Highways Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date23 Nov 2024
Closing Date24 Dec 2024
Tender Amount₹ 62,42,50,000 
Notes
Download

Costs

Summary

Formation Of Ring Road To Mannargudi Town At Km.0/0 - 5/610 Connecting Thanjavur

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Collection and supply of Carted Earth for filling including cost and conveyance of material to worksite,laying,handling charges and filling in layers tamping under optimum moisture content to get the maximum density, including watering, with all leads for water and compaction by vibratory soil compactor and all other incidental charges, etc complete for formation of Embankment using CBR of soil not less than 8% (For Formation of Embankment/Sub Grade & making up of berms) with an average lead of 60 km (Payment will be based on level measurements)

-

-

-

... More
Main work Km 0/0 - 5/610

144162

848

122311365.66

... More
Junction Improvement at Km.2/2

683.18

848

579630.41

... More
Junction Improvement at Km.3/8

1537.4

848

1304376.28

... More
Junction Improvement at Km.4/6

105.56

848

89560.27

... More
Junction Improvement at Km.5/6

1056.93

848

896731.12

... More
Picking the existing BT surface upto 50mm depth as directed by the departmental officers and levelling the surface including all labour charges for pickig and all other tools and plants employed of the work and including all other incidental charges etc., complete as per standard specifications.

-

-

-

... More
Junction Improvement at Km.0/2

680.61

21

14864.52

... More
Junction Improvement at Km.2/2

215.18

21

4699.53

... More
Junction Improvement at Km.3/8

151.17

21

3301.55

... More
Junction Improvement at Km.4/6

558.38

21

12195.02

... More
Junction Improvement at Km.5/6

300.16

21

6555.49

... More
Excavation for Roadway and drainage - Excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer, as per MORTH Specification. for Open Drain Cutting and Box cutting . MORTH No. 111, 112, 301, 305, 900.

-

-

-

... More
Main work Km 0/0 - 5/610

21175

123

2610030.5

... More
Junction Improvement at Km.0/2

138.04

123

17014.81

... More
Junction Improvement at Km.2/2

3.87

123

477.02

... More
Junction Improvement at Km.3/8

4.54

123

559.6

... More
Junction Improvement at Km.4/6

46.96

123

5788.29

... More
Junction Improvement at Km.5/6

48.21

123

5942.36

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, (Table : 401) mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 401) - for Grading V Material. as per MORT&H Rev.V specifications No.111,112,401,900

-

-

-

... More
Main work Km 0/0 - 5/610

12893

2837

36586852.89

... More
Junction Improvement at Km.0/2

565.04

2837

1603430.96

... More
Junction Improvement at Km.2/2

158.26

2837

449099.15

... More
Junction Improvement at Km.3/8

141.09

2837

400375.33

... More
Junction Improvement at Km.4/6

372.5

2837

1057054.43

... More
Junction Improvement at Km.5/6

241.16

2837

684346.97

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, (Table : 401) mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 401) - for Grading III Material. as per MORT&H Rev.V specifications No.111,112,401,900

-

-

-

... More
Main work Km 0/0 - 5/610

7780

2933

22820062.6

... More
Junction Improvement at Km.0/2

353.13

2933

1035790.32

... More
Junction Improvement at Km.2/2

98.9

2933

290090.51

... More
Junction Improvement at Km.3/8

88.18

2933

258646.93

... More
Junction Improvement at Km.4/6

148.47

2933

435487.75

... More
Junction Improvement at Km.5/6

150.71

2933

442058.05

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam required thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5

-

-

-

... More
Main work Km 0/0 - 5/610

10882

3091

33646817.54

... More
Junction Improvement at Km.0/2

891.29

3091

2755841.94

... More
Junction Improvement at Km.2/2

251.88

3091

778805.4

... More
Junction Improvement at Km.3/8

224.2

3091

693219.67

... More
Junction Improvement at Km.4/6

590.74

3091

1826550.36

... More
Junction Improvement at Km.5/6

383.6

3091

1186079.69

... More
Providing and laying Prime Coat over WMM surface using pressure distributor 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5

-

-

-

... More
Main work Km 0/0 - 5/610

43071

82

3540866.91

... More
Junction Improvement at Km.0/2

4121.01

82

338788.23

... More
Junction Improvement at Km.2/2

1292.88

82

106287.66

... More
Junction Improvement at Km.3/8

1139.05

82

93641.3

... More
Junction Improvement at Km.4/6

2809.42

82

230962.42

... More
Junction Improvement at Km.5/6

1895.44

82

155824.12

... More
Providing and laying Tack Coat over WMM surface (treated with primer) using pressure distributor 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5

-

-

-

... More
Main work Km 0/0 - 5/610

43071

19

820502.55

... More
Junction Improvement at Km.0/2

4121.01

19

78505.24

... More
Junction Improvement at Km.2/2

1292.88

19

24629.36

... More
Junction Improvement at Km.3/8

1139.05

19

21698.9

... More
Junction Improvement at Km.4/6

2809.42

19

53519.45

... More
Junction Improvement at Km.5/6

1895.44

19

36108.13

... More
Providing and laying Tack Coat over Existing BT surface using pressure distributor 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5

-

-

-

... More
Junction Improvement at Km.0/2

68.16

27

1856.68

... More
Junction Improvement at Km.2/2

36.27

27

987.99

... More
Junction Improvement at Km.3/8

30

27

817.2

... More
Junction Improvement at Km.4/6

69.48

27

1892.64

... More
Junction Improvement at Km.5/6

54.98

27

1497.66

... More
BM (Grade-II) 50mm Thick using VG30 Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50-13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm of 50mm thick including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc.,including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5

-

-

-

... More
Junction Improvement at Km.2/2

68.26

9792

668401.92

... More
Junction Improvement at Km.3/8

60.25

9792

589968

... More
DBM (Grade-I) 80mm Thick using VG30 Providing, laying 80 mm consolidated thick Dense Bituminous Macadam using 0.40 cum of 37.50 - 13.20mm,0.35 cum of 13.20 - 2.36 mm and 0.36 cum of 2.36 mm & below size IRC metal with 71.30 kgs of VG30 grade bitumen for premixing per 10sqm of 75mm thick including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required temperature in central hot mix plant 20 - 30 ton capacity, conveying the mix by tipper trucks to site, spreading the mix to uniform thickness of 80mm with mechanical paver to the specified grades and cross sections and consolidated by Vibratory Roller to the required density etc.,including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tippertrucks, PaverFinisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 505 of MORTH rev-5.

-

-

-

... More
Main work Km 0/0 - 5/610

3446

10628

36625466.4

... More
Junction Improvement at Km.0/2

335.13

10628

3561895.69

... More
Junction Improvement at Km.4/6

230.33

10628

2448039.37

... More
Junction Improvement at Km.5/6

156.02

10628

1658242.97

... More
BC (Grade-II) 30mm Thick using VG30 Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm of 40mm thick including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc.,complete as per specification using CMP as per clause 507 of MORTH Rev-5

-

-

-

... More
Main work Km 0/0 - 5/610

1293

12267

15861269.79

... More
Junction Improvement at Km.0/2

125.67

12267

1541597.66

... More
Junction Improvement at Km.2/2

39.87

12267

489086.49

... More
Junction Improvement at Km.3/8

35.07

12267

430204.74

... More
Junction Improvement at Km.4/6

86.37

12267

1059503.38

... More
Junction Improvement at Km.5/6

58.52

12267

717866.6

... More
Providing Barrier Type Kerb for median/islands using Vibrated cement concrete of grade M20 (1:1.5:3) Nominal mix using 20 and 12mm ISS HBG metal from approved quarry and using M.sand including cost and conveyance of all materials to worksite, including hire and fuel charges of all the machineries employed for this work, including all labour charges for mixing, laying, curing, painting, including all other incidental charges etc., complete as per drawing and standard specification.(Median kerb size) Top section, top width 0.115m, bottom width 0.165m to a height of 0.20m and Bottom section 0.165m uniform width to a height of 0.125m.

-

-

-

... More
Junction Improvement at Km.0/2

220.45

534

117753.37

... More
Junction Improvement at Km.4/6

279.42

533

149087.34

... More
Junction Improvement at Km.5/6

152.34

533

81213.98

... More
Refilling with available excavated earth layers, not exceeding limits including watering consolidation, including all labour charges and incidental charges etc.,complete as directed by the Engineer as per MORTH. (In Between Kerb blocks)

-

-

-

... More
Junction Improvement at Km.0/2

65.99

42

2827.67

... More
Junction Improvement at Km.4/6

58.01

42

2485.73

... More
Junction Improvement at Km.5/6

16.83

42

721.17

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For Carted Earth with compaction for berms with conveyance of 10 Kms Lead.

