Highways Department Tender

... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Works
Civil And Construction
Eprocure
Opening Date25 Sep 2024
Closing Date15 Oct 2024
Tender Amount₹ 4,53,25,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Road B

1930

591294

306.37

... More
Construction of granular sub-base-V by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 401

-

-

-

... More
Road B

222.3

490224

2205.24

... More
Road D

430.6

839997

1950.76

... More
Picking 5cm to 10cm old metalled surface and sectioning 1Sqm and clearing away from the site and depositing the debris including labour charges for picking etc., complete as directed by the Engineer as per standard specification and also as per MORTH No.111,112,202

-

-

-

... More
Road B

500

10920

21.84

... More
Road D

49.69

1085

21.84

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5

-

-

-

... More
Road B

595.5

1288245

2163.3

... More
Road D

717.66

1530173

2132.17

... More
Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5

-

-

-

... More
Road B

2981.85

242692

81.39

... More
Road D

2870.67

233586

81.37

... More
Providing and laying Tack Coat over WBM/ WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5

-

-

-

... More
Road B

2981.85

55850

18.73

... More
Road D

2870.67

53738

18.72

... More
Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5

-

-

-

... More
Road A

18375

495757

26.98

... More
Road C

3750

101175

26.98

... More
Road D

994.51

26831

26.98

... More
Road E

9000

242820

26.98

... More
Providing and laying Tack Coat over Dry Lean Cement Concrete surface using 3.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5

-

-

-

... More
Road D

46.46

984

21.18

... More
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5

-

-

-

... More
Road A

164.74

1374366

8342.64

... More
Road B

149.13

1251331

8390.88

... More
Road C

35.58

296831

8342.64

... More
Road D

148.02

1237006

8357.02

... More
Road E

98.88

826381

8357.42

... More
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5

-

-

-

... More
Road A

551.25

5818333

10554.8

... More
Road B

89.47

949538

10612.93

... More
Road C

112.5

1187415

10554.8

... More
Road D

116.84

1236079

10579.25

... More
Road E

270

2856581

10579.93

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For making up of low berms with conveyance

-

-

-

... More
Road A (Lead 8 Km)

858

239390

279.01

... More
Road C (Lead 9 Km)

160

46830

292.69

... More
Road E (Lead 10 Km)

450.4

137989

306.37

... More
Providing Barrier Type Kerb for median/ islands using vibrated cement concrete of grade M20 (1:1.5:3) using 20 and 12mm ISS HBG metal from approved quarry, including cost and conveyance of all materials to worksite, including hire and fuel charges of all the machineries employed for this work, including all labour charges for mixing, laying, curing, painting, including all other incidental charges etc., complete as per drawing and standard specification

-

-

-

... More
Road D

283.84

163599

576.38

... More
Re Filling using excavated earth laying,handling charges and filling in layers,tamping under optimum moisture content to get the maximum density by watering with all leads for water including all other incidental charges such as bailing out water if necessary forming protective bunds etc., complete for Centre Median

-

-

-

... More
Road D

70.16

3006

42.85

... More
Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for berms as per MORTH No. 111, 112, 201, 202, 301, 302.

-

-

-

... More
Road D

103

31556

306.37

... More
Culvert

-

-

-

... More
Dismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits including all labour, materials, tools, equipment, safe guards, incidental necessary to complete the work as directed by the Engineer for plain Cement Concrete

-

-

-

... More
Road D

14.27

6938

486.2

... More
Road F

15.48

7526

486.2

... More
Dismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits including all labour, materials, tools, equipment, safe guards, incidental necessary to complete the work as directed by the Engineer for Brick work in Cement Mortors per MORTH No.111,112,202

-

-

-

... More
Road F

2.7

764

283.14

... More
Earthwork excavation in all classes of soil except soft disintegrated rock and medium rock not requiring blasting and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF BOX CULVERT as per MORTH No. 111, 112, 304.

-

-

-

... More
Road D

202.89

50016

246.52

... More
Road F

329

81105

246.52

... More
Stone dust filling with good dry stone dust from approved quarry including cost and conveyance to site including all labour charges for filling watering and consolidation etc. complete for foundation as per the drawing and standard specification as per MORTH No. 111,112,900

-

-

-

... More
Road F

26.79

10375

387.3

... More
Plain cement concrete of grade M15 Nominal Mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of formwork, soft water,labour charges for mixing, transporting, laying and curing concrete, working at depths,Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification for BASE COURSE BELOW BOX PORTION as per MORTH No. 111, 112, 900, 1000, 1500, 1700, 2100

-

-

-

... More
Road D

16.42

104081

6338.73

... More
Road F

26.79

169729

6335.56

... More
Vibrated Reinforced Cement Concrete of grade M25 DESIGN MIX using ISS size graded HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for BELOW & SILABOVE SILL as per MORTH No. 111, 112, 900, 1000, 1500, 1600, 1700, 2200

-

-

-

... More
Road D

80.76

928359

11495.29

... More
Road F

129.79

1460526

11253

... More
Vibrated Cement Concrete of Grade M20 Nominal Mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of formwork, soft water,labour charges for mixing, transporting, laying and curing concrete, working at depths,Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification for Below sill as per MORTH No. 111, 112, 900, 1000, 1500, 1700, 2200

-

-

-

... More
Road D

27.57

233915

8484.42

... More
Road F

86.34

615922

7133.69

... More
Vibrated Cement Concrete of grade M20 Nominal Mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and cement at site including cost of formwork, soft water,labour charges for mixing, transporting, laying and curing concrete, working at depths,Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification for PARAPETS OVER BOX culvert as per MORTH No. 111, 112, 900, 1000, 1500, 1700, 2200

-

-

-

... More
Road D

14.69

141555

9636.15

... More
Road F

101.68

840551

8266.64

... More
Supply and fabrication of Fe 500 grade Steel required for all RCC items of works involved in the schedule including cost of steel and cost of fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including over lapping to the required length wherever necessary and providing to the reinforcement placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc. complete as directed by the Engineer as per MORTH No. 111, 112, 900, 1000

-

-

-

... More
Road D

5.26

502908

95610

... More
Road F

8.07

771572

95610

... More
Providing and fixing 110mm dia PVC seepage pipes of required length for Abutments and wings including cost and conveyance of all materials to work site, cost and labour semi spherical backfill arrangements with 100mm size granite stone at the periphery and labour charges for fixing etc., complete to drain the backfill as per standard specification as per MORTH No.2706

-

-

-

... More
Road D

7.52

1527

203.1

... More
Filling behind Abutmants and wings with clean gritty gravel including cost and conveyance of gravel toworksite, laying, handling charges and filling in layers,tamping under optimum moisture content to get the maximum density including watering,with all leads for water and all other incidental charges etc,complete for filling behind the abutment and wings as per MORTH No. for filling box culvert Approach.

-

-

-

... More
Road D

19.19

6567

342.21

... More
Road F

20.51

8982

437.95

... More
Diversion Road

-

-

-

... More
Supply of NP3 class RCC pipe with flush joint to a size of 1000mm inner diameter with wall thickness 115mm. to a length of 2.5m in RCC M35 with reinforcement as per table 5 of IS :458:2003 to a ultimate load capacity of 71.58 KN/Linearmeter including cost of conveyance of all matrials and steel including moulding charges, all labour charge, hire charges for all T & P including conveyance and supply of pipe to worksite and other incidental charges etc., as per the specification IS : 458:2003 as per MORTH No. 111, 112, 2900, 900 - For Diversion Road

-

-

-

... More
Road D

7.5

32076

4276.8

... More
Road F

7.5

32076

4276.8

... More
Hoisting and fixing of 1000 mm dia NP3 pipes to proper gradient including labour and all other incidental charges as directed by the Engineer as per MORTH No.2900 - For Diversion Road

-

-

-

... More
Road D

7.5

1996

266.2

... More
Road F

7.5

1996

266.2

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification - For Diversion Road as per MORTH No. 111, 112, 304.

-

-

-

... More
Road D

240.37

73642

306.37

... More
Road F

225.75

69163

306.37

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 150mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5 - For Diversion Road

-

-

-

... More
Road D

16.88

35991

2132.17

... More
Road F

15.19

32387

2132.17

... More
Approach Road

-

-

-

... More
Earthwork excavation in all classes of soil except soft disintegrated rock and medium rock not requiring blasting and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for Box cutting as per MORTH No. 111, 112, 304.

-

-

-

... More
Road F

16

1972

123.26

... More
Construction of Granular Sub-Base-III by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 401 - For Approach Road

-

-

-

... More
Road F

20.79

42680

2052.93

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant,conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery,fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5 - For Approach Road

-

-

-

... More
Road F

34.65

73879

2132.17

... More
Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 502 of MORTH Rev-5

-

-

-

... More
Road F

138.6

11276

81.36

... More
Providing and laying Tack Coat over WBM/ WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5

-

-

-

... More
Road F

138.6

2594

18.72

... More
Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5

-

-

-

... More
Road F

140

3777

26.98

... More
Providing and laying Tack Coat over Dry Lean Cement Concrete surface using 3.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5

-

-

-

... More
Road F

68.15

1443

21.18

... More
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5

-

-

-

... More
Road F

15.84

132147

8342.64

... More
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5

-

-

-

... More
Road F

9.5

100270

10554.8

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For making up of low berms with conveyance (Lead 10 Km)

-

-

-

... More
Road F

3.2

980

306.37

... More
Retaining Wall

-

-

-

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour,materials, tools, equipments and all incidental charges and sheeting,shoring and bracing and their subsequent removal of all logs, stumps and other deleterious matter and obstructions,trimming of bottom of excavation back filing,clearing up the site and disposal of all surplus materials etc., complete as per MORT&H No.304 for Foundation of PCC Retaining Walls

-

-

-

... More
Road B

340

41908

123.26

... More
Road D

241.8

29804

123.26

... More
Cement Concrete of grade M10 (Nominal mix) using 40 mm ISS HBG metal with M-Sand including cost and conveyance of all materials to site and cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete working at depths, Tools and Plants and etc., complete as per relevant standard specification as per MORTH No. 111, 112, 900, 1000, 1500, 1700, 2100 LEVELLING COURSE BELOW FOUNDATION OF RETAINING WALL

-

-

-

... More
Road B

37.78

243687

6450.18

... More
Road D

30.23

191619

6338.73

... More
Vibrated Cement Concrete M20 using 40mm ISS HBG graded metal with M-Sand including cost and conveyance of all materials to site, including cost of cement centering, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths but excluding cost of steel but including tools and plants employed as per relevant standard specifications as directed by the Engineer as per MORTH No. 111,112,900,1000, 1500, 1700, 2200 FOUNDATION OF RETAINING WALLS (BELOW SILL LEVEL)

-

-

-

... More
Road B

226.67

1635877

7217

... More
Road D

187.98

1378902

7335.37

... More
Vibrated Cement Concrete M20 using 40mm ISS HBG graded metal with M-Sand including cost and conveyance of all materials to site, including cost of cement centering, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths but excluding cost of steel but including tools and plants employed as per relevant standard specifications as directed by the Engineer as per MORTH No. 111,112,900,1000, 1500, 1700, 2200 Stem of Retaining Wall

-

-

-

... More
Road B

215.97

2515776

11648.73

... More
Road D

144.05

1309910

9093.44

... More
Vibrated Cement Concrete of grade M15 (Nominal mix) using 40mm ISS HBG metal with M-Sand including cost and conveyance of all materials to site and cement at site including cost of formwork, centering, lead for soft water, labour charges for mixing, transporting laying and curing concrete working at depths Tools and plants and all other incidental charges etc. complete as per standard specification as per MORTH No. 111, 112, 900, 1000, 1500, 1700, 2200 Broken Parapet over Retaining Wall

-

-

-

... More
Road B

9

66099

7344.38

... More
Providing and fixing 110mm dia PVC seepage pipes of required length for Abutments and wings including cost and conveyance of all materials to work site, cost and labour semi spherical backfill arrangements with 100mm size granite stone at the periphery and labour charges for fixing etc., complete to drain the backfill as per standard specification as per MORTH No.2706

-

-

-

... More
Road B

138

28027

203.1

... More
Road D

132.68

26947

203.1

... More
Refilling with available excavated earth for filling in layers, not exceeding limits including watering, tamping including all labour charges andincidental chages etc., complete and in accordance with standard specifications between Retaining wall as per MORTH Vth Rev., 305 & 2907.

-

-

-

... More
Road B

393

16840

42.85

... More
Road D

283.65

12154

42.85

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

38377289

... More
Add GST at 18%

1

-

6907912

... More
Total Value put to Tender

1

-

45285201

... More
Difference in Value

1

-

-

... More
Bidder quoted value

1

-

-

... More
Add GST at 18% of Final quoted Value

1

-

-

... More
Total Value of Contract Including 18% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

38377289

-

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.