Highways Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Works
Civil And Construction
Eprocure
Opening Date21 Oct 2024
Closing Date7 Nov 2024
Tender Amount₹ 2,31,85,000 
Notes
Download

Costs

Summary

Tn.34/sl.no.02/tvlr Div/cridp 2024-25

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Wet Mix Macadam (Table 400-13) (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, including cost of materials, labour charges, rentals for machinery, fuel and all other incidental charges etc., Complete as per clause 406 of MORTH Rev.5

-

-

-

... More
Road A

52.5

2894

151948.65

... More
Road B

52.5

2894

151948.65

... More
Prime coat - Providing and laying Prime Coat over WBM/WMM surface using 7Kg of Emulsion Bitumen (SS1) per 10sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5.

-

-

-

... More
Road A

350

81

28409.5

... More
Road B

350

81

28406

... More
Tack coat - Providing and laying Tack Coat over WBM/WMM surface (treated with primer) using 2.50Kg of bitumen emulsion (RS1) per 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5

-

-

-

... More
Road A

350

18

6527.5

... More
Road B

350

18

6527.5

... More
Tack coat - Providing and laying Tack Coat over Existing BT Surface using 2Kg of Bitumen Emulsion (RS1) per 10sqm for preparatory to another bituminous construction over it including cost of materials, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 503 of MORTH Rev-5.

-

-

-

... More
Road A

14350

26

386302

... More
Road B

19250

26

518210

... More
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20 cum of 26.50-13.20mm, 0.43 cum of 13.20-2.36mm and 0.08 cum of 2.36 & below size IRC metal with 37Kgs of VG40 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne vibratory roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30 tonne CMP with bitumen boiler, tipper trucks, paver finisher, vibratory roller and all other tools ans plant required, including all other incidental charges etc., Complete as per specification using CMP as per clause 504 of MORTH Rev-5

-

-

-

... More
Road A

169.4

9395

1591516.39

... More
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20 cum of 26.50-13.20mm, 0.43 cum of 13.20-2.36mm and 0.08 cum of 2.36 & below size IRC metal with 37Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne vibratory roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30 tonne CMP with bitumen boiler, tipper trucks, paver finisher, vibratory roller and all other tools ans plant required, including all other incidental charges etc., Complete as per specification using CMP as per clause 504 of MORTH Rev-5 - Grading II.

-

-

-

... More
Road B

220.5

9226

2034425.61

... More
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26cum of 2.36 & below IRC HBG metal with 50.30kgs of VG 40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5

-

-

-

... More
Road A

441

11684

5152767.48

... More
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26cum of 2.36 & below IRC HBG metal with 50.30 kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5

-

-

-

... More
Road B

588

11397

6701877

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and deposting on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools ad plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For making up of low berms with conveyance.

-

-

-

... More
Road A

486

169

82435.32

... More
Road B

663

169

112458.06

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

19646628

-

... More
Add GST at 18%

1

3536393

-

... More
Total Value put to Tender

1

23183021

-

... More
Quoted value

1

-

-

... More
Final Quoted Value

1

-

-

... More
Add GST at 18% of Final Quoted Value

1

-

-

... More
Total Value of Contract Including 18% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

-

19646628

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.