Highways Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Works
Bridge Construction
Civil And Construction
Road Construction
Civil Works Others
Eprocure
Opening Date16 Nov 2024
Closing Date24 Dec 2024
Tender Amount₹ 24,89,50,000 
Notes
Download

Costs

Summary

Widening from Two lane to Two lane with Paved Shoulders and Strengthening at km 38/0

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, (Table : 401) mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 401) - for Grading V Material. as per MORT&H Rev.V specifications No.111,112,401,900

-

-

-

... More
Main work Km 38/0 - 47/8

6145.87

2798

17196820.31

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, (Table : 401) mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 401) - for Grading III Material. as per MORT&H Rev.V specifications No.111,112,401,900

-

-

-

... More
Main work Km 38/0 - 47/8

2963.23

2893

8574254.17

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam required thickness, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5

-

-

-

... More
Main work Km 38/0 - 47/8

7627.43

3091

23582945.72

... More
Providing and laying Prime Coat over WMM surface using pressure distributor 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5

-

-

-

... More
Main work Km 38/0 - 47/8

31094.78

80

2513080.12

... More
Providing and laying Tack Coat over WMM surface (treated with primer) using pressure distributor 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5

-

-

-

... More
Main work Km 38/0 - 47/8

31094.78

18

575564.38

... More
Providing and laying Tack Coat over Existing BT surface using pressure distributor 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5

-

-

-

... More
Main work Km 38/0 - 47/8

68905.5

26

1847356.46

... More
Providing and Laying 50mm thick Bituminous Macadam using course aggregate and VG30 bitumen which shall consist of construction in a single course base/binder course confirming to the specfication on a previously prepared base, (using Mini Hot Mix Plant and Power Roller) including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 504 MORTH Rev-5 (For Patch Works)

-

-

-

... More
Main work Km 38/0 - 47/8

305.55

8947

2734055.29

... More
BM (Grade-II) 50mm Thick using VG30 Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50-13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm of 50mm thick including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc.,including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5

-

-

-

... More
Main work Km 38/0 - 47/8

3518.38

9218

32434537.87

... More
DBM (Grade-I) 80mm Thick using VG30 Providing, laying 75mm consolidated thick Dense Bituminous Macadam using 0.40 cum of 37.50 - 13.20mm,0.35 cum of 13.20 - 2.36 mm and 0.36 cum of 2.36 mm & below size IRC metal with 71.30 kgs of VG30 grade bitumen for premixing per 10sqm of 75mm thick including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required temperature in central hot mix plant 20 - 30 ton capacity, conveying the mix by tipper trucks to site, spreading the mix to uniform thickness of 80mm with mechanical paver to the specified grades and cross sections and consolidated by Vibratory Roller to the required density etc.,including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tippertrucks, PaverFinisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 505 of MORTH rev-5.

-

-

-

... More
Main work Km 38/0 - 47/8

2370.6

9916

23509216.49

... More
BC (Grade-II) 30/40mm Thick using VG30 Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm of 40mm thick including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30/40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc.,complete as per specification using CMP as per clause 507 of MORTH Rev-5

-

-

-

... More
Main work Km 38/0 - 47/8

3948.04

11355

44830902.25

... More
Providing compaction for embankment / making up of low berms using the available box cut earth including all hire and fuel charges for power roller for compaction, water sprinkler, including all labour charges for laying, spreading, watering etc.,complete and as directed by the departmental engineers.

-

-

-

... More
Main work Km 38/0 - 47/8

11873.47

26

316546.71

... More
Precast Box Culvert

-

-

-

... More
Dismantling Culverts,bridges and other structures Dismantling clearing away and carefully stacking material useful for re-use including salvaging and removal and disposing of resulting unusable materials and back filling the resulting trenches and pits etc.including all labour and incidental charges complying with MORTH 111, 112, 202 a)Dismantling PCC

-

-

-

... More
Reconstruction of Precast Box culvert at km 38/8

10.81

486

5255.82

... More
Reconstruction of Precast Box culvert at km 39/6 (i)

10.81

486

5255.82

... More
Reconstruction of Precast Box culvert at km 44/10

10.26

486

4988.41

... More
Reconstruction of Precast Box culvert at km 45/6

9.03

486

4390.39

... More
Reconstruction of Precast Box culvert at km 46/8, 46/10

19.97

486

9709.41

... More
Reconstruction of Precast Box culvert at km 47/2

10.68

486

5192.62

... More
Reconstruction of Precast Box culvert at km 47/4 (i) (ii) (iii)

31.04

486

15091.65

... More
Earth work Excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion backfilling, and clearing the site and disposal of all surplus materials etc. complete and in accordance with standard specification for Narrow foundation of Body wall, and Box portion as per MORTH Vth Rev., 304.

-

-

-

... More
Reconstruction of Precast Box culvert at km 38/8

131.72

289

38115.82

... More
Reconstruction of Precast Box culvert at km 39/6 (i)

112.69

289

32609.11

... More
Reconstruction of Precast Box culvert at km 44/10

199.95

289

57859.53

... More
Reconstruction of Precast Box culvert at km 45/6

139.69

289

40422.1

... More
Reconstruction of Precast Box culvert at km 46/8, 46/10

180.98

289

52370.18

... More
Reconstruction of Precast Box culvert at km 47/2

99.25

289

28719.97

... More
Reconstruction of Precast Box culvert at km 47/4 (i) (ii) (iii)

289.62

289

83807.34

... More
Vibrated Cement Concrete of grade M15 using 40mm ISS size HBG graded metal using with M-sand including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labor charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for LEVELLING COURSE BELOW Box Culvert and Wing wall as per MORTH Vth Rev., 1000, 1500, 1700, 2100 & 900.

