Highways Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date16 Nov 2024
Closing Date27 Nov 2024
Tender Amount₹ 5,21,20,000 
Notes
Download

Costs

Summary

Widening From Sl To Il And Strengthening At Km 2/6 - 4/0 Of Vellanur -senganthi Road Including Reconstruction Of Box Culverts At Km 2/8 (i), (ii), 3/2 And Construction Of Box Culvert At Km 3/8 And Reconstruction Of Minor Bridge ... Try 25

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory earth Compactor to achieve the desired density, complete as per clause 401 ) - for Grading V Material. as per MORT&H Rev. V

-

-

-

... More
Main work Km 2/6-4/0

384.27

1933

742813.12

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory earth Compactor to achieve the desired density, complete as per clause 401 ) - for Grading III Material. as per MORT&H Rev. V

-

-

-

... More
Main work Km 2/6-4/0

160.1

2022

323839.07

... More
Picking the existing BT surface upto 50mm depth as directed by the departmental officers and levelling the surface including all labour charges for pickig and all other tools and plants employed of the work and including all other incidental charges etc., complete as per standard specifications.

-

-

-

... More
Main work Km 2/6-4/0

1335.9

21

29176.06

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5

-

-

-

... More
Main work Km 2/6-4/0

1001.42

2237

2240817.45

... More
Providing and laying Prime Coat over WMM surface using Pressure Distributor at the rate of 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 502 of MORTH Rev-5

-

-

-

... More
Main work Km 2/6-4/0

5608.8

81

458126.78

... More
Providing and laying Tack Coat over WMM surface (treated with primer) using Pressure Distributor at the rate of 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as

-

-

-

... More
Main work Km 2/6-4/0

5608.8

18

105669.79

... More
Providing and laying Tack Coat over Existing BT surface using Pressure Distributor at the rate of 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5

-

-

-

... More
Main work Km 1/6 - 2/6

9.6

27

259.97

... More
Providing and laying Tack Coat over Cement Concrete surface using using Pressure Distributor at the rate 3.00Kg of Bitumen Emulsion (RS1) per 10sqm for preparatory to another bituminous construction over it including cost of material, labourcharges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 (Tack Coat For Culvert)

-

-

-

... More
Main work Km 1/6 - 2/6

90.78

21

1935.43

... More
BM (Grade-II) 50mm Thick Using VG30 Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm of 50mm thick including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5

-

-

-

... More
Main work Km 1/6 - 2/6

281.82

8563

2413264.11

... More
BC 30mm Thick (Grade-II) Using VG30 Bitumen Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm of 40mm thick including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5

-

-

-

... More
Main work Km 1/6 - 2/6

168.55

10829

1825329.08

... More
Providing and laying Bituminous Concrete to 50mm thick (Grade I) using 0.22 cum of 26.5-13.20 mm, 0.24 cum of 13.20-2.36 mm and 0.26 cum of 2.36 & below IRC HBG metal with 62.40 kgs of VG30 bitumen for premixing per 10 sqm of 50mm thick including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hotmix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP clause 507 of MORTH. (For Culverts)

-

-

-

... More
Main work Km 1/6 - 2/6

4.54

10316

46836.18

... More
Refilling of berms on both sides of carriageway by using exess box soil earth available at site with consolidation by power roller compaction and in accordance with the specificatin and the lines and cross sections shown in the drawings or as indicated by the engineer as per MORTH to berms.

-

-

-

... More
Main work Km 1/6 - 2/6

282.69

26

7536.52

... More
RECONSTRUCTION OF BOX CULVERTS

-

-

-

... More
Dismantling Culverts, bridges and other structuresDismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc.a)Dismantling Plain Cement Concrete MORTH 111 112 202

-

-

-

... More
Reconstruction Box of Culvert at Km 2/8 (i)

16.13

486

7842.41

... More
Reconstruction Box of Culvert at Km 2/8 (ii)

16.13

486

7842.41

... More
Reconstruction Box of Culvert at Km 3/2

16.13

486

7842.41

... More
Reconstruction Box of Culvert at Km 3/8

12.56

486

6106.67

... More
Earth work Excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion backfilling, and clearing the site and disposal of all surplus materials etc. complete and in accordance with standard specification for foundation of Body wall , box culvert as per MORTH Vth Rev., 304.

