Hindu Religious And Charitable Endowments Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Hindu Religious And Charitable Endowments - HRICE Tender
Civil And Construction
Building Construction
Eprocure
Opening Date19 Nov 2024
Closing Date3 Dec 2024
Tender Amount₹ 66,82,299
Costs
EMD
₹ 43,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Reconstruction Of Swamy Sannthi, Arthamandapam And Mahamandapam
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_HRCE_502131_1Tender No
01-L-PUK-2024Tender Authority
Hindu Religious And Charitable Endowments ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Random Rubble masonry work in Lime Mortor1:2 ( One of Lime and Two of sand) Using selected stones and bond stones in foundation and basement including dewatering wherever necessary proper setting, curing etc., complete in all respects complying with relevant standard Specifications.
136
-
-
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)
-
-
-
Centering for curved surface
64
-
-
Brick masonry Lime mortor 1:2 (One Lime and Two Sand) using Stock bricks including all varivargams, moulds, sthambams, mukapathrams, koodu, nasi and all ornamental brick work complete, all pancharams, agarais, karnakoodus, etc., forming core walls of Rajagopuram/ Vimanams complete including cost and conveyance of all materials including cement, all the labour charges including marking pathies shaping of the bricks, lifting of all the materials to required heights, curing and all extra for working in heights etc., 100 cft for vimanam / gopuram, complete complying with standard specifiction.
-
-
-
For Kalkaram - upto 15' height
1900
-
-
Vimanam / Gopuram of height up to 15'0" (excluding kalkaram)
2030
-
-
Brick work using Country Bricks of size 8-3/4" x 4-1/4" X2-3/4" in Cement Mortar 1:4 (One cement and Four sand) including cost and conveyance of all materials and labour charges and all other incidental charges etc completc complying with standard specification.
61
-
-
Dome/wall brick in Lime mortar 1:2 (One Lime and Two Sand) using Third class Country bricks size 8 -3/4"x4 1/4"x2" including cost and conveyance of all materials and labour charges and all other incidental charges etc completc complying with standard specification.
15
-
-
Flooring with cut stone slab of size 600mmX600mm and other sizes suitable for site requirement not less than 100mm thick with machine cut edges and top surface dressed as directed by the departmental officers including cost and conveyance of materials to site and labour charges for paving and Pointing With Lime Mortor1:1.5 (One Lime and One and Half Sand) etc complete. ( inner)
52
-
-
Supplying & fixing Teak wood temple type door including all materials, labour charges for manufacturing and fixing in position including all furniture fittings etc complete with std. Specifications
-
-
-
(Up to 7' height)
29
-
-
(Above 7' height)
103
-
-
Best varnish two coats for wood works etc, complete complying with standard specifications.
32
-
-
Supplying of cut stone for walls, Pillar , Pavukkal , Uthiram , Bodiyal and all works excluding labour charges but including cost and conveyance loding and unloding etc. complete with standard specification
5
-
-
Labour charges for cut stone Pavukkal excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
105
-
-
Labour charges for cut stone Nilaikal Nagapattam excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete.,
256
-
-
Pointing the cut stone joints with L.M 1:1.5 (One Lime and One and Half Sand) including cost of special tiles such brush and watering, curing etc complete, as per standard specifications
2
-
-
Scaffolding charges for Vimanams and Gopurams with casurina posts coconut or palm trees wherever necessary for main, form work and providing with net lawn / PVC mesh coverings, providing ladder arrangements, country wood plank for working, inspection etc. complete, hire charges only for erection, maintenance and removing the same on completion of the work.
-
-
-
Vimanam Up to 15'0" ht
241
-
-
Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with Lime Mortor1:1.5 (One Lime and One and Half Sand) complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plastering with L.M. 1:1.5 (One Lime and One and Half Sand) and finishing with final ornamental plastering and nayam theervani including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, including all extra for folding and including clearing from the vimanams/gopurams 100sft superficial area ,complete complying with standard specification and as directed by the departmental officers.
-
-
-
For Kalkaram up to 15'0"
750
-
-
Vimanam Upto 15'0" exculding Kalkaram
1425
-
-
Plastering with Lime Mortar 1:1.5 (One Lime and One and Half Sand),12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
243
-
-
Plastering with Lime Mortar 1:1.5 (One cement and One and Half Sand),20mm thick mixed with water proofing compound in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
145
-
-
Painting with multicolour (Panchavarnam) good water based exterior emulson paints complete for the Vinamans/Gopurams, including cost and conveyance of all materials, lobour charges including Artist painter, working in heights, lifting of material, cost of brushes etc, complete-which including all extra for foldings-100sft, superficial area.
-
-
-
Vimanam Upto 15'0" exculding Kalkaram
1425
-
-
Painting two coats of newly plastered wall surface with Water based Emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
460
-
-
Providing new sudhai vigrahams in the vimanams and Rajagopurams with galvanised iron rod reinforcement of suitable dia with binding wires wherever necessary, shaping the core with broken bricks set in Lime Mortor1:1:5 (One Lime and One and Half Sand) finishing the same with Lime Mortor 1:1:5 bringing to the correct shape (Lakshana) in conformift with silpa sastra inclusive of special ornaments, wiapons, peedam etc., complete and providing C.M. Nayam theervai wherever necessary. inclusive of cost and conveyance of all materials, such as cement broken bricks, and G.I. rods.binding wire all labour for working in heights, curing lifiting of materials etc., complete including cement painting 2 coats over a primary coat (one vigraham is accountable with one head, 4 hands with weapons, ornamental costumes etc., as per prathima lakshans, Vigraham height is measurable from the crown top to the bottom of foot only If peetam is pt\rovided the rate with peetam may be adopted as datailed hereunder)
-
-
-
Sudhai size above 1' 0" upto 2' 6"
20
-
-
Sudhai size above 2' 6" upto 3' 6"
8
-
-
Add GST 18%
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%