Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Works
Civil And Construction
Eprocure
Opening Date23 Sep 2024
Closing Date17 Oct 2024
Tender Amount₹ 5,78,80,000 
Notes
Download

Costs

Summary

Uthangarai (h) Candm Sub Division (slm-102)

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth Work excavation in all classes of soil except hard rock not requiring blasting and deposting on bank with all leads and lifts as per SS20B including cost of all labour,materials,tools,equipments and all incidental charges and sheeting, shoring,bracing and their subsequent removal of all logs,stumps and other deleteriuos matter and obstructions,trimming of bottom of excavation,backfilling and clearing the site and disposal of all surplus materials etc.,complete as per standard specification for Boxing as per clause 111, 112, 201, 202, 301 to 305 & 900 of MORTH Vth Revision

-

-

-

... More
1.Widening from Single Lane to Intermediate Lane and Strengthening at km 0/0 - 3/0 of Batlapalli - Jinjampatty road including CD works at Km 0/4 (i), (ii),0/6,1/4 & 1/10.

2388.55

294412

123.26

... More
2.Widening from Single Lane to Intermediate Lane and Strengthening at km 0/0 - 2/0, 4/6 - 5/6 of Koochur - Amballi road including CD Works at Km.0/2 (i), (ii), 0/6 (i), (ii), 0/8, 0/10, 1/2, 1/4, 1/6, 1/8, 1/10, 4/8, 5/2 (i), (ii), 5/4

1917.92

236402

123.26

... More
Granular Sub-base with Graded Material (Table:- 400-13) - Plant Mix Method :Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 111, 112, 401 & 900 of MORTH Vth Revision etc., complete - for grading- V Material

-

-

-

... More
1.Widening from Single Lane to Intermediate Lane and Strengthening at km 0/0 - 3/0 of Batlapalli - Jinjampatty road including CD works at Km 0/4 (i), (ii),0/6,1/4 & 1/10.

1039.5

2296276

2209.02

... More
2.Widening from Single Lane to Intermediate Lane and Strengthening at km 0/0 - 2/0, 4/6 - 5/6 of Koochur - Amballi road including CD Works at Km.0/2 (i), (ii), 0/6 (i), (ii), 0/8, 0/10, 1/2, 1/4, 1/6, 1/8, 1/10, 4/8, 5/2 (i), (ii), 5/4

831.18

1814150

2182.62

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm/150mm thickness, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 406 & 900 of MORTH Vth Revision

-

-

-

... More
1.Widening from Single Lane to Intermediate Lane and Strengthening at km 0/0 - 3/0 of Batlapalli - Jinjampatty road including CD works at Km 0/4 (i), (ii),0/6,1/4 & 1/10.

2075.42

4555588

2195.02

... More
2.Widening from Single Lane to Intermediate Lane and Strengthening at km 0/0 - 2/0, 4/6 - 5/6 of Koochur - Amballi road including CD Works at Km.0/2 (i), (ii), 0/6 (i), (ii), 0/8, 0/10, 1/2, 1/4, 1/6, 1/8, 1/10, 4/8, 5/2 (i), (ii), 5/4

2134.44

4685138

2195.02

... More
Providing and laying Prime Coat over WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 502 & 900 of MORTH Vth Revision

-

-

-

... More
1.Widening from Single Lane to Intermediate Lane and Strengthening at km 0/0 - 3/0 of Batlapalli - Jinjampatty road including CD works at Km 0/4 (i), (ii),0/6,1/4 & 1/10.

10266.63

828722

80.72

... More
2.Widening from Single Lane to Intermediate Lane and Strengthening at km 0/0 - 2/0, 4/6 - 5/6 of Koochur - Amballi road including CD Works at Km.0/2 (i), (ii), 0/6 (i), (ii), 0/8, 0/10, 1/2, 1/4, 1/6, 1/8, 1/10, 4/8, 5/2 (i), (ii), 5/4

13242.75

1069087

80.73

... More
Providing and laying Tack Coat over WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision

-

-

-

... More
1.Widening from Single Lane to Intermediate Lane and Strengthening at km 0/0 - 3/0 of Batlapalli - Jinjampatty road including CD works at Km 0/4 (i), (ii),0/6,1/4 & 1/10.

