Highways Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Civil And Construction
Road Construction
Eprocure
Opening Date24 Jul 2023
Closing Date10 Aug 2023
Tender Amount₹ 5,24,00,000 
Notes
Download

Costs

Summary

Salem (h) Candm Sub Division (slm-4)

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Picking the existing BT surface upto 50mm thick as directed by the Departmental officers and collecting the picked up salvaged metal and stacking the same for reuse and depositing the debris excludung cost of materials including all labour charges for picking and all other tools and plants employed of the work and including all other incidental charges etc.,complete as per clause 111, 112, 202, 305.4.3 of MORTH - Vth Revision etc.,complete.

-

-

-

... More
2. Strengthening at km 0/0 - 1/4 of Periyaseeragapady road including Construction of Culvert at Km.1/2

154

3059

19.87

... More
2.1 Construction of Culvert at Km.1/2 of Periyaseeragapady road

113.98

2264

19.87

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as instructed by the Engineer for Approches as per clause 111, 112, 301 to 305, 900 of MORTH Vth Revision etc complete

-

-

-

... More
2.1 Construction of Culvert at Km.1/2 of Periyaseeragapady road

51.3

5748

112.05

... More
Granular Sub-base with Graded Material (Table:400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401) - for Grading-V material for approaches

-

-

-

... More
2.1 Construction of Culvert at Km.1/2 of Periyaseeragapady road

9.26

15162

1637.41

... More
Wet Mix Macadam (Table 400-13) :Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, as per clause 111, 112, 406 & 900 of MORTH Vth Revision

-

-

-

... More
2. Strengthening at km 0/0 - 1/4 of Periyaseeragapady road including Construction of Culvert at Km.1/2

69.3

137017

1977.16

... More
2.1 Construction of Culvert at Km.1/2 of Periyaseeragapady road

15.44

30527

1977.16

... More
Prime coat :Providing and applying primer coat with bitumen emulsion (SS-I type) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per clause 111, 112, 501, 502 & 900 of MORTH Vth Revision - over WMM/ WBM

-

-

-

... More
2. Strengthening at km 0/0 - 1/4 of Periyaseeragapady road including Construction of Culvert at Km.1/2

462

34576

74.84

... More
2.1 Construction of Culvert at Km.1/2 of Periyaseeragapady road

403.72

30214

74.84

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision - over granular surfaces treated with primer

-

-

-

... More
2. Strengthening at km 0/0 - 1/4 of Periyaseeragapady road including Construction of Culvert at Km.1/2

462

7720

16.71

... More
2.1 Construction of Culvert at Km.1/2 of Periyaseeragapady road

403.72

6746

16.71

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision - over bituminous surfaces

-

-

-

... More
1. Strengthening at km 0/0 - 2/6 of P.Mannarpalayam road including Construction of Storm water Drain at Km 0/0-0/4, Construction of Culvert at Km 0/2 and construction of retaining wall at Km.0/10 Km.0/0-1/0 (Corporation Limit)

5582.5

138390

24.79

... More
1. Strengthening at km 0/0 - 2/6 of P.Mannarpalayam road including Construction of Storm water Drain at Km 0/0-0/4, Construction of Culvert at Km 0/2 and construction of retaining wall at Km.0/10 Km.1/0-2/6 (Non - Corporation Limit)

8907.5

214848

24.12

... More
2. Strengthening at km 0/0 - 1/4 of Periyaseeragapady road including Construction of Culvert at Km.1/2

8126.75

196098

24.13

... More
3. Improvements to Riding Quality at km 1/0 - 1/6, and Km. 2/4 - 3/0 of Trichy - Salem road

14350

355736

24.79

... More
Tack coat - Providing and laying Tack Coat over Dry Lean Cement Concrete surface using 3.00Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5

-

-

-

... More
2.1 Construction of Culvert at Km.1/2 of Periyaseeragapady road

23.66

450

19.03

... More
Providing and laying advance B.T. patchwork upto 50mm thick using 45mm IRC size HBG metal for premixed with 44kg of bitumen per cum of metal including cost of bitumen 80/100 grade procured by contractor's own supply and cost and conveyance of metal from approved source to worksite and all other labour charges etc., complete

