Highways Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Highways Department Tender
Civil And Construction
Eprocure
Opening Date21 Oct 2024
Closing Date7 Nov 2024
Tender Amount₹ 2,31,85,000
Costs
EMD
₹ 1,26,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Tn.34/sl.no.02/tvlr Div/cridp 2024-25
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_HWAY_495089_1Bid Award Id
ViewTender No
TN.34/Sl.No.02/TVLR Div/CRIDP 2024-25Tender Authority
Highways Department ViewPurchaser Address
-Website
http://https://tnhighways.gov.in/index.php/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Wet Mix Macadam (Table 400-13) (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, including cost of materials, labour charges, rentals for machinery, fuel and all other incidental charges etc., Complete as per clause 406 of MORTH Rev.5
-
-
-
Road A
52.5
2894
151948.65
Road B
52.5
2894
151948.65
Prime coat - Providing and laying Prime Coat over WBM/WMM surface using 7Kg of Emulsion Bitumen (SS1) per 10sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5.
-
-
-
Road A
350
81
28409.5
Road B
350
81
28406
Tack coat - Providing and laying Tack Coat over WBM/WMM surface (treated with primer) using 2.50Kg of bitumen emulsion (RS1) per 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5
-
-
-
Road A
350
18
6527.5
Road B
350
18
6527.5
Tack coat - Providing and laying Tack Coat over Existing BT Surface using 2Kg of Bitumen Emulsion (RS1) per 10sqm for preparatory to another bituminous construction over it including cost of materials, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 503 of MORTH Rev-5.
-
-
-
Road A
14350
26
386302
Road B
19250
26
518210
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20 cum of 26.50-13.20mm, 0.43 cum of 13.20-2.36mm and 0.08 cum of 2.36 & below size IRC metal with 37Kgs of VG40 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne vibratory roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30 tonne CMP with bitumen boiler, tipper trucks, paver finisher, vibratory roller and all other tools ans plant required, including all other incidental charges etc., Complete as per specification using CMP as per clause 504 of MORTH Rev-5
-
-
-
Road A
169.4
9395
1591516.39
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20 cum of 26.50-13.20mm, 0.43 cum of 13.20-2.36mm and 0.08 cum of 2.36 & below size IRC metal with 37Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne vibratory roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30 tonne CMP with bitumen boiler, tipper trucks, paver finisher, vibratory roller and all other tools ans plant required, including all other incidental charges etc., Complete as per specification using CMP as per clause 504 of MORTH Rev-5 - Grading II.
-
-
-
Road B
220.5
9226
2034425.61
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26cum of 2.36 & below IRC HBG metal with 50.30kgs of VG 40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
-
-
-
Road A
441
11684
5152767.48
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26cum of 2.36 & below IRC HBG metal with 50.30 kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
-
-
-
Road B
588
11397
6701877
Earthwork excavation in all classes of soils except hard rock requiring blasting and deposting on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools ad plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For making up of low berms with conveyance.
-
-
-
Road A
486
169
82435.32
Road B
663
169
112458.06
Calculation of SubTotal, GST and Total Amount carried out by system automatically
-
-
-
Basic cost of value put to tender as per estimate
1
19646628
-
Add GST at 18%
1
3536393
-
Total Value put to Tender
1
23183021
-
Quoted value
1
-
-
Final Quoted Value
1
-
-
Add GST at 18% of Final Quoted Value
1
-
-
Total Value of Contract Including 18% of GST
1
-
-
Basic cost of value put to tender as per Estimate
-
-
19646628
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )
-
-
-