10266.63

189727

18.48

... More
2.Widening from Single Lane to Intermediate Lane and Strengthening at km 0/0 - 2/0, 4/6 - 5/6 of Koochur - Amballi road including CD Works at Km.0/2 (i), (ii), 0/6 (i), (ii), 0/8, 0/10, 1/2, 1/4, 1/6, 1/8, 1/10, 4/8, 5/2 (i), (ii), 5/4

13242.75

244726

18.48

... More
Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision

-

-

-

... More
1.Widening from Single Lane to Intermediate Lane and Strengthening at km 0/0 - 3/0 of Batlapalli - Jinjampatty road including CD works at Km 0/4 (i), (ii),0/6,1/4 & 1/10.

6169.38

165216

26.78

... More
2.Widening from Single Lane to Intermediate Lane and Strengthening at km 0/0 - 2/0, 4/6 - 5/6 of Koochur - Amballi road including CD Works at Km.0/2 (i), (ii), 0/6 (i), (ii), 0/8, 0/10, 1/2, 1/4, 1/6, 1/8, 1/10, 4/8, 5/2 (i), (ii), 5/4

3147.38

84318

26.79

... More
Tack coat -Providing and laying Tack Coat over Dry Lean Cement Concrete surface using 3.00Kg of Bitumen Emulsion (RS1) per 10sqm for preparatory to another bituminous construction over itincluding cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5

-

-

-

... More
1.Widening from Single Lane to Intermediate Lane and Strengthening at km 0/0 - 3/0 of Batlapalli - Jinjampatty road including CD works at Km 0/4 (i), (ii),0/6,1/4 & 1/10.

94.5

1974

20.89

... More
2.Widening from Single Lane to Intermediate Lane and Strengthening at km 0/0 - 2/0, 4/6 - 5/6 of Koochur - Amballi road including CD Works at Km.0/2 (i), (ii), 0/6 (i), (ii), 0/8, 0/10, 1/2, 1/4, 1/6, 1/8, 1/10, 4/8, 5/2 (i), (ii), 5/4

173.25

3619

20.89

... More
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG 30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 111, 112, 501, 504 & 900 of MORTH Vth Revision- Grading II

-

-

-

... More
1.Widening from Single Lane to Intermediate Lane and Strengthening at km 0/0 - 3/0 of Batlapalli - Jinjampatty road including CD works at Km 0/4 (i), (ii),0/6,1/4 & 1/10.

569.89

4692907

8234.76

... More
2.Widening from Single Lane to Intermediate Lane and Strengthening at km 0/0 - 2/0, 4/6 - 5/6 of Koochur - Amballi road including CD Works at Km.0/2 (i), (ii), 0/6 (i), (ii), 0/8, 0/10, 1/2, 1/4, 1/6, 1/8, 1/10, 4/8, 5/2 (i), (ii), 5/4

670.8

5523877

8234.76

... More
Bituminous Concrete (Table 500-17) :Providing and laying Bituminous Concreteto 30 thick using 0.13 cum of 19.00-9.50mm ,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for pre mixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc.,complete as per specification using CMP as per clause No. 111,112,501,507 & 900 of MORTH vth Revision complete in all respects - Grading II

-

-

-

... More
1.Widening from Single Lane to Intermediate Lane and Strengthening at km 0/0 - 3/0 of Batlapalli - Jinjampatty road including CD works at Km 0/4 (i), (ii),0/6,1/4 & 1/10.

495.93

5143959

10372.35

... More
2.Widening from Single Lane to Intermediate Lane and Strengthening at km 0/0 - 2/0, 4/6 - 5/6 of Koochur - Amballi road including CD Works at Km.0/2 (i), (ii), 0/6 (i), (ii), 0/8, 0/10, 1/2, 1/4, 1/6, 1/8, 1/10, 4/8, 5/2 (i), (ii), 5/4

496.9

5154020

10372.35

... More
Providing compaction for embankment / making up of low berms using the available box cut earth including all hire and fuel charges for power roller for compaction, water sprinkler, including all labour charges for laying, spreading, watering etc., complete and as directed by the departmental engineers. for Hire and Labour charges only as per clause 111,112, 302-304

-

-

-

... More
1.Widening from Single Lane to Intermediate Lane and Strengthening at km 0/0 - 3/0 of Batlapalli - Jinjampatty road including CD works at Km 0/4 (i), (ii),0/6,1/4 & 1/10.

494

13160

26.64

... More
2.Widening from Single Lane to Intermediate Lane and Strengthening at km 0/0 - 2/0, 4/6 - 5/6 of Koochur - Amballi road including CD Works at Km.0/2 (i), (ii), 0/6 (i), (ii), 0/8, 0/10, 1/2, 1/4, 1/6, 1/8, 1/10, 4/8, 5/2 (i), (ii), 5/4

520

13852

26.64

... More
Dismantling Culverts and other Structures Dismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc as per clause No. 111, 112, 202 of MORTH vth Revision Dismantling Random Rubble Masonary

-

-

-

... More
1.Widening from Single Lane to Intermediate Lane and Strengthening at km 0/0 - 3/0 of Batlapalli - Jinjampatty road including CD works at Km 0/4 (i), (ii),0/6,1/4 & 1/10.

-

-

-

... More
1.1. Reconstruction of Culvert at km 0/4 (i), (ii), 0/6 of Batlapalli - Jinjampatty road

19.8

5606

283.14

... More
1.2. Reconstruction of Culvert at km 1/4 & 1/10 of Batlapalli - Jinjampatty road

13.2

3737

283.14

... More
2.Widening from Single Lane to Intermediate Lane and Strengthening at km 0/0 - 2/0, 4/6 - 5/6 of Koochur - Amballi road including CD Works at Km.0/2 (i), (ii), 0/6 (i), (ii), 0/8, 0/10, 1/2, 1/4, 1/6, 1/8, 1/10, 4/8, 5/2 (i), (ii), 5/4

-

-

-

... More
2.1.Reconstruction of culvert at Km 0/2 (i), (ii), 0/6 (i), (ii), 0/10 of Koochur - Amballi road

33

9343

283.14

... More
2.2.Reconstruction of culvert at Km 0/8 of Koochur - Amballi road

21.05

5960

283.14

... More
2.3.Reconstruction of culvert at Km 1/2, 1/4, 1/6, 1/8, 1/10 of Koochur - Amballi road

33

9343

283.14

... More
2.4.Reconstruction of culvert at Km 4/8 of Koochur - Amballi road

6.6

1868

283.14

... More
2.5.Reconstruction of culvert at Km 5/2 (i), (ii), 5/4 of Koochur - Amballi road

19.8

5606

283.14

... More
Earth Work excavation in all classes of soil except hard rock not requiring blasting and deposting on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal of all logs, stumps and other deleteriuos matter and obstructions, trimming of bottom of excavation, backfilling and clearing the site and disposal of all surplus materials etc.,complete as per standard specification for Foundation of Box Culvert as per clause 111, 112, 201, 202, 301 to 305 & 900 of MORTH Vth Revision

-

-

-

... More
1.Widening from Single Lane to Intermediate Lane and Strengthening at km 0/0 - 3/0 of Batlapalli - Jinjampatty road including CD works at Km 0/4 (i), (ii),0/6,1/4 & 1/10.

