Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date19 Oct 2024
Closing Date5 Nov 2024
Tender Amount₹ 2,02,30,000 
Notes
Download

Costs

Summary

Try-114 Aranthangi (h) C And M Sub Division

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
WET MIX MACADAM Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam required thickness, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5

-

-

-

... More
Road I

57

2330

132854.46

... More
Prime Coat Over WMM Surface Providing and laying Prime Coat over WMM surface using pressure distributor 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 502 of MORTH Rev-5

-

-

-

... More
Road I

570

80

45685.5

... More
Tack Coat Over Primed Surface Providing and laying Tack Coat over WMM surface (treated with primer) using pressure distributor 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 503 of MORTH REV 5

-

-

-

... More
Road I

570

18

10453.8

... More
Tack Coat Over Existing BT Surface Providing and laying Tack Coat over Existing BT surface using pressure distributor 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5

-

-

-

... More
Road A

2800

26

74676

... More
Road B

7000

26

186690

... More
Road C

4200

26

112014

... More
Road D

2838.8

26

75710.8

... More
Road E

2297.6

26

61276.99

... More
Road F

5683.75

26

151585.61

... More
Road G

5548.8

26

147986.5

... More
Road H

3789.39

26

101063.03

... More
Road I

3475.05

26

92679.58

... More
Providing and laying 50mm thick Bituminous Macadam using course aggregate and VG 30 bitumen which all consist of construction in a single course base/binder course confirming to the specification on a previously prepared base.(using Mini Hot Mix Plant and power roller) including cost of material,labour charged,rentals for machinery,fuel and all other incidental charges etc.,complete as per clause 504 MORTH Rev-5 (Mix in place method) (For Patch Work)

-

-

-

... More
Road A

6.39

8158

52130.51

... More
Road B

9.45

8158

77094.42

... More
Road C

4.57

8209

37515.13

... More
Road D

4.6

8221

37819.82

... More
Road F

5.81

8477

49256.95

... More
Road G

13.2

8466

111751.2

... More
Advance patch work upto 50mm thick using 45mm IRC siae HBG metal for making the potholes and patches using VG10 grade bitumen including mix at the rate of 44kg/cum of IRC metal after trimming the pot holes or depression proper shape and depth, side painting with tack coat and compacting the layers as directed by the Engineer and also as per MORTH No111, 112,501, 900

-

-

-

... More
Road H

8.82

3886

34276.81

... More
Road I

5.69

3915

22277.26

... More
BM (Grade-II) 50mm Thick Using VG30 Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm of 50mm thick including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5

-

-

-

... More
Road A

28

8433

236134.08

... More
Road B

70

8433

590335.2

... More
Road C

42

8433

354201.12

... More
Road D

28

8433

236134.08

... More
Road E

22

8433

185533.92

... More
Road F

55

8433

463834.8

... More
Road G

55

8433

463834.8

... More
Road H

37.5

8433

316251

... More
Road I

37.32

8433

314733

... More
BC 30mm Thick (Grade-II) Using VG30 Bitumen Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm of 40mm thick including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5

-

-

-

... More
Road A

84

10580

888793.92

... More
Road B

210

10580

2221984.8

... More
Road C

126

10580

1333190.88

... More
Road D

85.16

10580

901067.74

... More
Road E

68.92

10580

729234.25

... More
Road F

170.51

10580

1804145.85

... More
Road G

166.46

10580

1761293.28

... More
Road H

113.69

10580

1202940.25

... More
Road I

121.35

10580

1283989.79

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections including compaction by power roller shown in the drawings or as indicated by the Engineer as per MORTH Vth Rev., 111, 112 & 201 for making up berms using earth from borrow area.

-

-

-

... More
Road A

80

169

13571.2

... More
Road B

200

169

33928

... More
Road C

120

169

20356.8

... More
Road D

79.6

169

13503.34

... More
Road E

78.8

169

13367.63

... More
Road F

197.45

169

33495.42

... More
Road G

199.4

169

33826.22

... More
Road H

200

169

33928

... More
Road I

201.8

169

34233.35

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

17136791

-

... More
Add GST at 18%

1

3084622

-

... More
Total Value put to Tender

1

20221413

-

... More
Quoted Percentage

1

-

-

... More
Quoted Value

1

-

-

... More
Add GST at 18% of Final Quoted Value

1

-

-

... More
Total Value of Contract Including 18% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

-

17136791

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-

... More
Quoted Rate in Words

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.