Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Hindu Religious And Charitable Endowments - HRCE Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date27 Feb 2025
Closing Date28 Mar 2025
Tender AmountRefer Documents
Costs
EMD
₹ 50,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Thirupanni Works At Arulmigu Kasiviswanathar - Kasi Visalthirupanni Works At Arulmigachiyamman Temple
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_HRCE_528183_1Bid Award Id
ViewTender No
1034472/2024Tender Authority
Hindu Religious And Charitable Endowments ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Tender General Terms and Conditions
BOQ Items
... More
Providing new sudhai vigraham in the vimanams and Rajagopurams with Galvanished iron rod reinforcement of suitable dia with binding wires wherever necessary shaping the core with broken bricks in LM.1:3 finishing the same with LM.1:1.5, bringing to the correct shape(Lakshana)in conformity with silpa sastra inclusive of special ornaments,Weapons, peedam etc., compete and providing C.M. Nayam theervai where ever necessary, inclusive of cost and conveyance of all materials, such as cement broken bricks, sand G.I. rods,Binding wire, all albour for working in height, curing lifting of materials etc..,complete incuding cement painting 2coats over a primary coat (One vigraham is accountable with one head ,4hands with weapons, ornamental costumes etc..as per prathima lakshana, vaaigraham height is measurable from the crown top to the bottom of foot only. If peetam is provided the rate with peetam may be adopted as detailed hereunder).
-
-
-
... More
Sudhai size upto 1'0" up to 2'6"
19
-
-
... More
Painting wood work with two finishing coats of synthetic enamel ready mixed paint of approved quality and colour over one coat priming coat in all floors including the cost of primer etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)
78
-
-
... More
Removing the damaged existing floor tiles / wall tiles in cement mortor without affecting the adjacent structures including the cost of required tools and plants scaffolding, if necessary and clearing the debris away from the site etc., all complete and as directed by the departmnetal officers.
187
-
-
... More
Plastering with lime mortar 1:2, 20mm thick including cost of water proofing compound., Jaggary, Gullnut, all materials and all labour charges etc complete
229
-
-
... More
Painting with Egavarnam good water based emulsion paint complete for the Vimanams and Gopuram including cost and conveyance of all materials,Labour charges including Artist painter, working in height, lifting of material,cost of brushers etc, complete which including all extra for folding-100sft super ficial.areat.
1821.4
-
-
... More
Flooring with cut stone slab of not less than 100mm thick with size required as per site conditions,top surface dressed for machine cut edges,and pointing with Lime mortor 1:1.5 etc.,complete The cut stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification.
86
-
-
... More
Labour charges for dressing & fixing cutstone pillar of required of size including cost of labour charges etc complete scoffloding including pointing with lime mortor 1:1.5 etc complete with standards specifications.
-
-
-
... More
For Pavukkal
92
-
-
... More
Dismantling the damaged RCC Structures without affecting the adjacent structures including the cost of required tools and plants scaffolding, if necessary and clearing the debris away from the site etc., all complete and as directed by the departmnetal officers.
25.2
-
-
... More
Removing the damaged existing Doors and Rolling Shutter without affecting the adjacent structures including the cost of required tools and plants scaffolding etc., complete and as directed by the departmnetal officers.
28
-
-
... More
Labour charges for dressing & fixing cutstone pillar of required of size including cost of labour charges etc complete scoffloding including pointing with lime mortor 1:1.5 etc complete with standards specifications.
-
-
-
... More
Foundation & Basement
32
-
-
... More
Ground Floor
26
-
-
... More
Plastering with lime mortar 1:1.5 (One Lime and One and Half Sand), 12mm thick including cost of water proofing compound., Jaggary, Gullnut, all materials and all labour charges etc complete
47
-
-
... More
Plastering with Cement mortar 1:5 (One Cement and Five Sand), 12mm thick in all floors including curing etc., complete complying with standard specification and as directed by the departmental officers.
