Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date5 Nov 2024
Closing Date6 Dec 2024
Tender Amount₹ 16,70,60,000 
Notes
Download

Costs

Summary

Widening from Two Lane to Four Lane and Strengthening at km 57/0-60/0 of Trichy - Pudukkottai - Aranthangi

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification.a) box cutting for widening portion

-

-

-

... More
Main work Km 57/0-60/0

9767

123

1203880.42

... More
Providing compaction for embankment / making up of low berms using the available box cut earth including all hire and fuel charges for power roller for compaction, water sprinkler, including all labour charges for laying, spreading, watering etc., complete and as directed by the departmental engineers.complying with standard specification.

-

-

-

... More
Main work Km 57/0-60/0

9767

26

260485.89

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with an average lead of 1 km and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For Carted Earth with compaction for making up of low berms. Embackment using Carted earth with an average lead of 1 Km.

-

-

-

... More
Main work Km 57/0-60/0

3610

183

661821.3

... More
Construction of Granular sub-base by providing close graded Material, (Table:- 400-1) mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 401 for grading-V Material

-

-

-

... More
Main work Km 57/0-60/0

4833

1959

9470360.16

... More
Construction of granular sub-base by providing close graded Material, (Table:- 400-1) mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 401 for grading-III Material

-

-

-

... More
Main work Km 57/0-60/0

2612

2049

5352510.4

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5

-

-

-

... More
Main work Km 57/0-60/0

7055

2238

15789301.65

... More
Providing and laying Prime Coat over WMM surface using Pressure Distributor at the rate of 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 502 of MORTH Rev-5

-

-

-

... More
Main work Km 57/0-60/0

30464

81

2483729.92

... More
Providing and laying Tack Coat over WMM surface (treated with primer) using Pressure Distributor at the rate of 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 503 of MORTH Rev V

-

-

-

... More
Main work Km 57/0-60/0

30464

18

572113.92

... More
Providing and laying Tack Coat over Existing BT surface using Pressure Distributor at the rate of 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5

-

-

-

... More
Main work Km 57/0-60/0

11828

27

319710.84

... More
Providing, laying 65mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50- 13.20mm, 0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20Kgs of VG30 Grade bitumen for premixing per 10sqm of 50mm thick including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required temperature in Central Hot Mix Plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 65mm using paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire and fuel charges for 20-30ton CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory rollers and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5

-

-

-

... More
Main work Km 57/0-60/0

1981

9956

19723509.54

... More
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm of 50mm thick including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5

-

-

-

... More
Main work Km 57/0-60/0

850

8521

7243105

... More
BC 40mm Thick (Grade-II) Using VG30 Bitumen Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm of 40mm thick including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5

-

-

-

... More
Main work Km 57/0-60/0

1692

11300

19121207.4

... More
PRECAST BOX CULVERT

-

-

-

... More
Dismantling Culverts,bridges and other structures Dismantling clearing away and carefully stacking material useful for re-use including salvaging and removal and disposing of resulting unusable materials and back filling the resulting trenches and pits etc.including all labour and incidental charges complying with MORTH 111, 112, 202 a)Dismantling PCC work

-

-

-

... More
Reconstruction of Precast Box culvert at km 57/6(i)

17

486

8265.4

... More
Reconstruction of Precast Box culvert at km 57/6(ii)

17

486

8265.4

... More
Reconstruction of Precast Box culvert at km 57/8

17

486

8265.4

... More
Reconstruction of Precast Box culvert at km 58/6(i)

17

486

8265.4

... More
Removal of Cut Stone Slabs / RCC Cover Slabs Clearing away and carefully stacking materials use full for reuse for any thickness etc., complete complying with standard specification.

-

-

-

... More
Reconstruction of Precast Box culvert at km 58/6(ii)

36

512

18465.48

... More
Dismantling Culverts,bridges and other structures Dismantling clearing away and carefully stacking material useful for re-use including salvaging and removal and disposing of resulting unusable materials and back filling the resulting trenches and pits etc.including all labour and incidental charges complying with MORTH 111, 112, 202 b)Removal of Brick and Stone masonary in cement mortar under 3m height

-

-

-

... More
Reconstruction of Precast Box culvert at km 58/6(ii)

20.25

283

5733.59

... More
Earth work Excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion backfilling, and clearing the site and disposal of all surplus materials etc. complete and in accordance with standard specification for foundation of Body wall , box culvert as per MORTH Vth Rev., 304.

-

-

-

... More
Reconstruction of Precast Box culvert at km 57/6(i)

190.62

289

55159.71

... More
Reconstruction of Precast Box culvert at km 57/6(ii)

190.62

289

55159.71

... More
Reconstruction of Precast Box culvert at km 57/8

190.62

289

55159.71

... More
Reconstruction of Precast Box culvert at km 58/6(i)

190.62

289

55159.71

... More
Reconstruction of Precast Box culvert at km 58/6(ii)

190.62

289

55159.71

... More
Vibrated Cement Concrete of grade M15 using 40mm ISS size HBG graded metal using with M-sand including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labor charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for LEVELLING COURSE BELOW Box Culvert and Wing wall as per MORTH Vth Rev., 1000, 1500, 1700, 2100 & 900.