-

-

-

... More
1.1. Reconstruction of Culvert at km 0/4 (i), (ii), 0/6 of Batlapalli - Jinjampatty road

222.21

27389

123.26

... More
1.2. Reconstruction of Culvert at km 1/4 & 1/10 of Batlapalli - Jinjampatty road

148.14

18259

123.26

... More
2.Widening from Single Lane to Intermediate Lane and Strengthening at km 0/0 - 2/0, 4/6 - 5/6 of Koochur - Amballi road including CD Works at Km.0/2 (i), (ii), 0/6 (i), (ii), 0/8, 0/10, 1/2, 1/4, 1/6, 1/8, 1/10, 4/8, 5/2 (i), (ii), 5/4

-

-

-

... More
2.1.Reconstruction of culvert at Km 0/2 (i), (ii), 0/6 (i), (ii), 0/10 of Koochur - Amballi road

248.25

30599

123.26

... More
2.2.Reconstruction of culvert at Km 0/8 of Koochur - Amballi road

135.84

16743

123.26

... More
2.3.Reconstruction of culvert at Km 1/2, 1/4, 1/6, 1/8, 1/10 of Koochur - Amballi road

248.25

30599

123.26

... More
2.4.Reconstruction of culvert at Km 4/8 of Koochur - Amballi road

49.65

6119

123.26

... More
2.5.Reconstruction of culvert at Km 5/2 (i), (ii), 5/4 of Koochur - Amballi road

148.95

18359

123.26

... More
Vibrated Cement Concrete of grade M15 Nominal Mix using 40mm ISS size HBG metal including cost and conveyance of all materials to site complying with required standards and specifications. including cost of formwork, mixing, laying and compacting using vibrator including hire and fuel charges for all Tools and Plants and incidental charges such as maintaining of protective bunds, coffer dams strutting etc., complete as per relevant standard specification for base concrete of culverts as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision

-

-

-

... More
1.Widening from Single Lane to Intermediate Lane and Strengthening at km 0/0 - 3/0 of Batlapalli - Jinjampatty road including CD works at Km 0/4 (i), (ii),0/6,1/4 & 1/10.

-

-

-

... More
1.1. Reconstruction of Culvert at km 0/4 (i), (ii), 0/6 of Batlapalli - Jinjampatty road

25.46

155683

6114.82

... More
1.2. Reconstruction of Culvert at km 1/4 & 1/10 of Batlapalli - Jinjampatty road

16.97

104025

6129.97

... More
2.Widening from Single Lane to Intermediate Lane and Strengthening at km 0/0 - 2/0, 4/6 - 5/6 of Koochur - Amballi road including CD Works at Km.0/2 (i), (ii), 0/6 (i), (ii), 0/8, 0/10, 1/2, 1/4, 1/6, 1/8, 1/10, 4/8, 5/2 (i), (ii), 5/4

-

-

-

... More
2.1.Reconstruction of culvert at Km 0/2 (i), (ii), 0/6 (i), (ii), 0/10 of Koochur - Amballi road

22.57

139207

6167.8

... More
2.2.Reconstruction of culvert at Km 0/8 of Koochur - Amballi road

13.79

85053

6167.8

... More
2.3.Reconstruction of culvert at Km 1/2, 1/4, 1/6, 1/8, 1/10 of Koochur - Amballi road

22.57

139514

6181.4

... More
2.4.Reconstruction of culvert at Km 4/8 of Koochur - Amballi road

4.52

27878

6167.8

... More
2.5.Reconstruction of culvert at Km 5/2 (i), (ii), 5/4 of Koochur - Amballi road

13.55

83635

6172.33

... More
Vibrated Cement Concrete M20 grade, Nominal Mix using 40mm ISS size hard granite broken metal including cost and conveyance of all materials to site and cement at site including labour charges for mixing, transporting, laying, and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges,etc.,complete as per standard specification for Parapet, wing wall as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision

-

-

-

... More
1.Widening from Single Lane to Intermediate Lane and Strengthening at km 0/0 - 3/0 of Batlapalli - Jinjampatty road including CD works at Km 0/4 (i), (ii),0/6,1/4 & 1/10.