-

-

-

... More
Reconstruction of Precast Box culvert at km 38/8

7.4

6986

51703.43

... More
Reconstruction of Precast Box culvert at km 39/6 (i)

6.88

6993

48112.46

... More
Reconstruction of Precast Box culvert at km 44/10

9.36

7042

65914.99

... More
Reconstruction of Precast Box culvert at km 45/6

7.99

7048

56316.16

... More
Reconstruction of Precast Box culvert at km 46/8, 46/10

11.54

7060

81479.44

... More
Reconstruction of Precast Box culvert at km 47/2

5.77

7066

40775.15

... More
Reconstruction of Precast Box culvert at km 47/4 (i) (ii) (iii)

17.31

7066

122325.44

... More
Providing Precast Vibrated Reinforced Cement Concrete Box single M35 Design mix minimum cement content of 425 kg per cum of concrete of size 1.50 x 1.50 m x 1.50 m with 0.3m thick web, 0.3m thick bottom and 0.3m thick top slab including cost of Mild Steel Mouldings and conveyance of all materials to site and cost of cement including minimum of 0.212 MT of reinforcement steel per running meter of box including fabrication charges of Steel at site including cost of soft water, labour charges for mixing, laying and curing concrete, tools and plants, transporting from casting yard to work site through trailers, lifting, erecting by using cranes of required capacity and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for box units of size 1.50x1.50x1.50 as per standard specification.

-

-

-

... More
Reconstruction of Precast Box culvert at km 38/8

15

67013

1005195.75

... More
Reconstruction of Precast Box culvert at km 39/6 (i)

13.5

67013

904676.18

... More
Reconstruction of Precast Box culvert at km 45/6

13.5

67013

904676.18

... More
Reconstruction of Precast Box culvert at km 46/8, 46/10

27

67013

1809352.35

... More
Reconstruction of Precast Box culvert at km 47/2

13.5

67013

904676.18

... More
Reconstruction of Precast Box culvert at km 47/4 (i) (ii) (iii)

40.5

67013

2714028.53

... More
Providing Precast Vibrated Reinforced Cement Concrete Box single M35 Design mix minimum cement content of 425 kg per cum of concrete of size 2.00 x 2.00 m x 1.50 m with 0.3m thick web, 0.3m thick bottom and 0.3m thick top slab including cost of Mild Steel Mouldings and conveyance of all materials to site and cost of cement including minimum of 0.221 MT of reinforcement steel per running meter of box including fabrication charges of Steel at site including cost of soft water, labour charges for mixing, laying and curing concrete, tools and plants, transporting from casting yard to work site through trailers, lifting, erecting by using cranes of required capacity and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for box units of size 2.00x2.00x1.50 as per standard specification.

-

-

-

... More
Reconstruction of Precast Box culvert at km 44/10

13.5

80615

1088307.23

... More
Vibrated Cement Concrete M20 mix(Nominal mix)using 40mm ISS size hard broken granite metal and with M-sand including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for formwork and centering mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed and in accordance with standard specification for Above Sill level, Parapet & Wing wall as per MORTH Vth Rev., 1000, 1500, 1700, 2100

-

-

-

... More
Reconstruction of Precast Box culvert at km 38/8

24.89

9492

236258.62

... More
Reconstruction of Precast Box culvert at km 39/6 (i)

24.89

9498

236411.44

... More
Reconstruction of Precast Box culvert at km 44/10

47.4

9198

436014.11

... More
Reconstruction of Precast Box culvert at km 45/6

36.86

9374

345549.6

... More
Reconstruction of Precast Box culvert at km 46/8, 46/10

25.84

10075

260349.89

... More
Reconstruction of Precast Box culvert at km 47/2

12.92

10081

130254.14

... More
Reconstruction of Precast Box culvert at km 47/4 (i) (ii) (iii)

38.76

10081

390762.43

... More
Supply and fabrication of (HYSD) Steel Grade (as per steel schedule) required for all RCC items of works involved in the schedule of drawings including cost of steel, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, positioning and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete as per standard specification. - MORTH Vth Rev., 1000, 1500, 1600 & 900

-

-

-

... More
Reconstruction of Precast Box culvert at km 38/8

0.15

95609

14532.61

... More
Reconstruction of Precast Box culvert at km 39/6 (i)

0.14

95609

12907.25

... More
Reconstruction of Precast Box culvert at km 44/10

0.17

95609

16444.79

... More
Reconstruction of Precast Box culvert at km 45/6

0.14

95609

12907.25

... More
Reconstruction of Precast Box culvert at km 46/8, 46/10

0.27

95609

25814.5

... More
Reconstruction of Precast Box culvert at km 47/2

0.14

95609

12907.25

... More
Reconstruction of Precast Box culvert at km 47/4 (i) (ii) (iii)

0.41

95609

38721.75

... More
Vibrated Reinforced cement concrete M30 (Design mix) using 20mm and below ISS sized hard granite metal and using M-sand including cost and conveyance of all materials to site excluding cost and fabrication of steel reinforcement but including cost of premoulded expansion joints and fixing the same in position including cost and labour charges for formwork, labour charges for laying compacting curing, including all incidental charges etc., complete for - MORTH Vth Rev., 1000, 1500, 1700, 2702, 2704 & 900 WEARING COAT 75MM uniform thickness OVER DECK SLAB

-

-

-

... More
Reconstruction of Precast Box culvert at km 38/8

29.61

734

21762.17

... More
Reconstruction of Precast Box culvert at km 39/6 (i)

26.46

735

19459.21

... More
Reconstruction of Precast Box culvert at km 44/10

32.76

739

24212.92

... More
Reconstruction of Precast Box culvert at km 45/6

26.46

739

19568.76

... More
Reconstruction of Precast Box culvert at km 46/8, 46/10

52.92

740

39186.2

... More
Reconstruction of Precast Box culvert at km 47/2

26.46

740

19605.27

... More
Reconstruction of Precast Box culvert at km 47/4 (i) (ii) (iii)

