Hindu Religious Institutions And Charitable Endowments Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Hindu Religious Institutions And Charitable Endowments - HRICE Tender
Civil And Construction
Building Construction
Eprocure
Opening Date10 Jan 2025
Closing Date31 Jan 2025
Tender Amount₹ 6,27,28,123
Costs
EMD
₹ 3,24,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Repair And Renovation Of Moolavar Sannathi With Its First Praharam In Arulmigu Vijaya Varadharaja Perumal Temple,baburayanpettai, Madhuranthakam Taluk ,chengalpattu District
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_HRCE_518057_1Bid Award Id
ViewTender No
01/2025Tender Authority
Hindu Religious Institutions And Charitable Endowments ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Labour charge for removing the existing damaged or dislodged stone element like pavukkal and restacking it for later use etc., all complete complying with standard specification.
1683
-
-
... More
Labour charge for removing the existing damaged the uthiram, bothiyal and thoon or dislodged stone element and restacking it for later use etc., all complete complying with standard specification.
66
-
-
... More
Providing Two legged Scaffolding using 15cm Dia blue Gum post or Best quality Bamboo / casurina post of 4m overall length (3m ht + 0.5m Projection + 0.50m into the Ground), 3.50 -6.00m and 6.00 to 8.50 the Distance between the Two rows being 1.25m and the spacing of post being 2m ht both upto 18.00m ht etc., complete complying as per standard specification
129
-
-
... More
Labour charge for removing the existing damaged cement flooring from the praharam and removing all debris from the site of work inclusive cost and convayance charge etc., all complete complying with standard specification.
467
-
-
... More
Removing the existing damaged Plain cement concrete from below the existing flooring of the sannathi including removing all debris from site of works, etc., all complete complying with standard specifications
47
-
-
... More
Dismantling the existing cut stone flooring of the sannathi including removing all debris from site of works, etc., all complete complying with standard specifications
260
-
-
... More
Earth work excavation for foundation (for narrow excavation) in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification.
1990
-
-
... More
Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 3 mts. and clearing and levelling the site, etc., complete complying with standard specification.
100
-
-
... More
Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
100
-
-
... More
Lime concrete 1:5:10 (One part of cement five part of M-sand and ten part of HBG jelly )for foundation using 40mm gauge HBG jelly inclusive of shoring strutting and baling out water where ever necessary ramming and curing etc.,complete as per standard specification and as directed by the departmental officers The heritage limne should be purchased from Pollachi which is highly iron fortified and suitable for Structural and Masonary work
100
-
-
... More
Random Rubble masonry work in lime mortar 1:2 (one part of lime and two part of sand) Using selected stones and bond stones in foundation and basement including dewatering wherever necessary proper setting, curing etc., complete in all respects complying with relevant standard Specifications. The heritage limne should be purchased from Pollachi which is highly iron fortified and suitable for Structural and Masonary work
554
-
-
... More
Supply of cut stone for carrying out temple structure works such as of wall, thoon, bothiyal, uthiram, pavukkal, nilaikkal and etc,. all comple complying with standard specification.
-
-
-
... More
Temple structures upto 5'-00" length
205
-
-
... More
Temple structures from 5'-00" -10'-00" length
142
-
-
... More
Labour charge for dressing the new stones for first praharam including labour charge excluding the cost of cut stones etc., all complete complying with standard specification.
-
-
-
... More
Dhindu course
403
-
-
... More
Wall stones (Ulvari)
231
-
-
... More
Thoon
178
-
-
... More
Bothiyal
40
-
-
... More
Uthiram
87
-
-
... More
Pavukkal
688
-
-
... More
Kodungai
33
-
-
... More
Fixing charges for old and new stones on sannathi including cost of labour cost excluding cost of stones etc., all complete complying with standard specification.
