Hindu Religious And Charitable Endowments Tender

... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Hindu Religious And Charitable Endowments - HRCE Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date12 Apr 2025
Closing Date30 Apr 2025
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Vimanam/gopuram of ht upto 15'0" (excluding Kalkaram)

1699.21

-

-

... More
Dismantling clearing away plain cement concrete and clearing the debries as directed by the departmental officers.

6.75

-

-

... More
Brick masonry Combination Mortar1:1:4 using Stock bricks including all varivargams, moulds, sthambams, mukapathrams, koodu, nasi and all ornamental brick work complete, all pancharams, agarais, karnakoodus, etc., forming core walls of Rajagopuram/ Vimanams complete including cost and conveyance of all materials including cement, all the labour charges including marking pathies shaping of the bricks, lifting of all the materials to required heights, curing and all extra for working in heights etc., complete 100 cft for vimanam / gopuram as directed by the departmental Officers.

688.64

-

-

... More
For Kalkaram

2267.54

-

-

... More
Plastering with Lime Mortar 1:2, 12mm thick including the cost and conveyance of all materials, labour charges, curing, finishing etc, complete complying with standard specifications. The lime used should be sourced which is highly iron fortified sutitable for structural and masonry work.

127.83

-

-

... More
Cleaning the stone surfaces by water wash such as wall stones, pillar, pothiyal, uthiram, flooring and pavukkal from white wash/colour/ wash painting including cost of necessary soap/ brushes labour charges for cleaning etc.,all complete as directed by the department officers.

1303.39

-

-

... More
GST 18%

1

-

-

... More
Centering for beams and slabs

20.58

-

-

... More
Dismantling clearing away of doors & windows including removal of frames, hinges and fastenings including debries as shown by the departmental officers.

10.67

-

-

... More
Clean removal of old paint from the surface of wooden door and Painting old wood work with two coats of synthetic enamel paint of approved quality and color over one coat of primer in all floors include cost of all materials, brushes scaffolding charges etc, complete complying with standard specifications.

22.09

-

-

... More
Finishing the top of roof with one course of machine pressed tiles 23cm x 23cm x 20mm of approved quality laid in Lime mortar 1:2, 12mm thick mixed with water proofing compound 2% by weight of lime used pointing with same mortar with red oxide etc, complete with standard specifications.

400.58

-

-

... More
Refixing cut stone flooring slab as per the existing pattern and redoing the original condition and pointing in Lime mortar 1:1.5 as directed by the departmental officers.

209.37

-

-

... More
Ground floor

9.26

-

-

... More
Plastering with Combination Mortar 1:1:5, 12mm thick including the cost and conveyance of all materials, labour charges, curing, finishing etc, complete complying with standard specifications. The lime used should be sourced which is highly iron fortified sutitable for structural and masonry work.

352.36

-

-

... More
Clean removal of old paint from the surface iron work and Repainting old iron works such as gate, steel doors windows ventilators with two coats of approved quality and color of synthetic enamel paint over the existing zinc chromate yellow primer in all floor etc, complete complying with standard specifications.

5.4

-

-

... More
Brick work Combination motar 1:1:5 using best quality of country bricks of Size 8 ¾ x 4 ¼” x2 ¾” for Superstructure including cost and conveyance charges of all materials to site and including labor charges and incidental charges curing etc, complete complying with standard specification. The lime used should be sourced which is highly iron fortified sutitable for structural and masonry work.

91.2

-

-

... More
Sub Total

1

-

-

... More
Random Rubble masonry in Cement mortar 1:5, using selected stones and bond stones in foundation and basement including dewatering wherever necessary proper setting, curing, with simultaneous pointing etc complying with standard specification.

32.41

-

-

... More
Weathering course concrete with broken jelly 20mm size and pure unslaked lime over RCC roof slab, the proportion being 32:12.5 for required depth for giving required slope and thickness of roof, well beaten with wooden beater using lime Jaggery water constantly wetted etc, complete complying with standard specifications.

90.88

-

-

... More
Painting two coats of newly plastered wall surface with ready mixed exterior emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.

848.71

-

-

... More
Painting new wood work with two finishing coats with synthetic enamel ready mixed paint of approved quality and colour over one coat priming coat including brush, labour charges etc, complete complying with standard specification.

101.42

-

-

... More
Supplying and filling in foundation, basement, etc with filling M sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. Complete complying with standard specification

90.96

-

-

... More
Removal of cut stone slabs flooring numbering and stacking and without hinderence to stone slabs as directed by the departmental officers.