-

-

-

... More
Junction Improvement at Km.0/2

115.86

306

35501.82

... More
Junction Improvement at Km.2/2

179.35

306

54956.43

... More
Junction Improvement at Km.3/8

340.4

306

104305.37

... More
Junction Improvement at Km.4/6

224.14

306

68680.98

... More
Junction Improvement at Km.5/6

292.32

306

89572.69

... More
Providing compaction for embankment / making up of low berms using the available box cut earth including all hire and fuel charges with power roller for compaction, water sprinkler, including all labour charges for laying, spreading, watering etc.,complete and as directed by the departmental engineers.

-

-

-

... More
Junction Improvement at Km.0/2

138.04

26

3681.53

... More
Junction Improvement at Km.2/2

3.87

26

103.21

... More
Junction Improvement at Km.3/8

4.54

26

121.08

... More
Junction Improvement at Km.4/6

46.96

26

1252.42

... More
Junction Improvement at Km.5/6

48.21

26

1285.76

... More
Earth work excavation in all classes of soils such as hard rock requiring blasting and depositing on bank with all leads and lifts as per S S 20 B including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavaion back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification FOR FOUNDATION OF RETAINING WALL

-

-

-

... More
Junction Improvement at Km.4/6

405

289

117194.85

... More
Cement Concrete of grade M15 (nominal mix ) using 40mm ISS HBG metal with using M.sand including cost and conveyance of all materials to site and cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevent standard specification for Levelling course of Retaining wall

-

-

-

... More
Junction Improvement at Km.4/6

45

7011

315517.5

... More
Vibrated Reinforced cement concrete M25 design mix using 20mm graded size ISS graded hard granite crushed stone with using M.sand including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but including formwork and centering, soft water, labour charges for mixing, transporting and placing in position, vibrating and compacting, finishing and curing, working at heights, hire charges for tools and plants including all other incidental charges etc., complete as per specification for Retaining wall Below Sill level

-

-

-

... More
Junction Improvement at Km.4/6

172.34

10530

1814762.6

... More
Vibrated Reinforced cement concrete M25 design mix using 20mm graded size ISS graded hard granite crushed stone with using M.sand including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but including formwork and centering, soft water, labour charges for mixing, transporting and placing in position, vibrating and compacting, finishing and curing, working at heights, hire charges for tools and plants including all other incidental charges etc., complete as per specification for Retaining wall Above Sill level

-

-

-

... More
Junction Improvement at Km.4/6

159.87

13852

2214607.17

... More
Vibrated Cement Concrete of grade M20 (nominal mix 1:1.5:3) 20mm HBG metal with using M.sand including cost and conveyance of all materialsto site and cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevent standard specification for pillar

-

-

-

... More
Junction Improvement at Km.4/6

3.65

15734

57430.78

... More
Supply and fabrication of S-500 steel required for all RCC items of works involved in the schedule including cost of steel at site including cost of fabrication, labour charges for cleaning the rods strengthening, cutting, bending,tying grills, including overlaping to the required length wherever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire,provision of spacer bars, cover blocks and all other incidental charges etc complete, S-500 grade

-

-

-

... More
Junction Improvement at Km.4/6

16.8

95609

1606235.74

... More
Providing and fixing seepage pipes of 100mm PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to worksite, cost and labour for 900mm dia semi-spherical backfill arrangements with 100mm size broken granite chips at the periphery and labour charges for fixing, etc., complete as per drain the backfill -1 No.

-

-

-

... More
Junction Improvement at Km.4/6

6.28

192

1208.9

... More
Refilling/spreading with available Excavated Earth for filling in layers, not exceeding limits including all labour charges and incidental charges etc., complete and in accordance with standard specifications as per MORTH Vth Rev., 305 & 2907 for Behind retaining wall

-

-

-

... More
Junction Improvement at Km.4/6

493.73

42

21156.33

... More
High Level Bridge across pamini River

-

-

-

... More
Earth work excavation in all classes of soils except hard rock not requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as bailing out water, shoring, strutting,wallingand forming protective bunds wherever necessary etc., complete as per relevent standard specification for DRESSING THE BED UPTO SILL LEVEL.

-

-

-

... More
Construction of High Level Bridge at Km.4/6

1966

123

242329.16

... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank,with all leads and lifts as per SS 20B, Including cost of all labour, equipments and all providing and maintaining necessary cofferdams sheeting, shoring, bracing,and their other incidental charges such as bailing out water, subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming bottom of excavation backfilling,and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifation, for PILE CAPS UNDER ABUTMENTS AND PIERS as per section 300 of MORT&H Specifications (Fifth Revision) (including 600 mm from the face of footing as per Cl. 4.2.5.1 of IS: 1200 (Part 1) - 1992.)

-

-

-

... More
Construction of High Level Bridge at Km.4/6

1150

448

515200

... More
Providing reinforced cement concrete cast-in-situ bored piles of 1200mm diameter in RCC using M35 (Design mix) using 20 mm graded ISS HBG metal with minimum cement content of 400 kg per cu. m maximum water cement ratio of 0.4 and slump of 150 - 200 mm by tremie concreting including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel and placing it in position before concreting setting up of piling equipment, shifting the same from one pile location to another pile location dismantling and including all labour for boring through all soils, leading the excavated earth to a distance 200 m including forming of working platform over the river bed for accomadating piling equipment forming approaches to the working platform, mixing concrete, filling it position by tremie pipe, cutting of pile head to cut-off level for casting pilecap, including diversion of water course if necessary and all other incidental charges etc., complete as per standard specifications, forming and maintaining protective bunds and all other incidental charges etc., complete for PILES BELOW ABUTMENTS AND PIERS as per section 1100 & 1700 of MORT&H Specifications (V Revision).

-

-

-

... More
Construction of High Level Bridge at Km.4/6

693

19720

13665960

... More
Cement concrete M15 (Nominal mix 1:2:4) using 40mm ISS metal using M sand including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying compacting, curing concrete, Tools and Plants and incidential charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, struting etc; complete as per relevant standard specification, for LEVELLING COURSE BELOW PILECAP as per section 1100 of MORT&H Specifications (V Revision).

-

-

-

... More
Construction of High Level Bridge at Km.4/6

35

7047

246645

... More
Vibrated Reinforced Cement Concrete of grade M35 (Design mix) using 20 mm graded ISS metal and using M Sand including cost and conveyance of all materials to site excluding cost and fabrication of steel including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc.,complete, as per relevant standard specification, for PILECAPS UNDER ABUTMENTS, RETURNS AND PIERS as per section 1100,1500 & 1700 of MORT&H Specifications (V Revision).

-

-

-

... More
Construction of High Level Bridge at Km.4/6

826

10446

8628396

... More
Vibrated reinforced cement concrete M35 (Design mix) using 20 mm graded ISS HBG metal and using M sand including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying, curing concrete, working at heights, hire charges for tools and plants including all other incidental charges, etc., complete for ABUTMENT AND RETURNS as per section 1500,1700 & 2200 of MORT&H Specifications (V Revision).

-

-

-

... More
Construction of High Level Bridge at Km.4/6

209

12236

2557324

... More
Vibrated reinforced CementConcrete M35 (Design mix) using 20 mm graded ISS metal and using M sand including cost and conveyance of all materials to site and cost of cement at site, but excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying, curing concrete, working at heights, soft water, hire charges for tools and Plants, including all other incidental charges, etc., complete for BED BLOCK CUM DIRTWALL OVER ABUTMENTS as per section 1500,1700 & 2200 of MORT&H Specifications (V Revision).

-

-

-

... More
Construction of High Level Bridge at Km.4/6

45

14911

670995

... More
Vibrated reinforced CementConcrete M35 (Design mix) using 20 mm graded ISS metal and using M sand including cost and conveyance of all materials to site and cost of cement at site, but excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying, curing concrete, working at heights, soft water, hire charges for tools and Plants, including all other incidental charges, etc., complete for CIRCULAR PIERS of 1200 mm dia as per section 1500,1700 & 2200 of MORT&H Specifications (V Revision).

-

-

-

... More
Construction of High Level Bridge at Km.4/6

19

17167

326173

... More
Vibrated reinforced CementConcrete M35 (Design mix) using 20 mm graded ISS metal,and using M sand including cost and conveyance of all materials to site and cost of cement at site, but excluding cost and fabrication of steel but including cost of formwork labour charges for mixing transporting, laying, curing concrete, working at heights, soft water, hire charges, etc., Complete for PIER CAP OVER TWIN PIERS as per section 1500,1700 & 2200 of MORT&H Specifications (V Revision).

-

-

-

... More
Construction of High Level Bridge at Km.4/6

95

13887

1319265

... More
Vibrated reinforced CementConcrete M35 (Design mix) using 20 mm graded ISS metal and using M sand including cost and conveyance of all materials to site and cost of cement at site, but excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying, curing concrete, working at heights, soft water, hire charges for tools and Plants, including all other incidental charges, etc., complete for PEDESTALS OVER CAPPING BEAMS AND BED BLOCKS as per section 1500,1700 & 2200 of MORT&H Specifications (V Revision).