79.38

740

58815.82

... More
Providing and fixing 110mm dia PVC SEEPAGE PIPES of required length for abutment and wing, retaining wall including cost and conveyance of all materials to worksite, cost and labour for semi-spherical backfill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., complete to drain the backfill as per standard specification. -MORTH Vth Rev., 2700, 2706, 2707 & 900

-

-

-

... More
Reconstruction of Precast Box culvert at km 38/8

5.6

203

1137.36

... More
Reconstruction of Precast Box culvert at km 39/6 (i)

5.6

203

1137.36

... More
Reconstruction of Precast Box culvert at km 44/10

5.6

203

1137.36

... More
Reconstruction of Precast Box culvert at km 45/6

5.6

203

1137.36

... More
Reconstruction of Precast Box culvert at km 46/8, 46/10

11.2

203

2274.72

... More
Reconstruction of Precast Box culvert at km 47/2

5.6

203

1137.36

... More
Reconstruction of Precast Box culvert at km 47/4 (i) (ii) (iii)

16.8

203

3412.08

... More
Stone dust filling including cost and conveyance of Stone dust to work site including labour charges for filling in layers as specified by the departmental officers including watering with all leads for water including labour charges for compacting,tamping,ramming under optimum moisture content to obtain the maximum density and all other incidental charges etc. complete as per standard specification.

-

-

-

... More
Reconstruction of Precast Box culvert at km 38/8

4

739

2956.96

... More
Reconstruction of Precast Box culvert at km 39/6 (i)

4

743

2975.72

... More
Reconstruction of Precast Box culvert at km 44/10

5

767

3836.9

... More
Reconstruction of Precast Box culvert at km 45/6

4

772

3088.28

... More
Reconstruction of Precast Box culvert at km 46/8, 46/10

8

776

6214.08

... More
Reconstruction of Precast Box culvert at km 47/2

4

781

3125.8

... More
Reconstruction of Precast Box culvert at km 47/4 (i) (ii) (iii)

12

781

9377.4

... More
Widening Box Culvert

-

-

-

... More
Dismantling Culverts,bridges and other structures Dismantling clearing away and carefully stacking material useful for re-use including salvaging and removal and disposing of resulting unusable materials and back filling the resulting trenches and pits etc.including all labour and incidental charges complying with MORTH 111, 112, 202 a)Dismantling PCC

-

-

-

... More
Widening of Box culvert at km 39/6 (ii)

50.8

486

24698.96

... More
Earth work Excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion backfilling, and clearing the site and disposal of all surplus materials etc. complete and in accordance with standard specification for Narrow foundation of Body wall , box culvert as per MORTH Vth Rev., 304.

-

-

-

... More
Widening of Box culvert at km 39/6 (ii)

116.04

289

33578.49

... More
Vibrated Cement Concrete of grade M15 using 40mm ISS size HBG graded metal using with M-sand including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labor charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for LEVELLING COURSE BELOW Box Culvert and Wing wall as per MORTH Vth Rev., 1000, 1500, 1700, 2100 & 900.

-

-

-

... More
Widening of Box culvert at km 39/6 (ii)

3.8

6993

26573.74

... More
Vibrated Cement Concrete M 20 grade (nominal mix) using 40mm ISS size hard broken granite metal using with M-Sand including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for formwork and centering mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed and in accordance with standard specification for as per MORTH Vth Rev., 1000, 1500, 1700, 2100 & 900 - for foundation footing below wing wall

-

-

-

... More
Widening of Box culvert at km 39/6 (ii)

1.86

6784

12618.46

... More
Vibrated Cement Concrete M 20 grade (nominal mix) using 40mm ISS size hard broken granite metal using with M-Sand including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for formwork and centering mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed and in accordance with standard specification for as per MORTH Vth Rev., 1000, 1500, 1700, 2100 & 900 - for culvert wing wall and Parapet

-

-

-

... More
Widening of Box culvert at km 39/6 (ii)

30.2

11721

353981.15

... More
Vibrated Reinforced Cement Concrete of grade M25 (Design mix) using 20mm and 12mm ISShard broken granite metal using with M-Sand including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Box culvert.

-

-

-

... More
Widening of Box culvert at km 39/6 (ii)

25.34

13586

344282.42

... More
Supply and fabrication of (HYSD) Steel Grade (as per steel schedule) required for all RCC items of works involved in the schedule of drawings including cost of steel, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, positioning and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete as per standard specification. - MORTH Vth Rev., 1000, 1500, 1600 & 900

-

-

-

... More
Widening of Box culvert at km 39/6 (ii)

2.01

95609

192174.63

... More
Vibrated Reinforced cement concrete M30 (Design mix) using 20mm and below graded ISS sized hard granite metal and using M-sand including cost and conveyance of all materials to site excluding cost and fabrication of steel reinforcement but including cost of premoulded expansion joints and fixing the same in position including cost and labour charges for formwork, labour charges for laying compacting curing, including all incidental charges etc., complete for - MORTH Vth Rev., 1000, 1500, 1700, 2702, 2704 & 900 WEARING COAT 75MM uniform thickness OVER DECK SLAB

-

-

-

... More
Widening of Box culvert at km 39/6 (ii)

10.92

735

8030.79

... More
Stone dust filling including cost and conveyance of Stone dust to work site including labour charges for filling in layers as specified by the departmental officers including watering with all leads for water including labour charges for compacting,tamping,ramming under optimum moisture content to obtain the maximum density and all other incidental charges etc. complete as per standard specification.

