Highways Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date10 Sep 2024
Closing Date1 Oct 2024
Tender Amount₹ 5,32,60,000 
Notes
Download

Costs

Summary

Try 23 Lalgudi H C And M Sub Division

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of granular sub-base by providing close graded Material, (Table:- 400-1) mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 401 for grading-V Material

-

-

-

... More
Main work Km 1/6 - 2/6

412.21

802263

1946.25

... More
Construction of granular sub-base by providing close graded Material, (Table:- 400-1) mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 401 for grading-III Material

-

-

-

... More
Main work Km 1/6 - 2/6

175.41

357122

2035.93

... More
Picking the existing BT surface upto 50mm depth as directed by the departmental officers and levelling the surface including all labour charges for pickig and all other tools and plants employed of the work and including all other incidental charges etc., complete as per standard specifications.

-

-

-

... More
Main work Km 1/6 - 2/6

1280.43

27964

21.84

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5

-

-

-

... More
Main work Km 1/6 - 2/6

1007.06

2253437

2237.64

... More
Providing and laying Prime Coat over WMM surface using Pressure Distributor at the rate of 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 502 of MORTH Rev-5

-

-

-

... More
Main work Km 1/6 - 2/6

5595.45

457036

81.68

... More
Providing and laying Tack Coat over WMM surface (treated with primer) using Pressure Distributor at the rate of 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as

-

-

-

... More
Main work Km 1/6 - 2/6

5595.45

105418

18.84

... More
Providing and laying Tack Coat over Existing BT surface using Pressure Distributor at the rate of 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5

-

-

-

... More
Main work Km 1/6 - 2/6

22.6

612

27.08

... More
Providing and laying Tack Coat over Cement Concrete surface using pressure distributor at the rate of 3.00Kg of Bitumen Emulsion (RS1) per 10sqm for preparatory to another bituminous construction over it including cost of material, labourcharges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 (Tack Coat For C.C Surface)

-

-

-

... More
Main work Km 1/6 - 2/6

82.11

1750

21.32

... More
BM (Grade-II) 65mm Thick Using VG30 Providing, laying 65mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm 50mm thick including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform required thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5

-

-

-

... More
Main work Km 1/6 - 2/6

365.08

3126231

8563.14

... More
BC 30mm Thick (Grade-II) Using VG30 Bitumen Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm of 40mm thick including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5

-

-

-

... More
Main work Km 1/6 - 2/6

169.02

1830418

10829.6

... More
Providing and laying Bituminous Concrete to 50mm thick Grade-I using 0.22 cum of 26.5-13.20 mm, 0.24 cum of 13.20-2.36 mm and 0.26 cum of 2.36 & below IRC HBG metal with 62.40 kgs of VG30 bitumen for premixing per 10 sqm 50mm thick including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hotmix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP clause 507 of MORTH.

-

-

-

... More
Main work Km 1/6 - 2/6

4.11

42400

10316.4

... More
Refilling of berms on both sides of carriageway by using exess box soil earth available at site with consolidation by power roller compaction and in accordance with the specificatin and the lines and cross sections shown in the drawings or as indicated by the engineer as per MORTH to berms.

-

-

-

... More
Main work Km 1/6 - 2/6

151.5

4038

26.66

... More
RECONSTRUCTION OF BOX CULVERTS

-

-

-

... More
Dismantling Culverts, bridges and other structuresDismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc.a)Dismantling Plain Cement Concrete MORTH 111 112 202

-

-

-

... More
Reconstruction Box of Culvert at Km 1/10

12.52

6087

486.2

... More
Reconstruction Box of Culvert at Km 2/2 (i)

14.39

6996

486.2

... More
Reconstruction Box of Culvert at Km 2/2 (ii), 2/4

27.93

13579

486.2

... More
Reconstruction Box of Culvert at Km 2/6

14.88

7234

486.2

... More
Earth work Excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion backfilling, and clearing the site and disposal of all surplus materials etc. complete and in accordance with standard specification for Narrow foundation of Body wall , box culvert as per MORTH Vth Rev., 304.

