Highways Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Works
Civil And Construction
Eprocure
Opening Date8 Feb 2024
Closing Date14 Feb 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cement Concrete of Grade M20 (Nominal Mix 1:1.5:3) using 40mm ISS HBG graded metal including cost and conveyance of all materials to site but excluding cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing and compacting concrete, working at heights, hire charges for Tools and Plants and incidental Charges etc., complete as per standard specifications for Levelling course for BASE SLAB.

-

-

-

... More
Road B

81.54

477577

5856.97

... More
Road K

34.1

198116

5809.87

... More
Vibrated Reinforced Cement Concrete of Grade M25 (Design Mix) using 20mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting,laying and curing concrete, working at depths, Tools and Plants and incidental Charges such as maintaining of protective bund, cofferdams, shoring, strutting etc.,complete as per relevant standard specification for Bottom Slab

-

-

-

... More
Road B

144.96

1270362

8763.54

... More
Road K

62

541372

8731.81

... More
Vibrated Reinforced Cement Concrete of Grade M25 (Design Mix) using 20mm ISS HBG graded metal including cost and conveyance of al materials to site and cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting,laying and curing concrete, working at depths, Tools and Plants and incidental Charges such as maintaining of protective bund, cofferdams, shoring, strutting etc.,complete as per relevant standard specification for Side walls

-

-

-

... More
Road B

217.29

2682249

12344.1

... More
Road K

116.18

1347224

11596.01

... More
Vibrated Reinforced Cement Concrete M25 (Design Mix) using 20mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel, but including labour charges for mixing, transporting,laying and curing concrete, soft water working at heights, hire charges for Tools and Plants and incidental Charges etc.,complete for Top Slab

-

-

-

... More
Road B

96.6

1332539

13794.4

... More
Road K

40.25

541917

13463.78

... More
Supply and Fabrication of Fe -500 steel required for all RCC items of works involved in the schedule, including cost of steel at site and cost of fabrication, labour charges for cleaning the rods straightening,cutting, bending, tying grills,including overlaping to the required length wherever necessary and placing the reinforcement in position as specified in the drawings,including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete - Drain

-

-

-

... More
Road B

24.91

2361574

94804.27

... More
Road K

10.66

1010613

94804.27

... More
Providing and fixing of Weep holes of 100mm dia PVC pipes of required length for Drains including cost and conveyance of all materials to worksite, cost and labour for 900mm dia. and labour charges for fixing etc., to drain of the rain water at 5.00m interval.

-

-

-

... More
Road B

75

13312

177.5

... More
Road K

29

5147

177.5

... More
Dismantling the existing Random Rubble Masonry in Cement Mortar in the existing causeway / bridge and clearing away from the work site and carefully stacking the usefull materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete.

-

-

-

... More
Road D

42.08

10831

257.4

... More
Road E

39.6

10193

257.4

... More
Road F

15.39

3961

257.4

... More
Road G

44.55

11467

257.4

... More
Road H

34.23

8810

257.4

... More
Road I

22.82

5873

257.4

... More
Removing the existing cut stone slab in the existing causeway / bridge and clearing away from the work site and carefully stacking the usefull materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete.

-

-

-

... More
Road D

38.64

18017

466.3

... More
Road E

27.44

12795

466.3

... More
Road G

31.36

14623

466.3

... More
Road H

18.04

8412

466.3

... More
Road I

24.6

11470

466.3

... More
Earthwork excavation in all classes of soils except hard rock requring blasting depositing on bank with all leads and lifts as per SS 20B including cost of all labour,materials, tools, equipments and all incidential charges such as bailing out water providing and maintaining necessary conferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and cleaning the site and disposal of all surplus materials etc complete as per relevant standard specifiation FOUNDATION OF BOX CULVERT AND RETURN WALL.

-

-

-

... More
Road D

147.91

16573

112.05

... More
Road E

129.15

14471

112.05

... More
Road F

96.61

10825

112.05

... More
Road G

110.33

12362

112.05

... More
Road H

67.15

7524

112.05

... More
Road I

87.52

9806

112.05

... More
Vibrated Cement Concrete M20 grade using 40mm ISS size hard granite broken metal including cost and conveyance of all materials to site, including cost of cement at site including cost of form work soft water labour charges for mixing transporting laying and curing concrete working at heights,hire charges for all tools and plants and maintaining of protective bunds, coffer dams, shoring strutting etc., complete as per standard specification for LEVELLING COURSE OF BOX CULVERT

-

-

-

... More
Road D

14.58

86016

5899.59

... More
Road E

15.07

88501

5872.69

... More
Road F

14.36

84718

5899.59

... More
Road G

14.19

85241

6007.15

... More
Road H

5.81

35170

6053.43

... More
Road I

9.81

59838

6099.71

... More
Vibrated Reinforced Cement Concrete M25 Grade using 20mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for formwork and centering, labour charges, compacting, curing, and all incidental charges etc., complete for BOTTOM SLAB OF BOX CULVERT.