-

-

-

... More
1.1. Reconstruction of Culvert at km 0/4 (i), (ii), 0/6 of Batlapalli - Jinjampatty road

81.27

693579

8534.26

... More
1.2. Reconstruction of Culvert at km 1/4 & 1/10 of Batlapalli - Jinjampatty road

54.18

463207

8549.41

... More
2.Widening from Single Lane to Intermediate Lane and Strengthening at km 0/0 - 2/0, 4/6 - 5/6 of Koochur - Amballi road including CD Works at Km.0/2 (i), (ii), 0/6 (i), (ii), 0/8, 0/10, 1/2, 1/4, 1/6, 1/8, 1/10, 4/8, 5/2 (i), (ii), 5/4

-

-

-

... More
2.1.Reconstruction of culvert at Km 0/2 (i), (ii), 0/6 (i), (ii), 0/10 of Koochur - Amballi road

34.13

332451

9740.75

... More
2.2.Reconstruction of culvert at Km 0/8 of Koochur - Amballi road

35.59

304028

8542.53

... More
2.3.Reconstruction of culvert at Km 1/2, 1/4, 1/6, 1/8, 1/10 of Koochur - Amballi road

34.13

332916

9754.36

... More
2.4.Reconstruction of culvert at Km 4/8 of Koochur - Amballi road

6.83

66529

9740.75

... More
2.5.Reconstruction of culvert at Km 5/2 (i), (ii), 5/4 of Koochur - Amballi road

20.48

199583

9745.28

... More
Vibrated reinforced cement concrete M-25 Grade, Design mix, using ISS size hard granite broken graded metal including cost and conveyance of all materials to site complying with required standards and specifications. But excluding cost and fabrication of steel, including cost of formwork, mixing, laying and compacting using vibrator including hire and fuel charges for all Tools and Plants and incidental charges such as maintaining of protective bunds, coffer dams strutting etc., complete as per relevant standard specification as per clause 1000, 1500, 1700, 2100, 2200 & 2908 of MORTH Vth Revision for Box culvert base slab, side wall, Top slab

-

-

-

... More
1.Widening from Single Lane to Intermediate Lane and Strengthening at km 0/0 - 3/0 of Batlapalli - Jinjampatty road including CD works at Km 0/4 (i), (ii),0/6,1/4 & 1/10.

-

-

-

... More
1.1. Reconstruction of Culvert at km 0/4 (i), (ii), 0/6 of Batlapalli - Jinjampatty road

85.74

1068990

12467.81

... More
1.2. Reconstruction of Culvert at km 1/4 & 1/10 of Batlapalli - Jinjampatty road

57.16

713525

12482.95

... More
2.Widening from Single Lane to Intermediate Lane and Strengthening at km 0/0 - 2/0, 4/6 - 5/6 of Koochur - Amballi road including CD Works at Km.0/2 (i), (ii), 0/6 (i), (ii), 0/8, 0/10, 1/2, 1/4, 1/6, 1/8, 1/10, 4/8, 5/2 (i), (ii), 5/4

-

-

-

... More
2.1.Reconstruction of culvert at Km 0/2 (i), (ii), 0/6 (i), (ii), 0/10 of Koochur - Amballi road

79.5

1094255

13764.22

... More
2.2.Reconstruction of culvert at Km 0/8 of Koochur - Amballi road

41.36

515661

12467.64

... More
2.3.Reconstruction of culvert at Km 1/2, 1/4, 1/6, 1/8, 1/10 of Koochur - Amballi road

79.5

1095337

13777.83

... More
2.4.Reconstruction of culvert at Km 4/8 of Koochur - Amballi road

15.9

218851

13764.22

... More
2.5.Reconstruction of culvert at Km 5/2 (i), (ii), 5/4 of Koochur - Amballi road

47.7

656769

13768.76

... More
Supply and fabrication of Steel Grade Fe 500D required for all RCC items of works involved in the schedule including cost of steel, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete as per standard specification as per clause 1000, 1500, 1600, 1700, 2100 & 2300 of MORTH Vth Revision

-

-

-

... More
1.Widening from Single Lane to Intermediate Lane and Strengthening at km 0/0 - 3/0 of Batlapalli - Jinjampatty road including CD works at Km 0/4 (i), (ii),0/6,1/4 & 1/10.