-

-

-

... More
Reconstruction of Precast Box culvert at km 57/6(i)

14.67

6173

90563.78

... More
Reconstruction of Precast Box culvert at km 57/6(ii)

14.67

6173

90563.78

... More
Reconstruction of Precast Box culvert at km 57/8

14.67

6173

90563.78

... More
Reconstruction of Precast Box culvert at km 58/6(i)

14.67

6185

90744.81

... More
Reconstruction of Precast Box culvert at km 58/6(ii)

14.67

6185

90744.81

... More
Providing Precast Vibrated Reinforced Cement Concrete Box using M35 design mix minimum cement content of 425 kg per cu.m of concrete of size 1.50 x 1.50 m x 1.50 m with 0.25m thick web, 0.28m thick bottom and 0.25m thick top slab including cost of Mild Steel Mouldings and conveyance of all materials to site and cost of cement including minimum of 0.212 MT of reinforcement steel per running meter of box including cost and fabrication charges of Steel at site including cost of soft water, labour charges for mixing, laying and curing concrete, tools and plants, transporting from casting yard to work site through trailers, lifting, erecting by using cranes of required capacity and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for box units of size 1.50x1.50x1.50 as per standard specification.

-

-

-

... More
Reconstruction of Precast Box culvert at km 57/6(i)

21

60326

1266862.59

... More
Reconstruction of Precast Box culvert at km 57/6(ii)

21

60326

1266862.59

... More
Reconstruction of Precast Box culvert at km 57/8

21

60326

1266862.59

... More
Reconstruction of Precast Box culvert at km 58/6(i)

21

60326

1266862.59

... More
Reconstruction of Precast Box culvert at km 58/6(ii)

21

60326

1266862.59

... More
Vibrated Cement Concrete M 20 mix(Nominal mix)using 40mm ISS size hard broken granite metal and with M-sand including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for formwork and centering mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed and in accordance with standard specification for Above Sill level, Parapet & Wing wall as per MORTH Vth Rev., 1000, 1500, 1700, 2100

-

-

-

... More
Reconstruction of Precast Box culvert at km 57/6(i)

57.92

8052

466407.17

... More
Reconstruction of Precast Box culvert at km 57/6(ii)

57.92

8052

466407.17

... More
Reconstruction of Precast Box culvert at km 57/8

57.92

8052

466407.17

... More
Reconstruction of Precast Box culvert at km 58/6(i)

57.92

8064

467121.9

... More
Reconstruction of Precast Box culvert at km 58/6(ii)

57.92

8064

467121.9

... More
Supply and fabrication of (HYSD) Steel Fe500 Grade (as per steel schedule) required for all RCC items of works involved in the schedule of drawings including cost of steel, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, positioning and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete as per standard specification. - MORTH Vth Rev., 1000, 1500, 1600 & 900

-

-

-

... More
Reconstruction of Precast Box culvert at km 57/6(i)

0.21

95609

20269.17

... More
Reconstruction of Precast Box culvert at km 57/6(ii)

0.21

95609

20269.17

... More
Reconstruction of Precast Box culvert at km 57/8

0.21

95609

20269.17

... More
Reconstruction of Precast Box culvert at km 58/6(i)

0.21

95609

20269.17

... More
Reconstruction of Precast Box culvert at km 58/6(ii)

0.21

95609

20269.17

... More
Vibrated Reinforced cement concrete M30 (Design mix) using 20mm and below graded size ISS hard granite metal and using M-sand including cost and conveyance of all materials to site excluding cost and fabrication of steel reinforcement but including cost of premoulded expansion joints and fixing the same in position including cost and labour charges for formwork, labour charges for laying compacting curing, including all incidental charges etc., complete for - MORTH Vth Rev., 1000, 1500, 1700, 2702, 2704 & 900 WEARING COAT 75MM uniform thickness OVER DECK SLAB

-

-

-

... More
Reconstruction of Precast Box culvert at km 57/6(i)

40.2

673

27092.39

... More
Reconstruction of Precast Box culvert at km 57/6(ii)

40.2

673

27092.39

... More
Reconstruction of Precast Box culvert at km 57/8

40.2

673

27092.39

... More
Reconstruction of Precast Box culvert at km 58/6(i)

40.2

674

27129.37

... More
Reconstruction of Precast Box culvert at km 58/6(ii)

40.2

674

27129.37

... More
Providing and fixing 110mm dia PVC SEEPAGE PIPES of required length for abutment and wing, retaining wall including cost and conveyance of all materials to worksite, cost and labour for semi-spherical backfill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., complete to drain the backfill as per standard specification. -MORTH Vth Rev., 2700, 2706, 2707 & 900

-

-

-

... More
Reconstruction of Precast Box culvert at km 57/6(i)

16.8

203

3412.08

... More
Reconstruction of Precast Box culvert at km 57/6(ii)

16.8

203

3412.08

... More
Reconstruction of Precast Box culvert at km 57/8

16.8

203

3412.08

... More
Reconstruction of Precast Box culvert at km 58/6(i)

16.8

203

3412.08

... More
Reconstruction of Precast Box culvert at km 58/6(ii)