-

-

-

... More
Road D

46.4

402648

8677.76

... More
Road E

40.27

348436

8652.51

... More
Road F

34.2

301422

8813.51

... More
Road G

37.9

333273

8793.5

... More
Road H

13.68

124015

9065.49

... More
Road I

26.06

232764

8931.85

... More
Vibrated Reinforced Cement Concrete M25 Grade using 20mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for formwork and centering, labour charges, compacting, curing, and all incidental charges etc., complete for BODY WALL OF BOX CULVERT.

-

-

-

... More
Road D

32.72

403379

12328.21

... More
Road E

36.46

474616

13017.46

... More
Road F

23.62

349294

14788.1

... More
Road G

31.63

416240

13159.67

... More
Road H

12.46

187700

15064.22

... More
Road I

18.98

252595

13308.51

... More
Vibrated Cement Concrete M25 Grade using 20mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for formwork and centering, labour charges, compacting, curing, and all incidental charges etc., complete for TOP SLAB OF BOX CULVERT.

-

-

-

... More
Road D

44

443813

10086.66

... More
Road E

34.27

348273

10162.63

... More
Road F

32.83

339778

10349.63

... More
Road G

31.94

329539

10317.46

... More
Road H

10.66

116270

10907.15

... More
Road I

20.49

216343

10558.48

... More
Supply and fabrication of steel Grade Fe-500 / required for all RCC items of works involved in the schedule including cost of steel cost of fabrication labour charges for cleaning the bars straightening cutting bending tying grills hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire provision of spacer bars, cover blocks and all other incidental charges etc. complete as per standard specification.

-

-

-

... More
Road D

7.79

738430

94804.27

... More
Road E

6.79

643910

94804.27

... More
Road F

5.63

533368

94804.27

... More
Road G

6.27

594801

94804.27

... More
Road H

2.48

235493

94804.27

... More
Road I

4.19

396945

94804.27

... More
Vibrated Cement Concrete M20 Grade using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for formwork and centering, labour charges, compacting, curing, and all incidental charges etc., complete for Parapet.

-

-

-

... More
Road D

2.25

24008

10670.3

... More
Road E

1.73

18607

10755.53

... More
Road F

1.17

12903

11028.9

... More
Road G

1.73

18839

10889.99

... More
Road H

1.17

13083

11182.74

... More
Road I

1.73

18999

10982.55

... More
Vibrated Cement Concrete of grade M20 Nominal Mix, using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for FOOTINGS OF RETURN WALL.

-

-

-

... More
Road D

38.47

229642

5969.39

... More
Road E

27.76

164963

5942.49

... More
Road F

11.27

67275

5969.39

... More
Road G

18.74

113882

6076.95

... More
Road H

22.67

138813

6123.23

... More
Road I

20.43

126043

6169.51

... More
Vibrated Cement Concrete of grade M20 Nominal Mix, using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for STEM OF RETURN WALL.-Below sill

-

-

-

... More
Road D

13.04

93100

7139.61

... More
Road E

12.33

86731

7034.2

... More
Road F

5.1

37721

7396.39

... More
Road G

8.7

63277

7273.33

... More
Road H

9.61

71072

7395.67

... More
Road I

9.03

67001

7419.87

... More
Vibrated Cement Concrete of grade M20 Nominal Mix, using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for STEM OF RETURN WALL - Above sill

-

-

-

... More
Road D

48.91

424331

8675.76

... More
Road E

56.78

476811

8397.53

... More
Road F

13.14

123026

9362.78

... More
Road G

37.18

324182

8719.27

... More
Road H

34.84

313032

8984.86

... More
Road I

33.67

302477

8983.59

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for Carted Eath with a lead of 5 km for formation of Diversion Road for 95% compacion.