-

-

-

... More
1. Strengthening at km 0/0 - 2/6 of P.Mannarpalayam road including Construction of Storm water Drain at Km 0/0-0/4, Construction of Culvert at Km 0/2 and construction of retaining wall at Km.0/10(Non Corporation Limit)

38.33

136520

3561.72

... More
2. Strengthening at km 0/0 - 1/4 of Periyaseeragapady road including Construction of Culvert at Km.1/2

23.49

83724

3564.28

... More
Bituminous Macadam :Providing and laying bituminous macadam with hot mix plant using crushed aggregates of specified grading premixed with bituminous binder (Viscosity Grade 30), transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction, complete as per clause 111, 112, 501, 504 & 900 of MORTH Vth Revision- Grading II (Table 500-7)

-

-

-

... More
1. Strengthening at km 0/0 - 2/6 of P.Mannarpalayam road including Construction of Storm water Drain at Km 0/0-0/4, Construction of Culvert at Km 0/2 and construction of retaining wall at Km.0/10 (Non Corporation Limit)

20.65

165319

8005.8

... More
2. Strengthening at km 0/0 - 1/4 of Periyaseeragapady road including Construction of Culvert at Km.1/2

429.45

3438090

8005.8

... More
2.1 Construction of Culvert at Km.1/2 of Periyaseeragapady road

21.88

175166

8005.8

... More
Bituminous Concrete (Table 500-17) :Providing and laying bituminous concrete of required thickness with central hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by JMF of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 111,112,501,507 & 900 of MORTH vth Revision complete in all respects - Grading II

-

-

-

... More
1. Strengthening at km 0/0 - 2/6 of P.Mannarpalayam road including Construction of Storm water Drain at Km 0/0-0/4, Construction of Culvert at Km 0/2 and construction of retaining wall at Km.0/10 Km.0/0-1/0 (Corporation Limit)

169.09

1742751

10306.65

... More
1. Strengthening at km 0/0 - 2/6 of P.Mannarpalayam road including Construction of Storm water Drain at Km 0/0-0/4, Construction of Culvert at Km 0/2 and construction of retaining wall at Km.0/10 Km.1/0-2/6 (Non - Corporation Limit)

265.61

2724667

10258.15

... More
2. Strengthening at km 0/0 - 1/4 of Periyaseeragapady road including Construction of Culvert at Km.1/2

257.68

2643320

10258.15

... More
2.1 Construction of Culvert at Km.1/2 of Periyaseeragapady road

12.83

131612

10258.15

... More
Bituminous Concrete (Table 500-17) :Providing and laying bituminous concrete of required thickness with central hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-40) at percentage specified by JMF of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 111,112,501,507 & 900 of MORTH vth Revision complete in all respects - Grading II

-

-

-

... More
3. Improvements to Riding Quality at km 1/0 - 1/6, and Km. 2/4 - 3/0 of Trichy - Salem road

574

6045626

10532.45

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious smatter and obstructions, trimming of bottom of excavation backfilling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For making up of low berms with conveyance 5km as per MORTH specification clause No. 111, 112, 301 to 305 & 900 of MORTH vth Revision

-

-

-

... More
1. Strengthening at km 0/0 - 2/6 of P.Mannarpalayam road including Construction of Storm water Drain at Km 0/0-0/4, Construction of Culvert at Km 0/2 and construction of retaining wall at Km.0/10 Km.0/0-1/0 (Corporation Limit)

77.4

17813

230.15

... More
1. Strengthening at km 0/0 - 2/6 of P.Mannarpalayam road including Construction of Storm water Drain at Km 0/0-0/4, Construction of Culvert at Km 0/2 and construction of retaining wall at Km.0/10 Km.1/0-2/6 (Non - Corporation Limit)

110.35

24599

222.92

... More
2. Strengthening at km 0/0 - 1/4 of Periyaseeragapady road including Construction of Culvert at Km.1/2

