Highways Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date19 Oct 2024
Closing Date5 Nov 2024
Tender Amount₹ 2,02,50,000 
Notes
Download

Costs

Summary

Try-118 Alangudi (h) C And M Sub Division

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Advance patch work upto 50mm thick using 45mm IRC size HBG metal for making the potholes and patches using VG10 grade bitumen including mix at the rate of 44kg/cum of IRC metal after trimming the pot holes or depression proper shape and depth, side painting with tack coat and compacting the layers as directed by the Engineer and also as per MORTH No111, 112,501, 900

-

-

-

... More
Road- B

6.1

3925

23946.89

... More
Road- C

8.46

3875

32787.41

... More
Road- D

7.99

3880

31007.59

... More
Road- E

9.33

3872

36134.16

... More
Road- F

8.95

3932

35194.35

... More
Road- G

15.13

3888

58828.16

... More
Road- H

1.66

3688

6123.39

... More
Picking the existing BT surface upto 50mm depth as directed by the departmental officers and collecting the picked up salvaged metal and stacking the same for reuse and depositing the debris excluding cost of materials including all labour charges for picking and all other tools and plants employed of the work and including all other incidental charges etc., complete in accordance with standard specifications as per MORTH Vth Rev. 111, 112, 201 & 202

-

-

-

... More
Road- F

75

21

1638

... More
Wet Mix Macadam (Table 400-13) (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory soil compactor to achieve the desired density, Complete as per clause 406) .as per MORT&H Rev.-V specifications No.111. 112. 406. 900.

-

-

-

... More
Road- F

33.75

2330

78663.83

... More
Prime coat (Providing and applying primer coat with bitumen emulsion (SS-I type) on using pressure distributor prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per clause 502) - over WMM .as per MORT&H Rev. V specifications No.111, 112, 502, 900.

-

-

-

... More
Road- F

225

80

18022.5

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned using mechanical means as per clause 503 - over granular surfaces treated with primer.as per MORT&H Rev. V specifications No.111, 112, 503, 900.

-

-

-

... More
Road- F

225

18

4122

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom as per clause 503 - over the existing BT surfaces treated with primer.as per MORT&H Rev. V specifications No.111, 112, 503, 900.

-

-

-

... More
Road- A

4268.75

26

113847.56

... More
Road- B

3141.25

26

83777.14

... More
Road- C

4607.5

26

122835.95

... More
Road- D

3803.75

26

101407.98

... More
Road- E

5308.75

26

141531.28

... More
Road- F

6073.75

26

161926.18

... More
Road- G

7632.5

26

203482.45

... More
Road- H

1617.5

26

43122.55

... More
Providing and laying Bituminous Macadam with hot mix plant using crushed aggregates of specified grading premixed with bituminous binder (Viscosity Grade-30), transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction, complete as per clause 504 and in accordance with standard specifications for Grading II as per MORTH Vth Rev. 111, 112, 504 & 900

-

-

-

... More
Road- A

46.05

8433

388356.23

... More
Road- B

33.15

8433

279565.88

... More
Road- C

51.76

8433

436510.71

... More
Road- D

40.88

8433

344755.76

... More
Road- E

56.1

8433

473111.5

... More
Road- F

66.43

8433

560228.1

... More
Road- G

82.88

8433

698956.88

... More
Road- H

19.33

8433

163016.85

... More
Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm of 40mm thick including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5

-

-

-

... More
Road- A (40mm thickness)

170.75

10580

1806685.26

... More
Road- B (30mm thickness)

94.24

10580

997142.13

... More
Road- C (30mm thickness)

138.22

10580

1462489.23

... More
Road- D (30mm thickness)

114.11

10580

1207384.22

... More
Road- E (30mm thickness)

159.26

10580

1685110.95

... More
Road- F (30mm thickness)

188.95

10580

1999257.28

... More
Road- G (30mm thickness)

228.97

10580

2422704.09

... More
Road- H (30mm thickness)

48.52

10580

513384.3

... More
Collection and supply of Carted earth including cost and conveyance to worksite with an average lead of 1.00 Km and stacking them on road side for taking premeasurements and spreading the same in the low berms as directed by the Engineer with initial lift including all labour charges and consolidation with power roller including all tools and plants and all other incidental charges etc., complete for low berms in accordance with standard specifications as per MORTH Vth Rev., 111, 112, 408 & 900 for berms

-

-

-

... More
Road- A

178.5

183

32722.62

... More
Road- B

152.25

183

27910.47

... More
Road- C

238.6

183

43740.15

... More
Road- D

199.3

183

36535.68

... More
Road- E

279.2

183

51182.94

... More
Road- F

330.59

183

60603.76

... More
Road- G

398.1

183

72979.69

... More
Road- H

57.9

183

10614.23

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

17157763

-

... More
Add GST at 18%

1

3088397

-

... More
Total Value put to Tender

1

20246160

-

... More
Quoted Percentage

1

-

-

... More
Quoted Value

1

-

-

... More
Add GST at 18% of Final Quoted Value

1

-

-

... More
Total Value of Contract Including 18% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

-

17157763

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-

... More
Quoted Rate in Words

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.