Highways Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Highways Department Tender
Civil And Construction
Bridge Construction
Eprocure
Opening Date12 Jul 2023
Closing Date25 Jul 2023
Tender Amount₹ 29,70,451
Costs
EMD
₹ 25,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_HWAY_341614_1Bid Award Id
ViewTender No
8 2023 24 DO Dated 30 06 2023Tender Authority
Highways Department ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Plain cement concret M10(Nominal mix 1:3:6) using 40mmISS graded HBG metal including cost conveyance of all materials to site including cost and labour charges for form work and centering,labour charges for compacting, curing, including all incidental charges etc complete as per standard specification FOR LEVELLING course below foundation of Stair case.
8
42912
5364
VibratedReinforced Cement Concrete M-25 (Design Mix) using 20mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel, but including labour charges for mixing, transporting, laying, curing concrete, soft water working at heights, hire charges for tools and plants, including all other incidental chargeas, etc., complete for Footing of Stair case.
34
351254
10331
VibratedReinforced Cement Concrete M-25 (Design Mix) using 20mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel, but including labour charges for mixing, transporting, laying, curing concrete, soft water working at heights, hire charges for tools and plants, including all other incidental chargeas, etc., complete For Column.
-
-
-
Below Ground Level
3
51552
17184
Above Ground Level Upto 4.50m Height
5
86045
17209
Above 4.50m Height
2
34938
17469
VibratedReinforced Cement Concrete M-25 (Design Mix) using 20mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel, but including labour charges for mixing, transporting, laying, curing concrete, soft water working at heights, hire charges for tools and plants, including all other incidental chargeas, etc., complete For Plinth Beam
12
159384
13282
VibratedReinforced Cement Concrete M-25 (Design Mix) using 20mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel, but including labour charges for mixing, transporting, laying, curing concrete, soft water working at heights, hire charges for tools and plants, including all other incidental chargeas, etc., complete For Tie Beams.
4
95544
23886
VibratedReinforced Cement Concrete M-25 (Design Mix) using 20mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel, but including labour charges for mixing, transporting, laying, curing concrete, soft water working at heights, hire charges for tools and plants, including all other incidental chargeas, etc., complete Ffor Stringer Beam, Waist slab & Landing slab.
28
403312
14404
Vibrated reinforced Concrete M-25, Grade, Design Mix, using ISS size hard granite broken graded metal including cost and conveyance of all materials to site including cement at site including labour charges for mixing, transporting, laying, and curing concrete,working at heights,hire charges for tools and plants,including all other incidental charges,etc, complete for RCC Parapet wall.
10
253340
25334
VibratedReinforced Cement Concrete M-25 (Design Mix) using 20mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel, but including labour charges for mixing, transporting, laying, curing concrete, soft water working at heights, hire charges for tools and plants, including all other incidental chargeas, etc., complete for Steps.
5
93965
18793
Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of walls (RCC Kerb wall)
2
7834
3917
Supply and fabrication of Fe-500 steel required for all RCC items of works involved in the schedule including cost of steel at site and cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills including over lapping to the required length wherever necessary and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete for Fe-500 grade
9.27
878842
94805
Calculation of SubTotal, GST and Total Amount carried out by system automatically
-
-
-
Basic cost of value put to tender as per estimate
1
-
2517331
Add GST at 18%
1
-
453120
Total Value put to Tender
1
-
2970451
Quoted value
1
-
-
Final Quoted Value
1
-
-
Add GST at 18% of Final Quoted Value
1
-
-
Total Value of Contract Including 18% of GST
1
-
-
Basic cost of value put to tender as per Estimate
-
2517331
-
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements