Highways Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Civil And Construction
Road Construction
Eprocure
Opening Date11 Aug 2023
Closing Date17 Aug 2023
Tender Amount₹ 3,00,40,000 
Notes
Download

Costs

Summary

Valapady (h) Candm Sub Division (slm-19)

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
1. Widening from Intermediate Lane to Two Lane and Strengthening at km 38/0 - 39/5 of Ayothiyapattinam-Belur-Kilakkadu Road including Reconstruction of culvert at km.38/8.

382.18

7593

19.87

... More
Earthwork for formation of Approach Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as instructed by the Engineer. for Formation of Approach on both side of culvert by using carted earth with a lead of 1 km as per clause 111, 112, 301 to 305, 900 of MORTH Vth Revision etc complete.

-

-

-

... More
1. Widening from Intermediate Lane to Two Lane and Strengthening at km 38/0 - 39/5 of Ayothiyapattinam-Belur-Kilakkadu Road including Reconstruction of culvert at km.38/8.

2074.96

350377

168.86

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method :Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 111, 112, 401 & 900 of MORTH Vth Revision etc., complete - for grading- V Material

-

-

-

... More
1. Widening from Intermediate Lane to Two Lane and Strengthening at km 38/0 - 39/5 of Ayothiyapattinam-Belur-Kilakkadu Road including Reconstruction of culvert at km.38/8.

663.99

1166119

1756.23

... More
Wet Mix Macadam (Table 400-13) :Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, as per clause 111, 112, 406 & 900 of MORTH Vth Revision

-

-

-

... More
1. Widening from Intermediate Lane to Two Lane and Strengthening at km 38/0 - 39/5 of Ayothiyapattinam-Belur-Kilakkadu Road including Reconstruction of culvert at km.38/8.

922.2

1982942

2150.23

... More
Prime coat :Providing and applying primer coat with bitumen emulsion (SS-I type) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per clause 111, 112, 501, 502 & 900 of MORTH Vth Revision - over WMM

-

-

-

... More
1. Widening from Intermediate Lane to Two Lane and Strengthening at km 38/0 - 39/5 of Ayothiyapattinam-Belur-Kilakkadu Road including Reconstruction of culvert at km.38/8.

3688.82

276145

74.86

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision - over granular surfaces treated with primer

-

-

-

... More
1. Widening from Intermediate Lane to Two Lane and Strengthening at km 38/0 - 39/5 of Ayothiyapattinam-Belur-Kilakkadu Road including Reconstruction of culvert at km.38/8.

3688.82

61640

16.71

... More
Providing and Laying 50mm thick Bituminous Macadam using course aggregate and VG30 Bitumen which shall consist of construction in a single corse base/binder course confirming to the specification on apreviously prepared base. (Using mini hot mix palny and power roller) including cost of material, Labour charges, Rentals for Machinery , fuel and ll other incidental charges etc., complete as per Clause 5043 MORTH Rev-5 (Mix-in-Place Method) (For Patch works)

-

-

-

... More
1. Widening from Intermediate Lane to Two Lane and Strengthening at km 38/0 - 39/5 of Ayothiyapattinam-Belur-Kilakkadu Road including Reconstruction of culvert at km.38/8.

28.18

223123

7917.78

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision - over bituminous surfaces

-

-

-

... More
1. Widening from Intermediate Lane to Two Lane and Strengthening at km 38/0 - 39/5 of Ayothiyapattinam-Belur-Kilakkadu Road including Reconstruction of culvert at km.38/8.

7040

169945

24.14

... More
Providing and laying Tack Coat over Dry Lean Cement Concrete surface using 3.00Kg of Bitumen Emulsion(RS1) per 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 - over concrete surface

-

-

-

... More
1. Widening from Intermediate Lane to Two Lane and Strengthening at km 38/0 - 39/5 of Ayothiyapattinam-Belur-Kilakkadu Road including Reconstruction of culvert at km.38/8.

119.21

2269

19.04

... More
Dense Graded Bituminous Macadam (Table - 500-10) Providing and laying dense bituminous macadam with Hot Mix Plant using crushed aggregates of specified grading, premixed with bituminous binder (VG 40) at percentage specified by JMF by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No.111,112,501,505 & 900 - Grading I (using 75 mm thick)

-

-

-

... More
1. Widening from Intermediate Lane to Two Lane and Strengthening at km 38/0 - 39/5 of Ayothiyapattinam-Belur-Kilakkadu Road including Reconstruction of culvert at km.38/8.

331.99

3029319

9124.73

... More
Dense Graded Bituminous Macadam (Table - 500-10) Providing and laying dense bituminous macadam with Hot Mix Plant using crushed aggregates of specified grading, premixed with bituminous binder (VG 40) at percentage specified by JMF by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No.111,112,501,505 & 900 - Grading II ( using 50 mm thick)

-

-

-

... More
1. Widening from Intermediate Lane to Two Lane and Strengthening at km 38/0 - 39/5 of Ayothiyapattinam-Belur-Kilakkadu Road including Reconstruction of culvert at km.38/8.

352

3456618

9819.94

... More
Bituminous Concrete (Table 500-17) :Providing and laying bituminous concrete of required thickness with central hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (VG-40) at percentage specified by JMF of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 111,112,501,507 & 900 of MORTH vth Revision complete in all respects - Grading II

-

-

-

... More
1. Widening from Intermediate Lane to Two Lane and Strengthening at km 38/0 - 39/5 of Ayothiyapattinam-Belur-Kilakkadu Road including Reconstruction of culvert at km.38/8.

433.92

4620870

10649.13

... More
Providing compaction for making up of low berms using the available box cut earth including all hire and fuel charges for power roller for compaction, water sprinkler, including all labour charges for laying, spreading, watering etc., complete and as directed by the departmental engineers. as per MORTH specification clause No. 111, 112, 301 to 305 & 900 of MORTH Vth Revision. (Labour charges only)

-

-

-

... More
1. Widening from Intermediate Lane to Two Lane and Strengthening at km 38/0 - 39/5 of Ayothiyapattinam-Belur-Kilakkadu Road including Reconstruction of culvert at km.38/8.

576

14613

25.37

... More
Dismantling Culverts, bridges and other structures Dismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc as per clause No. 111, 112, 202 of MORTH vth Revision Dismantling Concrete Pavement.Plain cement concrete

-

-

-

... More
1.1 Reconstruction of culvert at km.38/8 of Ayothiyapattinam-Belur-Kilakkadu Road

17.31

7651

442

... More
Earthwork excavation in all class of soil except soft desintegrated rock and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for foundation of Box Culvert as per MORTH Specification clause No: 304.

-

-

-

... More
1.1 Reconstruction of culvert at km.38/8 of Ayothiyapattinam-Belur-Kilakkadu Road

903.9

101282

112.05

... More
Vibrated Cement Concrete of grade M15 Nominal Mix using 40mm ISS size HBG metal including cost and conveyance of all materials to site complying with required standards and specifications. including cost of formwork, mixing, laying and compacting using vibrator including hire and fuel charges for all Tools and Plants and incidental charges such as maintaining of protective bunds, coffer dams strutting etc., complete as per relevant standard specification for base concrete of culverts, Retaining wall as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revisionn for BASE COURSE BELOW BOX PORTION AND RETAINING WALL

-

-

-

... More
1.1 Reconstruction of culvert at km.38/8 of Ayothiyapattinam-Belur-Kilakkadu Road

149.47

925126

6189.38

... More
Vibrated Reinforced Cement Concrete of grade M25 DESIGN MIX using ISS size graded HBG metal including cost and conveyance of all materials to site but excluding cost and fabrication of steel including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for BASE SLAB, STEM AND TOP SLAB OF BOX CULVERT. as per MORTH Specification clause No: 1000, 1500, 1600, 1700.

-

-

-

... More
1.1 Reconstruction of culvert at km.38/8 of Ayothiyapattinam-Belur-Kilakkadu Road

199.96

2163639

10820.36

... More
Vibrated Cement Concrete of grade M20 Nominal Mix using 40mm ISS size HBG metal including cost and conveyance of all materials to site complying with required standards and specifications. including cost of formwork, mixing, laying and compacting using vibrator including hire and fuel charges for all Tools and Plants and incidental charges such as maintaing of protective bunds, coffer dams strutting etc., complete as per relevant standard specification for Above sill level for Retaining wall and Parapet as per MORTH Specification No: 1000, 1500, 1700.

-

-

-

... More
1.1 Reconstruction of culvert at km.38/8 of Ayothiyapattinam-Belur-Kilakkadu Road

664.05

5114287

7701.66

... More
Providing and fixing seepage pipes of 100mm dia. PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900mm dia. semi-spherical back fill arrangements with 100mm size broken granite chips at the periphery and labour charges for fixing, etc.,to drain of the backfill in the Retaining wall portion as per MORTH Vth Revision clause No. 2706

-

-

-

... More
1.1 Reconstruction of culvert at km.38/8 of Ayothiyapattinam-Belur-Kilakkadu Road

107.04

18999

177.5

... More
Supply and fabrication of Fe-500D steel required for all RCC items of works involved in the schedule cost of steel at site fabrication,labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc,complete, as per MORTH Vth Revision No. 1000, 1600, 900

-

-

-

... More
1.1 Reconstruction of culvert at km.38/8 of Ayothiyapattinam-Belur-Kilakkadu Road

15.1

1431544

94804.27

... More
Providing and fixing of cast iron drainage spouts 100mm dia as per MOST drawing SD/205 with grating arrangements at top as shown in the drawing using 12mm x 25mm flats for grating arrangements, and 100mm dia drainage spout projecting beyond the bottom of deck slab as shown in the drawing including cost and conveyance of cast iron pipes and flats and fixing them in position etc,complete as per Clause 2705 of MORTH Rev-5

-

-

-

... More
1.1 Reconstruction of culvert at km.38/8 of Ayothiyapattinam-Belur-Kilakkadu Road

6

13626

2271

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines , grades and cross sections shown in the drawings or as indicated by the Engineer using Site Earth for Forming Diversion Road. as per MORTH Revision No: 111, 112, 202, 201, 203, 304.

-

-

-

... More
1.1 Reconstruction of culvert at km.38/8 of Ayothiyapattinam-Belur-Kilakkadu Road

1500

206805

137.87

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

25452447

... More
Add GST at 18%

1

-

4581440

... More
Total Value put to Tender

1

-

30033887

... More
Negotiated Percentage

1

-

-

... More
Final Negotiated Value

1

-

-

... More
Add GST at 18% of Final Negotiated Value

1

-

-

... More
Total Value of Contract Including 18% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

25452447

-

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.