, ventilators, etc., including cost conveyance of all materials and fixing in position including priming coat etc complete with standard specifications.
360
-
-
... More
Painting new iron works such as gate, steel doors windows ventilators with two coats of approved quality and color of synthetic enamel paint over the existing red oxide primer in all floor etc, complete complying with standard specifications. including one coat of zinc chloride primer coat
18
-
-
... More
sub total
-
-
-
... More
GST 18%
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%