16.8

203

3412.08

... More
Providing filter media behInd the culvert sidewall and return wall with clean III graded material 53mm to 5.6mm to 500mm and well compacted in layers with smaller sized towards the soiland bigger size towards the wall including cost and conveyanceto work site including all labours and other incidental chargesincluding hire charges for tools and plants employed etc., for filtermedia as per MOST's ( Roads Wing) specifications for Roads andBridges " Fourth Revision Cl. 309-3-2-13 and 305-4-4 etc., complete-1 Cum

-

-

-

... More
Reconstruction of Precast Box culvert at km 57/6(i)

27.67

1474

40795.54

... More
Reconstruction of Precast Box culvert at km 57/6(ii)

27.67

1474

40795.54

... More
Reconstruction of Precast Box culvert at km 57/8

27.67

1474

40795.54

... More
Reconstruction of Precast Box culvert at km 58/6(i)

27.67

1483

41035.44

... More
Reconstruction of Precast Box culvert at km 58/6(ii)

27.67

1483

41035.44

... More
WIDENING OF BOX CULVERT

-

-

-

... More
Dismantling Culverts,bridges and other structures Dismantling clearing away and carefully stacking material useful for re-use including salvaging and removal and disposing of resulting unusable materials and back filling the resulting trenches and pits etc.including all labour and incidental charges complying with MORTH 111, 112, 202 a)Dismantling PCC work

-

-

-

... More
Widening of Box culvert at km 57/2

0.68

486

330.62

... More
Widening of Box culvert at km 57/10

1.35

486

656.37

... More
Widening of Box culvert at km 58/2

1.35

486

656.37

... More
Widening of Box culvert at km 58/8(i)

1.35

486

656.37

... More
Widening of Box culvert at km 58/8(ii)

1.35

486

656.37

... More
Widening of Box culvert at km 59/2

1.35

486

656.37

... More
Widening of Box culvert at km 59/10

1.35

486

656.37

... More
Earth work Excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion backfilling, and clearing the site and disposal of all surplus materials etc. complete and in accordance with standard specification for foundation of Body wall , box culvert as per MORTH Vth Rev., 304.

-

-

-

... More
Widening of Box culvert at km 57/2

61.62

289

17830.98

... More
Widening of Box culvert at km 57/10

81.35

289

23540.25

... More
Widening of Box culvert at km 58/2

81.35

289

23540.25

... More
Widening of Box culvert at km 58/8(i)

81.35

289

23540.25

... More
Widening of Box culvert at km 58/8(ii)

81.35

289

23540.25

... More
Widening of Box culvert at km 59/2

81.35

289

23540.25

... More
Widening of Box culvert at km 59/10

81.35

289

23540.25

... More
Vibrated Cement Concrete of grade M15 using 40mm ISS size HBG graded metal using with M-sand including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labor charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for LEVELLING COURSE BELOW Box Culvert and Wing wall as per MORTH Vth Rev., 1000, 1500, 1700, 2100 & 900.

-

-

-

... More
Widening of Box culvert at km 57/2

9.21

6173

56856.92

... More
Widening of Box culvert at km 57/10

12.72

6173

78525.52

... More
Widening of Box culvert at km 58/2

12.72

6185

78682.49

... More
Widening of Box culvert at km 58/8(i)

12.72

6185

78682.49

... More
Widening of Box culvert at km 58/8(ii)

12.72

6185

78682.49

... More
Widening of Box culvert at km 59/2

12.72

6198

78839.45

... More
Widening of Box culvert at km 59/10

12.72

6198

78839.45

... More
Vibrated Cement Concrete M 20 (Nominal grade mix) using 40mm ISS size hard broken granite metal using with M-Sand including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for formwork and centering mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed and in accordance with standard specification for as per MORTH Vth Rev., 1000, 1500, 1700, 2100 & 900 - for foundation footing below wing wall

-

-

-

... More
Widening of Box culvert at km 57/2

4.86

7289

35428.72

... More
Widening of Box culvert at km 57/10

5.85

7211

42185.34

... More
Widening of Box culvert at km 58/2

5.85

7223

42257.53

... More
Widening of Box culvert at km 58/8(i)

5.85

7223

42257.53

... More
Widening of Box culvert at km 58/8(ii)

5.85

7223

42257.53

... More
Widening of Box culvert at km 59/2

5.85

7235

42329.72

... More
Widening of Box culvert at km 59/10

5.85

7235

42329.72

... More
Vibrated Cement Concrete M 20(Nominal grade mix) using 40mm ISS size hard broken granite metal using with M-Sand including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for formwork and centering mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed and in accordance with standard specification for as per MORTH Vth Rev., 1000, 1500, 1700, 2100 & 900 - for culvert wing wall and Parapet

-

-

-

... More
Widening of Box culvert at km 57/2

44.06

8295

365514.27

... More
Widening of Box culvert at km 57/10

69.05

8001

552513.24

... More
Widening of Box culvert at km 58/2

69.05

8013

553365.32

... More
Widening of Box culvert at km 58/8(i)

69.05

8013

553365.32

... More
Widening of Box culvert at km 58/8(ii)

69.05

8013

553365.32

... More
Widening of Box culvert at km 59/2

69.05

8026

554217.4

... More
Widening of Box culvert at km 59/10

69.05

8026

554217.4

... More
Vibrated Reinforced Cement Concrete of grade M25 (Design mix) using 20mm and 12mm ISShard broken granite metal using with M-Sand including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Box culvert.