-

-

-

... More
Widening of Box culvert at km 39/6 (ii)

3.6

743

2678.15

... More
Box Culvert

-

-

-

... More
Dismantling Culverts,bridges and other structures Dismantling clearing away and carefully stacking material useful for re-use including salvaging and removal and disposing of resulting unusable materials and back filling the resulting trenches and pits etc.including all labour and incidental charges complying with MORTH 111, 112, 202 a)Dismantling Brick work in cum under 3m height

-

-

-

... More
Reconstruction of Box culvert at km 38/4

39.6

283

11212.34

... More
Reconstruction of Box culvert at km 45/6 (ii)

42.24

283

11959.83

... More
Reconstruction of Box culvert at km 45/10

37.51

283

10620.58

... More
Reconstruction of Box culvert at km 46/6

14

283

3963.96

... More
Dismantling Culverts,bridges and other structures Dismantling clearing away and carefully stacking material useful for re-use including salvaging and removal and disposing of resulting unusable materials and back filling the resulting trenches and pits etc.including all labour and incidental charges complying with MORTH 111, 112, 202 b)Removal of Cut stone

-

-

-

... More
Reconstruction of Box culvert at km 38/4

19.62

512

10063.69

... More
Reconstruction of Box culvert at km 45/6 (ii)

9.8

512

5026.71

... More
Reconstruction of Box culvert at km 45/10

10

512

5129.3

... More
Earth work Excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion backfilling, and clearing the site and disposal of all surplus materials etc. complete and in accordance with standard specification for Narrow foundation of Body wall , box culvert as per MORTH Vth Rev., 304.

-

-

-

... More
Reconstruction of Box culvert at km 38/4

308.28

289

89206.98

... More
Reconstruction of Box culvert at km 45/6 (ii)

391.25

289

113216.01

... More
Reconstruction of Box culvert at km 45/10

354.26

289

102512.22

... More
Reconstruction of Box culvert at km 46/6

412.31

289

119310.14

... More
Vibrated Cement Concrete of grade M15 using 40mm ISS size HBG graded metal using with M-sand including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labor charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for LEVELLING COURSE BELOW Box Culvert and Wing wall as per MORTH Vth Rev., 1000, 1500, 1700, 2100 & 900.

-

-

-

... More
Reconstruction of Box culvert at km 38/4

12.85

6983

89742.86

... More
Reconstruction of Box culvert at km 45/6 (ii)

12.08

7048

85143.83

... More
Reconstruction of Box culvert at km 45/10

12.08

7051

85180.91

... More
Reconstruction of Box culvert at km 46/6

12.08

7057

85255.08

... More
Vibrated Cement Concrete M 20 grade (nominal mix) using 40mm ISS size hard broken granite metal using with M-Sand including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for formwork and centering mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed and in accordance with standard specification for as per MORTH Vth Rev., 1000, 1500, 1700, 2100 & 900 - for foundation footing below wing wall

-

-

-

... More
Reconstruction of Box culvert at km 38/4

2.43

7096

17243.96

... More
Reconstruction of Box culvert at km 45/6 (ii)

2.94

7160

21052.55

... More
Reconstruction of Box culvert at km 45/10

2.94

7163

21061.57

... More
Reconstruction of Box culvert at km 46/6

3.27

7169

23445.7

... More
Vibrated Cement Concrete M 20 grade (nominal mix) using 40mm ISS size hard broken granite metal using with M-Sand including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for formwork and centering mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed and in accordance with standard specification for as per MORTH Vth Rev., 1000, 1500, 1700, 2100 & 900 - for culvert wing wall and Parapet

-

-

-

... More
Reconstruction of Box culvert at km 38/4

38.68

10108

391005.29

... More
Reconstruction of Box culvert at km 45/6 (ii)

63.35

9107

576946.19

... More
Reconstruction of Box culvert at km 45/10

63.35

9110

577140.67

... More
Reconstruction of Box culvert at km 46/6

82.19

8893

730984.71

... More
Vibrated Cement Concrete M 20 grade (nominal mix) using 20mm ISS size hard broken granite metal using with M-Sand including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for formwork and centering mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed and in accordance with standard specification for as per MORTH Vth Rev., 1000, 1500, 1700, 2100 & 900 - for Sluice

-

-

-

... More
Reconstruction of Box culvert at km 45/6 (ii)

5.23

10794

56453.56

... More
Reconstruction of Box culvert at km 45/10

5.23

10797

56469.62

... More
Vibrated Reinforced Cement Concrete of grade M25 (Design mix) using 20mm and 12mm ISShard broken granite metal using with M-Sand including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Box culvert.

-

-

-

... More
Reconstruction of Box culvert at km 38/4

96.5

12624

1218216

... More
Reconstruction of Box culvert at km 45/6 (ii)

80.88

13056

1055983.03

... More
Reconstruction of Box culvert at km 45/10

80.88

13059

1056231.33

... More
Reconstruction of Box culvert at km 46/6

80.88

13065

1056727.93

... More
Supply and fabrication of (HYSD) Steel Grade (as per steel schedule) required for all RCC items of works involved in the schedule of drawings including cost of steel, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, positioning and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete as per standard specification. - MORTH Vth Rev., 1000, 1500, 1600 & 900

-

-

-

... More
Reconstruction of Box culvert at km 38/4

6.52

95609

623372.44

... More
Reconstruction of Box culvert at km 45/6 (ii)

6.37

95609

608935.44

... More
Reconstruction of Box culvert at km 45/10

6.37

95609

608935.44

... More
Reconstruction of Box culvert at km 46/6

6.37

95609

608935.44

... More
Vibrated Reinforced cement concrete M30 (Design mix) using 20mm and below graded ISS sized hard granite metal and using M-sand including cost and conveyance of all materials to site excluding cost and fabrication of steel reinforcement but including cost of premoulded expansion joints and fixing the same in position including cost and labour charges for formwork, labour charges for laying compacting curing, including all incidental charges etc., complete for - MORTH Vth Rev., 1000, 1500, 1700, 2702, 2704 & 900 WEARING COAT 75MM uniform thickness OVER DECK SLAB

-

-

-

... More
Reconstruction of Box culvert at km 38/4

66.02

734

48506.87

... More
Reconstruction of Box culvert at km 45/6 (ii)

35.37

739

26158.24

... More
Reconstruction of Box culvert at km 45/10

35.37

739

26166.37

... More
Reconstruction of Box culvert at km 46/6

35.37

740

26182.64

... More
Stone dust filling including cost and conveyance of Stone dust to work site including labour charges for filling in layers as specified by the departmental officers including watering with all leads for water including labour charges for compacting,tamping,ramming under optimum moisture content to obtain the maximum density and all other incidental charges etc. complete as per standard specification.