-
-
-
... More
Dhindu course
403
-
-
... More
Wall stones (Ulvari)
1153
-
-
... More
Thoon
334
-
-
... More
Bothiyal
74
-
-
... More
Uthiram
174
-
-
... More
Pavukkal
688
-
-
... More
Kodungai
33
-
-
... More
Filling the core wall with in Lime mortar 1:3 (one part of lime and three part of sand) using second class ground moulded Chamber bricks size 9" x 43/8" x 23/4" including cost and conveyance of all materials and labour charges and all other incidental charges etc completc complying with standard specification. Ground floor
177
-
-
... More
Brick masonry lime mortar 1:2 (one part of lime and two part of sand) using Second class ground moulded Chamber bricks size 9" x 43/8" x 23/4" including all varivargams, moulds, sthambams, mukapathrams, koodu, nasi and all ornamental brick work complete, all pancharams, agarais, karnakoodus, etc., forming core walls of Rajagopuram/ Vimanams complete including cost and conveyance of all materials including cement, all the labour charges including marking pathies shaping of the bricks, lifting of all the materials to required heights, curing and all extra for working in heights etc., complete 100 cft for vimanam / gopuram The heritage limne should be purchased from Pollachi which is highly iron fortified and suitable for Structural and Masonary work kalkaran upto 15'0" for sannathi
35.5
-
-
... More
Re-fixing the removed cut stone slabs from praharam and the same to be dressed with single line and pointing using lime mortar 1:1.5 (one part of lime and one point five) including cost of labour cost excluding cost of stones etc., all complete complying with standard specification.The heritage limne should be purchased from Pollachi which is highly iron fortified and suitable for Structural and Masonary work
260
-
-
... More
Flooring with cut stone slab of size 600 x 600mm and other sizes suitable for site requirement not less than 100mm thick with machine cut edges and top surface dressed as directed by the departmental officers including cost and conveyance of materials to site and labour charges for paving and pointing with lime mortar 1:1.5 (one part of lime and one point five) etc all complete complying with standard specification.The heritage limne should be purchased from Pollachi which is highly iron fortified and suitable for Structural and Masonary work
-
-
-
... More
Dressing one line
732
-
-
... More
Dressing three line
93
-
-
... More
Plain lime Concrete 1:2:4 (one part of lime two part of M-sand and four part of HBG jelly) for all plain cement concrete works using 20mm brick jelly in position excluding centering and shuttering but including laying, curing and finishing etc.,complete. with standard specification.The heritage limne should be purchased from Pollachi which is highly iron fortified and suitable for Structural and Masonary work
41
-
-
... More
Pointing the cut stone masonary joints with lime mortar 1:1.5 (one part of lime and one point five) including cost of special tiles such brush and watering, curing etc.,complete as per standard specification and as directed by the departmental officers The heritage limne should be purchased from Pollachi which is highly iron fortified and suitable for Structural and Masonary work
2277
-
-
... More
Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the pavukkal in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers.The heritage limne should be purchased from Pollachi which is highly iron fortified and suitable for Structural and Masonary work ground floor
391
-
-
... More
Providing flat bricks on the terrace top using two layer of specially manufactured superior quality chamber moulded terrace brick of size 150x75x25mm for heritage works laid with lime mortar 1:1.5 and the joints of bricks raked up to receive lime mortar plastering to be done over the roof surface. The flat bricks should be laid in such a manner with proper slope and gradient that the rain water gets discharged easily through rain water outlet pipes freely. The quality of lime to be procured from Pollachi shall be of best and high calcium oxide content quality. This flat bricks shallbe subjected to curing for a period of 7 to 10 days and after which loose lime particles will be removed and the joints raked up to take up lime mortar plastering (two layers) The heritage limne should be purchased from Pollachi which is highly iron fortified and suitable for Structural and Masonary work
869
-
-
... More
Plastering with lime mortar 1:1.5 (one part of lime and one point five part of sand), 25mm thick including cost and conveyance of all materials and all labour charges, curing etc,complete complying with standard specifications.The heritage limne should be purchased from Pollachi which is highly iron fortified and suitable for Structural and Masonary work