-

-

-

... More
Widening of Box culvert at km 57/2

23.32

13471

314153.98

... More
Widening of Box culvert at km 57/10

49.94

11464

572558.6

... More
Widening of Box culvert at km 58/2

49.94

11477

573174.86

... More
Widening of Box culvert at km 58/8(i)

49.94

11477

573174.86

... More
Widening of Box culvert at km 58/8(ii)

49.94

11477

573174.86

... More
Widening of Box culvert at km 59/2

49.94

11489

573791.12

... More
Widening of Box culvert at km 59/10

49.94

11489

573791.12

... More
Supply and fabrication of (HYSD) Steel Fe500 Grade (as per steel schedule) required for all RCC items of works involved in the schedule of drawings including cost of steel, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, positioning and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete as per standard specification. - MORTH Vth Rev., 1000, 1500, 1600 & 900

-

-

-

... More
Widening of Box culvert at km 57/2

2.01

95609

191983.41

... More
Widening of Box culvert at km 57/10

3.25

95609

310634.52

... More
Widening of Box culvert at km 58/2

3.25

95609

310634.52

... More
Widening of Box culvert at km 58/8(i)

3.25

95609

310634.52

... More
Widening of Box culvert at km 58/8(ii)

3.25

95609

310634.52

... More
Widening of Box culvert at km 59/2

3.25

95609

310634.52

... More
Widening of Box culvert at km 59/10

3.25

95609

310634.52

... More
Vibrated Reinforced cement concrete M30 (Design mix) using 20mmm and below graded ISS sized hard granite metal and using M-sand including cost and conveyance of all materials to site excluding cost and fabrication of steel reinforcement but including cost of premoulded expansion joints and fixing the same in position including cost and labour charges for formwork, labour charges for laying compacting curing, including all incidental charges etc., complete for - MORTH Vth Rev., 1000, 1500, 1700, 2702, 2704 & 900 WEARING COAT 75MM uniform thickness OVER DECK SLAB

-

-

-

... More
Widening of Box culvert at km 57/2

14.6

673

9839.52

... More
Widening of Box culvert at km 57/10

27.01

673

18203.12

... More
Widening of Box culvert at km 58/2

27.01

674

18227.97

... More
Widening of Box culvert at km 58/8(i)

27.01

674

18227.97

... More
Widening of Box culvert at km 58/8(ii)

27.01

674

18227.97

... More
Widening of Box culvert at km 59/2

27.01

675

18253.09

... More
Widening of Box culvert at km 59/10

27.01

675

18253.09

... More
Providing and fixing 110mm dia PVC SEEPAGE PIPES of required length for abutment and wing, retaining wall including cost and conveyance of all materials to worksite, cost and labour for semi-spherical backfill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., complete to drain the backfill as per standard specification. -MORTH Vth Rev., 2700, 2706, 2707 & 900

-

-

-

... More
Widening of Box culvert at km 57/2

16.8

203

3412.08

... More
Widening of Box culvert at km 57/10

16.8

203

3412.08

... More
Widening of Box culvert at km 58/2

16.8

203

3412.08

... More
Widening of Box culvert at km 58/8(i)

16.8

203

3412.08

... More
Widening of Box culvert at km 58/8(ii)

16.8

203

3412.08

... More
Widening of Box culvert at km 59/2

16.8

203

3412.08

... More
Widening of Box culvert at km 59/10

16.8

203

3412.08

... More
DRAIN

-

-

-

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification for foundation of Drain

-

-

-

... More
At Km 57/095-57/195(L/S) & (R/S)

378

166

62789.58

... More
Plain Cement Concrete of grade M15 (Nominal mix) using 40mm ISS hard broken granite metal and using M-sand including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges for compacting, curing and all incidental charges etc., complete as per standard specification for LEVELLING COURSE BELOW DRAIN.

-

-

-

... More
At Km 57/095-57/195(L/S) & (R/S)

36

6155

221615.64

... More
Vibrated Reinforced Cement Concrete M25 (Design Mix) using 20mm and below ISS hard broken granite metal and using M-sand including cost and conveyance of all materials from approved quarry to worksite including cost of cement which has to be procured by the contractor but excluding cost and fabrication of steel including cost of form work and labour charges for mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft portable water, working in all depths including hire, running and fuel charges for all tools and plants employed including as per standard specification MORTH Rev. V Nos. 1000,1700,2200 for Drain bottom Slabs,Walls and cover slabs

-

-

-

... More
At Km 57/095-57/195(L/S) & (R/S)

200.39

14971

3000213.03

... More
Supply and fabrication of (HYSD) Fe500 grade required for all RCC items as per steel schedule of works involved in the schedule of drawings including cost of steel, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, positioning and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete as per standard specification. - MORTH Vth Rev., 1000, 1500, 1600 & 900

-

-

-

... More
At Km 57/095-57/195(L/S) & (R/S)

11.08

95609

1058872.67

... More
Providing and fixing of FRP Gratings of 600 x 200 mm size with M.S flats of 25x10 mm for outer frames, 25x6 mm for inner braces and PVC pipe 150 mm dia fixed with mild steel grating, including cost and conveyance of pipes and gratings and fixing them in position complying with standard specification.

