Highways Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date24 Aug 2024
Closing Date23 Sep 2024
Tender Amount₹ 5,61,50,000 
Notes
Download

Costs

Summary

Mdu No 006 Tn No 05 2024 25 Hdo Dated 14 08 2024

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
ROAD C

2549.86

314295

123.26

... More
ROAD D

3744.19

461508

123.26

... More
ROAD E

1908

235180

123.26

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up site and disposal of all surplus materials etc., complete as per standard specification. For making up low berms including forming Sub Grade

-

-

-

... More
ROAD D

1656.72

326324

196.97

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 of MORTH Specification no.111, 112, 401,900 - for grading- III Material

-

-

-

... More
ROAD A

55.3

103851

1877.96

... More
ROAD B

350

675766

1930.76

... More
ROAD C

373.34

696189

1864.76

... More
ROAD D

319.51

667507

2089.16

... More
ROAD E

350

763546

2181.56

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 of MORTH Specification no.111, 112, 401,900 - for grading- V Material

-

-

-

... More
ROAD A

69.12

123618

1788.46

... More
ROAD B

665

1224437

1841.26

... More
ROAD C

952

1690047

1775.26

... More
ROAD D

718.92

1437595

1999.66

... More
ROAD E

420

878665

2092.06

... More
Wet Mix Macadam (Table 400-13) Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5 Specification no.111,112,406,900

-

-

-

... More
ROAD A

138.26

305636

2210.59

... More
ROAD B

875

1934266

2210.59

... More
ROAD C

933.34

2063232

2210.59

... More
ROAD D

798.79

1765797

2210.59

... More
ROAD E

875

1934266

2210.59

... More
Advance B.T. Patches with bituminous premix chips upto 50mm thick using standard 45mm IRC size HBG metal cum of metal premix with 44Kgs of 80/100 grade bitumen per cum of metal in accordance with the requirement of the specifications to serve as base course and in conformity with the drawing or as directed by the Engineer.

-

-

-

... More
ROAD B

36.97

139679

3778.18

... More
ROAD C

36.13

132253

3660.48

... More
ROAD D

28.68

106236

3704.2

... More
ROAD E

34.7

133580

3849.57

... More
Prime coat Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 502 of MORTH Rev-5 Specification no. 111, 112, 501,502,900- over WMM

-

-

-

... More
ROAD A

552.99

45173

81.69

... More
ROAD B

3500

285915

81.69

... More
ROAD C

3727.85

304528

81.69

... More
ROAD D

3195.15

260947

81.67

... More
ROAD E

3500

285985

81.71

... More
Tack coat - Providing and laying Tack Coat over WBM/ WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5 Specification no.111,112,501, 503,900

-

-

-

... More
ROAD A

552.99

10418

18.84

... More
ROAD B

3500

65940

18.84

... More
ROAD C

3727.85

70232

18.84

... More
ROAD D

3195.15

60164

18.83

... More
ROAD E

3500

65975

18.85

... More
Tack coat - Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5 Specification no.111,112,501, 503,900

-

-

-

... More
ROAD B

8028.76

217338

27.07

... More
ROAD C

8070.75

218475

27.07

... More
ROAD D

6826.13

184783

27.07

... More
ROAD E

7500

203100

27.08

... More
Tack coat - Providing and laying Tack Coat over Dry Lean Cement Concrete surface using 3.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 Specification no.111,112,501, 503,900

-

-

-

... More
ROAD C

53.9

1149

21.32

... More
ROAD D

50.6

1078

21.31

... More
Dense Bituminous Macadam Providing, laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required temperature in Central Hot Mix Plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm using paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire and fuel charges for 20-30ton CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory rollers and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5 - Grading II

-

-

-

... More
ROAD A

30.41

308847

10156.12

... More
ROAD B

210

2132785

10156.12

... More
ROAD C

223.68

2271720

10156.12

... More
ROAD D

175.73

1784734

10156.12

... More
ROAD E

210

2132785

10156.12

... More
Bituminous Concrete (Table 500-17) Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 Specification no. 111, 112, 507, 900 complete in all respects - Grading II

