Highways Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date17 Sep 2024
Closing Date7 Oct 2024
Tender Amount₹ 2,39,00,000 
Notes
Download

Costs

Summary

Tn No 18 2024 25 Hdo Dt 10 09 2024 Tvm 69

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Road A (For Bridge Work) (241.96+115.75)

357.71

762698

2132.17

... More
Providing and laying Prime Coat over WBM/WMM surface using 7Kg of Emulsion Bitumen(SS1) per 10sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5

-

-

-

... More
Road A (For Bridge Work)

967.8

78566

81.18

... More
Providing and laying Tack Coat over WBM/WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion(RS1) per 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5

-

-

-

... More
Road A (For Bridge Work)

967.8

18059

18.66

... More
Providing, laying 75mm consolidated thick Dense Bituminous Macadam using 0.40 cum of 37.50-13.20mm,0.35cum of 13.20-2.36mm and 0.36cum of 2.36mm&below size IRC metal with 71.30kgs of VG30 grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to site, spreading the mix to uniform thickness of 75mm with mechanical paver to the specified grades and cross sections and consolidated by Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 505 of MORTH rev-5.

-

-

-

... More
Road A (For Bridge Work)

72.6

650522

8960.37

... More
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13cum of 19.00 9.50mm, 0.17cum of 9.50-2.36mm and 0.26cum of 2.36 and below with 50.30kgs of VG30 bitumenfor premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and crosssections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5

-

-

-

... More
Road A (For Bridge Work)

29.04

304125

10472.65

... More
Earthwork excavation in all classes of soil except soft desigtegrated rock and hard rock not requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for DRESSING THE BED UP TO SILL LEVEL.

-

-

-

... More
Road A (For Bridge Work)

303.98

37468

123.26

... More
Earthwork excavation in all class of soil except soft desintegrated rock and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF ABUTMENTS, PIERS AND WINGS.

-

-

-

... More
Road A (For Bridge Work)

355.15

146009

411.12

... More
Earthwork excavation in Soft disintegrated rock not requiring blasting except medium rock and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF ABUTMENTS, PIERS AND WINGS.

-

-

-

... More
Road A (For Bridge Work)

378.82

201448

531.78

... More
Plain Cement concrete M10 Grade (Nominal mix) using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site, cost of cement at site, including soft water, labour charges for mixing, transporting, laying, compacting, curing, tools and plants and all incidental charges such as baling out water maintaining of protective bunds coffer dam, Shoring, Strutting etc complete as per relevant standard specification for base course under footing

-

-

-

... More
Road A (For Bridge Work)

23.68

124846

5272.22

... More
Vibrated Cement Concrete M20 grade (Nominal Mix) using 40mm ISS size hard granite broken metal including cost and conveyance of all materials to site and cement at sitel including labour charges for mixing,transporting, laying, and curing concrete,working at heights,hire charges for tools and plants, including all other incidental charges,etc.,complete as per standard specification for FOOTINGS OF ABUTMENT, PIER AND WINGS BELOW SILL LEVEL.

-

-

-

... More
Road A (For Bridge Work)

530.26

3688849

6956.68

... More
Vibrated Cement Concrete M20 grade (Nominal Mix) using 40mm ISS size hard granite broken metal including cost and conveyance of all materials to site and cement at sitel including labour charges for mixing,transporting, laying, and curing concrete,working at heights,hire charges for tools and plants, including all other incidental charges,etc.,complete as per standard specification for SUBSTRUCTURE OF ABUTMENTS, WINGS, AND PIERS ABOVE SILL LEVEL.

-

-

-

... More
Road A (For Bridge Work)

234.68

1970821

8397.91

... More
Vibrated Reinforced Cement Concrete of grade M30 (design mix) using ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants including all other incidental charges etc; complete as per relevant standard specifications, for DIRT WALL CUM BED BLOCK OVER ABUTMENTS AND BED BLOCK OVER PIERS

-

-

-

... More
Road A (For Bridge Work)

12.15

152031

12512.89

... More
Providing and fixing seepage pipes of 100mm dia. PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900mm dia. semi-spherical back fill arrangements with 100mm size broken granite chips at the periphery and labour charges for fixing, etc., to drain of the backfill IN THE ABUTMENTS AND WINGS

-

-

-

... More
Road A (Bridge Work & Retaining Wall) (72.00+89.20)

161.2

28613

177.5

... More
Providing and fixing KRAFT PAPER for full width of seating of deck slab and including cost and conveyance to work site, labour charges for fixing the same in the correct position and all other incidental charges et., complete.