-

-

-

... More
Reconstruction Box of Culvert at Km 2/8 (i)

65.52

289

18959.52

... More
Reconstruction Box of Culvert at Km 2/8 (ii)

73.94

289

21396.02

... More
Reconstruction Box of Culvert at Km 3/2

299.87

289

86773.38

... More
Reconstruction Box of Culvert at Km 3/8

1193.31

289

345308.11

... More
Cement Concrete of grade M15 using 40mm ISS size HBG graded metal using with M-Sand including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labor charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for LEVELLING COURSE BELOW Box Culvert and Wing wall as per MORTH Vth Rev., 1000, 1500, 1700, 2100 & 900.

-

-

-

... More
Reconstruction Box of Culvert at Km 2/8 (i)

4.82

6192

29846.26

... More
Reconstruction Box of Culvert at Km 2/8 (ii)

5.49

6192

33995.01

... More
Reconstruction Box of Culvert at Km 3/2

14

6192

86690.38

... More
Reconstruction Box of Culvert at Km 3/8

39.32

6180

243016.08

... More
Vibrated Reinforced Cement Concrete of grade M25 (Design mix) using 20mm ISShard broken granite metal using with M-Sand, including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete as per relevant standard specifications as directed by the Engineer for BASE SLAB, STEM AND TOP SLAB OF Box culvert as per MORTH No. 111, 112, 900, 1000, 1500, 1600, 1700, 2100

-

-

-

... More
Reconstruction Box of Culvert at Km 2/8 (i)

21.45

12091

259365.25

... More
Reconstruction Box of Culvert at Km 2/8 (ii)

24.96

12076

301435.43

... More
Reconstruction Box of Culvert at Km 3/2

49.99

12358

617794.92

... More
Reconstruction Box of Culvert at Km 3/8

71.54

11696

836749.73

... More
Supply and fabrication of (HYSD) Steel Grade (as per steel schedule) required for all RCC items of works involved in the schedule of drawings including cost of steel, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, positioning and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete as per standard specification. - MORTH Vth Rev., 1000, 1500, 1600 & 900

-

-

-

... More
Reconstruction Box of Culvert at Km 2/8 (i)

1.67

95609

159954.31

... More
Reconstruction Box of Culvert at Km 2/8 (ii)

1.92

95609

183856.63

... More
Reconstruction Box of Culvert at Km 3/2

3.4

95609

324784.69

... More
Reconstruction Box of Culvert at Km 3/8

4.62

95609

441810.44

... More
Vibrated Cement Concrete M 20 mix(Nominal mix)using 40mm ISS size hard broken granite metal using with M-Sand, including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for formwork and centering mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed and in accordance with standard specification for Parapet & Wing wall as per MORTH Vth Rev., 1000, 1500, 1700, 2100

-

-

-

... More
Reconstruction Box of Culvert at Km 2/8 (i)

7.56

9953

75249.82

... More
Reconstruction Box of Culvert at Km 2/8 (ii)

7.56

9953

75249.82

... More
Reconstruction Box of Culvert at Km 3/2

79.62

8235

655673.09

... More
Reconstruction Box of Culvert at Km 3/8

501.03

7786

3901049.64

... More
Stone Dust Filling in between the box culvert and wing wall including cost and conveyance to site including labour charges for filling in layers, watering tamping under optimum moisture content to get the maximum density all incidental charges etc., complete. MORTH Vth Rev.

-

-

-

... More
Reconstruction Box of Culvert at Km 2/8 (i)

6.13

328

2014.2

... More
Reconstruction Box of Culvert at Km 2/8 (ii)

7.59

328

2493.92

... More
Reconstruction Box of Culvert at Km 3/2

23.13

328

7600.06

... More
Reconstruction Box of Culvert at Km 3/8

51.44

322

16595.06

... More
EARTH WORK INCL. COMPACTION USING CONVEYED EARTH: Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For diversion road with conveyance with average lead of 5 Km

-

-

-

... More
Reconstruction Box of Culvert at Km 3/2

404.02

238

96164.84

... More
Reconstruction Box of Culvert at Km 3/8

559.57

238

133188.85

... More
Supply of 1000mm dia RCC NP3 class pipes confirming to IS 458 specification as directed by the departmental officers including cost and conveyance of pipes to the worksite and all other incidental charges etc., complete as per standard specification as per MORTH Vth Rev., 1000, 2900 & 900 for diversion road

-

-

-

... More
Reconstruction Box of Culvert at Km 3/2

12.5

4276

53460

... More
Reconstruction Box of Culvert at Km 3/8

22.5

4276

96228

... More
Laying and fixing of 1000mm dia RCC NP3 pipe in position excluding cost of pipes but including conveyance to work spot and handling charges on both sides including labour charges for hoisting and placing the pipes in position and packing the joints and all other incidental charges etc., complete as per standard specification as per MORTH Vth Rev., 2905, 2906 & 900 for diversion

-

-

-

... More
Reconstruction Box of Culvert at Km 3/2

12.5

266

3327.5

... More
Reconstruction Box of Culvert at Km 3/8

22.5

266

5989.5

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory earth Compactor to achieve the desired density, complete as per clause 401 ) - for Grading V Material. as per MORT&H Rev. V For diversion road,

-

-

-

... More
Reconstruction Box of Culvert at Km 3/2

44.63

1933

86272.02

... More
Reconstruction Box of Culvert at Km 3/8

62.25

1933

120332.36

... More
CONSTRUCTION OF PROTECTIVE WALL

-

-

-

... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal, removal of all logs, stumps and other deletrious matter and obstructions, trimming bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification -MORTH Vth Rev., 304 for foundation of Protective wall

-

-

-

... More
Construction Of Protective Wall at Km 3/4

463.45

289

134108.53

... More
Construction Of Protective Wall at Km 3/6

443.3

289

128277.72

... More
Plain Cement Concrete of grade M15 (Nominal mix) using 40mm ISS hard broken granite metal and using M-Sand and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges for compacting, curing and all incidental charges etc., complete as per standard specification for LEVELLING COURSE BELOW FOUNDATION.

-

-

-

... More
Construction Of Protective Wall at Km 3/4

53.48

6188

330948.68

... More
Construction Of Protective Wall at Km 3/6

51.15

6369

325807.6

... More
Vibrated Cement Concrete of grade M20 using 40mm ISS size HBG graded metal using with M-Sand including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labor charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per MORTH Vth Rev., 1000, 1500, 1700, 2100 & 900. complete For Protective wall for Below sill

-

-

-

... More
Construction Of Protective Wall at Km 3/4

287.39

7321

2104191.98

... More
Construction Of Protective Wall at Km 3/6

274.9

7314

2010844.02

... More
Vibrated Cement Concrete of grade M20 using 40mm ISS size HBG graded metal using with M-Sand including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labor charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per MORTH Vth Rev., 1000, 1500, 1700, 2100 & 900. complete For Protective wall for Above Sill

-

-

-

... More
Construction Of Protective Wall at Km 3/4

188.58

9517

1794893.13

... More
Construction Of Protective Wall at Km 3/6

180.38

9510

1715439.05

... More
Providing and fixing 100mm dia PVC SEEPAGE PIPES of required length for abutment and wing, retaining wall / protective wall including cost and conveyance of all materials to worksite, cost and labour for semi-spherical backfill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., complete to drain the backfill as per standard specification. -MORTH Vth Rev., 2700, 2706, 2707 & 900

-

-

-

... More
Construction Of Protective Wall at Km 3/4

77

192

14822.5

... More
Construction Of Protective Wall at Km 3/6

73

192

14052.5

... More
Refilling of berms on both sides of carriageway by using exess box soil earth available at site with consolidation by power roller compaction and in accordance with the specificatin and the lines and cross sections shown in the drawings or as indicated by the engineer as per MORTH to berms.

-

-

-

... More
Construction Of Protective Wall at Km 3/4

308.97

26

8237.14

... More
Construction Of Protective Wall at Km 3/6

295.53

26

7878.83

... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all lead sand lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller ,watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, back filling, clearing up the site .,complete as per standard specification. For Carted Earth with compaction for Filling With an average lead of 5Km.

-

-

-

... More
Construction Of Protective Wall at Km 3/4

227.07

238

54047.2

... More
Construction Of Protective Wall at Km 3/6

217.21

238

51700.32

... More
Vibrated Cement Concrete of grade M20 using 40mm ISS size HBG graded metal using with M Sand including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labor charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per MORTH Vth Rev., 1000, 1500, 1700, 2100 & 900 for Parapet.

-

-

-

... More
Construction Of Protective Wall at Km 3/4

7.29

11841

86327.52

... More
Construction Of Protective Wall at Km 3/6

7.29

11834

86270.66

... More
Providing and fixing PVC EXPANSION JOINT 20mm thick confiriming to specification in retaining/protective wall including cost and conveyance of expansion joints to site including cost of testing as per MORT&H specification, including charges for fixing in all respect etc., Complete.

-

-

-

... More
Construction Of Protective Wall at Km 3/4

6.6

653

4312.44

... More
Construction Of Protective Wall at Km 3/6

6.6

653

4312.44

... More
CONSTRUCTION OF DRAIN

-

-

-

... More
Earthwork excavation in all classes of soil such as hard stiff clay, stiff black cotton soil, hard red earth, shales, muram, gravel, stone earth etc., depositing on bank with all leads and lifts as per SS 20B and all other incidental charges such as baling out water, shoring, strutting, walling, and forming protective bund wherever necessary etc., complete as directed by the Engineer as per MORTH No. 111, 112, 304. for Foundation

-

-

-

... More
Drain

198

166

32889.78

... More
Cement Concrete M15 Mix using 40mm ISS size HBG metal and using Msand including cost and conveyance of all materials to site including cost of cement, centering, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants employed and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications as directed by the Engineer for Base Slab as per MORTH No. 111, 112, 900, 1000, 1500, 1700, 2100

-

-

-

... More
Drain

13

6192

80498.21

... More
Vibrated reinforced cement concrete M25 (Design Mix) using 20mm and 12mm ISS graded hard granite broken metal and using Msand including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but transporting, placing in, position vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges etc complete as per standard specification for Cover slab

-

-

-

... More
Drain

69

14460

997795.2

... More
Supply and fabrication of (HYSD) Steel Grade (as per steel schedule) required for all RCC items of works involved in the schedule of drawings including cost of steel, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, positioning and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete as per standard specification. - MORTH Vth Rev., 1000, 1500, 1600 & 900

-

-

-

... More
Drain

4.37

95609

417813.82

... More
Providing and fixing 100mm dia PVC SEEPAGE PIPES of required length for abutment and wing, retaining wall / protective wall including cost and conveyance of all materials to worksite, cost and labour for semi-spherical backfill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., complete to drain the backfill as per standard specification. -MORTH Vth Rev., 2700, 2706, 2707 & 900

-

-

-

... More
Drain

9

192

1732.5

... More
Supply and fixing of Reinforced cement concrete man hole cover 750mm X750mm with frames as directed by the Departmental officers including labour charges for fixing at every intervals along the drain including all other incidental charges etc.,complete

-

-

-

... More
Drinage

8

2971

23768

... More
CONSTRUCTION OF MINOR BRIDGE AT KM 3/10

-

-

-

... More
Earth work excavation in all classes of soil except hard rock requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as bailing out water shoring strutting, walling and forming protective bunds whereever necessary etc., complete as per relevent standard specification for DRESSING THE BED UPTO SILL LEVEL.