-

-

-

... More
ROAD A

16.59

182452

10997.75

... More
ROAD B

345.89

3804011

10997.75

... More
ROAD C

355.58

3910579

10997.75

... More
ROAD D

302.17

3323190

10997.75

... More
ROAD E

330

3629257

10997.75

... More
Providing compaction for embankment / making up of low berms using the available box cut earth including all hire and fuel charges for power roller for compaction, water sprinkler, including all labour charges for laying, spreading, watering etc., complete and as directed by the departmental engineers (Earth work compaction only)

-

-

-

... More
ROAD A

45

1198

26.64

... More
ROAD B

437

11641

26.64

... More
ROAD C

478

12733

26.64

... More
ROAD D

434

11561

26.64

... More
ROAD E

337.5

8991

26.64

... More
Dismantling Dismantling the existing RR masonry with cement mortor / PCC / RCC / Cut Stone Slab salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc,as per MORTH Specification no.111,112,202

-

-

-

... More
R.R.Masonry

-

-

-

... More
ROAD C (FOR BOX CULVERT AT KM 0/4)

5.85

1656

283.14

... More
Cut Stone Slab

-

-

-

... More
ROAD C (FOR BOX CULVERT AT KM 0/4)

12

6155

512.93

... More
Earthwork excavation in all classes of soils except hard rock requiring, blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour` materials, tools, equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, Trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials, etc, complete as per standard specification 111,112,304 for Dressing the bed up to Sill Level

-

-

-

... More
ROAD C (FOR BOX CULVERT AT KM 0/4)

19.38

2388

123.26

... More
Earthwork excavation in all classes of soils except hard rock requiring, blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, Trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials, etc, complete as per standard specification 111,112,304 for foundation

-

-

-

... More
ROAD C (FOR BOX CULVERT AT KM 0/4)

193.42

55969

289.37

... More
EarthworkExcavation inall classesof soils except hard rock requiring blasting and depositingonbank withall leadsand lifts as per SS20B including cost of all labour, materials, tools, equipmentsandall incidental charges and sheeting, shoring, bracing and theirsubsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottomof excavtion backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification for foundation of Body wall and pipes

-

-

-

... More
ROAD C (FOR PIPE CULVERT AT KM 0/2 & 2/2)

86.14

21235

246.52

... More
ROAD E (FOR PIPE CULVERT AT KM 0/4)

63.35

15617

246.52

... More
ROAD E (FOR PIPE CULVERT AT KM 0/10 & 1/4)

86.14

21235

246.52

... More
Vibrated Cement Concrete M15 using 40mm ISS size HBG graded metal crushed stone including cost and conveyance of all materials to site but excluding cost and fabrication for steel but including cost and labour charges for formwork and centering, labour charges, compacting, finishing and curing, including all incidental charges etc., complete as per MORTH Specification no.111, 112, 1000, 1500, 1700, 2200, 900 For Leveling Course (BOX CULVERT)

-

-

-

... More
ROAD C (FOR BOX CULVERT AT KM 0/4)

26.22

156888

5983.53

... More
Plain Cement Concrete M10 grade mix using 40mm ISS size hard broken granite metal including cost and conveyance of all materials from approved quarry to work site including cost of cement including cost and labour charges for mixing the concrete, transporting, laying, vibrating, compacting, curingwithall leads for soft potable water, working in all depths includinghire, runningandfuel charges for all tools and plants employed as per standard specification for Levelling course below the body wall

-

-

-

... More
ROAD C (FOR PIPE CULVERT AT KM 0/2 & 2/2)

3.86

20554

5325.05

... More
ROAD E (FOR PIPE CULVERT AT KM 0/4)

2.1

11710

5576.3

... More
ROAD E (FOR PIPE CULVERT AT KM 0/10 & 1/4)

3.86

21569

5588

... More
Vibrated Reinforced Cement Concrete M25 (Design Mix) using crushed ISS size HBG graded metal of including cost and conveyance of all materials to site but excluding cost and fabrication of steel but including cost and labour charges for formwork and centering, labour charges for formwork and centering, labour charges compacting, finishing and curing including all incidental charges etc., completed as per MORTH Specification no.1000,1500,1600,1700,2300, 900 for BOX CULVERT