-

-

-

... More
Road A (For Bridge Work)

35

3850

110

... More
Vibrated Reinforced Cement Concrete of grade M30 (Design mix) using ISS size HBG graded metal including cost and conveyance of all materials to site including cost ofcement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants including all other incidental charges etc; complete as per relevant standard specifications, for DECK SLAB.

-

-

-

... More
Road A (For Bridge Work)

267.61

3199159

11954.56

... More
Providing and laying of filter media with granular materials /stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2 of MORTH specification to a thickness of 600 mm with smaller size toward the soil and bigger size toward the wall over the entire surface behind abutment ,wing to a full height compacted to a firm condition complete as per drawing and specification IRC 78- 2000-13.10

-

-

-

... More
Road A (For Bridge Work)

53.15

68372

1286.4

... More
Filling behind Abutmants and wings with clean gritty gravel including cost and conveyance of gravel to worksite,laying,handling charges and filling in layers,tamping under optimum moisture content to get the maximum density including watering,with all leads for water and all other incidental charges etc,complete for filling behind the abutment and wings.

-

-

-

... More
Road A (For Bridge Work)

100.12

27767

277.34

... More
Supplying and fixing 20mm thick Bitumen pad in 20mm expansion gap provided in between Retaining wall as shown in the drawing including cost and conveyance of expansion joints etc.

-

-

-

... More
Road A (For Bridge Work)

31.84

22892

719

... More
Vibrated Cement Concrete M15 grade (Nominal Mix) using 40mm ISS hard granite broken metal including cost and conveyance of all materials to site and cement at site including cost of formwork,lead for soft water, labour charges for mixing , transporting, laying, and curing concrete working in heights and hire charges for tools and plants, and all other incidental charges etc complete as per relevant specification for BASE COURSE BELOW APPROACH SLAB

-

-

-

... More
Road A (For Bridge Work)

12.78

82075

6422.21

... More
Vibrated reinforced cement concrete M30 grade (Design mix) using ISS graded hard granite broken metal including cost and conveyance of all materials to site including cement at site including labour charges for mixing, laying, curing concrete, working at heights,hire charges for tools and plants, including all other incidental chages etc., complete for Approach Slab

-

-

-

... More
Road A (For Bridge Work)

18.27

164700

9014.81

... More
Vibrated cement Concrete M30 grade (design mix) using ISS size HBG graded metal including cost and conveyance of all materials to worksite and cement at site including all labour charges for fixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges,formwork,cost of premoulded expansion joints and fixing the same in position etc., complete for wearing cost of 75mm uniform thickness over deck slab and approach slab.

-

-

-

... More
Road A (For Bridge Work)

334.5

208918

624.57

... More
Vibrated Reinforced Cement Concrete of grade M40 (Design mix) using 20mm and below ISS graded metal including cost and conveyance of all materials to site excluding cost and fabrication of steel including cost of cement at site and including cost of formwork, labour charges for mixing, transporting, laying and curing concrete, working at heights, soft water, hire charges for Tools and Plants including all other incidental charges etc., complete as per relevant standard specification for Crash barriers for over Deck

-

-

-

... More
Road A (For Bridge Work)

21.36

384467

17999.43

... More
Vibrated Cement Concrete M20 grade (Nominal Mix) using 40mm ISS size hard granite broken metal including cost and conveyance of all materials to site and cement at sitel including labour charges for mixing,transporting, laying, and curing concrete,working at heights,hire charges for tools and plants, including all other incidental charges,etc.,complete as per standard specification for PCC PARAPET OVER WINGS.

-

-

-

... More
Road A (For Bridge Work)

6.32

73115

11568.96

... More
Providing and fixing of cast iron drainage spouts 100mm dia as per MOST drawing SD/205 with grating arrangements at top as shown in the drawing using 12mm x 25mm flats for grating arrangements, and 100mm dia drainage spout projecting beyond the bottom of deck slab as shown in the drawing including cost and conveyance of cast iron pipes and flats and fixing them in position etc,complete.

