Highways Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Works
Civil And Construction
Eprocure
Opening Date30 Sep 2024
Closing Soon22 Oct 2024
Tender Amount₹ 3,06,00,000 
Notes
Download

Costs

Summary

Try 89 Vedaranyam H C And M Sub Division

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Road-C

1280.32

157812

123.26

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil Compactor to achieve the desired density, complete as per clause 401 ) - for Grading V Material. as per MORT&H Rev. V

-

-

-

... More
Road-A

174.2

516013

2962.19

... More
Road-C

413.65

1274451

3080.99

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil Compactor to achieve the desired density, complete as per clause 401 ) - for Grading III Material. as per MORT&H Rev. V

-

-

-

... More
Road-A

57.11

174728

3059.5

... More
Road-C

147.71

469466

3178.3

... More
Picking the existing BT Surface to 50mm depth as directed by the department officers and collecting the picked up salvages meta and sracking the same for reuse and depositing the debris the excluding cost of materials but including labour charges for picking and all other tools and plants employed for the work and including all other incidental charges etc.,complete as per standard specifications.

-

-

-

... More
Road-B

107.33

2344

21.84

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5

-

-

-

... More
Road-A

142.78

481302

3370.94

... More
Road-B

48.3

162816

3370.94

... More
Road-C

369.33

1244989

3370.94

... More
Providing and laying Prime Coat over WMM surface using Pressure Distributor at the rate of 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 502 of MORTH Rev-5

-

-

-

... More
Road-A

571.13

46192

80.88

... More
Road-B

322

26043

80.88

... More
Road-C

1503.89

121619

80.87

... More
Providing and laying Tack Coat over WMM surface (treated with primer) using Pressure Distributor at the rate of 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5

-

-

-

... More
Road-A

571.13

10583

18.53

... More
Road-B

322

5966

18.53

... More
Road-C

1503.89

27867

18.53

... More
Providing and laying Tack Coat over Existing BT surface using Pressure Distributor at the rate of 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5

-

-

-

... More
Road-A

1595.75

42813

26.83

... More
Road-B

13753

368992

26.83

... More
Road-C

5416.73

145330

26.83

... More
Providing and laying Tack Coat over Cement Concrete surface using using Pressure Distributor at the rate 3.00Kg of Bitumen Emulsion (RS1) per 10sqm for preparatory to another bituminous construction over it including cost of material, labourcharges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5

-

-

-

... More
Road-A

15

314

20.95

... More
Road-C

79.38

1663

20.95

... More
Providing and Laying 50mm thick Bituminous Macadam using course aggregate and VG30 bitumen which shall consist of construction in a single course base/binder course confirming to the specfication on a previously prepared base, (using Mini Hot Mix Plant and Power Roller) including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 504 MORTH Rev-5 (For Patch Works)

-

-

-

... More
Road-A

6.26

57692

9216.02

... More
Road-C

27.05

252307

9327.44

... More
BM (Grade-II) 50mm Thick Using VG30 Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm of 50mm thick including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5

-

-

-

... More
Road-B

136.5

1302756

9544

... More
Road-C

376.1

3589498

9544

... More
DBM 75mm Thick (Grade-I) Using VG30 Bitumen Providing, laying 75mm consolidated thick Dense Bituminous Macadam using 0.40cum of 37.50-13.20mm, 0.35cum of 13.20-2.36mm and 0.36cum of 2.36mm & below size IRC metal with 71.30kgs of VG30 grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing the min the required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to site, spreading the mix to uniform thickness of 75mm with mechanical paver to the specified grades and cross sections and consolidated by Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tippertrucks, PaverFinisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 505 of MORTH rev-5.

-

-

-

... More
Road-A

42.84

439634

10262.24

... More
BC 30mm/40mm Thick (Grade-II) Using VG30 Bitumen Providing and laying Bituminous Concrete to 30mm/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm of 40mm thick including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm/40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5

-

-

-

... More
Road-A (40 mm Thick)

83.96

981828

11694

... More
Road-B (30 mm Thick)

422.25

4937791

11694

... More
Road-C (30 mm Thick)

207.62

2427908

11694

... More
Providing and laying Bituminous Concrete to 50mm thick (Grade I) using 0.22 cum of 26.5-13.20 mm, 0.24 cum of 13.20-2.36 mm and 0.26 cum of 2.36 & below IRC HBG metal with 62.40 kgs of VG30 bitumen for premixing per 10 sqm of 50mm thick including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hotmix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP clause 507 of MORTH. (For Culverts)

-

-

-

... More
Road-A

0.75

8426

11235.82

... More
Road-C

3.98

44718

11235.82

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with an average lead of 10Km and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For Carted Earth with compaction for making up of low berms of lead 10km.

-

-

-

... More
Road-B

399.48

122404

306.41

... More
Spreading, Compaction Utilizing available Box Cut Earth Providing compaction making up of low berms using the available box cut earth including all hire and fuel charges for power roller for compaction, water sprinkler, including all labour charges for laying, spreading, watering etc., complete and as directed by the departmental engineers.

-

-

-

... More
Road-A

42.45

1131

26.66

... More
Road-C

197.73

5271

26.66

... More
BOX CULVERT

-

-

-

... More
Dismantling Culverts,bridges and other structures Dismantling clearing away and carefully stacking material useful for re-use including salvaging and removal and disposing of resulting unusable materials and back filling the resulting trenches and pits etc.including all labour and incidental charges complying with MORTH 111, 112, 202 a)Dismantling brick masonry in cement mortar

-

-

-

... More
Road- C - 2/6

18.97

5371

283.14

... More
Road- C - 2/8(i)

7.97

2256

283.14

... More
Road- C - 2/8(ii)

7.97

2256

283.14

... More
Road- C - 2/10

7.97

2256

283.14

... More
Dismantling Culverts,bridges and other structures Dismantling clearing away and carefully stacking material useful for re-use including salvaging and removal and disposing of resulting unusable materials and back filling the resulting trenches and pits etc.including all labour and incidental charges complying with MORTH 111, 112, 202 b)Dismantling Plain cement concrete

-

-

-

... More
Road- C - 2/6

3.41

1657

486.2

... More
Road- C - 2/8(i)

2.51

1220

486.2

... More
Road- C - 2/8(ii)

2.51

1220

486.2

... More
Road- C - 2/10

2.51

1220

486.2

... More
Earth work Excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion backfilling, and clearing the site and disposal of all surplus materials etc. complete and in accordance with standard specification for foundation of Body wall , box culvert as per MORTH Vth Rev., 304.

-

-

-

... More
Road- C - 2/6

262.29

75898

289.37

... More
Road- C - 2/8(i)

140.29

40595

289.37

... More
Road- C - 2/8(ii)

140.29

40595

289.37

... More
Road- C - 2/10

140.29

40595

289.37

... More
Cement Concrete of grade M15 nominal mix using 40mm ISS size HBG graded metal using with M-Sand including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labor charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for LEVELLING COURSE BELOW Box Culvert and Wing wall as per MORTH Vth Rev., 1000, 1500, 1700, 2100 & 900.

-

-

-

... More
Road- C - 2/6

13.85

101997

7364.44

... More
Road- C - 2/8(i)

8.34

61445

7367.51

... More
Road- C - 2/8(ii)

8.34

61445

7367.51

... More
Road- C - 2/10

8.34

61496

7373.64

... More
Vibrated Cement Concrete M 20 grade nominal mix using 40mm ISS size hard broken granite metal using with M-Sand including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for formwork and centering mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed and in accordance with standard specification for as per MORTH Vth Rev., 1000, 1500, 1700, 2100 & 900 - for wing wall & Parapet.

-

-

-

... More
Road- C - 2/6

65.77

614212

9338.79

... More
Road- C - 2/8(i)

42.34

411307

9714.39

... More
Road- C - 2/8(ii)

42.34

411307

9714.39

... More
Road- C - 2/10

42.34

411566

9720.52

... More
Vibrated Reinforced Cement Concrete of grade M25 (Design mix) using 20mm ISShard broken granite metal using with M-Sand, including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete as per relevant standard specifications as directed by the Engineer for BASE SLAB, STEM AND TOP SLAB OF Box culvert as per MORTH No. 111, 112, 900, 1000, 1500, 1600, 1700, 2100

-

-

-

... More
Road- C - 2/6

70.74

922799

13044.95

... More
Road- C - 2/8(i)

31.2

421886

13522.01

... More
Road- C - 2/8(ii)

31.2

421886

13522.01

... More
Road- C - 2/10

31.2

422078

13528.15

... More
Supply and fabrication of (HYSD) Steel 500 Grade (as per steel schedule) required for all RCC items of works involved in the schedule of drawings including cost of steel, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, positioning and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete as per standard specification. - MORTH Vth Rev., 1000, 1500, 1600 & 900

-

-

-

... More
Road- C - 2/6

4.71

450319

95609.27

... More
Road- C - 2/8(i)

2.29

218945

95609.27

... More
Road- C - 2/8(ii)

2.29

218945

95609.27

... More
Road- C - 2/10

2.29

218945

95609.27

... More
Providing and fixing 100mm dia PVC SEEPAGE PIPES of required length for abutment and wing, retaining wall including cost and conveyance of all materials to worksite, cost and labour for semi-spherical backfill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., complete to drain the backfill as per standard specification. -MORTH Vth Rev., 2700, 2706, 2707 & 900

-

-

-

... More
Road- C - 2/6

8.4

1617

192.5

... More
Road- C - 2/8(i)

8.4

1617

192.5

... More
Road- C - 2/8(ii)

8.4

1617

192.5

... More
Road- C - 2/10

8.4

1617

192.5

... More
Stone Dust Filling in between the box culvert and wing wall including cost and conveyance to site including labour charges for filling in layers, watering tamping under optimum moisture content to get the maximum density all incidental charges etc., complete. MORTH Vth Rev.

-

-

-

... More
Road- C - 2/6

11.17

10457

936.22

... More
Road- C - 2/8(i)

9.89

9259

936.22

... More
Road- C - 2/8(ii)

9.89

9259

936.22

... More
Road- C - 2/10

9.89

9305

940.91

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil Compactor to achieve the desired density, complete as per clause 401 ) - for Grading III Material. as per MORT&H Rev. V for Culvert Filling Portion

-

-

-

... More
Road- C - 2/6

0.69

2193

3178.3

... More
Road- C - 2/8(i)

0.86

2733

3178.3

... More
Road- C - 2/8(ii)

0.86

2733

3178.3

... More
Road- C - 2/10

0.86

2733

3178.3

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil Compactor to achieve the desired density, complete as per clause 401 ) - for Grading V Material. as per MORT&H Rev. V for Culvert Filling Portion

-

-

-

... More
Road- C - 2/6

16.97

52284

3080.99

... More
Road- C - 2/8(i)

17.46

53794

3080.99

... More
Road- C - 2/8(ii)

17.46

53794

3080.99

... More
Road- C - 2/10

17.46

53794

3080.99

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5. for Culvert Portion & Diversion Road.

-

-

-

... More
Road- C - 2/6

16.8

56631

3370.94

... More
Road- C - 2/8(i)

17.25

58148

3370.94

... More
Road- C - 2/8(ii)

17.25

58148

3370.94

... More
Road- C - 2/10

17.25

58148

3370.94

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with an average lead of 10Km and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For Carted Earth with compaction for making up of low berms of lead 10km. (For Diversion Road)

-

-

-

... More
Road- C - 2/6

225

68942

306.41

... More
Road- C - 2/8(i)

225

68942

306.41

... More
Road- C - 2/8(ii)

225

68942

306.41

... More
Road- C - 2/10

225

68942

306.41

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

25925458

... More
Add GST at 18%

1

-

4666582

... More
Total Value put to Tender

1

-

30592040

... More
Quoted Percentage

1

-

-

... More
Quoted Value

1

-

-

... More
Add GST at 18% of Final Quoted Value

1

-

-

... More
Total Value of Contract Including 18% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

25925458

-

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-

... More
Quoted Rate in Words

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.