-

-

-

... More
Reconstruction Box of Culvert at Km 1/10

189.49

54832

289.37

... More
Reconstruction Box of Culvert at Km 2/2 (i)

267.04

77273

289.37

... More
Reconstruction Box of Culvert at Km 2/2 (ii), 2/4

379.98

109954

289.37

... More
Reconstruction Box of Culvert at Km 2/6

83

24017

289.37

... More
Cement Concrete of grade M15 using 40mm ISS size HBG graded metal using with M-Sand including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labor charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for LEVELLING COURSE BELOW Box Culvert and Wing wall as per MORTH Vth Rev., 1000, 1500, 1700, 2100 & 900.

-

-

-

... More
Reconstruction Box of Culvert at Km 1/10

10.11

62721

6203.88

... More
Reconstruction Box of Culvert at Km 2/2 (i)

12.29

76245

6203.88

... More
Reconstruction Box of Culvert at Km 2/2 (ii), 2/4

20.81

129102

6203.88

... More
Reconstruction Box of Culvert at Km 2/6

6

37153

6192.17

... More
Vibrated Reinforced Cement Concrete of grade M25 (Design mix) using 20mm ISShard broken granite metal using with M-Sand, including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete as per relevant standard specifications as directed by the Engineer for BASE SLAB, STEM AND TOP SLAB OF Box culvert as per MORTH No. 111, 112, 900, 1000, 1500, 1600, 1700, 2100

-

-

-

... More
Reconstruction Box of Culvert at Km 1/10

27.62

339107

12277.61

... More
Reconstruction Box of Culvert at Km 2/2 (i)

39.42

488382

12389.2

... More
Reconstruction Box of Culvert at Km 2/2 (ii), 2/4

55.24

678215

12277.61

... More
Reconstruction Box of Culvert at Km 2/6

25.1

297897

11868.44

... More
Supply and fabrication of (HYSD) Steel Grade (as per steel schedule) required for all RCC items of works involved in the schedule of drawings including cost of steel, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, positioning and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete as per standard specification. - MORTH Vth Rev., 1000, 1500, 1600 & 900

-

-

-

... More
Reconstruction Box of Culvert at Km 1/10

2

191122

95609.27

... More
Reconstruction Box of Culvert at Km 2/2 (i)

2.61

249731

95609.27

... More
Reconstruction Box of Culvert at Km 2/2 (ii), 2/4

3.86

369434

95609.27

... More
Reconstruction Box of Culvert at Km 2/6

2.11

201639

95609.27

... More
Vibrated Cement Concrete M 20 mix(Nominal mix)using 40mm ISS size hard broken granite metal using with M-Sand, including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for formwork and centering mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed and in accordance with standard specification for Parapet & Wing wall as per MORTH Vth Rev., 1000, 1500, 1700, 2100

-

-

-

... More
Reconstruction Box of Culvert at Km 1/10

62.18

522456

8402.33

... More
Reconstruction Box of Culvert at Km 2/2 (i)

79.62

656605

8246.74

... More
Reconstruction Box of Culvert at Km 2/2 (ii), 2/4

124.35

1044940

8403.22

... More
Reconstruction Box of Culvert at Km 2/6

12.69

118357

9326.84

... More
Stone Dust Filling in between the box culvert and wing wall including cost and conveyance to site including labour charges for filling in layers, watering tamping under optimum moisture content to get the maximum density all incidental charges etc., complete. MORTH Vth Rev.

-

-

-

... More
Reconstruction Box of Culvert at Km 1/10

6.18

2067

334.55

... More
Reconstruction Box of Culvert at Km 2/2 (i)

16.8

5620

334.55

... More
Reconstruction Box of Culvert at Km 2/2 (ii), 2/4

16.15

5402

334.55

... More
Reconstruction Box of Culvert at Km 2/6

6.18

2030

328.58

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For diversion road with average lead of 5 Km.