-

-

-

... More
Construction of High Level Bridge at Km.4/6

5

14023

70115

... More
Supplying and fixing of Elastomeric bearing of size 60x45x8cm as shown in the drawing including cost and conveyance to work site, labour for fixing the bearing in position and all other incidental charges etc., complete as per section 2000 of MORT&H Specifications (VRevision) and IRC:83-2015(Part-II).

-

-

-

... More
Construction of High Level Bridge at Km.4/6

432000

1

764640

... More
Vibrated reinforced Cement Concrete M35 (Design mix) using 20 mm graded ISS metal,and using M sand including cost and conveyance of all materials to site and cost of cement at site, but excluding cost and fabrication of steel but including cost of formwork labour charges for mixing transporting, laying, curing concrete, working at heights, soft water, hire charges, etc., Complete as per relevant standard spectification for T-BEAMS and CROSS BEAMS as per section 1500,1700 &2300 of MORT&H Specifications (V Revision).

-

-

-

... More
Construction of High Level Bridge at Km.4/6

689

18462

12720318

... More
Vibrated reinforced CementConcrete M35 (Design mix) using 20 mm graded ISS metal and using M sand including cost and conveyance of all materials to site and cost of cement at site, but excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying, curing concrete, working at heights, soft water, hire charges for tools and Plants, including all other incidental charges,including inspection chamber etc., complete for DECK SLAB AND SAFETY KERB, MEDIAN, AND KERB BELOW CRASH BARRIER as per section 1500, 1700 and 2300 of MORT&H Specifications (V Revision).

-

-

-

... More
Construction of High Level Bridge at Km.4/6

614

14433

8861862

... More
Vibrated reinforced Cement Concrete M40 (Design mix) using 20 mm graded ISS metal, and using M Sand including cost and conveyance of all materials to site and cost of cement at site,but excluding cost and fabrication of steel but including cost of form work, labour charges for mixing ,transporting, laying, curing concrete, working at heights, soft water, hire charges for Tools and Plants, including all other incidental charges, etc., complete for CRASH BARRIER as per section 811,1700 &2703.3 of MORT&H Specifications(V Revision)

-

-

-

... More
Construction of High Level Bridge at Km.4/6

70

18555

1298850

... More
Providing and fixing of G.I. Drainage spouts 100mm dia asper GOI drawing SD/205 with grating arrangements at top as shown in the drawing and 100mm dia drainage spout projecting atleast 300mm beyond the bottom of deck slab as shown in the drawing, including cost and conveyance of Galvanised Iron pipes and flats and fixing them in position, etc.,.complete as per section 2705 of MORT&H Specifications (V Revision).

-

-

-

... More
Construction of High Level Bridge at Km.4/6

40

2498

99924

... More
Vibrated Cement Concrete M15 (Nominal mix 1:2:4) using 40mm ISS metal ,using M Sand including cost and conveyance of all materials to site and cost of cement at site,including all lablour charges for mixing Concrete, laying, hire charges for Tools and plants , compacting, curing with all leads for soft water, including all other incidental charges, form work etc., complete, BASE COURSE BELOW APPROACH SLAB AND SAFETY KERB RAMP as per section 1500, 1700 & 2704 of MORT&H Specifications (V Revision)

-

-

-

... More
Construction of High Level Bridge at Km.4/6

22

7369

162118

... More
Vibrated reinforced Cement Concrete M30 (Design mix) using 20 mm graded ISS metal, and using M Sand including cost and conveyance of all materials to site and cost of cement at site,but excluding cost and fabrication of steel but including labour charges for mixing , and Plants, including all other incidental charges, etc., complete For APPROACH SLABS as per section 1500,1700 &2704 of MORT&H Specifications (V Revision).

-

-

-

... More
Construction of High Level Bridge at Km.4/6

39

9968

388752

... More
Vibrated reinforced CementConcrete M35 (Design mix) using 20 mm graded ISS HBG metal,and using M sand including cost and conveyance of all materials to work site including cement at site, but excluding cost and fabrication of steel but including all labour charges for mixing concrete, laying, hire charges for tools and plants, compacting, curing, with all leads for soft water, including all other incidental charges form work, Complete for SAFETY KERB RAMP as per MORT&H-REV- 5)

-

-

-

... More
Construction of High Level Bridge at Km.4/6

6

10466

62796

... More
Vibrated Reinforced cement concrete M30 (Design mix) 75mm thick using 20mm graded ISS HBG metal with M sand including cost and conveyance of all materials to work site including cement at site excluding cost and fabrication of reinforcement steel but including all labour charges for mixing concrete , laying, hire charges for tools and plants, compacting , curing with all leads for soft water, including all other incidental charges form work , cost of premoulded expansion joints and fixing the same in position etc.,complete for WEARING COAT OVER DECK SLAB AND OVER APPROACH SLABas per section 2702.2 of MORT&H-REV- 5)

-

-

-

... More
Construction of High Level Bridge at Km.4/6

1847

736

1360869.6

... More
Supplying and installation of STRIP SEAL EXPANSION joint system conforming to specifications for Road and Bridge Works _ V th Revision:2013 published by Ministry of Surface Transport(Roads Wing) in the 40mm wide expansion gap provided in between decks over piers and in between deck and dirt wall over abutment with fatigue tested structural steel section at the nosing and anchorage assembly , including cost and conveyance of all materials , cost of testing as per the MORT&H specifications, including labour, equipment and incidental charges for fixing the joints complete in all respects, as per specifications as per section 2600 of MORT&H Specifications (V Revision).

-

-

-

... More
Construction of High Level Bridge at Km.4/6

117

13981

1635777

... More
Providing and fixing PVC seepage pipes of 100 mm dia of required lengths for abutments and wings including costs and conveyance of all materials to work site and labour charges for fixing, etc., complete to drain the backfill as per section 2706 of MORT&H Specifications (V Revision).

-

-

-

... More
Construction of High Level Bridge at Km.4/6

206

192

39655

... More
Providing FILTER MEDIA behind Abutment and wings for 600mm thickness using filter material conforming to clause 309.3.2.B of MORT&H-rev-5 well packed with smaller size towards the soil and bigger size towards the wall including cost and conveyance to worksite including all other incidental charges, etc complete as per Cl.710.1.4 & Appendix-6 of IRC: 78-2014.

-

-

-

... More
Construction of High Level Bridge at Km.4/6

152

2028

308256

... More
Filling behind Abutments and returns with clean gritty free draining gravel including cost and draining gravel having Pie value more than 40 conveyance of gravel to worksite, laying, handling charges and filling in layers tamping under optimum moisture content to get the maximum density, including watering, with all leads and lifts for water and all other incidental charges, etc., complete as per Cl.710.1.4 & Appendix-6 of IRC:78-2014.

-

-

-

... More
Construction of High Level Bridge at Km.4/6

494

936

462384

... More
Supply and fabrication of Fe-500 steel required for all RCC items of works involved in the schedule, including cost of steel at site and cost of fabrication labour charges for cleaning the rods straightening,cutting,bending,tying grills, including over laping to the required length wherever necessary and providing to the reinforcement placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges, etc., complete as per section 1600 of MORT&H Specifications (V Revision).

-

-

-

... More
Construction of High Level Bridge at Km.4/6

358

95610

34228380

... More
Supply and fabrication of Fe-250 steel required in the schedule including cost of steel at site cost of providing and cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills including over lapping to the required length wherever necessary and providing to the reinforcement, placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc complete as per section 1600 of MORT&H Specifications (V Revision).

-

-

-

... More
Construction of High Level Bridge at Km.4/6

12

95610

1147320

... More
Supply and fixing of High Quality of PVC pipes of 160mm dia. Including cost and conveyance of pipes to the site and fixing in position to proper grade and level, including labour charges for fixing and including all other incidental charges etc complete., for proving utility services in footpaths.

-

-

-

... More
Construction of High Level Bridge at Km.4/6

468

419

196419.6

... More
Minor Bridge at km 4/475 and 4/675

-

-

-

... More
Earth work excavation in all classes of soils except hard rock not requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as bailing out water, shoring, strutting, walling and forming protective bunds wherever necessary etc., complete as per relevent standard specification for DRESSING THE BED UPTO SILL LEVEL.