-

-

-

... More
Minor Bridge at Km 3/10

205.64

123

25347.19

... More
Blasting and removing the hard rock measured in solid in the foundation and removing the blasted stones and stacking the same for pre-measurement at site including the all other labour and incidental charges including the cost of the blasting materials and all other tools and plants employed etc., complete as per standard specifications for FOUNDATION OF ABUTMENTS, PIERS AND WINGS WALLS

-

-

-

... More
Minor Bridge at Km 3/10

260.17

1901

494583.17

... More
Benching, Hard rock upto an average of 10cm depth including all albour and incidental charges and hire charges for tools and plants employed etc., complete as per MORTH specifications for the FOUNDATION OF ABUTMENTS AND WING WALLS.

-

-

-

... More
Minor Bridge at Km 3/10

260.17

843

219505.43

... More
Providing Fe-415 grade 25mm dowel bars including cost and conveyance of all materials to site drilling 40mm holes in rock and grouting the same with cm 1:2 after placing the 25mm dowel bars etc., complete complete complying with relevent MORTH specifications in the FOUNDATION OF ABUTMENTS AND WING WALLS.

-

-

-

... More
Minor Bridge at Km 3/10

236

352

83072

... More
Vibrated Cement Concrete of Grade M20 (Nominal Mix), using 40mm ISS HBG metal and using Msand including cost and conveyance of al1 materials to site including cement at site including cost of formwork, soft water, labour changes for mixing, transporting, lfi ying and curing concrete,working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring , Strutting etc; complete as per relevant standard specification for LEVELLING COURSE UNDER FOUNDATION OF ABUTMENTS, RETURN WALLS & PIERS as per section 2100 of MORT&H Specifications.

-

-

-

... More
Minor Bridge at Km 3/10

26.02

6369

165738.29

... More
Vibrated Cement Concrete of M20 (Nominal Mix) using 40mm ISS size HBG graded metal and using Msand including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting,laying Fig and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for FOOTINGS UNDER ABU TMENTS, RETURN WALLS as per section 1500,1700 & 2100 of MORT&H Specifications (Fifth Revision-2013).

-

-

-

... More
Minor Bridge at Km 3/10

233.85

6993

1635313.05

... More
Vibrated Cement Concrete of grade M20 Nominal mix using 40mm ISS size HBG graded metal and using Msand including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for SUBSTRUCTURE OF ABUTMENTS, WINGS, AND PIERS ABOVE SILL LEVEL. as per section 1500,1700 & 2100 of MORT&H Specifications (Fifth Revision-2013).

-

-

-

... More
Minor Bridge at Km 3/10

293.92

8302

2440150.29

... More
Vibrated Reinforced Cement Concrete of gratie M30 Design mix using 20inm ISS size HBG graded metal and using Msand including cost and conveyancc of all inaterials to site including cost of cement at site but excluding cost and tabrication of steel but including cost of formwork, potable water, labour charles for mixing, transporting, lnying and curing concrete, working at heights, hire charles for tools and plants including all other incidental charles etc; complete as per relevant standard specifications, for DIRT WALL CUM BED BLOCK OVER ABUTMENTS AND BED BLOCK OVER PIERS as per section 1500, 1700 & 2200 of MORT&H Specifications (Fifth Revision-2013).

-

-

-

... More
Minor Bridge at Km 3/10

10.38

12491

129665.82

... More
Providing and fixing seepage pipes of 100mm dia. PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900mm dia. semi-spherical back fill arrangements with 100mm size broken granite chips at the periphery and labour charges for fixing, etc.,to drain of the backfill IN THE ABUTMENTS AND WINGS as per Appendix - 6 of IRC: 78 - 2014 & Sect ion 2706 of MORT& H speci fications (Fifth Revision)

-

-

-

... More
Minor Bridge at Km 3/10

181.38

192

34915.65

... More
Providing and fixing KRAFT PAPER for full width of seating of deck slab and including cost and conveyance to worksite, labour for fixing the same in correct position and all other incidental charges etc., complete.