869
-
-
... More
Plastering with lime mortar 1:1.5 (one part of lime and one point five part of sand), 20mm thick including cost and conveyance of all materials and all labour charges, curing etc,complete complying with standard specifications.The heritage limne should be purchased from Pollachi which is highly iron fortified and suitable for Structural and Masonary work
137
-
-
... More
Scraping the decayed lime plaster from the surface of Vimanams and Gopurams, carefully including isolated bricks or brickwork without damaging the vari vargams, racking out the joints, cleaning the surface with water, including all working in heights, hire charges for special tools, brushes complete superficial area including all folds complete compyling standard specifications Vimanams / Gopurams up to 50' 0" height (excluding Kalkaram)
80
-
-
... More
Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with lime mortar 1:1.5 (one part of lime and one point five part of sand) complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plastering with Cement Mortar1:4and finishing with final ornamental plastering and nayam theervani including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete including all extra for folding and including clearing from the vimanams/gopurams 100sft superficial area. for kalkaramThe heritage limne should be purchased from Pollachi which is highly iron fortified and suitable for Structural and Masonary work
-
-
-
... More
For kalkaram
80
-
-
... More
Vimanam / gopuram of ht. Up to 25'0" excluding Kalkaram
80
-
-
... More
Providing new sudhai vigrahams in the vimanams and Rajagopurams with Copper rod reinforcement of suitable dia with binding wires wherever necessary, shaping the core with broken bricks set in lime mortar 1:1.5 (one part of lime and one point five part of sand) finishing the same with lime mortar 1:1.5 (one part of lime and one point five part of sand) bringing to the correct shape (Lakshana) in conformist with silpa sastra inclusive of special ornaments, weapons, peedam etc., complete and providing cement mortar. Nayam theervai wherever necessary. inclusive of cost and conveyance of all materials, such as cement broken bricks, and Copper rods. binding wire all labour for working in heights, curing lifting of materials etc., complete including Exterior Emulsion painting two coats over a primary coat (one vigraham is accountable with one head, four hands with weapons, ornamental costumes etc., as per prathima lakshans, Vigraham height is measurable from the crown top to the bottom of foot only If peetam is provided the rate with peetam may be adopted as detailed hereunder)The heritage limne should be purchased from Pollachi which is highly iron fortified and suitable for Structural and Masonary work
-
-
-
... More
Sudhai size Up to 1' 0"
8
-
-
... More
Sudhai size above 1' 0" up to 2' 6"
16
-
-
... More
Sudhai size above 2' 6" up to 3' 6"
12
-
-
... More
Painting two coat with approved water based exterior emulsion over the cement plastered wall surface, ceiling and other new surface including clearing preparing the surface, curing in all floors including brushes etc., complete compyling as per standard specification.
366
-
-
... More
Scaffolding charges for Vimanans and gopurams with casurina posts coconut or plam trees wherever necessary for main, form work and providing with Non Flamable Shaded coverings, providing ladder arrangements, country wood plant for working, inspection etc, complete hire charges only for erection, maintenance and removing the same on completion of the work1 sq,ft.
-
-
-
... More
Vimanam/ Gopuram upto 15'-00" ht
491
-
-
... More
Vimanam/ Gopuram upto 25'-00" ht
80
-
-
... More
Supply and fixing of green shade net over the moolavar vimanam for construction including cost and conveyance etc., all complete complyinh with standard specification.
80
-
-
... More
Supplying & fixing Teak wood temple type door including all materials, labour charges for manufacturing and fixing in position including all furniture fittings etc complete with std. Specifications.
-
-
-
... More
Considering door size 1.04m x 1.38m = 1.64sqm
3.7
-
-
... More
Considering door size 1.18m x 2.13m = 2.51 sqm
2.3
-
-
... More
Considering door size 1.71m x 2.60m = 4.45sqm
4.5
-
-
... More
Varnishing the new wood work with two coats of Varnish of good quality and color over one coat of primer over new wood work include costs of all materials, brushes charges etc, complete complying with standard specifications.
26
-
-
... More
sub total
-
-
-
... More
GST 18%
1
-
-