-

-

-

... More
At Km 57/095-57/195(L/S) & (R/S)

34

500

17000

... More
Supply and fixing of SFRC Reinforced Cement concrete Man Hole cover 750x750 mm including frames EHD 35 as per IRC 50-1999 and IS 12592 as directed by the Departmental officers including labour charges for fixing at every interval of 5m along the drain including all other incidental charges etc.,complete for Drain.

-

-

-

... More
At Km 57/095-57/195(L/S) & (R/S)

34

2971

101014

... More
REVETMENT

-

-

-

... More
Earth work Excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion backfilling, and clearing the site and disposal of all surplus materials etc. complete and in accordance with standard specification for foundation of revetment as per MORTH Vth Rev., 304.

-

-

-

... More
At Km 57/600-57/813(L/S)

145.37

289

42065.72

... More
At Km 57/840-58/000 (R/S)

109.2

289

31599.2

... More
At Km 59/850-59/987(L/S) & (R/S)

187.01

289

54115.08

... More
Vibrated Cement Concrete of grade M15 using 40mm ISS size HBG graded metal using with M-sand including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labor charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for LEVELLING COURSE BELOW revetment as per MORTH Vth Rev., 1000, 1500, 1700, 2100 & 900.

-

-

-

... More
At Km 57/600-57/813(L/S)

20.77

6173

128221.31

... More
At Km 57/840-58/000 (R/S)

15.6

6173

96304.88

... More
At Km 59/850-59/987(L/S) & (R/S)

26.72

6198

165612.43

... More
Vibrated Cement Concrete M 20 grade nominal mix using 40mm ISS size hard broken granite metal using with M-Sand including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for formwork and centering mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed and in accordance with standard specification for as per MORTH Vth Rev., 1000, 1500, 1700, 2100 & 900 - for revetment.

-

-

-

... More
At Km 57/600-57/813(L/S)

115.02

10358

1191442.72

... More
At Km 57/840-58/000 (R/S)

86.4

10366

895675.1

... More
At Km 59/850-59/987(L/S) & (R/S)

147.96

10370

1534454.69

... More
Filling below with Good gritty gravel including cost and conveyance of Gravellt to work site, laying, handling charges and filling in layers including all labour and machinary charges tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc,complete and in accordance with standard specifications as per MORTH Vth Rev., 305 &2907

-

-

-

... More
At Km 57/600-57/813(L/S)

150.17

348

52271.17

... More
At Km 57/840-58/000 (R/S)

112.8

348

39263.42

... More
At Km 59/850-59/987(L/S) & (R/S)

193.17

324

62683.67

... More
Providing and laying pitching on slopes with vibrated cement concrete M15 grade with M.sand laid over prepared filter media including Concrete block of size 0.30m X 0.30m X 0.30m laid dry in front of toe of embackment completeincluding trimming of slope to proper profile and preparation of bed including all cost of materials ,labour,formwork and all other incidental charges etc,complete complying with standard specifications

-

-

-

... More
At Km 57/600-57/813(L/S)

300.33

7960

2390891.09

... More
At Km 57/840-58/000 (R/S)

225.6

7960

1795974.53

... More
At Km 59/850-59/987(L/S) & (R/S)

386.34

7985

3085141.25

... More
Supply and fixing of RCC guide post of size1.20 x 0.20 x 0.20 m with reflective star stickers with tin M.s sheet with two side packing and top cover of 0.75 inches in RCC 1: 2: 4 Mix using 20 mm HBG ISS metal and M.sand with 10 mm. dia bars as vertical with 8mm dia Stirrups including 8.25 inches x 4.25 feet mould with star shape of 5 inches and top projection by 0.75 inches x 3 inches including cost and conveyance of all materials to worksite etc., complete., including labour, incidental charges complete complying with standard specifications.

-

-

-

... More
At Km 57/600-57/813(L/S)

43

1220

52469.46

... More
At Km 57/840-58/000 (R/S)

32

1220

39047.04

... More
At Km 59/850-59/987(L/S) & (R/S)

54

1220

65891.88

... More
KERB TYPE CENTRE MEDIAN

-

-

-

... More
Providing Barrier Type Kerb for median / islands using vibrated cement concrete of grade M20 (1:1.5:3)Nominal mix using 20 and 12mm ISS HBG metal from approved quarry and using M.sand including cost and conveyance of all materials to worksite, including hire and fuel charges of all the machineries employed for this work, including all labour charges for mixing, laying, curing, painting, including all other incidental charges etc., complete as per drawing and standard specification.(Median kerb Size)Top section, top width 0.115m, bottom width 0.165m to a height of 0.20m and Bottom section 0.165m uniform width to a height of 0.125m.

-

-

-

... More
At km 57/0-60/0

5684.37

569

3235031.81

... More
Refilling with available excavated earth in between kerb stones, layers not exceeding limits including watering consolidation including all labour charges and incidental charges etc., complete as directed by the Engineer as per MORTH Vth Rev.111, 112, 301, 304, 305, 2907.