-

-

-

... More
Road H

1044.02

203228

194.66

... More
Road I

1032.04

200896

194.66

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for Carted Eath with a lead of 5 km for formation of Diversion Road for 97% compacion and for approach road on both sides of culvert

-

-

-

... More
Road H

147.5

28862

195.68

... More
Road I

147.5

28862

195.68

... More
Supply and Hoisting of NP 3 class RCC 1000 mm dia. pipes supplied by the Contractor at his own cost specified below confirming to IS 458 / 1989 cost of pipe as a finished work including all other incidental charges, testing charges including loading and unloading transport and delivery in good condition at work site as directed by the departmental officers etc., complete.

-

-

-

... More
Road H

20

82600

4130

... More
Road I

20

82600

4130

... More
Providing and laying Gravel soling for specified thick with clean good gritty gravel over the well prepared sub grade from the approved quarry including cost and conveyance of material, laying in accordance with the requirements and specification. The materials shall be laid in one or more layers as sub-base according to the line and grade and cross action shown in the drawing or as directed by the Engineers for DIVERSION ROAD

-

-

-

... More
Road H

165

60472

366.5

... More
Road I

165

62394

378.15

... More
Earthwork excavation in all classes of soils except hard rock requring blasting depositing on bank with all leads and lifts as per SS 20B including cost of all labour,materials, tools, equipments and all incidential charges such as bailing out water providing and maintaining necessary conferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and cleaning the site and disposal of all surplus materials etc complete as per relevant standard specifiation for FOUNDATION OF RETAINING WALL

-

-

-

... More
Road A

1153.49

129248

112.05

... More
Road C

483.98

54229

112.05

... More
Road J

148.01

16584

112.05

... More
Plain Cement Concrete M20 gradeMix using 40mm ISS size hard granite broken metal including cost and conveyance of all materials to site, including cost of cement at site including cost of form work soft water labour charges for mixing transporting laying and curing concrete working at heights,hire charges for all tools and plants and maintaining of protective bunds, coffer dams, shoring strutting etc., complete as per standard specification for Foundation of Retaining Wall

-

-

-

... More
Road A

424.97

2617993

6160.42

... More
Road C

161.33

967378

5996.27

... More
Road J

49.34

294529

5969.38

... More
Vibrated Cement Concrete M20 gradeMix using 40mm ISS size HBG metal including cost and conveyance of all materials to site, including cost of cement at site including cost of form work soft water labour charges for mixing transporting laying and curing concrete working at heights, tools and plants and maintaining of protective bunds, coffer dams, shoring strutting etc., complete as per standard specification for STEM OF PCC RETAINING WALL (below sill level)

-

-

-

... More
Road A

542.19

3832269

7068.13

... More
Road C

226.57

1612408

7116.6

... More
Road J

72.54

503609

6942.51

... More
Vibrated Cement Concrete of grade M20 Nominal Mix, using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for STEM OF RETURN WALL - Above sill

-

-

-

... More
Road A

1432.96

11534539

8049.45

... More
Road C

475.2

3918076

8245.11

... More
Road J

175.83

1393247

7923.83

... More
Providing and fixing SEEPAGE PIPES of 110mm dia PVC pipes of required length for Retaining Walls including cost and conveyance of all materials to worksite, cost and labour for 900mm dia. Semi-spherical back fill arrangements with 100mm size broken granite chips at the periphery and labour charges for fixing etc., to drain of the Backfill in the Retaining Wall

-

-

-

... More
Road A

322.7

65540

203.1

... More
Road C

164.5

33409

203.1

... More
Road J

44.1

8956

203.1

... More
Filling with carted earth including cost and conveyance of earth to work site including labour charges for filling in layers as specified by the departmental officers including watering with all leads for water including labour charges for compacting,tamping and ramming under optimum moisture to obtain the maximun density and all other incidential charges etc., complete as per standard specification

-

-

-

... More
Road A

969.02

146322

151

... More
Road C

267.67

40418

151

... More
Road J

123.69

18677

151

... More
Filling with excavated earth excluding cost and conveyance of earth to work site including labour charges for filling in layers as specified by the departmental officers including watering with all leads for water including labour charges for compacting,tamping and ramming under optimum moisture to obtain the maximun density and all other incidential charges etc., complete as per standard specification

-

-

-

... More
Road A

1153.49

44928

38.95

... More
Road C

483.98

18851

38.95

... More
Road J

148.01

5764

38.95

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

52703207

... More
Add GST at 18%

1

-

9486577

... More
Total Value put to Tender

1

-

62189784

... More
Negotiated Percentage

1

-

-

... More
Final Negotiated Value

1

-

-

... More
Add GST at 18% of Final Negotiated Value

1

-

-

... More
Total Value of Contract Including 18% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

52703207

-

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.