-

-

-

... More
1.1. Reconstruction of Culvert at km 0/4 (i), (ii), 0/6 of Batlapalli - Jinjampatty road

6.57

628152

95609.27

... More
1.2. Reconstruction of Culvert at km 1/4 & 1/10 of Batlapalli - Jinjampatty road

4.38

418768

95609.27

... More
2.Widening from Single Lane to Intermediate Lane and Strengthening at km 0/0 - 2/0, 4/6 - 5/6 of Koochur - Amballi road including CD Works at Km.0/2 (i), (ii), 0/6 (i), (ii), 0/8, 0/10, 1/2, 1/4, 1/6, 1/8, 1/10, 4/8, 5/2 (i), (ii), 5/4

-

-

-

... More
2.1.Reconstruction of culvert at Km 0/2 (i), (ii), 0/6 (i), (ii), 0/10 of Koochur - Amballi road

7.2

688386

95609.27

... More
2.2.Reconstruction of culvert at Km 0/8 of Koochur - Amballi road

2.91

278222

95609.27

... More
2.3.Reconstruction of culvert at Km 1/2, 1/4, 1/6, 1/8, 1/10 of Koochur - Amballi road

7.2

688386

95609.27

... More
2.4.Reconstruction of culvert at Km 4/8 of Koochur - Amballi road

1.44

137677

95609.27

... More
2.5.Reconstruction of culvert at Km 5/2 (i), (ii), 5/4 of Koochur - Amballi road

4.32

413032

95609.27

... More
Refilling behind culvert side walls by using Foundation Earth including cost and conveyance to site including labour charges for filling in layers, watering, tamping under optimum moisture content to get the maximum density and all other incidental charges etc., complete- as per clause 304 & 2907 of MORTH Vth revision. labour charges only

-

-

-

... More
1.Widening from Single Lane to Intermediate Lane and Strengthening at km 0/0 - 3/0 of Batlapalli - Jinjampatty road including CD works at Km 0/4 (i), (ii),0/6,1/4 & 1/10.

-

-

-

... More
1.1. Reconstruction of Culvert at km 0/4 (i), (ii), 0/6 of Batlapalli - Jinjampatty road

55.5

2378

42.85

... More
1.2. Reconstruction of Culvert at km 1/4 & 1/10 of Batlapalli - Jinjampatty road

37

1585

42.85

... More
2.Widening from Single Lane to Intermediate Lane and Strengthening at km 0/0 - 2/0, 4/6 - 5/6 of Koochur - Amballi road including CD Works at Km.0/2 (i), (ii), 0/6 (i), (ii), 0/8, 0/10, 1/2, 1/4, 1/6, 1/8, 1/10, 4/8, 5/2 (i), (ii), 5/4

-

-

-

... More
2.1.Reconstruction of culvert at Km 0/2 (i), (ii), 0/6 (i), (ii), 0/10 of Koochur - Amballi road

22.5

964

42.85

... More
2.2.Reconstruction of culvert at Km 0/8 of Koochur - Amballi road

29.11

1247

42.85

... More
2.3.Reconstruction of culvert at Km 1/2, 1/4, 1/6, 1/8, 1/10 of Koochur - Amballi road

22.5

964

42.85

... More
2.4.Reconstruction of culvert at Km 4/8 of Koochur - Amballi road

4.5

192

42.85

... More
2.5.Reconstruction of culvert at Km 5/2 (i), (ii), 5/4 of Koochur - Amballi road

13.5

578

42.85

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

49046248

... More
Add GST at 18%

1

-

8828325

... More
Total Value put to Tender

1

-

57874573

... More
Negotiated Percentage

1

-

-

... More
Final Negotiated Value

1

-

-

... More
Add GST at 18% of Final Negotiated Value

1

-

-

... More
Total Value of Contract Including 18% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

49046248

-

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.