-

-

-

... More
At km 57/0-60/0

801.53

42

34345.56

... More
ROAD FURNITURE

-

-

-

... More
Providing and laying of hot applied Thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes etc., complete as per MoRT&H specification No.803

-

-

-

... More
Road furniture at Km 57/0-60/0

4073.8

890

3625682

... More
Road Markers / Road Stud with Lens Reflector. Providing and fixing relative road studs of 'Category A' Raised Pavement makers made out of Poly Carbonate / methyl methecrylate / ABS moulded body confirirming to ASTM D 788 and relative panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face with retro reflectance and chromaticity values conforming to ASTM D4280.The reflective raised pavement markers shall also confirm to the MORTH circular No RW / NH. 33023/10/97-DO.III dt 11.06.97.The height,width and length shall not be less than 15mm,90mm and 100mm and with minimum reflective area of 13 sq.cm on each side and the slope to the base shall be 35 +/- 5 degree.Each reflector shall have a CIL not less than values specified in Table 2 of said MORTH circular.The strength of detachment of the integrated cylindrical shanks,(of diameter not less than 19 +/- 2mm height not less than 30 +/- 2mm) from the body is to be a minimum value of 500 kgf.Fixing will be by drilling holes on the road for the shanks to go inside,without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The marker shall support a load of 13635 kg tested in accordance with ASTM D4280 and confirming to IRC 35 - 2015 guidelines and MORTH&H specification 804 etc.,complete

-

-

-

... More
Road furniture at Km 57/0-60/0

2970

480

1425600

... More
Providing and Erecting of Retro - Reflectorised Hazard Marker Traffic Sign made out of High Intensity Prismatic Grade Sheeting confirming to Type-IV standards of IRC-67: 2012 and ASTM D 4956 —09, specification and fixed over 2mm thick Aluminium sheet fixed over a back supporting frame of 25mmx25mmx3mm Mild Steel angle and supported on a mild steel angle post 75X75X6mm and 0.60m below ground level. The sign post should be painted as per IRC 67-2012 and firmly fixed to the ground by means of properly designed foundation with MIS grade cement concrete 45cmX45cmX60cm size including cost and conveyance of all materials, equipment, Machinery and labour with all leads and lifts, loading charges necessary for satisfactory completion of the work as directed by the engineer in charge. High intensity Retro - Reflectro sheet shall consist of minimum coefficient of Retro-reflection as per Table 6.6 of IRC 67-2012. The retro- reflective sheeting shall be covered under 7 year warranty issued for field performance and a certified copy of three years outdoor exposure report shall be obtained as per IRC 67:2012. (as per MORT&H Specification No.801) 30cm X 90cm Ractangular

-

-

-

... More
Road furniture at Km 57/0-60/0

100

4000

400000

... More
Proving and fixing Solar powered Traffic Blinkers of 30cm dia with Polycarbonate Dome 5mm Red of Led 150 Nos. iri each Red Blinkers Light - 1 No. with Red / White / Blue Led Blinkers Delineator Solar Panel : 12v 50w Solar Panel — 1 No. 12v 18 AH Battery - 1 No. with Box, Solar Circuit Controller Board Box. Straight Pole : MS Pole 3” dia 2.5mm thick 18 Feet height pole (1 No.) with 2 Feet under ground pole foundation, pole painting including transportation charges, installation charges etc., complete as per standard specification.

-

-

-

... More
Road furniture at Km 57/0-60/0

30

25000

750000

... More
Providing and erecting of Direction and Place Identification Retro-reflectorised Sign made out of High Intensity Prismatic Grade Sheeting confirming to Type-IV standards of IRC-67: 2012 and ASTM D 4956 –09, specification and fixed over 2mm thick Aluminium sheet fixed over a back supporting frame of 25mmx25mmx3mm Mild Steel angle and supported on a mild steel angle post 75X75X6mm with a clear height of not less than 2.10m from the ground level to the bottom of the sign board and 0.60m below ground level. The sign post should be painted as per IRC 67-2012 and firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45cmX45cmX60cm size including cost and conveyance of all materials, equipment, Machinery and labour with all leads and lifts, loading charges necessary for satisfactory completion of the work as directed by the engineerin-charge. High intensity Retro Reflectro sheet shall consist of minimum coefficient of Retro-reflection as per Table 6.6 of IRC 67-2012. The retro- reflective sheeting shall be covered under 7 year warranty issued for field performance and a certified copy of three years outdoor exposure report shall be obtained as per IRC 67:2012. (as per MoRT&H Specification No.801) for sign having area upto 0.90sqm(Type IV)

-

-

-

... More
Road furniture at Km 57/0-60/0

21.6

11491

248205.6

... More
Providing and erecting of Retro - Reflector›sed Cautionary, Mandatory and Informatory signs {without definition board} made out of High Intensity Prismatic Grade Sheeting confirming to Type-IV standards of IRC-67: 2012 and ASTM D 4956 —09, specification and fixed over 2mm thick Aluminium sheet fixed over a back supporting frame of 25mmx25mmx3mm Mild Steel angle and supported on a mild steel angle post 75X75X6mm with a clear height of not less than 2.10m from the ground level to the bottom of the sign board and 0.6Om below ground level. The sign post should be painted as per IRC 67-2012 and firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 45cmX45cmX60cm size including cost and conveyance of all materials, equipment, Machinery and labour with all leads and lifts, loading charges necessary for satisfactory completion of the work as directed by the engineer in charge. High intensity Retro - Reflectro sheet shall consist of minimum coefficient of Retro-reflection as per Table 6.6 of IRC 67- 20 12. The retro - reflective sheeting shall be covered under 7 3 ear warranty issued for field performance and a certified copy of three years outdoor exposure report shall be obtained as per IRC 67: 20 12 . ( as per MO RT&H Specification No.801) 60cm equilateral triangle