-

-

-

... More
Reconstruction Box of Culvert at Km 1/10

404.02

96164

238.02

... More
Reconstruction Box of Culvert at Km 2/2 (i)

404.02

96164

238.02

... More
Reconstruction Box of Culvert at Km 2/2 (ii), 2/4

808.05

192332

238.02

... More
Supply of 1000mm dia RCC NP3 class pipes confirming to IS 458 specification as directed by the departmental officers including cost and conveyance of pipes to the worksite and all other incidental charges etc., complete as per standard specification as per MORTH Vth Rev., 1000, 2900 & 900 for diversion road

-

-

-

... More
Reconstruction Box of Culvert at Km 1/10

12.5

53460

4276.8

... More
Reconstruction Box of Culvert at Km 2/2 (i)

12.5

53460

4276.8

... More
Reconstruction Box of Culvert at Km 2/2 (ii), 2/4

25

106920

4276.8

... More
Laying and fixing of 1000mm dia RCC NP3 pipe in position excluding cost of pipes but including conveyance to work spot and handling charges on both sides including labour charges for hoisting and placing the pipes in position and packing the joints and all other incidental charges etc., complete as per standard specification as per MORTH Vth Rev., 2905, 2906 & 900 for diversion

-

-

-

... More
Reconstruction Box of Culvert at Km 1/10

12.5

3327

266.2

... More
Reconstruction Box of Culvert at Km 2/2 (i)

12.5

3327

266.2

... More
Reconstruction Box of Culvert at Km 2/2 (ii), 2/4

25

6655

266.2

... More
Construction of granular sub-base by providing close graded Material, (Table:- 400-1) mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 401 for grading-V Material for diversion road.

-

-

-

... More
Reconstruction Box of Culvert at Km 1/10

44.63

86861

1946.25

... More
Reconstruction Box of Culvert at Km 2/2 (i)

44.63

86861

1946.25

... More
Reconstruction Box of Culvert at Km 2/2 (ii), 2/4

89.25

173702

1946.25

... More
CONSTRUCTION OF PROTECTIVE WALL

-

-

-

... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal, removal of all logs, stumps and other deletrious matter and obstructions, trimming bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification -MORTH Vth Rev., 304 for foundation of Protective wall

-

-

-

... More
Construction Of Protective Wall at Km 1/8

437

72590

166.11

... More
Construction Of Protective Wall at Km 1/10

710.13

117959

166.11

... More
Construction Of Protective Wall at Km 2/2

673.75

111916

166.11

... More
Construction Of Protective Wall at Km 2/4

305.9

50813

166.11

... More
Plain Cement Concrete of grade M15 (Nominal mix) using 40mm ISS hard broken granite metal and using M-Sand including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges for compacting, curing and all incidental charges etc., complete as per standard specification for LEVELLING COURSE BELOW FOUNDATION.

-

-

-

... More
Construction Of Protective Wall at Km 1/8

69

428067

6203.88

... More
Construction Of Protective Wall at Km 1/10

112.13

695641

6203.88

... More
Construction Of Protective Wall at Km 2/2

91.88

570012

6203.88

... More
Construction Of Protective Wall at Km 2/4

48.3

299459

6199.98

... More
Vibrated Reinforced Cement Concrete of grade M30 (Design mix) using 20mm and below ISS hard broken granite metal and using M-Sand including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for For Protective wall for Below sill

-

-

-

... More
Construction Of Protective Wall at Km 1/8

164.4

1770417

10768.96

... More
Construction Of Protective Wall at Km 1/10

267.15

2876927

10768.96

... More
Construction Of Protective Wall at Km 2/2

231.15

2511981

10867.32

... More
Construction Of Protective Wall at Km 2/4

115.08

1238843

10765.06

... More
Providing and fixing 100mm dia PVC SEEPAGE PIPES of required length for abutment and wing, retaining wall / protective wall including cost and conveyance of all materials to worksite, cost and labour for semi-spherical backfill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., complete to drain the backfill as per standard specification. -MORTH Vth Rev., 2700, 2706, 2707 & 900