30
-
-
... More
Supplying and filling in foundation, basement, etc with filling sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
44
-
-
... More
Cement Concrete 1:5:10 (One Cement, Five sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification
24
-
-
... More
Supply of cut stone for carrying out Garpagraham, Arthamandapam, Maha Mandapam, Thirumathil and other Temple Structures above 5 Feet and upto 10 Feet
2
-
-
... More
Labour charges for dressing & fixing cutstone pillar of required of size including cost of labour charges etc complete scoffloding including pointing with lime mortor 1:1.5 etc complete with standards specifications.
-
-
-
... More
Door Size 3'3" x 6'0"
2
-
-
... More
Door Size 5'0" x 7'0"
4.5
-
-
... More
Supply and fixing of teak wood Window Fully Panelled 1000x1300mm window and shutter frames for styles and rails etc., of sizes specified by Engineers
3
-
-
... More
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers)
-
-
-
... More
25mm thick
42
-
-
... More
40mm thick
64
-
-
... More
Supply and fixing Mild Steel Grills for windows and ventilators etc., including the cost of mild steel angles, plates, rods, cost of welding charges and one coat of priming coat etc., complete.(The design should be got approved by the departmental officers.)
1625
-
-
... More
Painting new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over one coat of Zincromate priming coat in all floors including cost of priming coat etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)
83
-
-
... More
Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers.
62
-
-
... More
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Lime Mortar 1:1.5 (One Lime and One and Half Five Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers.
275
-
-
... More
Dismantling the damaged brick work in Lime mortar without affecting the adjacent structures including the cost of required tools and plants scaffolding, if necessary and clearing the debris away from the site etc., all complete and as directed by the departmnetal officers.
49
-
-
... More
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid)
117
-
-
... More
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)
-
-
-
... More
For plane surfaces such as RCC floor slab, roof slab, beams, lintels, bed blocks, landing slab, waist slab, portico slabs and beams, etc.
139
-
-
... More
For plane surfaces such as rectangular or square RCC columns, sunshades, top and bottom slab of RCC boxing, etc.
31
-
-
... More
Providing and laying in position, Standardised Concrete Mix M-25 Grade in accordance with IS:456-2000, using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 350 kg/mᶾ and maximum water cement ratio of 0.50, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5.0 cu.m.)7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10- 12mm machine crushed stone jelly and with about (4.79 cu.m.) 7670 kg. of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used shouldcomply with the requirements of IS Standards.
-
-
-
... More
Ground Floor
15
-
-
... More
First Floor
1
-
-
... More
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
4800
-
-
... More
Brick masonry in LM 1:2 using brick including all varivargams, moulds, sthambams, mukapathrams, koodu, Nasi and all ornamental brick work complete,all pancharams, Agarais, karnakoodus,etc., forming core walls of Rajagopuram/ Vimanams complete including cost and conveyance of all materials including cement,ball the labour charges including marking pathies shaping ofthe bricks,lifting of all the materials to required heights,curing and all extra for working in heights etc., complete 100cft.
-
-
-
... More
Kalkaram of Gopuram/Vimanams
4
-
-
... More
Vimanam/Gopuram of height upto 15'0" (Excluding kalkaram)
3
-
-
... More
Providing vargapoochu over the core walls of vimanam/gopuram with LM 1:1.5 complete including shaping the mukhapathram ,mahanasi ,koodu all ornamental works to proper shape by embedding broken bricks or shaped /chiselled bricks,rough plastering with LM 1:1.5 and finishing with final ornamental plastering and nayam theervai including cost and conveyance of all materials,labour therefore,lifting of materials,all working in heights,curing with water etc., complete including all extra for folding and including clearing the debris from the vimanams/ Gopurams-100sq.ft superficial area.