-

-

-

... More
Minor Bridge at Km 3/10

28.22

110

3103.76

... More
Vibrated Reinforced Cement Concrete of grade M30 (Design mix) using 20mm ISShard broken granite metal using with M-Sand, including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete as per relevant standard specifications as directed by the Engineer for Above sill as per MORTH No. 111, 112, 900, 1000, 1500, 1600, 1700, 2100 , for DECK SLAB AND KERBS & SAFETY KERBS

-

-

-

... More
Minor Bridge at Km 3/10

104.16

13034

1357639.15

... More
Providing and fixing PVC EXPANSION JOINT 20mm thickness with approved type of PVC water stopper of 300mm width over abutments and piers in 20mm gap between deck slabs as shown in the drawing including cost and conveyance of expansion joints including expansion joint filler and joint sealant etc, complete. as per section 2600 of MoRT&(H) specifications (fifth revision)

-

-

-

... More
Minor Bridge at Km 3/10

47.3

653

30905.82

... More
Compacted Plain Cement Concrete M15 (Nominal Mix), using 40mm ISS hard granite broken metal and using msand including cost and conveyance of all materials to site and cement at site including cost of formwork, lead for soft water, labour charges tor mixing , transporting, laying, and Curing concrete working in heights and hire charges for tools and plants, and all other incidental chargesetc complete as per relevant specification for BASE COURSE BELOW APPROACH SLAB AND SAFETY KERB RAMP as per section 1500,1700 & 2704 of MoRT&(H) Specifications (Fifth Revision-2013).

-

-

-

... More
Minor Bridge at Km 3/10

19.49

6545

127565.56

... More
Vibrated Reinforced Cement Concrete of grade M30 (Design mix) using 20mm ISShard broken granite metal using with M-Sand, including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete as per relevant standard specifications as directed by the Engineer for Above sill as per MORTH No. 111, 112, 900, 1000, 1500, 1600, 1700, 2100 for APPROACH SLAB a

-

-

-

... More
Minor Bridge at Km 3/10

25.58

9344

239028.22

... More
Vibrated reinforced cement Concrete M30 design mix using ISS size HBG graded metal and using Msand including cost and conveyance of all materials to worksite and cement at site excluding cost and fabrication of steel including all labour charges for ixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges,formwork,cost of premoulded expansion joints and fixing the same in position etc., complete for wearing coat of 75mm uniform thickness over deck slab and approach slab as per section 2702.2 of MORT&H Specifications (Fifth Revision-2013).

-

-

-

... More
Minor Bridge at Km 3/10

237.57

674

160233.84

... More
Vibrated Reinforced Cement Concrete M-40, Grade, Design Mix, using ISS size hard granite broken graded metal and using Msand including cost and conveyance of all materials to site including cement at site but excluding cost and fabrication of steel, including labour charges for mixing, transporting, laying, and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges etc.,, complete for RCC CRASH BARRIERS OVER DECK SLAB. -1RM(For Estimate Purpose, mix 1:1.5:3)as per section 811, 1700 & 2703.3 of MORT&H Specifications (Fifth Itevirion-2013).

-

-

-

... More
Minor Bridge at Km 3/10

8.88

18292

162441.48

... More
Providing and fixing of G.I. drainage spouts 100mm dia as per GOI drawing SD/205 with grating arrangements at top as shown in the drawing using 12mm x 25mm flats for grating arrangements, and 100mm dia drainage spout projecting beyond the bottom of deck slab as shown in the drawing including cost and conveyance of cast iron pipes and flats and fixing them in position etc,complete.as per section 2705 of MORT&H Specifications (Fifth Itevirion-2013).

-

-

-

... More
Minor Bridge at Km 3/10

4

2498

9992.4

... More
Providing filter media behind the abutments and wings with clean III graded material 53mm to 5.6mm to 600mm thick and well compacted in layers with smaller sized towards the soil and bigger size towards the wall including cost and conveyance to work site including all labours and other incidental charges including hire charges for tools and plants employed etc.,complete as per Cl. 710.1.4 & Appendix 6 of IRC : 78-2014.

-

-

-

... More
Minor Bridge at Km 3/10

82.45

1398

115346.73

... More
Filling behind Abutments and Wings with clean gritty gravel including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc, complete as per Cl. 710.1.4 & Appendix 6 of IRC : 78-2014 and Section 305 of MoRT&(H) specifications (Fifth Revision).

-

-

-

... More
Minor Bridge at Km 3/10

203.37

369

75157.42

... More
Supply and fabrication of Fe-500 steel required for all RCC items of works involved in the schedule cost of steel at site fabrication,labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc,complete, as per section 1009.3, 1600 of MoRT&(H) Specifications (Fiftli Revision-2013).

-

-

-

... More
Minor Bridge at Km 3/10

14.89

95609

1423813.25

... More
Supply and fabrication of Fe-240 steel required for all RCC items of works involved in the schedule cost of steel at site fabrication,labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc,complete, as per section 1009.3, 1600 of MoRT&(H) Specifications (Fiftli Revision-2013).

-

-

-

... More
Minor Bridge at Km 3/10

1.5

95609

143031.47

... More
Vibrated Plain Cement Concrete M20 (Nominal Mix), using 40mm ISS hard granite broken metal and using Msand including cost and conveyance of all materials to site and cement at site including cost of formwork, lead for soft water, labour charges tor mixing , transporting, laying, and Curing concrete working in heights and hire charges for tools and plants, and all other incidental chargesetc complete as per relevant specification forCC PARAPET as per section 1500,1700 & 2704 of MoRT&(H) Specifications (Fifth Revision-2013).

-

-

-

... More
Minor Bridge at Km 3/10

6.74

13055

87992.59

... More
Supply and fixing of High Quality of PVC pipes of 160mm dia.. Including cost and conveyance of pipes to the site and fixing in position to proper grade and level, including labour charges for fixing and including all other incidental charges etc complete., for proving utility services in footpaths.

-

-

-

... More
Minor Bridge at Km 3/10

91

419

38192.7

... More
Diversion Road

-

-

-

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all lead average of 5 Km and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For making up diversion road with conveyance for 5 Km Lead

-

-

-

... More
Diversion Road

679.23

238

161670.32

... More
Supply of 1000mm dia RCC NP3 class pipes confirming to IS 458 specification as directed by the departmental officers including cost and conveyance of pipes to the worksite and all other incidental charges etc., complete as per standard specification as per MORTH Vth Rev., 1000, 2900 & 900 for diversion road

-

-

-

... More
Diversion Road

62.5

4276

267300

... More
Laying and fixing of 1000mm dia RCC NP3 class pipes confirming to IS 458 specification as directed by the departmental officers including cost and conveyance of pipes to the worksite and all other incidental charges etc., complete as per standard specification as per MORTH Vth Rev., 1000, 2900 & 900 for diversion road

-

-

-

... More
Diversion Road

62.5

266

16637.5

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory EARTH Compactor to achieve the desired density, complete as per clause 401 ) - for Grading V Material. as per MORT&H Rev. V specifications No.111,112,401,900.

-

-

-

... More
Diversion Road

118.13

1933

228351.2

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5

-

-

-

... More
Diversion Road

157.5

2237

352428.3

... More
Dismantling Culverts,bridges and other structures Dismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc. a) Dismantling stone masonry in lime mortar. MORTH 111 112 202

-

-

-

... More
Diversion Road

120

231

27720

... More
Dismantling Culverts,bridges and other structures Dismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc. a) Dismantling Plain Cement Concrete MORTH 111 112 202

-

-

-

... More
Diversion Road

34.13

4308

147055.93

... More
Providing sand bags in the diversion road including cost and conveyance of sand, supply of empty bags, loading and unloading, filling in bags with sand, shifting them and placing at eroded berms as directed by department officers etc., complete.

-

-

-

... More
Diversion Road

5427

50

271350

... More
Providing causuarina wallings with causurina posts of 10-13 cm dia spaced at 1.10m intervals and cross dia of 5-10 cm at 0.50 m intervals complying with standard specifications

-

-

-

... More
Diversion Road

90

71

6417

... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal, removal of all logs, stumps and other deletrious matter and obstructions, trimming bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification -MORTH Vth Rev., 304 for Protective wall

-

-

-

... More
Retaining wall km 3/10

110.2

289

31888.57

... More
Plain Cement Concrete of grade M15 (Nominal mix) using 40mm ISS hard broken granite metal and using msand including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges for compacting, curing and all incidental charges etc., complete as per standard specification for LEVELLING COURSE BELOW FOUNDATION..