-

-

-

... More
Reconstruction of Box culvert at km 38/4

4

739

2956.96

... More
Reconstruction of Box culvert at km 45/6 (ii)

14

772

10808.98

... More
Reconstruction of Box culvert at km 45/10

14

772

10808.98

... More
Reconstruction of Box culvert at km 46/6

14

776

10874.64

... More
Retaining Wall

-

-

-

... More
Earth work excavation in all classes of soils such as hard rock requiring blasting and depositing on bank with all leads and lifts as per S S 20 B including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavaion back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification for FOR FOUNDATION OF RETAINING WALL

-

-

-

... More
Construction of Retaining wall at Km 42/8 (R/S)

124

289

35881.88

... More
Construction of Retaining wall at Km 43/2 (R/S)

153

289

44273.61

... More
Construction of Retaining wall at Km 44/4 (R/S)

165.75

289

47963.08

... More
Construction of Retaining wall at Km 44/6 (R/S)

63.75

289

18447.34

... More
Construction of Retaining wall at Km 46/6 (R/S)

93

289

26911.41

... More
Plain Cement Concrete of grade M20 (nominal mix) using 40mm ISS size HBG metal and using M-Sand including cost and conveyance of all materials from approved quarry to work site including cost of cement which has to be procured by the contractor including cost and labour charges for mixing the concrete, transporting, laying, compacting, curing with all leads for soft portable water, working in all depths including hire, running and fuel charges for all tools and plants employed including as per MORTH Rev. V Specification for foundation

-

-

-

... More
Construction of Retaining wall at Km 42/8 (R/S)

37.2

7136

265465.9

... More
Construction of Retaining wall at Km 43/2 (R/S)

45.9

7142

327832.49

... More
Construction of Retaining wall at Km 44/4 (R/S)

49.73

7151

355645.09

... More
Construction of Retaining wall at Km 44/6 (R/S)

19.13

7151

136808.58

... More
Construction of Retaining wall at Km 46/6 (R/S)

27.9

7169

200041.33

... More
Vibrated Cement Concrete of grade M20 (nominal mix) using 40mm ISS size HBG metal and using M-Sand including cost and conveyance of all materials from approved quarry to work site including cost of cement which has to be procured by the contractor including cost and labour charges for mixing the concrete, transporting, laying, compacting, curing with all leads for soft portable water, working in all depths including hire, running and fuel charges for all tools and plants employed including as per MORTH Rev. V Specification for footing and Body Wall (Below Sill).

-

-

-

... More
Construction of Retaining wall at Km 42/8 (R/S)

54.18

8188

443632.34

... More
Construction of Retaining wall at Km 43/2 (R/S)

59.14

8560

506290.44

... More
Construction of Retaining wall at Km 44/4 (R/S)

64.07

8570

549085.03

... More
Construction of Retaining wall at Km 44/6 (R/S)

24.65

8614

212354.57

... More
Construction of Retaining wall at Km 46/6 (R/S)

40.64

8230

334500.52

... More
Vibrated Cement Concrete of grade M20 (nominal mix) using 40mm ISS size HBG metal and using MSand including cost and conveyance of all materials from approved quarry to work site including cost of cement which has to be procured by the contractor including cost and labour charges for mixing the concrete, transporting, laying, compacting, curing with all leads for soft portable water, working in all depths including hire, running and fuel charges for all tools and plants employed including as per MORTH Rev. V Specification for footing and Body Wall (Above sill).

-

-

-

... More
Construction of Retaining wall at Km 42/8 (R/S)

125.64

9342

1173774.11

... More
Construction of Retaining wall at Km 43/2 (R/S)

104.99

9943

1043983.81

... More
Construction of Retaining wall at Km 44/4 (R/S)

113.77

9952

1132335.74

... More
Construction of Retaining wall at Km 44/6 (R/S)

43.71

9995

436897.19

... More
Construction of Retaining wall at Km 46/6 (R/S)

94.25

9397

885702.12

... More
Providing and fixing seepage pipes of 110mm PVC pipes of required lengths for retaining wall including cost and conveyance of all materials to worksite, cost and labour for 900mm dia semi-spherical backfill arrangements with 100mm size broken granite chips at the periphery and labour charges for fixing, etc., complete as per drain the backfill -1 No.