-

-

-

... More
Road furniture at Km 57/0-60/0

68

3228

219504

... More
Providing and erecting of Retro - Reflector›sed Cautionary, Mandatory and Informatory signs {without definition board} made out of High Intensity Prismatic Grade Sheeting confirming to Type-IV standards of IRC-67: 2012 and ASTM D 4956 —09, specification and fixed over 2mm thick Aluminium sheet fixed over a back supporting frame of 25mmx25mmx3mm Mild Steel angle and supported on a mild steel angle post 75X75X6mm with a clear height of not less than 2.10m from the ground level to the bottom of the sign board and 0.6Om below ground level. The sign post should be painted as per IRC 67-2012 and firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 45cmX45cmX60cm size including cost and conveyance of all materials, equipment, Machinery and labour with all leads and lifts, loading charges necessary for satisfactory completion of the work as directed by the engineer in charge. High intensity Retro - Reflectro sheet shall consist of minimum coefficient of Retro-reflection as per Table 6.6 of IRC 67- 20 12. The retro - reflective sheeting shall be covered under 7 3 ear warranty issued for field performance and a certified copy of three years outdoor exposure report shall be obtained as per IRC 67: 20 12 . ( as per MO RT&H Specification No.801) 60cm circular

-

-

-

... More
Road furniture at Km 57/0-60/0

30

4513

135390

... More
Providing and erecting of Retro - Reflector›sed Cautionary, Mandatory and Informatory signs {without definition board} made out of High Intensity Prismatic Grade Sheeting confirming to Type-IV standards of IRC-67: 2012 and ASTM D 4956 —09, specification and fixed over 2mm thick Aluminium sheet fixed over a back supporting frame of 25mmx25mmx3mm Mild Steel angle and supported on a mild steel angle post 75X75X6mm with a clear height of not less than 2.10m from the ground level to the bottom of the sign board and 0.6Om below ground level. The sign post should be painted as per IRC 67-2012 and firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 45cmX45cmX60cm size including cost and conveyance of all materials, equipment, Machinery and labour with all leads and lifts, loading charges necessary for satisfactory completion of the work as directed by the engineer in charge. High intensity Retro - Reflectro sheet shall consist of minimum coefficient of Retro-reflection as per Table 6.6 of IRC 67- 20 12. The retro - reflective sheeting shall be covered under 7 3 ear warranty issued for field performance and a certified copy of three years outdoor exposure report shall be obtained as per IRC 67: 20 12 . ( as per MO RT&H Specification No.801) 60cm X45cm rectangular

-

-

-

... More
Road furniture at Km 57/0-60/0

60

4316

258960

... More
Providing and erecting of Retro - Reflector›sed Cautionary, Mandatory and Informatory signs {without definition board} made out of High Intensity Prismatic Grade Sheeting confirming to Type-IV standards of IRC-67: 2012 and ASTM D 4956 —09, specification and fixed over 2mm thick Aluminium sheet fixed over a back supporting frame of 25mmx25mmx3mm Mild Steel angle and supported on a mild steel angle post 75X75X6mm with a clear height of not less than 2.10m from the ground level to the bottom of the sign board and 0.6Om below ground level. The sign post should be painted as per IRC 67-2012 and firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 45cmX45cmX60cm size including cost and conveyance of all materials, equipment, Machinery and labour with all leads and lifts, loading charges necessary for satisfactory completion of the work as directed by the engineer in charge. High intensity Retro - Reflectro sheet shall consist of minimum coefficient of Retro-reflection as per Table 6.6 of IRC 67- 20 12. The retro - reflective sheeting shall be covered under 7 3 ear warranty issued for field performance and a certified copy of three years outdoor exposure report shall be obtained as per IRC 67: 20 12 . ( as per MO RT&H Specification No.801) 90cm octagon

-

-

-

... More
Road furniture at Km 57/0-60/0

8

8205

65640

... More
Providing and erecting Single sided Double Guard Metal Beam Crash Barrier System 1.70m high, comprising of 3mm thick wall “W” beams posts and spacer channels shall be made by cold roll forming using HR conform to IS 5986 Fe 410/360 and dip galvanized having Zinc Mass of 550gms/sqm, minimum 950mm above road/ ground level fixed on ISMC series channel vertical post 150x75x5mm spaced 2m center to center 312mm x 83mm flange width x 3mm thick, 4318mm long post directly embedded in the concrete (M15) pit size 350x350x800mm for a depth of 750mm below ground. All fixing bolts and nuts hot dip galvanized conforming to IS:1367 clause 4.60 all complete as per Technical Specification and as directed by the Engineer-in-charge