210

46813

222.92

... More
Earth Work excavation in all classes of soil except hard rock not requiring blasting and depositing onbank with an initial lead of 10 metres and initial 2 metres in hard stiff clay stiff black cotton soil with small sized boulders as per SS 20B for foundation and all other incidental charges such as shorting, strutting, walling, bailing out water and forming protective bunds etc., complete as per standard specification for Earth work excavation for Drain, culvert and Retaining wall as per clause 304 of MORTH Vth Revision

-

-

-

... More
1.1 Construction of Strom water Drain at Km.0/0-0/4 of P.Mannarapalayam road

2539.8

298807

117.65

... More
1.2 Construction of Culvert at Km.0/2 of P.Mannarapalayam road

116.86

13748

117.65

... More
1.3 Construction of Retaining wall at Km.0/10 of P.Mannarapalayam road

182.5

21471

117.65

... More
2.1.Construction of Culvert at Km.1/2 of Periyaseeragapady road

173.16

19402

112.05

... More
Vibrated Cement Concrete of grade M15 Nominal Mix using 40mm ISS size HBG metal including cost and conveyance of all materials to site complying with required standards and specifications. including cost of formwork, mixing, laying and compacting using vibrator including hire and fuel charges for all Tools and Plants and incidental charges such as maintaining of protective bunds, coffer dams strutting etc., complete as per relevant standard specification for Base course of Culvert,Drain and Retaining wall as per clause 1000, 1500, 1700 & 2100 of MORTH Vth Revision

-

-

-

... More
1.1 Construction of Strom water Drain at Km.0/0-0/4 of P.Mannarapalayam road

149.4

885002

5923.71

... More
1.2 Construction of Culvert at Km.0/2 of P.Mannarapalayam road

6.15

36430

5923.71

... More
1.3 Construction of Retaining wall at Km.0/10 of P.Mannarapalayam road

36.5

216598

5934.2

... More
2.1 Construction of Culvert at Km.1/2 of Periyaseeragapady road

9.52

55957

5877.88

... More
Vibrated Cement Concrete of grade M20 Nominal Mix using 40mm ISS size HBG metal including cost and conveyance of all materials to site complying with required standards and specifications. including cost of formwork, mixing, laying and compacting using vibrator including hire and fuel charges for all Tools and Plants and incidental charges such as maintaining of protective bunds, coffer dams strutting etc., complete as per relevant standard specification for Retaining wall, Culvert and Parapet as per clause 1000, 1500, 1700 & 2100 of MORTH Vth Revision

-

-

-

... More
1.2 Construction of Culvert at Km.0/2 of P.Mannarapalayam road

1.4

16593

11852.66

... More
1.3 Construction of Retaining wall at Km.0/10 of P.Mannarapalayam road

189.11

1709367

9039.01

... More
2.1 Construction of Culvert at Km.1/2 of Periyaseeragapady road

41.81

339412

8117.98

... More
Vibrated Reinforced Cement Concrete of grade M25 Design Mix using graded ISS size HBG metal including cost and conveyance of all materials to site complying with required standards and specifications but excluding cost and fabrication of steel including cost of formwork, mixing, laying and compacting using vibrator including hire and fuel charges for all Tools and Plants and incidental charges such as maintaing of protective bunds, coffer dams strutting etc., complete as per relevant standard specification for Drain and Culvert as per clause 1000, 1500, 1700 & 2200 of MORTH Vth Revision

-

-

-

... More
1.1 Construction of Strom water Drain at Km.0/0-0/4 of P.Mannarapalayam road

926.01

13505235

14584.33

... More
1.2 Construction of Culvert at Km.0/2 of P.Mannarapalayam road

39.66

467372

11784.47

... More
2.1 Construction of Culvert at Km.1/2 of Periyaseeragapady road

35.23

410566

11653.89

... More
Supply and fabrication of Steel Grade Fe 500D required for all RCC items of works involved in the schedule including cost of steel, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete as per standard specification as per clause 1000, 1600 & 900 of MORTH Vth Revision

-

-

-

... More
1.1 Construction of Strom water Drain at Km.0/0-0/4 of P.Mannarapalayam road