-

-

-

... More
Construction of Minor Bridge at Km.4/6

224.66

123

27691.59

... More
Construction of Minor Bridge at Km.4/8

233.15

123

28738.07

... More
Earth work Excavation in all classes of soils except hard rock not requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification for Foundation of Abutments, wings

-

-

-

... More
Construction of Minor Bridge at Km.4/6

771.77

447

345289.9

... More
Construction of Minor Bridge at Km.4/8

898.93

447

402181.28

... More
Vibrated Cement concrete of grade M15 (Nominal mix) using 40mm ISS HBG granite metal and using M Sand including cost and conveyance of all materials to site including cement at site, including cost of form work, soft water, labour charges for mixing, transporting, laying and curing concrete, worikingat depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevent standard specification for LEVELLING COURSE BELOW Footing under Abutments, wings

-

-

-

... More
Construction of Minor Bridge at Km.4/6

24.9

7089

176516.1

... More
Construction of Minor Bridge at Km.4/8

29

7089

205581

... More
Vibrated Cement concrete of grade M20 (Nominal mix) using 40mm ISS HBG granite metal and using M Sand including cost and conveyance of all materials to site including cement at site, including cost of form work, soft water, labour charges for mixing, transporting, laying and curing concrete, woriking at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevent standard specification for Footing of Abutments, Returns below sill.

-

-

-

... More
Construction of Minor Bridge at Km.4/6

561.04

7773

4360963.92

... More
Construction of Minor Bridge at Km.4/8

638.13

7723

4928277.99

... More
Vibrated Cement Concrete of grade M20 (Nominal mix) using 40mm ISS size HBG metal and using M Sand including cost and conveyance of all materials to site and cost cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths Tools and Plants and incidental charges etc., complete as per relevent standard specification for Substructure of Abutments, Return walls Above sill.

-

-

-

... More
Construction of Minor Bridge at Km.4/6

169.84

9094

1544524.96

... More
Construction of Minor Bridge at Km.4/8

295.91

8943

2646323.13

... More
Vibrated Reinforced Cement Concrete of grade M30 (Design mix) using 20mm and below ISS HBG metal using M Sand including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Bed block cum Dirtwall

-

-

-

... More
Construction of Minor Bridge at Km.4/6

9.34

12095

112967.3

... More
Construction of Minor Bridge at Km.4/8

9.96

12175

121263

... More
Providing and fixing Class I PVC seepage pipes of 100mm dia of required lengths for abutments and return walls including costs and conveyance of all materials to work site and labour charges for fixing etc., complete to drain from the backfill as per section 2706 of MORTH specification (Rev- V)

-

-

-

... More
Construction of Minor Bridge at Km.4/6

96

192

18480

... More
Construction of Minor Bridge at Km.4/8

185.6

192

35728

... More
Supply and fixing of KRAFT paper for full width of seating of deckslab and including cost and conveyance to worksite, labour for fixing the same in correct position and all other incidental charges etc., complete.

-

-

-

... More
Construction of Minor Bridge at Km.4/6

18.42

110

2026.2

... More
Construction of Minor Bridge at Km.4/8

18.98

110

2087.8

... More
Vibrated Reinforced Cement Concrete of grade M30 (Design mix) using 20mm and below ISS hard broken granite metal and using M Sand including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc.,complete for Deck slab.

-

-

-

... More
Construction of Minor Bridge at Km.4/6

113.11

12664

1432425.04

... More
Construction of Minor Bridge at Km.4/8

99.83

13473

1345009.59

... More
Vibrated Reinforced Cement Concrete of grade M30 (Design mix) using 20mm and below ISS hard broken granite metal and using M Sand including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc.,complete for Median

-

-

-

... More
Construction of Minor Bridge at Km.4/6

5.41

11692

63253.72

... More
Construction of Minor Bridge at Km.4/8

5.69

11708

66618.52

... More
Providing FILTER MEDIA behind abutments and return walls for 600mm thickness using filter material conforming to clause 309.3.2.B of MORTH well packed with smaller size towards the soil and bigger size towards the wall including cost and conveyance of all materials to worksite and including labour charges and all other incidental charges etc.,complete.

-

-

-

... More
Construction of Minor Bridge at Km.4/6

74.82

2028

151734.96

... More
Construction of Minor Bridge at Km.4/8

111.78

2028

226689.84

... More
Filling behind Abutments and return walls with clean gritty free draining gravel including cost of gravel having pie value more than 40, conveyance of gravel to worksite. Laying, handling charges and filling in layers tamping under optimum moiture content to get the maximum density, including watering, with all leads and lifts for water and all other incidental charges etc., complete.

-

-

-

... More
Construction of Minor Bridge at Km.4/6

169.17

936

158343.12

... More
Construction of Minor Bridge at Km.4/8

275.34

936

257718.24

... More
Supplying and fixing of PVC expansion joint in between deck slabs over abutment and pier as shown in the drawing including cost and conveyance of expansion joints including pad and joint sealent etc., complete as per section 2600 of MORTH specifications (Rev - V)

-

-

-

... More
Construction of Minor Bridge at Km.4/6

41.41

653

27057.29

... More
Construction of Minor Bridge at Km.4/8

42.65

653

27867.51

... More
Supply and fabrication of STEEL grade Fe500 D for all the reinforced cement concrete items of work involved in the shedule including cost of steel, cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawing including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete. Complying with standard specification MoRT&H Vth Rev

-

-

-

... More
Construction of Minor Bridge at Km.4/6

16.38

95610

1565613.75

... More
Construction of Minor Bridge at Km.4/8

17.26

95610

1649941.77

... More
Vibrated cement concrete M15 (Nominal mix) 1:2:4 using 40mm ISS size hard broken granite metal and M Sand including cost and conveyance of all materials to site including cost and labour charges for formwork, centering, labour charges for laying, compacting, curing all incidental charges etc., complete for BASE COURSE BELOW APPROACH SLAB

-

-

-

... More
Construction of Minor Bridge at Km.4/6

20.21

7581

153212.01

... More
Construction of Minor Bridge at Km.4/8

23.79

7483

178020.57

... More
Vibrated reinforced cement concrete M30 Grade (Design mix) using HBG graded metal of 20mm and below ISS size using M sand including cost and conveyance of all materials to work site but excluding cost and conveyance and fabrication of steel but including cost and labour charges for form work and centering, labour charges for laying, compacting, curing including all other incidental charges etc.,complete for APPROACH SLAB.

-

-

-

... More
Construction of Minor Bridge at Km.4/6

51.79

10154

525875.66

... More
Construction of Minor Bridge at Km.4/8

45.6

10465

477204

... More
Vibrated Reinforced cement concrete M30 Grade (Design mix) using 20mm and below graded ISS size HBG metal with using M.sand including cost and conveyance of all materials to site cost of premoulded expansion joints and fixing the same in position excluding cost and fabrication of steel reinforcement but including cost and labour charges for formwork, labour charges for laying, compacting, curing including all other incidental charges etc.,complete for WEARING COAT 75mm UNIFORM THICKNESS OVER DECK SLAB AND OVER APPROACH SLAB

-

-

-

... More
Construction of Minor Bridge at Km.4/6

244.25

736

179963.4

... More
Construction of Minor Bridge at Km.4/8

237.23

736

174791.06

... More
Vibrated Reinforced cement concrete of grade M40 (Design mix) using 20mm and below ISS hard broken granite metal and using M Sand including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc.,complete for Crash Barrier.

-

-

-

... More
Construction of Minor Bridge at Km.4/6

4.56

19640

89558.4

... More
Construction of Minor Bridge at Km.4/8

5.01

19352

96953.52

... More
Vibrated cement concrete M20 grade (Nominal mix) using 40mm ISS size hard broken granite metal using M Sand including cost and conveyance of all materials to site and cement at site including labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for Parapets over wings

-

-

-

... More
Construction of Minor Bridge at Km.4/6

6.07

12999

78903.93

... More
Construction of Minor Bridge at Km.4/8

6.07

14101

85593.07

... More
Providing and fixing G.I Drainage spouts of 100mm Dia as per GOI drawing No. SD/103 with grating arrangements at top as shown in the drawing and 100mm dia drainage spouts projecting atleast 300mm beyond bottom of deck slab including cost and conveyance of all materials to site and fixing them in position etc., complete.

-

-

-

... More
Construction of Minor Bridge at Km.4/6

4

2498

9992.4

... More
Construction of Minor Bridge at Km.4/8

4

2498

9992.4

... More
Supply and fixing of High Quality of PVC pipes of 160mm dia. Including cost and conveyance of pipes to the site and fixing in position to proper grade and level, including labour charges for fixing and including all other incidental charges etc complete., for proving utility services in Safety Kerb.

-

-

-

... More
Construction of Minor Bridge at Km.4/6

60.12

419

25232.36

... More
Construction of Minor Bridge at Km.4/8

63.26

419

26550.22

... More
Box Culvert

-

-

-

... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal, removal of all logs, stumps and other deletrious matter and obstructions, trimming bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification -MORTH Vth Rev., 304 for foundation.

-

-

-

... More
Construction of Box culvert at Km.0/2 (i) (1.50m x 2.00m)

55.62

289

16094.76

... More
Construction of Box culvert at Km.0/2 (ii) (1.50m x 2.00m)

47.7

289

13802.95

... More
Construction of Box culvert at Km.0/4 (i), 0/6 (ii), 0/8 (i) (1.50m x 2.00m)

140.13

289

40549.42

... More
Construction of Box culvert at Km.0/4 (ii), 0/6 (i) (2.00m x 2.00m)

105.38

289

30493.81

... More
Construction of Box culvert at Km.0/8 (ii) 2 Cell of (2.00m x 3.00m)

104.08

289

30117.63

... More
Construction of Box culvert at Km.0/10 (i) (ii) (iii) (1.50m x 2.00m)

140.13

289

40549.42

... More
Construction of Box culvert at Km.1/2 (i) (ii) (iii) (1.50m x 2.00m)

140.13

289

40549.42

... More
Construction of Box culvert at Km.1/4 (i) (ii) (1.50m x 2.00m)

93.42

289

27032.95

... More
Construction of Box culvert at Km.1/6 (i) (ii) (2.00m x 2.00m)

105.38

289

30493.81

... More
Construction of Box culvert at Km.1/8 (2.00m x 3.00m)

74.27

289

21491.51

... More
Construction of Box culvert at Km.1/10 (i) 2 Cell of (2.00m x 2.00m)

75.37

289

21809.82

... More
Construction of Box culvert at Km.1/10 (ii) 2 Cell of (2.00m x 3.00m)

104.08

289

30117.63

... More
Construction of Box culvert at Km.2/2 2 Cell of (3.00m x 3.00m)

121.09

289

35039.81

... More
Construction of Box culvert at Km.2/4 (i) (1.50m x 1.50m)

45.5

289

13166.34

... More
Construction of Box culvert at Km.2/4 (ii), 2/6 2 Cell of (2.00m x 2.00m)

150.74

289

43619.63

... More
Construction of Box culvert at Km.2/8 (i) (ii) (iii) (1.50m x 2.00m)

140.13

289

40549.42

... More
Construction of Box culvert at Km.2/10 (1.50m x 2.00m)

46.71

289

13516.47

... More
Construction of Box culvert at Km.3/2 (i) (ii), 3/4 (i) (1.50m x 2.00m)

140.13

289

40549.42

... More
Construction of Box culvert at Km.3/4 (ii), 3/8 (2.00m x 2.00m)

105.38

289

30493.81

... More
Construction of Box culvert at Km.3/10 (1.50m x 2.00m)

46.71

289

13516.47

... More
Construction of Box culvert at Km.4/2 (i) 2 Cell of (3.00m x 3.00m)

121.09

289

35039.81

... More
Construction of Box culvert at Km.4/2 (ii), 4/10 (1.50m x 2.00m)

93.42

289

27032.95

... More
Construction of Box culvert at Km.4/4 2 cell (3.00m x 3.00m)

121.43

289

35138.2

... More
Construction of Box culvert at Km.5/2, 5/4 (ii), 5/6 (i) (1.50m x 2.00m)

140.13

289

40549.42

... More
Construction of Box culvert at Km.5/4 (i) (2.00m x 3.00m)

74.27

289

21491.51

... More
Construction of Box culvert at Km.5/6 (ii) (1.50m x 2.00m)

55.62

289

16094.76

... More
Plain Cement Concrete of grade M15 (Nominal Mix) using 40mm ISS size HBG graded metal using with M.Sand including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labor charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for LEVELLING COURSE as per MORTH Vth Rev., 1000, 1500, 1700, 2100 & 900

-

-

-

... More
Construction of Box culvert at Km.0/2 (i)

11.35

7023

79719.9

... More
Construction of Box culvert at Km.0/2 (ii)

7.39

7023

51905.73

... More
Construction of Box culvert at Km.0/4 (i), 0/6 (ii), 0/8 (i)

20.7

7029

145519.14

... More
Construction of Box culvert at Km.0/4 (ii), 0/6 (i)

15.82

7029

111213.18

... More
Construction of Box culvert at Km.0/8 (ii)

12.25

7029

86116.4

... More
Construction of Box culvert at Km.0/10 (i) (ii) (iii)

20.7

7029

145519.14

... More
Construction of Box culvert at Km.1/2 (i) (ii) (iii)

20.7

7032

145582.69

... More
Construction of Box culvert at Km.1/4 (i) (ii)

13.8

7039

97139.86

... More
Construction of Box culvert at Km.1/6 (i) (ii)

15.82

7039

111358.88

... More
Construction of Box culvert at Km.1/8

11.42

7039

80386.75

... More
Construction of Box culvert at Km.1/10 (i)

12.14

7039

85454.92

... More
Construction of Box culvert at Km.1/10 (ii)

12.25

7039

86229.22

... More
Construction of Box culvert at Km.2/2

16.56

7029

116415.31

... More
Construction of Box culvert at Km.2/4 (i)

6.28

7029

44147.83

... More
Construction of Box culvert at Km.2/4 (ii), 2/6

24.28

7029

170686.21

... More
Construction of Box culvert at Km.2/8 (i) (ii) (iii)

20.7

7029

145519.14

... More
Construction of Box culvert at Km.2/10

6.9

7029

48506.38

... More
Construction of Box culvert at Km.3/2 (i) (ii), 3/4 (i)

20.7

7020

145328.7

... More
Construction of Box culvert at Km.3/4 (ii), 3/8

15.82

7020

111067.63

... More
Construction of Box culvert at Km.3/10

6.9

7020

48442.9

... More
Construction of Box culvert at Km.4/2 (i)

16.56

7011

116110.44

... More
Construction of Box culvert at Km.4/2 (ii), 4/10

13.8

7011

96758.7

... More
Construction of Box culvert at Km.4/4

18.45

7011

129362.18

... More
Construction of Box culvert at Km.5/2, 5/4 (ii), 5/6 (i)

20.7

7002

144947.4

... More
Construction of Box culvert at Km.5/4 (i)

11.42

7002

79966.15

... More
Construction of Box culvert at Km.5/6 (ii)

11.35

7002

79475.99

... More
Vibrated Cement Concrete M20 grade nominal mix using 40mm ISS size hard broken granite metal using with M.Sand including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for formwork and centering mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed and in accordance with standard specification for as per MORTH Vth Rev., 1000, 1500, 1700, 2100 & 900 - for foundation of wing wall

-

-

-

... More
Construction of Box culvert at Km.0/2 (i)

3.11

7136

22193.52

... More
Construction of Box culvert at Km.0/2 (ii)

3.11

7136

22193.52

... More
Construction of Box culvert at Km.0/4 (i), 0/6 (ii), 0/8 (i)

9.33

7142

66637.85

... More
Construction of Box culvert at Km.0/4 (ii), 0/6 (i)

6.22

7142

44425.23

... More
Construction of Box culvert at Km.0/8 (ii)

7.02

7142

50139.09

... More
Construction of Box culvert at Km.0/10 (i) (ii) (iii)

9.33

7142

66637.85

... More
Construction of Box culvert at Km.1/2 (i) (ii) (iii)

9.33

7145

66666.4

... More
Construction of Box culvert at Km.1/4 (i) (ii)

6.22

7151

44482.45

... More
Construction of Box culvert at Km.1/6 (i) (ii)

6.22

7151

44482.45

... More
Construction of Box culvert at Km.1/8

4.02

7151

28749.11

... More
Construction of Box culvert at Km.1/10 (i)

4.01

7151

28677.6

... More
Construction of Box culvert at Km.1/10 (ii)

7.02

7151

50203.67

... More
Construction of Box culvert at Km.2/2

7.02

7142

50139.09

... More
Construction of Box culvert at Km.2/4 (i)

3.23

7142

23069.69

... More
Construction of Box culvert at Km.2/4 (ii), 2/6

8.02

7142

57281.41

... More
Construction of Box culvert at Km.2/8 (i) (ii) (iii)

9.33

7142

66637.85

... More
Construction of Box culvert at Km.2/10

3.11

7142

22212.62

... More
Construction of Box culvert at Km.3/2 (i) (ii), 3/4 (i)

9.33

7133

66551.92

... More
Construction of Box culvert at Km.3/4 (ii), 3/8

6.22

7133

44367.94

... More
Construction of Box culvert at Km.3/10

3.11

7133

22183.97

... More
Construction of Box culvert at Km.4/2 (i)

7.02

7123

50009.78

... More
Construction of Box culvert at Km.4/2 (ii), 4/10

6.22

7123

44310.66

... More
Construction of Box culvert at Km.4/4

7.02

7123

50009.78

... More
Construction of Box culvert at Km.5/2, 5/4 (ii), 5/6 (i)

9.33

7114

66380.06

... More
Construction of Box culvert at Km.5/4 (i)

4.02

7114

28601.05

... More
Construction of Box culvert at Km.5/6 (ii)

3.11

7114

22126.69

... More
Vibrated reinforced cement concrete design mix M25 grade using 20mm & 12 mm ISS size HBG graded metal crushed stone with M.Sand including cost and conveyance of all materials to site but excluding cost and fabrication of steel but including cost and labour charges for formwork and centering, labour charges, compacting, finishing and curing including all incidental charges etc., complete - MORTH Vth Rev., 1000, 1500, 1600, 1700, 2200, 2300 & 900 for Box culvert

