Hindu Religious And Charitable Endowments Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Hindu Religious And Charitable Endowments - HRICE Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date19 Dec 2024
Closing Date7 Jan 2025
Tender Amount₹ 67,23,183 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying position, Standardised concrete mi M-30 Grade in accordance with IS :456-2000,using 20mm and down graded hard brocken granite stone jelly for all Rcc items of works with minimum cement content of 4000 kg/cum and maximum water cement ratio of 0.55,inculding admiture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retart setting of concrete, improve workablity without imparing strengh and durability with about (5 cum)7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m)5156 kg of 10-12 mm machine crushed stone jelly and with about(4.79 cu.m)7670 kg of M-sand ,but eculding cost of reinforcement grill and fabricating charges,centering and shuttering and also inculding laying, vibrating with mechanical vibrtors, finishing, curing, etc, complete complying with standred specification and ass directed by the departmentel officers.the coarse and fine aggregates to be used shoul comply with the requirments of IS standreds.(No separate payment will be made by the Department for the excess usage of materials.)

-

-

-

... More
For Foundation and Basement

12

-

-

... More
For Super Structure

14.5

-

-

... More
Scaffolding charges for Vimanans and gopurams with casurina posts coconut or plam trees wherever necessary for main, form work and providing with Non Flamable Shaded coverings, providing ladder arrangements, country wood plant for working, inspection etc, complete hire charges only for erection, maintenance and removing the same on completion of the work1 sq,ft.

-

-

-

... More
Vimanam/ Gopuram upto 15'-00" ht

892

-

-

... More
Vimanam/ Gopuram upto 25'-00" ht

132

-

-

... More
Brick masonry Cement Mortor 1:4 using Stock bricks including all varivargams, moulds, sthambams, mukapathrams, koodu, nasi and all ornamental brick work complete, all pancharams, agarais, karnakoodus, etc., forming core walls of Rajagopuram/ Vimanams complete including cost and conveyance of all materials including cement, all the labour charges including marking pathies shaping of the bricks, lifting of all the materials to required heights, curing and all extra for working in heights etc., complete.

-

-

-

... More
Vimanam/ Salakara Vimanam up to 15'0"

4

-

-

... More
Kalkaram

22.5

-

-

... More
Brick masonry lime mortar 1:2 using Stock bricks including all varivargams, moulds, sthambams, mukapathrams, koodu, nasi and all ornamental brick work complete, all pancharams, agarais, karnakoodus, etc., forming core walls of Rajagopuram/ Vimanams complete including cost and conveyance of all materials including cement, all the labour charges including marking pathies shaping of the bricks, lifting of all the materials to required heights, curing and all extra for working in heights etc., complete. The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works. Vimanam up to 25' 0"

1.8

-

-

... More
Centering for soffis of RCC slab of plane surface Iike grade beam, column, Roof beam, Kodungai & Roof slab etc. complete with std. specification.

-

-

-

... More
Centering upto grade beam

29.5

-

-

... More
Centering for coloumn

77

-

-

... More
Centring for beams and slabs for 3m to 4.5m

62

-

-

... More
Centring for Kodungai ( Curved surface )

31.5

-

-

... More
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)

2.95

-

-

... More
Brick work in LM 1:2 using Second Class Ground Moulded Chamber Burnt brick of size 9"x 4 3/8"x2 3/4" including cost and conveyance of all materials and labour charges and all other incidental charges etc completc complying with standard specification.

4

-

-

... More
Special plastering for R.C.C. slab beam and sunshades with Cement mortar 1:3 (one part of cement and three part of P-sand), 10mm thick including cost and conveyance of all materials and labour charges, curing etc. complete complying with standard specifications.

90

-

-

... More
Plastering with cement mortar 1:5 (one part of cement and five part of P-sand), 12mm thick including cost and conveyance of all materials and all labour charges, curing etc,complete complying with standard specifications.

78

-

-

... More
Plastering with Lime Mortor1:1.5,12mm thick including cost and conveyance of all materials and all labour charges, curing etc,complete complying with standard specifications.

40

-

-

... More
Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with Cement Mortor 1:4 complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plastering with C.M. 1:4 and finishing with final ornamental plastering and nayam theervani including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete including all extra for folding and including clearing from the vimanams/gopurams.

-

-

-

... More
Salakara Vimanam upto 15'0"

20

-

-

... More
Kalakaram

124

-

-

... More
Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with Lime mortar1:1.5 complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plastering with Lime mortar1:1.5and finishing with final ornamental plastering and nayam theervani including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete including all extra for folding and including clearing from the vimanams/gopurams.

