Hindu Religious And Charitable Endowments Joint Commissioner Office Nagapattinam Arulmigu Renugadeviamman Temple Vijayapuram Arulmigu Madhangeswaraswamy Temple Adipudhucheri Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Hindu Religious And Charitable Endowments Joint Commissioner Office Nagapattinam Arulmigu Renugadeviamman Temple Vijayapuram Arulmigu Madhangeswaraswamy Temple Adipudhucheri Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date10 Jan 2025
Closing Date27 Jan 2025
Tender Amount₹ 1,67,90,850
Costs
EMD
₹ 93,960Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Re-construction Of Swamy Sannathi,ambal Sannathai, Arthamandabam, Mahamandabam,uba Sannathi And Thirumathil Wall
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_HRCE_511225_1Tender No
01-L-MDN-2024Tender Authority
Hindu Religious And Charitable Endowments Joint Commissioner Office Nagapattinam Arulmigu Renugadeviamman Temple Vijayapuram Arulmigu Madhangeswaraswamy Temple Adipudhucheri ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Cement concrete 1:5:10 (One of cement five of
sand and ten of HBG jelly )for foundation using
40mm gauge HBG jelly inclusive of shoring
strutting and baling out water where ever
necessary ramming curing etc.,complete in
respects complying with relevant St
48
-
-
... More
Random Rubble masonry work in Lime mortor
1:2 ( One of Lime and Two of sand) Using
selected stones and bond stones in foundation
and basement including dewatering wherever
necessary proper setting, curing etc., complete
in all respects complying with relevant
standard Specifications.
360
-
-
... More
Supplying and erecting centering for sides and
soffits including necessary supports and
strutting upto 3.29 M height for plane surfaces
as detailed below in all floors with all cross
bracings using Mild Steel sheets of size 90 x
60 cm and 10 BG stiffened with welded Mild
Steel angle of size 25mm x 25mm x 3 mm for
boarding laid over silver oak joists of size
10cm x 6.50 cm spaced at abote 90 cm centre
to centre and supported by casurina props of
10cm to 13 cm dia spaced at not more than 75
cm centre to centre etc. complete complying
with the standard specificaiton. (Payment for
centering shall be given after the concrete is
laid)
-
-
-
... More
Centering upto grade beam
140
-
-
... More
Centering for Slab & Lintel
22
-
-
... More
Centering for curved surface
35
-
-
... More
Providing and laying in position, standardised
concrete Mix M-20 Grade in accordance with
IS 456 using 20mm and down graded hard
broken granite stone jelly for all RCC items of
works with minimum cement content of 325
kg/m3 and maximum water cement ratio of
0.55, including admixture (plasticiser / super
plasticiser) in recommended proportions as per
IS:9103 to accelerate, retard setting of
concrete, improve workability without impairing
strength and durability with about (5 cu.m.)
7730 kg. of 20mm machine crushed stone jelly
and with about (3.3 cu.m.) 5156 kg. of 10-
12mm machine crushed stone jelly and with
about (4.79 cu.m) 7670 kg. of crushed stone
sand, but excluding cost of reinforcement grill
and fabricating charges, centering and
shuttering and also including laying, vibrating
with mechanical vibrators, finishing, curing,
etc. complete complying with standard
specification and as directed by the
departmental officers. The coarse and fine
aggregates to be used should comply with the
requirements of IS standards. (No separate
payment will be made by the Department for
the excess usage of materials).