-

-

-

... More
Construction of Box culvert at Km.0/2 (i)

67.72

13797

934392.43

... More
Construction of Box culvert at Km.0/2 (ii)

44.2

13748

607705.36

... More
Construction of Box culvert at Km.0/4 (i), 0/6 (ii), 0/8 (i)

123.9

13747

1703338.79

... More
Construction of Box culvert at Km.0/4 (ii), 0/6 (i)

101.26

13241

1340865.68

... More
Construction of Box culvert at Km.0/8 (ii)

109.02

13030

1420565.49

... More
Construction of Box culvert at Km.0/10 (i) (ii) (iii)

123.9

13747

1703338.79

... More
Construction of Box culvert at Km.1/2 (i) (ii) (iii)

123.9

13750

1703719.16

... More
Construction of Box culvert at Km.1/4 (i) (ii)

82.6

13756

1136319.11

... More
Construction of Box culvert at Km.1/6 (i) (ii)

101.26

13251

1341797.27

... More
Construction of Box culvert at Km.1/8

76.27

12894

983500.12

... More
Construction of Box culvert at Km.1/10 (i)

91.18

12738

1161520.14

... More
Construction of Box culvert at Km.1/10 (ii)

109.02

13039

1421568.47

... More
Construction of Box culvert at Km.2/2

146.24

12996

1900580.37

... More
Construction of Box culvert at Km.2/4 (i)

31.48

14005

440906.99

... More
Construction of Box culvert at Km.2/4 (ii), 2/6

182.36

12729

2321362.56

... More
Construction of Box culvert at Km.2/8 (i) (ii) (iii)

123.9

13747

1703338.79

... More
Construction of Box culvert at Km.2/10

41.3

13747

567779.6

... More
Construction of Box culvert at Km.3/2 (i) (ii), 3/4 (i)

123.9

13738

1702197.67

... More
Construction of Box culvert at Km.3/4 (ii), 3/8

101.26

13232

1339933.08

... More
Construction of Box culvert at Km.3/10

41.3

13738

567399.22

... More
Construction of Box culvert at Km.4/2 (i)

146.24

12977

1897886.63

... More
Construction of Box culvert at Km.4/2 (ii), 4/10

82.6

13729

1134037.7

... More
Construction of Box culvert at Km.4/4

165.37

12997

2149317.2

... More
Construction of Box culvert at Km.5/2, 5/4 (ii), 5/6 (i)

123.9

13720

1699916.67

... More
Construction of Box culvert at Km.5/4 (i)

76.27

12858

980691.86

... More
Construction of Box culvert at Km.5/6 (ii)

67.72

13776

932937.81

... More
Supply and fabrication of (HYSD) Steel Grade Fe 500 as per Steel Schedule required for all RCC items of works involved in the schedule of drawings including cost of steel, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, positioning and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete as per standard specification. - MORTH Vth Rev., 1000, 1500, 1600 & 900

-

-

-

... More
Construction of Box culvert at Km.0/2 (i)

6.58

95609

628822.17

... More
Construction of Box culvert at Km.0/2 (ii)

4.23

95609

404809.65

... More
Construction of Box culvert at Km.0/4 (i), 0/6 (ii), 0/8 (i)

11.82

95609

1130388.4

... More
Construction of Box culvert at Km.0/4 (ii), 0/6 (i)

7.12

95609

680929.22

... More
Construction of Box culvert at Km.0/8 (ii)

7.97

95609

762005.88

... More
Construction of Box culvert at Km.0/10 (i) (ii) (iii)

11.82

95609

1130388.4

... More
Construction of Box culvert at Km.1/2 (i) (ii) (iii)

11.82

95609

1130388.4

... More
Construction of Box culvert at Km.1/4 (i) (ii)

7.88

95609

753592.27

... More
Construction of Box culvert at Km.1/6 (i) (ii)

7.12

95609

680929.22

... More
Construction of Box culvert at Km.1/8

5.94

95609

568301.5

... More
Construction of Box culvert at Km.1/10 (i)

6.08

95609

580826.32

... More
Construction of Box culvert at Km.1/10 (ii)

7.97

95609

762005.88

... More
Construction of Box culvert at Km.2/2

10.56

95609

1009155.84

... More
Construction of Box culvert at Km.2/4 (i)

2.42

95609

231278.82

... More
Construction of Box culvert at Km.2/4 (ii), 2/6

12.15

95609

1161652.63

... More
Construction of Box culvert at Km.2/8 (i) (ii) (iii)

11.82

95609

1130388.4

... More
Construction of Box culvert at Km.2/10

3.94

95609

376796.13

... More
Construction of Box culvert at Km.3/2 (i) (ii), 3/4 (i)

11.82

95609

1130388.4

... More
Construction of Box culvert at Km.3/4 (ii), 3/8

7.12

95609

680929.22

... More
Construction of Box culvert at Km.3/10

3.94

95609

376796.13

... More
Construction of Box culvert at Km.4/2 (i)

10.56

95609

1009155.84

... More
Construction of Box culvert at Km.4/2 (ii), 4/10

7.88

95609

753592.27

... More
Construction of Box culvert at Km.4/4

12.08

95609

1154481.94

... More
Construction of Box culvert at Km.5/2, 5/4 (ii), 5/6 (i)

11.82

95609

1130388.4

... More
Construction of Box culvert at Km.5/4 (i)

5.94

95609

568301.5

... More
Construction of Box culvert at Km.5/6 (ii)

6.58

95609

628822.17

... More
Vibrated Reinforced cement concrete M30 (Design mix) using 20mm and below graded ISS hard granite metal and using M.sand including cost and conveyance of all materials to site excluding cost and fabrication of steel reinforcement but including cost of premoulded expansion joints and fixing the same in position including cost and labour charges for formwork, labour charges for laying compacting curing, including all incidental charges etc., complete for - MORTH Vth Rev., 1000, 1500, 1700, 2702, 2704 & 900 WEARING COAT 75MM uniform thickness OVER DECK SLAB

-

-

-

... More
Construction of Box culvert at Km.0/2 (i)

44.31

737

32688.37

... More
Construction of Box culvert at Km.0/2 (ii)

27.51

737

20294.68

... More
Construction of Box culvert at Km.0/4 (i), 0/6 (ii), 0/8 (i)

76.23

738

56271.46

... More
Construction of Box culvert at Km.0/4 (ii), 0/6 (i)

62.92

738

46446.29

... More
Construction of Box culvert at Km.0/8 (ii)

61.71

738

45553.09

... More
Construction of Box culvert at Km.0/10 (i) (ii) (iii)

76.23

738

56271.46

... More
Construction of Box culvert at Km.1/2 (i) (ii) (iii)

76.23

738

56288.99

... More
Construction of Box culvert at Km.1/4 (i) (ii)

50.82

738

37549.37

... More
Construction of Box culvert at Km.1/6 (i) (ii)

62.92

738

46489.7

... More
Construction of Box culvert at Km.1/8

32.67

738

24138.88

... More
Construction of Box culvert at Km.1/10 (i)

60.98

738

45056.29

... More
Construction of Box culvert at Km.1/10 (ii)

61.71

738

45595.67

... More
Construction of Box culvert at Km.2/2

87

738

64221.66

... More
Construction of Box culvert at Km.2/4 (i)

24.2

738

17863.96

... More
Construction of Box culvert at Km.2/4 (ii), 2/6

121.96

738

90028.43

... More
Construction of Box culvert at Km.2/8 (i) (ii) (iii)

76.23

738

56271.46

... More
Construction of Box culvert at Km.2/10

25.41

738

18757.15

... More
Construction of Box culvert at Km.3/2 (i) (ii), 3/4 (i)

76.23

737

56218.86

... More
Construction of Box culvert at Km.3/4 (ii), 3/8

62.92

737

46402.87

... More
Construction of Box culvert at Km.3/10

25.41

737

18739.62

... More
Construction of Box culvert at Km.4/2 (i)

87

736

64101.6

... More
Construction of Box culvert at Km.4/2 (ii), 4/10

50.82

736

37444.18

... More
Construction of Box culvert at Km.4/4

97.41

736

71771.69

... More
Construction of Box culvert at Km.5/2, 5/4 (ii), 5/6 (i)

76.23

736

56113.67

... More
Construction of Box culvert at Km.5/4 (i)

32.67

736

24048.71

... More
Construction of Box culvert at Km.5/6 (ii)

44.31

736

32617.03

... More
Vibrated Cement Concrete M20 grade nominal mix using 40mm ISS size hard broken granite metal and using M.sand including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for formwork and centering mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed and in accordance with standard specification for - Wing wall and Parapet as per MORTH Vth Rev., 1000, 1500, 1700, 2100 & 900

-

-

-

... More
Construction of Box culvert at Km.0/2 (i)

45.76

9240

422827.43

... More
Construction of Box culvert at Km.0/2 (ii)