-

-

-

... More
Kalkaram

48.5

-

-

... More
Vimanam upto 25'0"

8

-

-

... More
Painting with multicolour (Panchavarnam) good water based exterior emulson paints complete for the Vinamans/Gopurams, including cost and conveyance of all materials, lobour charges including Artist painter, working in heights, lifting of material, cost of brushes etc, complete-which including all extra for foldings-100sft, superficial area.

-

-

-

... More
Vimanam/ Gopuram upto 15'-00" Height

346

-

-

... More
Vimanam/ Gopuram upto 25'-00" Height

61

-

-

... More
Supplying and (Manually operated) erecting pull and push type rolling shutter with ISI make of approved size and section using 18 GI sheet. The shutter shall be painted with one coat of red oxide primer and the rate is inclusive of hood covers, transportation charges etc.,

19.5

-

-

... More
Supplying and fixing in position of Country wood fully Glazed Window of size 1.05 x 1.50m including cost and conveyance of all materials furniture fitting etc complete with standard specifications.

5

-

-

... More
Weathering course concrete with broken jelly 20mm size and pure slaked lime over RCC roof slab, the proportion being 32:12.5 for required depth of 80mm for giving required slope and thickness of roof on required, well beaten with wooden beater etc, complete

3

-

-

... More
Finishing the top of roof with one course of machine pressed tiles 23cmx 23cmx20mm of approved quality laid in Cement Mortor 1:3, 12mm thick mixed with water proofing compound 2% by weight of cement used etc, complete with standard specifications.

39

-

-

... More
Finishing the top of roof with one course of machine pressed tiles 23cmx 23cmx20mm of approved quality laid in ;LM 1:1.5, 12mm thick mixed with water proofing compound 2% by weight of cement used etc, complete with standard specifications.

174

-

-

... More
Pointing the cut stone joints with Lime Mortor1:1.5, using red and yellow oxide and including cost of special tiles such brush and watering, curing etc complete, as per standard specifications. The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works.

976

-

-

... More
Flooring with Cut stone Slab size 600 x 600mm not less than 100mm thick and similar varities with machine cut edges fixing the slabs with required cement slurry and laid in true right angles with minimum possible width of joints and pointing the joints with cement mortor 1:3 (One Cement and Three M-sand). The granite stone slabs and other materials to be used shall be got approved by the executive engineer concerned before use on work, etc., complete as per standard specification.

-

-

-

... More
With Single Line Dressing

208

-

-

... More
With Three Line Dressing

61

-

-

... More
Providing new sudhai vigrahams in the vimanams and Rajagopurams with Copper rod reinforcement of suitable dia with binding wires wherever necessary, shaping the core with broken bricks set inCM 1:4 finishing the same with CM 1:4 bringing to the correct shape (Lakshana) in conformist with silpa sastra inclusive of special ornaments, weapons, peedam etc., complete and providing L.M. Nayam theervai wherever necessary. inclusive of cost and conveyance of all materials, such as cement broken bricks, and Copper rods. binding wire all labour for working in heights, curing lifting of materials etc., complete including Exterior Emulsion painting 2 coats over a primary coat (one vigraham is accountable with one head, 4 hands with weapons, ornamental costumes etc., as per prathima lakshans, Vigraham height is measurable from the crown top to the bottom of foot only If peetam is provided the rate with peetam may be adopted as detailed hereunder) Sudhai size above 2'6" upto 3'6"

8

-

-

... More
Providing Water wash and appropriate methodology to restore the originalities of the existing Granite structures inclusive of necessary scaffolding charges, conveyance and all hire charegs for all tools and plants and clearing the site after completeion of work etc., complete.

10500

-

-

... More
Painting two coat with approved water based exterior / interior Emulsion over the cement plastered wall surface, ceiling and other new surface including clearing preparing the surface including brushes etc., complete as per specification.

2122

-

-

... More
Painting new iron works such as gate, steel doors windows ventilators with two coats of approved quality and color of synthetic enamel paint over the existing red oxide primer in all floor etc, complete complying with standard specifications, including one coat zinc chromite primer over the existing priming coat

43

-

-

... More
Varnishing the new wood work with two coats of Varnish of good quality and color over one coat of primer over new wood work include costs of all materials, brushes charges etc, complete complying with standard specifications.

10

-

-

... More
Clean removal of old paint from the surface of wooden door and Painting old wood work with two coats of enamel paint of approved quality and color over one coat of white primer in all floors the rates is to include cost of all materials, brushes scaffolding charges etc, complete complying with standard specifications.

36

-

-

... More
Sub Total

1

-

-

... More
GST @ 18%

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.