-

-

-

... More
Construction of Retaining wall at Km 42/8 (R/S)

18

203

3655.8

... More
Construction of Retaining wall at Km 43/2 (R/S)

18

203

3655.8

... More
Construction of Retaining wall at Km 44/4 (R/S)

18

203

3655.8

... More
Construction of Retaining wall at Km 44/6 (R/S)

18

203

3655.8

... More
Construction of Retaining wall at Km 46/6 (R/S)

13.5

203

2741.85

... More
Refilling/spreading with available Excavated Earth for filling in layers, not exceeding limits including compaction including all labour charges and incidental charges etc., complete and in accordance with standard specifications as per MORTH Vth Rev., 305 & 2907 for Behind retaining wall

-

-

-

... More
Construction of Retaining wall at Km 42/8 (R/S)

166.88

42

7150.81

... More
Construction of Retaining wall at Km 43/2 (R/S)

143.16

42

6134.41

... More
Construction of Retaining wall at Km 44/4 (R/S)

155.03

42

6643.04

... More
Construction of Retaining wall at Km 44/6 (R/S)

59.63

42

2555.15

... More
Construction of Retaining wall at Km 46/6 (R/S)

125.16

42

5363.11

... More
Minor Bridge

-

-

-

... More
Dismantling the Plain cement concrete in the existing bridge and clearing away from the work site and carefully stacking the usefull materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete.

-

-

-

... More
Reconstruction of Minor Bridge at Km 43/2

114.86

486

55844.93

... More
Dismantling the Reinforced Cement Concrete in the existing bridge and clearing away from the work site and carefully stacking the useful materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete.

-

-

-

... More
Reconstruction of Minor Bridge at Km 43/2

72.17

4308

310958.88

... More
Earth work excavation in all classes of soils except hard rock not requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as bailing out water, shoring, strutting, walling and forming protective bunds wherever necessary etc., complete as per relevent standard specification for DRESSING THE BED UPTO SILL LEVEL.

-

-

-

... More
Reconstruction of Minor Bridge at Km 43/2

290.42

123

35797.17

... More
Earth work Excavation in all classes of soils except hard rock not requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification for Foundation of Raft, Cut off walls.

-

-

-

... More
Reconstruction of Minor Bridge at Km 43/2

1255.03

387

485696.61

... More
Plain Cement concrete M10 (nominal mix) using 40mm ISS size hard broken granite metal with M sand including cost and conveyance of all materials to site and cost of cement at site, including soft water, labour charges for mixing transporting, laying, compacting, curing concrete, tools and plants and all incidental chargessuch as bailing out water, maintaining protective bunds, cofferdams, shoring etc., complete for LEVELLING COURSE BELOW RAFT.

-

-

-

... More
Reconstruction of Minor Bridge at Km 43/2

38

6391

242858

... More
Filling inside the raft with M sand including cost and conveyance of sand to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering with all leads for water and all other incidental charges etc., complete for Filling inside the Raft. Complying with standard specification.

-

-

-

... More
Reconstruction of Minor Bridge at Km 43/2

761.93

2216

1688436.88

... More
Vibrated Reinforced Cement Concrete of grade M30 (Design mix) using 20mm and below ISS graded metal using M sand including cost and conveyance of all materials to site excluding cost of steel including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths Tools and Plants and incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevent standard specification for Raft and Cut off walls

-

-

-

... More
Reconstruction of Minor Bridge at Km 43/2

300.53

11240

3377957.2

... More
Vibrated Cement Concrete of grade M15 (Nominal mix) using 40mm ISS hard broken granite metal with M sand including cost and conveyance of all materials to site including cost and labour charges for form work, centering, labour charges for laying, compacting, curing all other incidental charges etc., complete for Toe wall around Flexible Apron

-

-

-

... More
Reconstruction of Minor Bridge at Km 43/2

37.55

11167

419320.85

... More
Vibrated Cement Concrete of grade M20 (Nominal mix) using 40mm ISS hard broken granite metal with M sand including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, soft water, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Substructure of Abutmet, Wings and piers above sill level.

-

-

-

... More
Reconstruction of Minor Bridge at Km 43/2

211.92

9443

2001160.56

... More
Vibrated Reinforced cement concrete of grade M30 (Design mix) using 20mm and below ISS hard broken granite metal with M sand including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc.,complete for Bed Block cum Dirtwall over Abutments

-

-

-

... More
Reconstruction of Minor Bridge at Km 43/2

8.19

13318

109074.42

... More
Providing and fixing Class I PVC seepage pipes of 100mm dia of required lengths for abutments and return walls including costs and conveyance of all materials to work site and labour charges for fixing etc., complete to drain from the backfill as per section 2706 of MORTH specification (Rev- V)

-

-

-

... More
Reconstruction of Minor Bridge at Km 43/2

134.4

192

25872

... More
Supply and fixing of Kraft Paper for full width of seaating of deck slab and including cost and conveyance to worksite, labour for fixing same and all other incidental charges etc., complete

-

-

-

... More
Reconstruction of Minor Bridge at Km 43/2

22.79

110

2506.9

... More
Vibrated Reinforced cement concrete of grade M30 (Design mix) using 20mm and below ISS hard broken granite metal and using M Sand including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc.,complete for Deck slab.

-

-

-

... More
Reconstruction of Minor Bridge at Km 43/2

89.32

13597

1214484.04

... More
Providing FILTER MEDIA behind abutments and return walls for 600mm thickness using filter material conforming to clause 309.3.2.B of MORTH well packed with smaller size towards the soil and bigger size towards the wall including cost and conveyance of all materials to worksite and including labour charges and all other incidental charges etc.,complete.

-

-

-

... More
Reconstruction of Minor Bridge at Km 43/2

71.88

2041

146707.08

... More
Filling behind Abutments and return walls with clean gritty free draining gravel including cost of gravel having pi value more than 40, conveyance of gravel to worksite. Laying, handling charges and filling in layers tamping under optimum moiture content to get the maximum density, including watering, with all leads and lifts for water and all other incidental charges etc., complete.

-

-

-

... More
Reconstruction of Minor Bridge at Km 43/2

133.73

955

127712.15

... More
Supplying and fixing 300mm wide PVC EXPANSION JOINT in the 20mm expansion gap provided in between decks over piers and in between deck and dirt wall over abutment as shown in the drawing including cost and conveyance of expansion joints including shalimar pad and joint sealant etc., complete

-

-

-

... More
Reconstruction of Minor Bridge at Km 43/2

38.85

653

25384.59

... More
Supply and fabrication of STEEL grade Fe500 for all the reinforced cement concrete items of work involved in the shedule including cost of steel, cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawing including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete.