-
-
-
... More
Foundation and Basement
57
-
-
... More
For Ground floor
4
-
-
... More
Supplying, fabricating and placing in position
Mild Steel / Ribbed Tor Steel grills for all RCC
works as per design given including cost of
steel and G.I. binding wire in all floors etc.
complete complying with standard
specification. (Contractor has to make his own
arrangements for the supply of steel and
binding wire)
6.8
-
-
... More
Brick masonry Lime mortor 1:2 (One Lime and
Two Sand) using Stock bricks including all
varivargams, moulds, sthambams,
mukapathrams, koodu, nasi and all ornamental
brick work complete, all pancharams, agarais,
karnakoodus, etc., forming core walls of
Rajagopuram/ Vimanams complete including
cost and conveyance of all materials including
cement, all the labour charges including
marking pathies shaping of the bricks, lifting of
all the materials to required heights, curing
and all extra for working in heights etc., 100 cft
for vimanam / gopuram, complete complying
with standard specifiction.
-
-
-
... More
For Kalkaram
5800
-
-
... More
Vimanam / Gopuram of height up to 15' 0"
(excluding kalkaram)
2056
-
-
... More
Brick work using Country Bricks of size 8-3/4"
x 4-1/4" X2-3/4"" in Cement Mortar 1:5 (One
cement and five sand) including cost and
conveyance of all materials and labour
charges and all other incidental charges etc
completc complying with standard
specification.
165
-
-
... More
Dome/wall brick in Lime mortar 1:2 (One Lime
and Two Sand) using Third class Country
bricks size 8 -3/4"x4 1/4"x2" including cost and
conveyance of all materials and labour
charges and all other incidental charges etc
completc complying with standard
specification.
9
-
-
... More
Flooring with cut stone slab of size
600mmX600mm and other sizes suitable for
site requirement not less than 100mm thick
with machine cut edges and top surface
dressed as directed by the departmental
officers including cost and conveyance of
materials to site and labour charges for paving
and Pointing With Lime Mortor1:1.5 (One Lime
and One and Half Sand) etc complete.
80
-
-
... More
Supplying & fixing Teak wood temple type door
including all materials, labour charges for
manufacturing and fixing in position including
all furniture fittings etc complete with std.
Specifications
-
-
-
... More
4'-7'
112
-
-
... More
4'-6'
72
-
-
... More
Best varnish two coats for wood works etc,
complete complying with standard
specifications.
55
-
-
... More
Supplying of cut stone for walls, Pillar ,
Pavukkal , Uthiram , Bodiyal and all works
excluding labour charges but including cost
and conveyance loding and unloding etc.
complete with standard specification
-
-
-
... More
Up to 5' length
1.5
-
-
... More
Up to 10' length
22
-
-
... More
Labour charges for cut stone excluding cost
and conveyance of stone from quarry but
including all labour charges for tools and plants
for dressing charcoal scaffolding charges
handling charges hoisting and fixing in position
etc complete.,
-
-
-
... More
Bothiyal
62.5
-
-
... More
Thoon
151
-
-
... More
Uthiram
200
-
-
... More
Pavukal
698
-
-
... More
Nilaikal Nagapattam
380
-
-
... More
Scaffolding charges for Vimanams and
Gopurams with casurina posts coconut or palm
trees wherever necessary for main, form work
and providing with net lawn / PVC mesh
coverings, providing ladder arrangements,
country wood plank for working, inspection etc.
complete, hire charges only for erection,
maintenance and removing the same on
completion of the work
-
-
-
... More
Vimanam Up to 15' ht
605.95
-
-
... More
Providing Vargapoochu over the corewalls of
Vimanams / Gopurams, with Lime Mortor1:1.5
(One Lime and One and Half Sand) complete
including shaping the mukhapathram,
mahanasi, Koodu all ornamentals works to
proper shape by embedding broken bricks of
shaped/chiseled bricks, rough-plastering with
L.M. 1:1.5 (One Lime and One and Half Sand)
and finishing with final ornamental plastering
and nayam theervani including cost and
conveyance of all materials, labour therefore,
lifting of materials, all working in heights,
curing with water etc, including all extra for
folding and including clearing from the
vimanams/gopurams 100sft superficial area
,complete complying with standard
specification and as directed by the
departmental officers.