45.76

9240

422827.43

... More
Construction of Box culvert at Km.0/4 (i), 0/6 (ii), 0/8 (i)

137.28

9246

1269325.2

... More
Construction of Box culvert at Km.0/4 (ii), 0/6 (i)

93.36

9249

863564.13

... More
Construction of Box culvert at Km.0/8 (ii)

125.39

8818

1105791.84

... More
Construction of Box culvert at Km.0/10 (i) (ii) (iii)

137.28

9246

1269325.2

... More
Construction of Box culvert at Km.1/2 (i) (ii) (iii)

137.28

9249

1269745.28

... More
Construction of Box culvert at Km.1/4 (i) (ii)

91.52

9255

847058.78

... More
Construction of Box culvert at Km.1/6 (i) (ii)

93.36

9259

864423.04

... More
Construction of Box culvert at Km.1/8

88.3

8951

790410.39

... More
Construction of Box culvert at Km.1/10 (i)

30.56

10990

335860.51

... More
Construction of Box culvert at Km.1/10 (ii)

125.39

8828

1106945.43

... More
Construction of Box culvert at Km.2/2

128.25

8834

1132964.35

... More
Construction of Box culvert at Km.2/4 (i)

38.83

9273

360108.26

... More
Construction of Box culvert at Km.2/4 (ii), 2/6

61.12

10981

671158.72

... More
Construction of Box culvert at Km.2/8 (i) (ii) (iii)

137.28

9246

1269325.2

... More
Construction of Box culvert at Km.2/10

45.76

9246

423108.4

... More
Construction of Box culvert at Km.3/2 (i) (ii), 3/4 (i)

137.28

9237

1268060.85

... More
Construction of Box culvert at Km.3/4 (ii), 3/8

93.36

9240

862704.28

... More
Construction of Box culvert at Km.3/10

45.76

9237

422686.95

... More
Construction of Box culvert at Km.4/2 (i)

128.25

8815

1130601.98

... More
Construction of Box culvert at Km.4/2 (ii), 4/10

91.52

9227

844531

... More
Construction of Box culvert at Km.4/4

125.39

8800

1103482.16

... More
Construction of Box culvert at Km.5/2, 5/4 (ii), 5/6 (i)

137.28

9218

1265532.15

... More
Construction of Box culvert at Km.5/4 (i)

88.3

8914

787158.3

... More
Construction of Box culvert at Km.5/6 (ii)

45.76

9218

421844.05

... More
Rivertment

-

-

-

... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal, removal of all logs, stumps and other deletrious matter and obstructions, trimming bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification -MORTH Vth Rev., 304 for Toe wall

-

-

-

... More
Construction of Revertment at Km 0/10

38.87

289

11247.81

... More
Plain Cement Concrete of grade M15 (Nominal Mix) using 40mm ISS size HBG graded metal using with M.Sand including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labor charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for LEVELLING COURSE as per MORTH Vth Rev., 1000, 1500, 1700, 2100 & 900

-

-

-

... More
Construction of Revertment at Km 0/10

5.07

7029

35641.64

... More
Vibrated Cement Concrete M20 grade nominal mix using 40mm ISS size hard broken granite metal using with M.Sand including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for formwork and centering mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed and in accordance with standard specification for as per MORTH Vth Rev., 1000, 1500, 1700, 2100 & 900 - for Toe wall

-

-

-

... More
Construction of Revertment at Km 0/10

23.4

7142

167130.29

... More
Gravel packing for revetment in layers not exceeding 15cm thick including stacking for premeasurement, cost of gravel at site of work, watering, mixing with water so as to form into stiff plastic balls, laying and finishing, consolidationand trimming the top surface so as to receive the C.C. Blocks etc, complete as directed by the engineer in charge of works and as per the technical specifications.

-

-

-

... More
Construction of Revertment at Km 0/10

35.72

1625

58046.79

... More
Manufacturing and fixing of precast cement concrete blocks of size 25cmx25cmx30cm in cement concrete 1:2:4 using 20mm ISS size HBG metal and using M.sand and fixing them in apron and revetment slopes including cost of all materials from approved source to work site including cost of moulding, mixing, laying in mould, curing with soft potable water and conveying the blows to work site including labour charges for fixing the blocks to the correct line and level and pointing with cement mortar 1:3 to full depth and all incidental charges etc, complete. complying with standard specification.

-

-

-

... More
Construction of Revertment at Km 0/10

238.16

2572

612719

... More
Median

-

-

-

... More
Providing Barrier Type Kerb for median/islands using Vibrated cement concrete of grade M20 (1:1.5:3) Nominal mix using 20 and 12mm ISS HBG metal from approved quarry and using M.sand including cost and conveyance of all materials to worksite, including hire and fuel charges of all the machineries employed for this work, including all labour charges for mixing, laying, curing, painting, including all other incidental charges etc., complete as per drawing and standard specification.(Median kerb size) Top section, top width 0.115m, bottom width 0.165m to a height of 0.20m and Bottom section 0.165m uniform width to a height of 0.125m.

-

-

-

... More
Along Ring road I.A

799.8

534

427093.2

... More
Refilling with available excavated earth layers, not exceeding limits including watering consolidation, including all labour charges and incidental charges etc.,complete as directed by the Engineer as per MORTH. (In Between Kerb blocks)

-

-

-

... More
Along Ring road I.A

147.65

42

6326.8

... More
KM, HM, Guide post and Avenues

-

-

-

... More
Supply and fixing of Kilometre stone of standard design and drawing as per IRC:8-1980 (second revision),including painting and numbering etc., and all other incidental charges etc., complete.

-

-

-

... More
Along Ring road I.A

5

2197

10985

... More
Supply and fixing of HM stone of standard design and drawing as per IRC:26-1967, including painting and numbering etc., and all other incidental charges etc., complete.

-

-

-

... More
Along Ring road I.A

23

574

13216.95

... More
Supply and fixing of RCC guide post of size1.20 x 0.20 x 0.20 m with reflective star stickers with tin M.s sheet with two side packing and top cover of 0.75 inches in RCC 1: 2: 4 Mix using 20 mm HBG ISS metal with 10 mm. dia bars as vertical with 8mm dia Stirrups including 8.25 inches x 4.25 feet mould with star shape of 5 inches and top projection by 0.75 inches x 3 inches including cost and conveyance of materials to worksite etc., complete.,

-

-

-

... More
Along Ring road I.A

280

1220

341661.6

... More
Tree Plantation including pit excavation, Cost and supply of plants with a growth of 6 feet height and above (the pit size, variety of plants are as directed by the engineer in charge) fertiliser, fencing guard all labour charges watering for one year Period. (Payment based on survival plants)

-

-

-

... More
Along Ring road I.A

1800

1500

2700000

... More
Road Furniture's

-

-

-

... More
Providing and laying of hot applied Thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes etc., complete as per MoRT&H specification No.803

-

-

-

... More
Km 0/0 - 5/610

6174.16

890

5495002.4

... More
Road Markers / Road Stud with Lens Reflector. 2.Providing and fixing relative road studs of 'Category A' Raised Pavement makers made out of Poly Carbonate / methyl methecrylate / ABS moulded body confirirming to ASTM D 788 and relative panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face with retro reflectance and chromaticity values conforming to ASTM D4280.The reflective raised pavement markers shall also confirm to the MORTH circular No RW / NH. 33023/10/97-DO.III dt 11.06.97.The height,width and length shall not be less than 15mm,90mm and 100mm and with minimum reflective area of 13 sq.cm on each side and the slope to the base shall be 35 +/- 5 degree.Each reflector shall have a CIL not less than values specified in Table 2 of said MORTH circular.The strength of detachment of the integrated cylindrical shanks,(of diameter not less than 19 +/- 2mm height not less than 30 +/- 2mm) from the body is to be a minimum value of 500 kgf.Fixing will be by drilling holes on the road for the shanks to go inside,without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The marker shall support a load of 13635 kg tested in accordance with ASTM D4280 and confirming to IRC 35 - 2015 guidelines and MORTH&H specification 804 etc.,complete

-

-

-

... More
Km 0/0 - 5/610

3563

480

1710240

... More
Providing and erecting of Retro - Reflector›sed Cautionary, Mandatory and Informatory signs {without definition board} made out of High Intensity Prismatic Grade Sheeting confirming to Type-IV standards of IRC-67: 2012 and ASTM D 4956 —09, specification and fixed over 2mm thick Aluminium sheet fixed over a back supporting frame of 25mmx25mmx3mm Mild Steel angle and supported on a mild steel angle post 75X75X6mm with a clear height of not less than 2.10m from the ground level to the bottom of the sign board and 0.6Om below ground level. The sign post should be painted as per IRC 67-2012 and firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 45cmX45cmX60cm size including cost and conveyance of all materials, equipment, Machinery and labour with all leads and lifts, loading charges necessary for satisfactory completion of the work as directed by the engineer in charge. High intensity Retro - Reflectro sheet shall consist of minimum coefficient of Retro-reflection as per Table 6.6 of IRC 67- 20 12. The retro - reflective sheeting shall be covered under 7 3 ear warranty issued for field performance and a certified copy of three years outdoor exposure report shall be obtained as per IRC 67: 20 12 . ( as per MO RT&H Specification No.801)