-

-

-

... More
Reconstruction of Minor Bridge at Km 43/2

29.72

95610

2841911.64

... More
Vibrated cement concrete M15 (Nominal mix) using 40mm ISS size hard broken granite metal with Msand including cost and conveyance of all materials to site including cost and labour charges for formwork, centering, labour charges for laying, compacting, curing all incidental charges etc., complete for BASE COURSE BELOW APPROACH SLAB.

-

-

-

... More
Reconstruction of Minor Bridge at Km 43/2

14.44

7547

108978.68

... More
Vibrated reinforced cement concrete M30 Grade (Design mix) using HBG graded metal of 20mm size HBG metal with M sand and below ISS size including cost and conveyance of all materials to work site but excluding cost and fabrication of steel reinforcement but including cost and labour charges for form work and centering, labour charges for laying, compacting, curing including all other incidental charges etc.,complete for APPROACH SLABS.

-

-

-

... More
Reconstruction of Minor Bridge at Km 43/2

26.9

10238

275402.2

... More
Vibrated Reinforced Cement Concrete M30 Grade (Design mix) using 20mm and below ISS size hard broken granite metal with Msand including cost and conveyance of all materials to site exclding cost and fabrication of steel reinforcement but inclding cost of premoulded expansion joints and fixing the same in position including cost and labour charges for formwork, labour charges for laying, compacting, curing including all other incidental charges etc.,complete for WEARING COAT OVER DECK SLAB AND APPROACH SLAB.75 mm Uniform thick

-

-

-

... More
Reconstruction of Minor Bridge at Km 43/2

207.9

738

153471.78

... More
Vibrated Reinforced cement concrete of grade M40 (Design mix) using 20mm and below ISS hard broken granite metal with M Sand including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc.,complete for Inner Crash Barrier .

-

-

-

... More
Reconstruction of Minor Bridge at Km 43/2

7.27

19036

138391.72

... More
Vibrated cement concrete M15 (Nominal mix) using 40mm ISS size hard broken granite metal with Msand including cost and conveyance of all materials to site including cost and labour charges for formwork, centering, labour charges for laying, compacting, curing all incidental charges etc., complete for Parapet.

-

-

-

... More
Reconstruction of Minor Bridge at Km 43/2

6.07

13692

83110.44

... More
Supply and fixing of High Quality of PVC pipes of 160mm dia. Including cost and conveyance of pipes to the site and fixing in position to proper grade and level, including labour charges for fixing and including all other incidental charges etc complete., for proving utility services in Safety kerb

-

-

-

... More
Reconstruction of Minor Bridge at Km 43/2

79.2

419

33240.24

... More
Providing and fixing G.I Drainage spouts of 100mm Dia as per GOI drawing No. SD/205 with grating arrangements at top as shown in the drawing and 100mm dia drainage spouts projecting atleast 300mm beyond bottom of deck slab including cost and conveyance of all materials to site and fixing them in position etc., complete. as per clause 2705 of MoRTH Specification (Vth Rev)

-

-

-

... More
Reconstruction of Minor Bridge at Km 43/2

4

2498

9992.4

... More
Spreading and compaction for embankment using the available box cut earth including all hire and fuel charges for power roller for compaction, water sprinkler, including all labour charges for laying, spreading, watering etc., complete and as directed by the departmental engineers. For Diversion road

-

-

-

... More
Reconstruction of Minor Bridge at Km 43/2

422.34

26

11263.81

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250 mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base / Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5

-

-

-

... More
Reconstruction of Minor Bridge at Km 43/2

68.75

3091

212565.38

... More
Supply of NP3 Class RCC Pipe conforming to IS 458/2003 including cost of pipe as a finished work including all other incidental charges, testing charges including loading, unloading, transport and delivery in good condition at work site etc., complete, as directed by the Departmental Officers, as per standard specifications.

-

-

-

... More
Reconstruction of Minor Bridge at Km 43/2

30

4276

128304

... More
Hoisting and fixing of NP3 Class RCC Pipe and Collars in proper gradient including all labour charges and all other incidental charges etc., complete, as directed by the Departmental Officers, as per standard specifications.

-

-

-

... More
Reconstruction of Minor Bridge at Km 43/2

30

266

7986

... More
Granite rough stone dry packing for the specified thickness for apron using good size granite rough stone ,properly wedged with quarry spalls including cost and conveyance of all materials to site labour charges for packing the same in position and all other incidetal charges etc., complete for Apron.

-

-

-

... More
Reconstruction of Minor Bridge at Km 43/2

71.76

2819

202292.16

... More
Road Furniture

-

-

-

... More
Providing and laying of hot applied Thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes etc., complete as per MoRT&H specification No.803

-

-

-

... More
KM 38/0 - 47/8

2715.44

890

2416741.6

... More
Road Markers / Road Stud with Lens Reflector. Providing and fixing relative road studs of 'Category A' Raised Pavement makers made out of Poly Carbonate / methyl methecrylate / ABS moulded body confirirming to ASTM D 788 and relative panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face with retro reflectance and chromaticity values conforming to ASTM D4280.The reflective raised pavement markers shall also confirm to the MORTH circular No RW / NH. 33023/10/97-DO.III dt 11.06.97.The height,width and length shall not be less than 15mm,90mm and 100mm and with minimum reflective area of 13 sq.cm on each side and the slope to the base shall be 35 +/- 5 degree.Each reflector shall have a CIL not less than values specified in Table 2 of said MORTH circular.The strength of detachment of the integrated cylindrical shanks,(of diameter not less than 19 +/- 2mm height not less than 30 +/- 2mm) from the body is to be a minimum value of 500 kgf.Fixing will be by drilling holes on the road for the shanks to go inside,without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The marker shall support a load of 13635 kg tested in accordance with ASTM D4280 and confirming to IRC 35 - 2015 guidelines and MORTH&H specification 804 etc.,complete

-

-

-

... More
KM 38/0 - 47/8

1488

480

714240

... More
Providing and erecting of Retro - Reflector›sed Cautionary, Mandatory and Informatory signs {without definition board} made out of High Intensity Prismatic Grade Sheeting confirming to Type-IV standards of IRC-67: 2012 and ASTM D 4956 —09, specification and fixed over 2mm thick Aluminium sheet fixed over a back supporting frame of 25mmx25mmx3mm Mild Steel angle and supported on a mild steel angle post 75X75X6mm with a clear height of not less than 2.10m from the ground level to the bottom of the sign board and 0.6Om below ground level. The sign post should be painted as per IRC 67-2012 and firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 45cmX45cmX60cm size including cost and conveyance of all materials, equipment, Machinery and labour with all leads and lifts, loading charges necessary for satisfactory completion of the work as directed by the engineer in charge. High intensity Retro - Reflectro sheet shall consist of minimum coefficient of Retro-reflection as per Table 6.6 of IRC 67- 20 12. The retro - reflective sheeting shall be covered under 7 3 ear warranty issued for field performance and a certified copy of three years outdoor exposure report shall be obtained as per IRC 67: 20 12 . ( as per MO RT&H Specification No.801) 90 cm equilatarel triangle board

-

-

-

... More
KM 38/0 - 47/8

60

5126

307560

... More
Providing and erecting of Direction and Place Identification Retro-reflectorised Sign made out of High Intensity Prismatic Grade Sheeting confirming to Type-IV standards of IRC-67: 2012 and ASTM D 4956 –09, specification and fixed over 2mm thick Aluminium sheet fixed over a back supporting frame of 25mmx25mmx3mm Mild Steel angle and supported on a mild steel angle post 75X75X6mm with a clear height of not less than 2.10m from the ground level to the bottom of the sign board and 0.60m below ground level. The sign post should be painted as per IRC 67-2012 and firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45cmX45cmX60cm size including cost and conveyance of all materials, equipment, Machinery and labour with all leads and lifts, loading charges necessary for satisfactory completion of the work as directed by the engineer in-charge. High intensity Retro Reflectro sheet shall consist of minimum coefficient of Retro-reflection as per Table 6.6 of IRC 67-2012. The retro- reflective sheeting shall be covered under 7 year warranty issued for field performance and a certified copy of three years outdoor exposure report shall be obtained as per IRC 67:2012. (as per MoRT&H Specification No.801) ( for sign having area more than 0.9 sqm) Type-I

-

-

-

... More
KM 38/0 - 47/8

29.16

11805

344233.8

... More
Supplying and installation of delineators (Road way indicators, hazard markers and object markers), 80-100 cm high above ground level, painted at atrernatively black and white in 15 cm wide strips, fitted with 80x100mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC -79 etc., complete (as per MORT&H specification No.806)

-

-

-

... More
KM 38/0 - 47/8

30

2400

72000

... More
Providing and Erecting of Retro - Reflectorised Hazard Marker Traffic Sign made out of High Intensity Prismatic Grade Sheeting confirming to Type-IV standards of IRC-67: 2012 and ASTM D 4956 —09, specification and fixed over 2mm thick Aluminium sheet fixed over a back supporting frame of 25mmx25mmx3mm Mild Steel angle and supported on a mild steel angle post 75X75X6mm and 0.60m below ground level. The sign post should be painted as per IRC 67-2012 and firmly fixed to the ground by means of properly designed foundation with MIS grade cement concrete 45cmX45cmX60cm size including cost and conveyance of all materials, equipment, Machinery and labour with all leads and lifts, loading charges necessary for satisfactory completion of the work as directed by the engineer in charge. High intensity Retro - Reflectro sheet shall consist of minimum coefficient of Retro-reflection as per Table 6.6 of IRC 67-2012. The retro- reflective sheeting shall be covered under 7 year warranty issued for field performance and a certified copy of three years outdoor exposure report shall be obtained as per IRC 67:2012. (as per MORT&H Specification No.801) 30cm x 90cm rectangular

-

-

-

... More
KM 38/0 - 47/8

48

4000

192000

... More
Providing and erecting Single sided Single Guard Metal Beam Crash Barrier System (Type - A, “W” Single Guard)1.80m high, comprising of 3mm thick wall “W” beams posts and spacer channels shall be made by cold roll forming using HR conform to IS 5986 Fe 410/360 and dip galvanized having Zinc Mass of 550gms/ sqm, minimum 700 mm above road/ ground level fixed on ISMC series channel vertical post 150x75x5mm spaced 2m center to center 312mm x 83mm flange width x 3mm thick, 4318mm long post directly embedded in the concrete (M15) pit size 350x350x800mm for a depth of 1100mm below ground. All fixing bolts and nuts hot dip galvanized conforming to IS:1367 clause 4.60 all complete as per Technical Specification of IRC 119 2015 and as directed by the Engineer-in-charge.

-

-

-

... More
KM 38/0 - 47/8

56

4696

262976

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

210955143

-

... More
Add GST at 18%

1

37971926

-

... More
Total Value put to Tender

1

248927069

-

... More
Quoted Percentage

1

-

-

... More
Quoted Value

1

-

-

... More
Add GST at 18% of Final Quoted Value

1

-

-

... More
Total Value of Contract Including 18% of GST

1

-

-

... More
Contract Value of put to tender as per Estimate

-

-

210955143

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-

... More
Quoted Rate in Words

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.