47.57

4581931

96319.77

... More
1.2 Construction of Culvert at Km.0/2 of P.Mannarapalayam road

2.61

251394

96319.77

... More
2.1 Construction of Culvert at Km.1/2 of Periyaseeragapady road

2.48

235209

94804.27

... More
Supply and fixing of extra heavy duty 600mm dia FRC manhole cover and 600mm dia clear opening manhole frame as per IS 12592:2002 to its latest revision with reinforcement details for covers and frames at drainage cover slab and made good to the original condition after fixing as directed by the departmental offcers including all incidental charges etc., complete

-

-

-

... More
1.1 Construction of Strom water Drain at Km.0/0-0/4 of P.Mannarapalayam road

83

245265

2955

... More
Fabrication, supply and fixing in position of Grating at fixing at Drainage wall using M.S. angle of size 25 x 25 x 5 mm for frame and Special type of Hold fast welded to the frame fixed at centre for wall and fxing the 8mm RTS bar including necessary dismantling, making holes in RCC/PCC walls wherever necessary with power drill to the extend required and made good to the original conditions after fixing as directed by the departmental officers.

-

-

-

... More
1.1 Construction of Strom water Drain at Km.0/0-0/4 of P.Mannarapalayam road

84

84000

1000

... More
Refilling inbetween Drain and Culvert with excavated earth including cost and conveyence to site including labour charges for filling in layers, watering,tamping under optimum moisture content to get themaximum density and all other incidental charges etc., complete as per MORTH Vth Revision Specifications No. 304, 2907 (Labour charges only)

-

-

-

... More
2.1 Construction of Culvert at Km.1/2 of Periyaseeragapady road

24.53

955

38.95

... More
Refilling inbetween Drain and Culvert with excavated earth including cost and conveyence to site including labour charges for filling in layers, watering,tamping under optimum moisture content to get themaximum density and all other incidental charges etc., complete as per MORTH Vth Revision Specifications No. 304, 2907 (Labour charges only)

-

-

-

... More
1.1 Construction of Strom water Drain at Km.0/0-0/4 of P.Mannarapalayam road (Corporation Limit)

265.6

10863

40.9

... More
1.2 Construction of Culvert at Km.0/2 of P.Mannarapalayam road (Corporation Limit)

29.54

1208

40.9

... More
1.3 Construction of Retaining wall at Km.0/10 of P.Mannarapalayam road (Corporation Limit)

182.5

7464

40.9

... More
Supply of NP3 class RCC 1200mm dia hume pipes of 2.50m length confirming to IS458/1989 cost of pipes including all other incidental charges , testing charges, including Loading and Unloading charges, transport and delivery in good condition at work site as directed by the departmental officers etc., complete

-

-

-

... More
2.1 Construction of Culvert at Km.1/2 of Periyaseeragapady road

10

56860

5686

... More
Hoisting and fixing of 1200mm dia pipes to proper gradient including all labour charges and all other incidental chargesetc.,

-

-

-

... More
2.1 Construction of Culvert at Km.1/2 of Periyaseeragapady road

10

2560

256

... More
Disposal of Earth from foundation and Conveyance to 5km lead including all other incidental charges etc., complete as per clause 304 of MORTH Vth Revision Specification

-

-

-

... More
1.2 Construction of Culvert at Km.0/2 of P.Mannarapalayam road

87.32

5086

58.25

... More
Filling behind Reataining Wall including cost and conveyance of earth to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc., complete as per MORTH Vth Revision Specifications No. 304, 2907

-

-

-

... More
1.3 Construction of Retaining wall at Km.0/10 of P.Mannarapalayam road (Corporation Limit)

57.13

6721

117.65

... More
Providing and fixing 110mm dia PVC SEEPAGE PIPES of required length for including cost and conveyance of all materials to worksite, cost and labour for semisperical backfill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., to drain of the backfill in Retaining Wall as per clause 2706 of MORTH Vth Revision

-

-

-

... More
1.3 Construction of Retaining wall at Km.0/10 of P.Mannarapalayam road

187.92

38166

203.1

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

44400494

... More
Add GST at 18%

1

-

7992089

... More
Total Value put to Tender

1

-

52392583

... More
Negotiated Percentage

1

-

-

... More
Final Negotiated Value

1

-

-

... More
Add GST at 18% of Final Negotiated Value

1

-

-

... More
Total Value of Contract Including 18% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

44400494

-

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.