-

-

-

... More
Km 0/0 - 5/610 (90 cm equilateral Triangle)

41

5126

210166

... More
Km 0/0 - 5/610 (60 cm circular)

41

4513

185033

... More
Km 0/0 - 5/610 (90 cm octagon)

11

8205

90255

... More
Providing and erecting of Direction and Place Identification Retro-reflectorised Sign made out of High Intensity Prismatic Grade Sheeting confirming to Type-IV standards of IRC-67: 2012 and ASTM D 4956 –09, specification and fixed over 2mm thick Aluminium sheet fixed over a back supporting frame of 25mmx25mmx3mm Mild Steel angle and supported on a mild steel angle post 75X75X6mm with a clear height of not less than 2.10m from the ground level to the bottom of the sign board and 0.60m below ground level. The sign post should be painted as per IRC 67-2012 and firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45cmX45cmX60cm size including cost and conveyance of all materials, equipment, Machinery and labour with all leads and lifts, loading charges necessary for satisfactory completion of the work as directed by the engineer in-charge. High intensity Retro Reflectro sheet shall consist of minimum coefficient of Retro-reflection as per Table 6.6 of IRC 67-2012. The retro- reflective sheeting shall be covered under 7 year warranty issued for field performance and a certified copy of three years outdoor exposure report shall be obtained as per IRC 67:2012. (as per MoRT&H Specification No.801) for sign having more than 0.90sqm Type 1V

-

-

-

... More
Km 0/0 - 5/610

19.44

11805

229489.2

... More
Supplying and installation of delineators (Road way indicators, hazard markers and object markers), 80-100 cm high above ground level, painted at atrernatively black and white in 15 cm wide strips, fitted with 80x100mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC -79 etc., complete (as per MORT&H specification No.806)

-

-

-

... More
Km 0/0 - 5/610

280

2400

672000

... More
Providing and Erecting of Retro - Reflectorised Hazard Marker Traffic Sign made out of High Intensity Prismatic Grade Sheeting confirming to Type-IV standards of IRC-67: 2012 and ASTM D 4956 —09, specification and fixed over 2mm thick Aluminium sheet fixed over a back supporting frame of 25mmx25mmx3mm Mild Steel angle and supported on a mild steel angle post 75X75X6mm and 0.60m below ground level. The sign post should be painted as per IRC 67-2012 and firmly fixed to the ground by means of properly designed foundation with MIS grade cement concrete 45cmX45cmX60cm size including cost and conveyance of all materials, equipment, Machinery and labour with all leads and lifts, loading charges necessary for satisfactory completion of the work as directed by the engineer in charge. High intensity Retro - Reflectro sheet shall consist of minimum coefficient of Retro-reflection as per Table 6.6 of IRC 67-2012. The retro- reflective sheeting shall be covered under 7 year warranty issued for field performance and a certified copy of three years outdoor exposure report shall be obtained as per IRC 67:2012. (as per MORT&H Specification No.801) (30cm x 90cm rectangular)

-

-

-

... More
Km 0/0 - 5/610

100

4000

400000

... More
Providing and erecting Single sided Single Guard Metal Beam Crash Barrier System (Type - A, “W” Single Guard)1.80m high, comprising of 3mm thick wall “W” beams posts and spacer channels shall be made by cold roll forming using HR conform to IS 5986 Fe 410/360 and dip galvanized having Zinc Mass of 550gms/ sqm, minimum 700 mm above road/ ground level fixed on ISMC series channel vertical post 150x75x5mm spaced 2m center to center 312mm x 83mm flange width x 3mm thick, 4318mm long post directly embedded in the concrete (M15) pit size 350x350x800mm for a depth of 1100mm below ground. All fixing bolts and nuts hot dip galvanized conforming to IS:1367 clause 4.60 all complete as per Technical Specification of IRC 119 2015 and as directed by the Engineer-in-charge.

-

-

-

... More
Km 0/0 - 5/610

260

4696

1220960

... More
Providing and erecting of Retro - Reflectorised Cautionary, Mandatory and Informatory signs (without definition board) made out of High Intensity Prismatic Grade Sheeting confirming to Type-IV standards of IRC-67: 2012 and ASTM D 4956 —09, specification and fixed over 2mm thick Aluminium sheet fixed over a back supporting frame of 25mmx25mmx3mm Mild Steel angle and supported on a mild steel angle post 75X75X6mm with a clear height of not less than 2. lOm from the ground level to the bottom of the sign board and 0.60m below ground level. The sign post should be painted as per IRC 67-2012 and firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrète 45cmX45cmX60cm size including cost and conveyance of all materials, equipment, Machinery and labour with all leads and lifts, loading charges necessary for satisfactory completion of the work as directed by the engineer in charge. High intensity Retro - Reflectro sheet shall consist of minimum coefficient of Retro-reflection as per Table 6.6 of IRC 67-2012. The retro - reflective sheeting shall be covered under 7 year warranty issued for field performance and a certified copy of three years outdoor exposure report shall be obtained as per IRC 67:2012 (as per MORT&H Specification No.801) (60cm x 60 cm Square Chevron)

-

-

-

... More
Km 0/0 - 5/610

60

5184

311040

... More
Providing fixing of Rigid Median marker double sided made of polycarbonate for impact resistance and good weather ability. Polycarbonate used for molding the median marker shall have a minimum Izod impact strength value of 600 J/m at room temperature. The impact strength of the poly carbonate should not decrease to less than 70% of its initial value on being subjected to UV weathering as per ASTM G 155 for 1000 hours or exposure to 2 years of natural weathering. The body of the median marker shall be in the form of an isosceles trapezoidal structure of length 15cm height and width of 10 x 10 cm. The median marker shall have fluorescent yellow retro - reflective sheeting confirming to Tpe XI Specifications as per ASTM D 4956. Area of Reflective sheeting should not be less than 70cm 2. Edge of retro reflective shall be concealed using a grill/ mesh / similar mechanism to prevent vandalism and sheeting pilferage. the Logo of the manufacture shall be embossed and painted in contrasting colour on both side of median marker for distinct identification.

-

-

-

... More
Km 0/0 - 5/610

334

470

156980

... More
Providing and fixing of Digitally Printed Retro Reflectorized Overhead Cantilever Informatory sign Board of Size 5.00m x 1.80m made of cube corner Micro Prismatic grade sheeting conforming to Type XI standards of IRC67 - 2012 and ASTMD4956 – 09, specification and fixed over 2mm thick aluminum sheet fixed on back supporting frame mild steel L angle of size 50mm x 50mm x 6mm. The Vertical support post for the installation of overhead sign Gantry shall be made of 300NB (Nominal Bore) MS Pipe with 12mm thick with a ground clearance f 6 meters along with 80NB (Nominal Bore) MS Pipe with 4mm thick and 40NB (Nominal Bore) MS Pipe with 3.20mm thick support posts. MS Base plate of size 1200mm x 1200mm x 25mm and MS Top plate of size 900mm x 1650mm x 16mm to be used to hold the sign board at the top and bottom respectively. MS Stiffener plates 8mm thick of sizes 420x420, 682x420, 288x288, 288x927 & 44x130 are to be used. Anchor bolts of dimension 25mm dia and 1000mm length are to be used as fixtures. The approved direction information should be digitally printed and should have 70% of the co-efficient of Retro-reflection values against the values as mentioned in Table 6.9 of IRC67 – 2012. The Latex printer used for digital printing should use inks with low VOC emissions and have green guard, eco logo certificates as per UL 2801 standards. The retro-reflective sheeting shall be covered under 10 years warranty issued for field performance and a certified copy of three years Outdoor exposure report shall be obtained as per IRC 67-2012 (As per MoRT&H specification No.801).Cantilever sign shall be installed at the site as per the approved tructural and foundation drawing provided in the tender document and including cost and conveyance of all materials, equipment, machineries to worksite, including all labour charges for fixing the gantry in position with all leads and lifts, loading charges and necessary for satisfactory completion of the work as directed by the engineer-in-charge etc., complete.

-

-

-

... More
Km 0/0 - 5/610

1

540490

540490

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

529009699

-

... More
Add GST at 18%

1

95221746

-

... More
Total Value put to Tender

1

624231445

-

... More
Quoted Percentage

1

-

-

... More
Quoted Value

1

-

-

... More
Add GST at 18% of Final Quoted Value

1

-

-

... More
Total Value of Contract Including 18% of GST

1

-

-

... More
Contract Value of put to tender as per Estimate

-

-

529009699

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-

... More
Quoted Rate in Words

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.