-

-

-

... More
Road furniture at Km 57/0-60/0

360

6500

2340000

... More
Providing and fixing of Digitally Printed Retro Reflectorized Overhead Cantilever Informatory sign Board of Size 5.00m x 1.80m made of cube corner Micro Prismatic grade sheeting conforming to Type XI standards of IRC67 - 2012 and ASTMD4956 – 09, specification and fixed over 2mm thick aluminum sheet fixed on back supporting frame mild steel L angle of size 50mm x 50mm x 6mm. The Vertical support post for the installation of overhead sign Gantry shall be made of 300NB (Nominal Bore) MS Pipe with 12mm thick with a ground clearance of 6 meters along with 80NB (Nominal Bore) MS Pipe with 4mm thick and 40NB (Nominal Bore) MS Pipe with 3.20mm thick support posts. MS Base plate of size 1200mm x 1200mm x 25mm and MS Top plate of size 900mm x 1650mm x 16mm to be used to hold the sign board at the top and bottom respectively. MS Stiffener plates 8mm thick of sizes 420x420, 682x420, 288x288, 288x927 & 44x130 are to be used. Anchor bolts of dimension 25mm dia and 1000mm length are to be used as fixtures. The approved direction information should be digitally printed and should have 70% of the co-efficient of Retro-reflection values against the values as mentioned in Table 6.9 of IRC67 – 2012. The Latex printer used for digital printing should use inks with low VOC emissions and have green guard, eco logo certificates as per UL 2801 standards. The retro-reflective sheeting shall be covered under 10 years warranty issued for field performance and a certified copy of three years Outdoor exposure report shall be obtained as per IRC 67-2012 (As per MoRT&H specification No.801).Cantilever sign shall be installed at the site as per the approved structural and foundation drawing provided in the tender document and including cost and conveyance of all materials, equipment, machineries to worksite, including all labour charges for fixing the gantry in position with all leads and lifts, loading charges and necessary for satisfactory completion of the work as directed by the engineer-in-charge etc., complete

-

-

-

... More
Road furniture at Km 57/0-60/0

2

540490

1080980

... More
Providing fixing of Rigid Median Marker double sided made of polycarbonate for impact resistance and good weather ability. Polycarbonate used for molding the median marker shall have a minimum Izod impact strength value of 600 J/m at room temperature. The impact strength of the poly carbonate should not decrease to less than 70% of its initial value on being subjected to UV weathering as per ASTM G 155 for 1000 hours or exposure to 2 years of natural weathering. The body of the median marker shall be in the form of an isosceles trapezoidal structure of length 15 cm height and width of 10 x 10 cm. The median marker shall have fluorescent yellow retro - reflective sheeting confirming to Type XI specifications as per ASTM D 4956. Area of reflective sheeting should not be less than 70 cm2. Edge of retro reflective shall be concealed using a grill/mesh/similar mechanism to prevent vandalism and sheeting pilferage. The logo of the manufacturer shall be embossed and painted in contrasting colour on both side of median marker for distinct identification.

-

-

-

... More
Road furniture at Km 57/0-60/0

640

470

300800

... More
BUS LAY BAY AND BRANCH ROAD IMPROVEMENTS

-

-

-

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification.a) box cutting for widening portion

-

-

-

... More
Bus lay bay and branch road improvement in Km 57/0-60/0

1796.49

123

221435.36

... More
Construction of Granular sub-base by providing close graded Material, (Table:- 400-1) mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 401 for grading-V Material

-

-

-

... More
Bus lay bay and branch road improvement in Km 57/0-60/0

608.35

1959

1192073.99

... More
Construction of granular sub-base by providing close graded Material, (Table:- 400-1) mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 401 for grading-III Material

-

-

-

... More
Bus lay bay and branch road improvement in Km 57/0-60/0

328.84

2049

673858.93

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5

-

-

-

... More
Bus lay bay and branch road improvement in Km 57/0-60/0

822.1

2238

1839884.46

... More
Providing and laying Prime Coat over WMM surface using Pressure Distributor at the rate of 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 502 of MORTH Rev-5

-

-

-

... More
Bus lay bay and branch road improvement in Km 57/0-60/0

3288.4

81

268103.25

... More
Providing and laying Tack Coat over WMM surface (treated with primer) using Pressure Distributor at the rate of 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 503 of MORTH Rev V

-

-

-

... More
Bus lay bay and branch road improvement in Km 57/0-60/0

3288.4

18

61756.15

... More
Providing and laying Tack Coat over Existing BT surface using Pressure Distributor at the rate of 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5

-

-

-

... More
Bus lay bay and branch road improvement in Km 57/0-60/0

1149.65

27

31075.04

... More
Providing, laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50- 13.20mm, 0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20Kgs of VG30 Grade bitumen for premixing per 10sqm of 50mm thick including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required temperature in Central Hot Mix Plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm using paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire and fuel charges for 20-30ton CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory rollers and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5

-

-

-

... More
Bus lay bay and branch road improvement in Km 57/0-60/0

161.2

9956

1604962.01

... More
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm of 50mm thick including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5

-

-

-

... More
Bus lay bay and branch road improvement in Km 57/0-60/0

105.1

8521

895588.63

... More
BC 30/40mm Thick (Grade-II) Using VG30 Bitumen Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm of 40mm thick including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30/40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5

-

-

-

... More
Bus lay bay and branch road improvement in Km 57/0-60/0

157.94

10774

1701740.32

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

141568403

-

... More
Add GST at 18%

1

25482313

-

... More
Total Value put to Tender

1

167050716

-

... More
Quoted Percentage

1

-

-

... More
Total Value of Contract Including 18% of GST

1

-

-

... More
Contract Value of put to tender as per Estimate

-

-

167050716

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-

... More
Quoted Rate in Words

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.