-
-
-
... More
Kalkaram of Gopuram/Vimanams
29
-
-
... More
Vimanam/Gopuram of height upto 15'0" (Excluding kalkaram)
22
-
-
... More
Plastering the surface of walls with Cement Mortar 1:3 (One cement and Three plastering sand), 12mm thick in all floors including curing etc., complete complying with standard specification and as directed by the departmental officers.
243
-
-
... More
Removing the damaged existing One Course of Pressed Tile Roof finish in cement mortar and weathering Course without affecting the adjacent structures including the cost of required tools and plants, if necessary and clearing the debris away from the site etc., all complete and as directed by the departmnetal officers.
225
-
-
... More
Plastering with lime mortar 1:1.5 (One Lime and One and Half Sand), 12mm thick including cost of water proofing compound., Jaggary, Gullnut, all materials and all labour charges etc complete
40
-
-
... More
Removing the GI Sheet roofing without any damages including the cost of required tools and plants scaffolding, etc., complete and as directed by the departmnetal officers.
318
-
-
... More
Removing the cut stone slab finish in cement mortar without affecting the adjacent structures including the cost of required tools and plants, if necessary and clearing the debris away from the site etc., all complete and as directed by the departmnetal officers.
48
-
-
... More
Refixing cut stone slab finish in lime mortar including the cost of required tools and plants, if necessary and clearing the debris away from the site etc., all complete and as directed by the departmnetal officers.
5
-
-
... More
Clearing the light jungle from the site without affecting the adjacent structures including the cost of required tools and plants scaffolding, if necessary and clearing the jungle away from the site etc., all complete and as directed by the departmnetal officers.
69
-
-
... More
Restoration by providing water wash and appropriate methodology to restore the originalities of the existing cutstone structures inclusive of necessary scaffolding charges, conveyance and all hire charges, conveyance and all hire charges for all tools and plants and clearing the site after completion of work etc., complete.
852
-
-
... More
Pointing with lime mortar 1:1.5 (One lime and One and Half p.sand) inclusive cost and conveyance of all materials and all labour charges etc complete complying with standard specification
1022
-
-
... More
Clean removal of lime plastering from the wall surface including clearing away from the wall surface including clearing away from the site etc complete.
425
-
-
... More
Earth work excavation for foundation (for narrow excavation) in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification.
177
-
-
... More
Providing and laying in position, Standardised Concrete Mix M-30 Grade in accordance with IS:456-2000, using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 400 kg/mᶾ and maximum water cement ratio of 0.45, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5.0 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m.) 7670 kg. of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. (No separate payment will be made by the Department for the excess usage of materials).
-
-
-
... More
Foundation & Basement
14
-
-
... More
Ground Floor
6
-
-
... More
Painting two coats of newly plastered wall surface with ready mixed Emulsion Paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
243
-
-
... More
Supplying and fixing Teak wood scantlings including materials and labour Charges etc., complete complying with standard specification and as directed by the departmental officers.
-
-
-
... More
TW Scantlings over 2m and below 3m
0.1
-
-
... More
TW Scantlings below 2m
0.07
-
-
... More
Supplying and fixing Teak wood shutter of 30-45 Cm wide and 12mm thickness well seasoned Teak wood scantlings. The scantlings of size 6"x 2" (150X50mm) Vertical and top rails. The T.w planks should be placed in such a way that there should not be any movement or fixed in Airtight condition with necessary adhesive etc.The bottom rails are made out of well seasoned t.w scantlings of size 12”X2”(300X50mm) with necessary grooves so as to place the panel planks inside with necessary adhesives. The fabricated and assembled frames should be kept in the door opening for user friendly. The furniture fitting such as butt hinges made out of brass 8Nos of size 5” with proper brass screws of heavy duty. The hinges are placed in such a way that the surface of frame and hinges should fall on the same plane. The door stopper 2 Nos of brass and 2 nos of brass handles heavy duty placed in Zig – Zag in each side and 4 Nos bross tower bolts are properly fixed as user friendly.
4
-
-
... More
Sub total
1
-
-
... More
GST 18%
1
-
-