-

-

-

... More
ROAD C (FOR BOX CULVERT AT KM 0/4)

32.23

386379

11988.18

... More
Supply and fabrication of steel Grade Fe-500 required for all RCC items of works involved in the schedule including cost of steel cost of fabrication labour charges for cleaning the bars straightening cutting bending tying grills hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire provision of spacer bars, cover blocks and all other incidental charges etc. complete as per MORTH Vth Revision Specification No. 1000, 1500, 1600, 900

-

-

-

... More
ROAD C (FOR BOX CULVERT AT KM 0/4)

1.84

175729

95609.27

... More
Vibrated Cement Concrete M20 Nominal mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, complying to the required standard and specifications including cost and formwork, mixing, laying, compacting using vibrator including hire and fuel charges for all tools and plants engaged in curing and all other incidental charges such as bailing out water wherever necessary forming protective bunds coffer dams etc., complete for for Wings walls, & parapet wall.. as per MORTH Specification no. 111,112,1000, 1500, 1700,2200,900

-

-

-

... More
ROAD C (FOR BOX CULVERT AT KM 0/4)

192.54

1465685

7612.37

... More
ROAD C (FOR PIPE CULVERT AT KM 0/2 & 2/2)

40.2

300187

7467.34

... More
ROAD E (FOR PIPE CULVERT AT KM 0/4)

18.29

169630

9274.49

... More
ROAD E (FOR PIPE CULVERT AT KM 0/10 & 1/4)

40.2

310757

7730.29

... More
Supplyof 1000 mm dia RCC NP3 class pipes confirming to IS458 specification as directed by the departmental officers including cost and conveyance of pipes to the worksite and all other incidental chargesetc., complete as per standard specification.

-

-

-

... More
ROAD C (FOR PIPE CULVERT AT KM 0/2 & 2/2)

10

42768

4276.8

... More
ROAD E (FOR PIPE CULVERT AT KM 0/4)

15

64152

4276.8

... More
ROAD E (FOR PIPE CULVERT AT KM 0/10 & 1/4)

10

42768

4276.8

... More
Laying and fixing of 1000 mm dia RCC NP3 pipe in position excluding cost of pipes but including conveyance to work spot and handling charges on both sides including labour charges for hoisting and placing the pipes

-

-

-

... More
ROAD C (FOR PIPE CULVERT AT KM 0/2 & 2/2)

10

2662

266.2

... More
ROAD E (FOR PIPE CULVERT AT KM 0/4)

15

3993

266.2

... More
ROAD E (FOR PIPE CULVERT AT KM 0/10 & 1/4)

10

2662

266.2

... More
Stone dust filling including cost and conveyance of Stone dust to work site including labour charges for filling in layers as specified by the departmental officers including watering with all leads for water including labour charges for compacting, tamping, ramming under optimum moisture content to obtain the maximum density and all other incidental charges etc. complete as per standard specification.

-

-

-

... More
ROAD C (FOR PIPE CULVERT AT KM 0/2 & 2/2)

9.46

2348

248.21

... More
ROAD E (FOR PIPE CULVERT AT KM 0/4)

15.71

5709

363.42

... More
ROAD E (FOR PIPE CULVERT AT KM 0/10 & 1/4)

9.46

3494

369.39

... More
Construction of cement concrete centre median kerb with top and bottom width 150 and 165 mm respecively, 325 mm high in M 20 grade PCC on M 10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid , foundation concrete laid manually, all complete as per clause 408.

-

-

-

... More
ROAD A (JUNCTION IMPROVEMENT)

91.96

42063

457.41

... More
Filling Carted Earth in between gap for median and island and above road level with approved materials deposited at site from roadway cutting and excavation for drain and foundation of otherstructures,spread,greaded and compacted as per CL:407 of MORTH

-

-

-

... More
ROAD A (JUNCTION IMPROVEMENT)

20.85

4106

196.97

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

47583624

... More
Add GST at 18%

1

-

8565052

... More
Total Value put to Tender

1

-

56148676

... More
Excess/Less Percentage

1

-

-

... More
Final Value

1

-

-

... More
Add GST at 18% of Final Value

1

-

-

... More
Total Value of Contract Including 18% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

47583624

-

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.