-
-
-
... More
For Kalkaram up to 15'0"
2950
-
-
... More
Vimanam Upto 15'0" exculding Kalkaram
2090
-
-
... More
Plastering with Lime Mortar 1:1.5 (One Lime
and One and Half Sand),12mm thick in all
floors including curing etc. complete complying
with standard specification and as directed by
the departmental officers.
205
-
-
... More
Plastering with Lime Mortar 1:1.5 (One Limet
and One and Half Sand),20mm thick mixed
with water proofing compound in all floors
including curing etc. complete complying with
standard specification and as directed by the
departmental officers.
57
-
-
... More
Plastering with Cement Mortar 1:5 (One
cement and Five Sand), 12mm thick in all
floors including curing etc. complete complying
with standard specification and as directed by
the departmental officers.
720
-
-
... More
Painting with multicolour (Panchavarnam)
good water based exterior emulson paints
complete for the Vinamans/Gopurams,
including cost and conveyance of all
materials, lobour charges including Artist
painter, working in heights, lifting of material,
cost of brushes etc, complete-which including
all extra for foldings-100sft, superficial area.
2090
-
-
... More
Painting two coats of newly plastered wall
surface with Water based Emulsion paint of
first class quality and of approved colour over
a priming coat including thorough scrapping,
clean removal of dirt, and including necessary
plaster of paris putty, wherever required etc.,
complete complying with standard
specification.
1289
-
-
... More
Supplying and fixing mild steel grill Gate
including cost conveyance of all materials and
fixing in position including priming coat etc
complete with standard specifications.
285
-
-
... More
Painting new iron works such as gate, steel doors windows ventilators with two coats of approved quality and color of synthetic enamel paint over the existing red oxide over one coat zinc chloride primer in all floor etc, complete complying with standard specifications.
9
-
-
... More
Providing new sudhai vigrahams in the
vimanams and Rajagopurams with galvanised
iron rod reinforcement of suitable dia with
binding wires wherever necessary, shaping the
core with broken bricks set in Lime Mortor1:1:5
(One Lime and One and Half Sand) finishing
the same with Lime Mortor 1:1:5 bringing to
the correct shape (Lakshana) in conformift with
silpa sastra inclusive of special ornaments,
wiapons, peedam etc., complete and providing
C.M. Nayam theervai wherever necessary.
inclusive of cost and conveyance of all
materials, such as cement broken bricks, and
G.I. rods.binding wire all labour for working in
heights, curing lifiting of materials etc.,
complete including cement painting 2 coats
over a primary coat (one vigraham is
accountable with one head, 4 hands with
weapons, ornamental costumes etc., as per
prathima lakshans, Vigraham height is
measurable from the crown top to the bottom
of foot only If peetam is pt\rovided the rate with
peetam may be adopted as datailed
hereunder)
-
-
-
... More
Sudhai size above 1' 0" upto 2' 6"
64
-
-
... More
Sudhai size above 2' 6" upto 3' 6"
4
-
-
... More
Weathering course in brick jelly lime concrete
using broken brick jelly of size 20mm uniform
gauge in pure slaked lime (no crushed stone
sand to be used) to the proportion of brick jelly
to lime being 32:12.5 by volume and laid over
the RCC roof slab in a single layer of required
slope and finished by beating the concrete with
wooden beaters of approved pattern, keeping
the surface constantly wet by sprinkling lime
jaggery water, etc., complete as per standard
specification and as directed by the
deparmental officers
12
-
-
... More
Finishing the top of roof with one course of
machine pressed tiles of size 200mm x 200mm
x 20mm of approved quality set in Lime
Mortor1:1.5 (One Lime and One and Half
Sand) 12mm thick mixed with water proofing
compound conforming to ISS at 2% by weight
of cement used and the joints pointed neatly to
full depth of tiles with the same cement mortar
mixed with red oxide and water proofing
compound including curing etc., complete
complying with standard specification and as
directed by the departmental officers
73
-
-
... More
Add GST 18%
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%