-

-

-

... More
Construction Of Protective Wall at Km 1/8

79.6

15323

192.5

... More
Construction Of Protective Wall at Km 1/10

129.2

24871

192.5

... More
Construction Of Protective Wall at Km 2/2

100

19250

192.5

... More
Construction Of Protective Wall at Km 2/4

56

10780

192.5

... More
Vibrated Reinforced Cement Concrete of grade M30 (Design mix) using 20mm and below ISS hard broken granite metal and using M-Sand including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for For Protective wall for Above Sill

-

-

-

... More
Construction Of Protective Wall at Km 1/8

97.14

1514886

15594.88

... More
Construction Of Protective Wall at Km 1/10

157.85

2461651

15594.88

... More
Construction Of Protective Wall at Km 2/2

142.3

2216126

15573.62

... More
Construction Of Protective Wall at Km 2/4

68

1060908

15601.6

... More
Supply and fabrication of (HYSD) Steel Grade (as per steel schedule) required for all RCC items of works involved in the schedule of drawings including cost of steel, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, positioning and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete as per standard specification. - MORTH Vth Rev., 1000, 1500, 1600 & 900

-

-

-

... More
Construction Of Protective Wall at Km 1/8

23

2199013

95609.27

... More
Construction Of Protective Wall at Km 1/10

37.38

3573874

95609.27

... More
Construction Of Protective Wall at Km 2/2

32.25

3083398

95609.27

... More
Construction Of Protective Wall at Km 2/4

16.1

1539309

95609.27

... More
Refilling of berms on both sides of carriageway by using exess box soil earth available at site with consolidation by power roller compaction and in accordance with the specificatin and the lines and cross sections shown in the drawings or as indicated by the engineer as per MORTH to berms.

-

-

-

... More
Construction Of Protective Wall at Km 1/8

291.33

7766

26.66

... More
Construction Of Protective Wall at Km 1/10

473.42

12621

26.66

... More
Construction Of Protective Wall at Km 2/2

449.17

11974

26.66

... More
Construction Of Protective Wall at Km 2/4

203.93

5436

26.66

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For conveyance for 5 Km Lead

-

-

-

... More
Construction Of Protective Wall at Km 1/8

212.37

50548

238.02

... More
Construction Of Protective Wall at Km 1/10

313.75

74678

238.02

... More
Construction Of Protective Wall at Km 2/2

395.85

94220

238.02

... More
Construction Of Protective Wall at Km 2/4

148.66

35384

238.02

... More
Vibrated Cement Concrete of grade M20 using 40mm ISS size HBG graded metal using with M Sand including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labor charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per MORTH Vth Rev., 1000, 1500, 1700, 2100 & 900 for Parapet.

-

-

-

... More
Construction Of Protective Wall at Km 1/8

7.61

105403

13850.69

... More
Construction Of Protective Wall at Km 1/10

15.06

208591

13850.69

... More
Construction Of Protective Wall at Km 2/2

9.4

130112

13841.75

... More
Construction Of Protective Wall at Km 2/4

5.35

74032

13837.85

... More
Providing and fixing PVC EXPANSION JOINT 20mm thick confiriming to specification in Protective Wall including cost and conveyance of expansion joints to site including cost of testing as per MORT&H specification, including charges for fixing in all respect etc., Complete.

-

-

-

... More
Construction Of Protective Wall at Km 1/8

10.5

6860

653.4

... More
Construction Of Protective Wall at Km 1/10

16.5

10781

653.4

... More
Construction Of Protective Wall at Km 2/2

12.25

8004

653.4

... More
Construction Of Protective Wall at Km 2/4

7.5

4900

653.4

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

45130060

... More
Add GST at 18%

1

-

8123411

... More
Total Value put to Tender

1

-

53253471

... More
Negotiated Percentage

1

-

-

... More
Final Negotiated Value

1

-

-

... More
Add GST at 18% of Final Negotiated Value

1

-

-

... More
Total Value of Contract Including 18% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

45130060

-

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.