-

-

-

... More
Road A (For Bridge Work)

16

39969

2498.1

... More
Supply and fixing of High Quality of PVC pipes of 160mm dia.. Including cost and conveyance of pipes to the site and fixing in position to proper grade and level, including labour charges for fixing and including all other incidental charges etc complete., for proving utility services in footpaths.

-

-

-

... More
Road A (For Bridge Work)

176

73867

419.7

... More
Supply and fabrication of STEEL grade Fe500D with suitable anticorrsive measure required for all the reinforced cement concrete items of work involved in the shedule including cost of steel, cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawing including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete.

-

-

-

... More
Road A (For Bridge & Retaining Wall Work) (24.910+8.928)

33.84

3235226

95609.27

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines , grades and cross sections shown in the drawings or as indicated by the Engineer using Carted Earth with an average lead of 3km for filling of Approach Road.

-

-

-

... More
Road A (Bridge Work) (95% Compaction)

1050.4

204943

195.11

... More
Road A (Bridge Work) (97% Compaction)

623.78

123246

197.58

... More
Earth work Excavation in all classes of soils except hard rock not requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion, backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification with a lead of 5km for formation of Diversion Road using Carted earth.

-

-

-

... More
Road A (Bridge Work)

3467.17

730290

210.63

... More
Supply of NP 3 class RCC 1000 mm dia. pipes supplied by the Contractor at his own cost specified below confirming to IS 458 / 1989 cost of pipe as a finished work including all other incidental charges, testing charges including loading and unloading transport and delivery in good condition at work site as directed by the departmental officers etc., complete for Bridge

-

-

-

... More
Road A (Bridge Work)

60

256608

4276.8

... More
Hoisting and Fixing of NP3 class RCC 1000 mm dia. pipes and Collars in proper gradient including all labour charges and all other incidental charges etc., complete, as directed by the departmental Officers, as per Standard Specifications.

-

-

-

... More
Road A (Bridge Work)

60

15972

266.2

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification for Foundation

-

-

-

... More
Road A (Bridge Work-Retaining Wall)

243

29952

123.26

... More
Plain Cement Concrete of grade M10 (Nominal mix) using 40mm ISS size HBG metal including cost and conveyance of all materials from approved quarry to work site including cost of cement which has to be procured by the contractor including cost and labour charges for mixing the concrete, transporting, laying, compacting, curing with all leads for soft portable water, working in all depths including hire, running and fuel charges for all tools and plants employed including as per MORTH Rev. V Specification for Base Course (Without Centering).

-

-

-

... More
Road A (Bridge Work-Retaining Wall)

18

94899

5272.22

... More
Vibrated Reinforced cement concrete of grade M25 (Design mix) using 20mm ISS hard broken granite metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Footing and Body wall.

-

-

-

... More
Road A (Bridge Work-Retaining Wall)

213.79

2308611

10798.5

... More
Vibrated cement concrete M20 grade (Nominal mix) using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site including cost and labour charges for formwork, centering, labour charges for laying, compacting, curing all incidental charges etc., complete for Parapet.

-

-

-

... More
Road A (Bridge Work-Retaining Wall)

8.1

62119

7669.1

... More
Filling with Carted earth for behind retaining wall to required thick below the foundation concrete including cost and conveyance of all mateial to site from any approved source , satisfying the standards and specifications and all labour charges for filling in layers compacting, ramming to obtain the maximum density by watering with all leads for water including all other incidental charges such as bailing out water, if necessary forming protective bunds etc.., complete as per MORT&H N0.111, 112,&2900 with average lead of 3 Km

-

-

-

... More
Road A (Bridge Work-Retaining Wall)

240.3

48415

201.48

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

20247048

... More
Add GST at 18%

1

-

3644469

... More
Total Value put to Tender

1

-

23891517

... More
Quoted value

1

-

-

... More
Final Quoted Value

1

-

-

... More
Add GST at 18% of Final Quoted Value

1

-

-

... More
Total Value of Contract Including 18% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

20247048

-

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.