-

-

-

... More
Retaining wall km 3/10

11.4

6180

70457.36

... More
Vibrated Cement Concrete M 20 mix(Nominal mix)using 40mm ISS size hard broken granite metal using with M Sand, including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for formwork and centering mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed and in accordance with standard specification below sill level as per MORTH Vth Rev., 1000, 1500, 1700, 2100

-

-

-

... More
Retaining wall km 3/10

73.1

7171

524254.93

... More
Vibrated Cement Concrete M 20 mix(Nominal mix)using 40mm ISS size hard broken granite metal using with M Sand, including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for formwork and centering mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed and in accordance with standard specification above sill level as per MORTH Vth Rev., 1000, 1500, 1700, 2100

-

-

-

... More
Retaining wall km 3/10

61

8784

535839.86

... More
Refilling behind Retaining wall with using Excavated earth including cost and conveyance of filling in layers, rolling with power roller under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc., complete-1 cum

-

-

-

... More
Retaining wall km 3/10

73.47

26

1958.71

... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with and average lead of 5 km and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller ,watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, clearing up the site and disposal of all surplus materials etc.,complete as per standard specification. For Carted Earth with compaction for Filling With Conveyance Of 5 Kms Lead

-

-

-

... More
Retaining wall km 3/10

78.03

238

18572.7

... More
Providing and fixing 100mm dia PVC SEEPAGE PIPES of required length for abutment and wing, retaining wall / protective wall including cost and conveyance of all materials to worksite, cost and labour for semi-spherical backfill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., complete to drain the backfill as per standard specification. -MORTH Vth Rev., 2700, 2706, 2707 & 900

-

-

-

... More
Retaining wall km 3/10

13

192

2502.5

... More
Vibrated Cement Concrete M 20 mix(Nominal mix)using 40mm ISS size hard broken granite metal using with M Sand, including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for formwork and centering mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed and in accordance with standard specification for Parapet as per MORTH Vth Rev., 1000, 1500, 1700, 2100

-

-

-

... More
Retaining wall km 3/10

0.81

11834

9585.63

... More
Collection and supply of carted earth with averge lead of 5 km including excavation, removal and satisfactory disposal of all materials necessary for the construction of road way in accordance with the specifications and the lines, grades and cross section shown in the drawings or as directed by the Engineer for formation of embankment Approach road using vibrator soil compactor etc.complete.

-

-

-

... More
APPROACH ROAD

1530

273

418225.5

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory EARTH Compactor to achieve the desired density, complete as per clause 401 ) - for Grading V Material. as per MORT&H Rev. V specifications No.111,112,401,900.

-

-

-

... More
APPROACH ROAD

328.14

1933

634311.03

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5

-

-

-

... More
APPROACH ROAD

581.28

2237

1300695.38

... More
Providing and laying Prime Coat over WMM surface using Pressure Distributor at the rate of 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 502 of MORTH Rev-5

-

-

-

... More
APPROACH ROAD

2187.63

81

178685.62

... More
Providing and laying Tack Coat over WMM surface (treated with primer) using Pressure Distributor at the rate of 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as

-

-

-

... More
APPROACH ROAD

2187.63

18

41214.95

... More
BM (Grade-II) 50mm Thick Using VG30 Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm of 40mm thick including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5

-

-

-

... More
APPROACH ROAD

109.38

8563

936636.25

... More
BC 30mm Thick (Grade-II) Using VG30 Bitumen Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm of 40mm thick including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5

-

-

-

... More
APPROACH ROAD

65.63

10829

710746.65

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

44168660

-

... More
Add GST at 18%

1

7950359

-

... More
Total Value put to Tender

1

52119019

-

... More
Quoted Percentage

1

-

-

... More
Total Value of Contract Including 18% of GST

1

-

-

... More
Contract Value of put to tender as per Estimate

-

-

52119019

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-

... More
Quoted Rate in Words

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.