297.45

-

-

... More
Providing vargapoochu over the core walls of vimanam/ gopuram with Lime Mortar 1:1.5 (One lime , one and half sand) complete including shaping the mukapathiram, maha nasi, koou all ornamaental works to proper shape by embedding broken bricks or shaped chiseled bricks rough plastering with Lime mortar 1:1.5 and finishing with final ornamental plastering and nayam threervai including cost and conveyance of all matrials labour therefore , lifting of materials all working in heights curing with water etc. compltete including all extra for folding and including clearing the debris from vimanam/ gopuram complete all as specified and directed by Engineer -in-Charge

-

-

-

... More
Supplying and erecting centering for sides and soffits including necessary supports and stutting upto 3.29M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90x60cm and 10 BG stiffened with welded Mild steel angle of size 25mmx25mmx3mm for boarding laid over silver oak joists of size 10cmx6.50cm spaced at abote 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specification. (Payment for centering shall be given after the concrete is laid)

-

-

-

... More
Scraping the decayed lime plaster from the surface of Vimanams and Gopurams, carefully including isolated bricks or brickwork without damaging the vari vargams, racking out the joints, cleaning the surface with water, including all working in height, hire charges for special tooks, brushes complete superficial area including all folds upto 25' ht

3432.35

-

-

... More
Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth within the compound in places shown by the departmenal officers and clearing and levelling the site etc., complete complying with standard specification.

102

-

-

... More
Pointing the cut stone flooring and masonry work with lime mortar 1:1.5 excluding cost and conveyance of cut stone but including all labour charges scaffolding etc complete with standard specifications. The lime used which is highly iron fortified and suitable for structural and masonry works.

1303.39

-

-

... More
Scaffolding charges for Vimanams and gopurams with casurina posts coconut or plam trees wherever necessary for main, form work and providing ladder arrangements, country wood plank for working, inspection etc, complete hire charges only for erection, maintainance and removing the same on completion of the work

-

-

-

... More
Providing new Sudai Vigrahams in the Vimanams and Rajagopurams with galvanized copper rod reinforcement of suitable dia with binding wires wherever necessary shaping the core with broken bricks set in Combination mortar 1:1:3 with 20% of cement finishing the same with Combination mortar 1:1:3 bringing to the correct shape (lakshana) in conformity with silpa sastra inclusive of special ornaments weapons, peedam etc complete and providing lime mortar nayam theervai wherever necessary inclusive of cost and conveyance of all meterials. Such as lime, broken bricks, sand GI rods binding wire all labour for working heights, curing lifting of all materials etc complete. Including painting water based emulsion paint two coats over a primary coat. (one vigraham is accountable with one head, 4 hands, with weapons, ornamentals costumes etc, as per prathima lakshans, Vigraham height is measurable from the crown top to the bottom of foot only if peetam is provided the rate with Peetam may be adopted as detailed hereunder)

-

-

-

... More
Upto 25' ft

84.49

-

-

... More
Upto 50' ft

153.28

-

-

... More
Supplying and fixing of best quality well seasoned country wood for temple wood work plank 9" to 15" width and frames upto 6" thick for door frame including wrought and put up and all labour charges as directed by the departmental officers.

1.07

-

-

... More
Supplying and fabricating and placing in position Mild Steel /Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I binding wire in all floors etc. Complete complying with standard specification. (The steel and binding wire contractor own supply.

0.93

-

-

... More
Sudhai above 2'6" upto 3'6" size

39

-

-

... More
Flooring with cut stone slab of size 600mm x 600mm and other sizes for site requirement not less than 100mm thick with machine cut edges and top surface dressed as directed by the departmental officers including cost and conveyance of materials to site and labour charges for paving and pointing with Lime Mortar 1:1.5 etc., complete as directed by the departmental Officers. Single line dressing

329.5

-

-

... More
Labour charge for old stone refixing to the original condition pavukal bothiyal, thoon, Uthiram wall stones, flooring, numbering, stacking and without any hinderence to stones and dressing pointing with Lime mortar 1:1.5 as directed by the departmental officers.

145.28

-

-

... More
Supplying and fixing teak wood temple type door using well seasoned best quality teak wood including wrought and put up all materials, labour charges and fixing in position including all furniture fittings making grows in the frame and door shutter for housing the shutter etc complete with standard specifications.

29.35

-

-

... More
Dismantling clearing away the existing damaged weathering course and pressed tiles and removing all debries from the site of work and depositing the same in the place as shown by the departmental officers.

401.77

-

-

... More
Providing and laying in position, standardised concrete Mix M-20 Grade in accordance with IS:456-2000, using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser/super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m) 7730 kg. of 20mm machine crushed stone jelly with about (3.3 cu.m) 5156kg. of 10-12mm machine crushed stone jelly with about (4.79 cu.m) 7670 kg. of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mehanical vibrators, finishing, curing etc. and providing fixtures like fan clamps extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS standards. (No separate payment will be made by the Department for the excess usage of materials).

-

-

-

... More
Clean removal of cement plaster from the wall surface carefully to any height and clearing the debries as directed by the departmental officers.

127.83

-

-

... More
Plain cement concrete 1:5:10(One of cement five of sand and ten aggregate) using 40mm gauge hard granite broken stone jelly for foundation and basement including cost and conveyance of all materials labour for mixing, laying, compacting, curing, dewatering, side shuttering, wherever necessary including curing etc., complete complying with standard specification.

20.14

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.