Hindu Religious And Charitable Endowments Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Hindu Religious And Charitable Endowments Tender
Civil And Construction
Building Construction
Eprocure
Opening Date11 Nov 2024
Closing Date27 Nov 2024
Tender Amount₹ 57,05,036
Costs
EMD
₹ 38,600Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_HRCE_492571_1Bid Award Id
ViewTender No
660081/2024/Q4Tender Authority
Hindu Religious And Charitable Endowments ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Kalkaram
322
-
-
... More
Vimanam height 15'
104
-
-
... More
Providing water washing to existing cutstone masonry work for the removal of lime wash on stone and other deposits like soot and enamel paints.
15.5
-
-
... More
Pointing the stone joints with lime mortar 1:1.5 (one lime, and one & half of sand) ) including cost and conveyance of all materials and all labour charges etc complete
15.5
-
-
... More
Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification.
-
-
-
... More
For narrow excavation
107
-
-
... More
For open excavation
12.5
-
-
... More
Supplying and filling in foundation, basement, etc with filling sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
54
-
-
... More
Cement Concrete 1:5:10 (One Cement, Five sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification
15
-
-
... More
Random Rubble masonry work Lime Mortar 1:2 mix using selected stones and rough stones in foundation and basement including dewatering wherever necessary proper setting,curing,etc.,
41.5
-
-
... More
Providing and laying in position, Standardised Concrete Mix M-20 Grade in accordance with IS:456-2000, using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/mᶾ and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate,etc. complete complying with standard specification
-
-
-
... More
Foundation and Basement
6
-
-
... More
For super structure G.F
4
-
-
... More
Supplying and fabricating and placing in position mild steel/ Ribbed tor steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (contractor has to make his own arrangements for the supply of steel and binding wire)
1
-
-
... More
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid)
26.5
-
-
... More
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)
27
-
-
... More
Brick work in lime mortar 1:2 (one of lime, two of sand ) using country bricks of size 83/4" x 41/4" x 23/4" including cost and conveyance of all materials and labour charges and all other incidental charges etc complete complying with standard specifiction.
-
-
-
... More
Foundation and Basement
6
-
-
... More
For super structure G.F
58
-
-
... More
Plastering with lime mortar 1:1.5 (one of lime, one and half of sand ), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
403
-
-
... More
Paving with cut stone flooring using cut stone of size 600x600mm and 100mm thick and all the sides are machine cutting, top surface is neatly dressed and pointing with lime mortar 1:1.5 including all materials and labour charges
274
-
-
... More
Supplying and fixing ornamental teak wood temple pattern door of following size with four leaves as per the drawing approved by the departmental officer. The outer frames are four horizontal and two vertical santling. Shutter frame are two scantling.The panel shall have 20mm thick best and approved quality teak wood plank. the shutter shall be equal planks. the rate including cost of the best quality teak wood, Brarees Hinges, Tower bolts, Air drops ornamental Handles. The door frame and Shutter gives two coat best quality synthetic enamel paint.
17
-
-
... More
Painting with multicolour (panchavarnam) good emulsion paints complete for the vimanams/gopurams, including cost and conveyance of all materials , labours charges including artist painter, working in heights, lifting of materials,cost of brushes etc, complete which including all extra for foldings 100 sft
104
-
-
... More
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
853
-
-
... More
Painting new wood work with two finishing coats of synthetic enamel ready mixed paint of approved quality and colour over one coat priming coat in all floors including the cost of primer etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)
44
-
-
... More
Weathering Course in brick jelly lime concrete using broken brick jelly of size 20 mm uniform gauge in pure slaked lime (no sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the cutstone slab in a single layer of required slope and finishing by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water etc, complete as per standard specifications.
4.1
-
-
... More
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Lime mortar 1:1.5 (One Lime, One and Half of Five Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
40.5
-
-
... More
Providing new sudhai vigrahams in the vimanams and rajagopurams with galvanized iron rod Reinforecement of suitable dia with binding wires wherever necessary, shapping the core with broken bricks set in cement mortar 1:3 finishing the same with cement mortar 1:3 bringing to the correct shape (lakshana) in conformist with silpa sastra inclusive of specials ornaments, weapons,peedam etc., complete and providing cement mortar nayam theervai wherever necessary inclusive of cost and conveyance of all materials, such as cement broken bricks, and GI rods binding wire all labour for working in heights curing lifting of materials etc.,complete including cement painting 2 coats over a primary coat(one vigraham is accountable with one head, 4 hands with weapons, ornamental costumees etc., as per prathima lakshans, vigraham height is measurable from the crown top to the bottom of foot only if peedam of foot only if peetam is provided the rate with peedam may be adopted as detailed hereunder)
12
-
-
... More
Sub total
-
-
-
... More
GST @ 18%
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements