Highways Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Highways Department Tender
Civil And Construction
Road Construction
Eprocure
Opening Date5 Nov 2024
Closing Soon21 Nov 2024
Tender Amount₹ 4,27,60,000
Costs
EMD
₹ 2,24,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Tn.35/sl.no.01/ccr Div/cridp 2024-25
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_HWAY_498468_1Bid Award Id
ViewTender No
TN.35/Sl.No.01/CCR Div/CRIDP 2024-25Tender Authority
Highways Department ViewPurchaser Address
-Website
http://https://tnhighways.gov.in/index.php/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Road A
1488.5
96
143238.36
Providing and laying Tack Coat over WBM / WMM surface (treater with Primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 502 of MORTH Rev – 5
-
-
-
Road A
1488.5
20
29933.74
Removal of the Black Topper (BT) surface to 50 to 70 mm depth using milling Machine, including conveying the milled waste materials away from the worksite to an average distance including hire and running charges for the machine, conveyance charges, unloading at unobjectionable place, cleaning the milled surface as to avoid slippery including all other incidental charges etc., complete as per the direction of the departmental officers
-
-
-
Road A
29267.9
130
3817704.88
Road B
24335
130
3174257.4
Providing and laying Tack Coat over Existing BT Surface using 2.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 503 of MORTH Rev – 5
-
-
-
Road A
29267.9
32
940084.95
Road B
24335
32
781640.2
Providing, Laying 50mm consolidated thick Dense Bituminous Macadam using 0.24 Cum of 26.50 – 13.20mm, 0.25 Cum of 13.20 – 2.36mm and 0.23 Cum of 2.36mm & Below and with 53.20 Kgs of VG 40 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required temperature in Central Hot Mix Plant 20 – 30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm using paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire and fuel charges for 20 – 30 ton CMP with bitumen boiler, tipper trucks, Paver finisher, Vibratory Roller and all other Tools and Plant required, including all other incidental charges etc., complete as per specification using CMP a per Clause 505 MORTH Rev – 5
-
-
-
Road A
74.44
10652
793004.85
Providing and laying Bituminous Concrete to 30/40 mm thick using 0.13 cum of 19.00 - 9.50 mm, 0.17cum of 9.50-2.36 mm and 0.26 cum of 2.36 and below with 50.30 kgs of VG 40 bitumen for premixing per 10 sqm including cost and conveyance of all materials to CMP site , heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20 -30 ton capacity , conveying the mix by tipper trucks to paver site , spreading the mix to uniform thickness of 40 mm with mechanical paver to the specified grade sand cross section sand consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charge sand fuel charges for 20 – 30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
-
-
-
Road A
1230.26
11561
14223687.9
Providing and Laying Bituminous Concrete to 30 / 40 mm thick using 0.13 Cum of 19.00 – 9.50mm, 0.17 Cum of 9.50 – 2.36mm and 0.26 Cum of 2.36mm & Below and with 50.30 Kgs of VG 40 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required temperature in Central Hot Mix Plant 20 – 30 ton capacity, conveying the mix by tipper trucks to Paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8 – 10 tonne Pneumatic Roller to the required density etc., including labor for attending to paver to site etc., including hire charges and fuel charges for 20 – 30 T CMP with bitumen boiler, tipper trucks, Paver finisher hydrostatic (More than 5m width), Vibratory / Pneumatic Roller and all other Tools and Plant required, including all other incidental charges etc., complete as per specification using CMP a per Clause 505 MORTH Rev – 5
-
-
-
Road B
974
12088
11774228.22
Calculation of SubTotal, GST and Total Amount carried out by system automatically
-
-
-
Basic cost of value put to tender as per estimate
1
36235876
-
Add GST at 18%
1
6522458
-
Total Value put to Tender
1
42758334
-
Quoted value
1
-
-
Final Quoted Value
1
-
-
Add GST at 18% of Final Quoted Value
1
-
-
Total Value of Contract Including 18% of GST
1
-
-
Basic cost of value put to tender as per Estimate
-
-
36235876
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%