Highways Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date17 Sep 2024
Closing Date7 Oct 2024
Tender Amount₹ 2,83,50,000 
Notes
Download

Costs

Summary

Tn No 17 2024 25 Hdo Dt 09 09 2024 Tvm 66

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Road A (For Road Work) (123.75+502.17)

625.92

1064038

1699.96

... More
Plant Mix Method - Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 401 For Grading-III Material (Drainage Layer at Top)

-

-

-

... More
Road A (For Road Work)

401.72

718648

1788.93

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/Base course on well prepared surface and compacting with vibratory soil compactor to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5

-

-

-

... More
Road A (For Road Work)

1004.29

2141317

2132.17

... More
Providing and laying Prime Coat over WBM/WMM surface using 7Kg of Emulsion Bitumen(SS1) per 10sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5

-

-

-

... More
Road A (For Road Work)

4017.2

326156

81.19

... More
Providing and laying Tack Coat over WBM/WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion(RS1) per 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5

-

-

-

... More
Road A (For Road Work)

4017.2

74960

18.66

... More
Providing and laying Tack Coat over Existing BT surface using 2Kg of Bitumen Emulsion(RS1) per 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5

-

-

-

... More
Road A (For Road Work)

8558.89

230490

26.93

... More
Providing and laying Tack Coat over Dry Lean Cement Concrete surface using 3.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5

-

-

-

... More
Road A (For Road Work)

74.97

1581

21.1

... More
Providing, laying 75mm consolidated thick Dense Bituminous Macadam using 0.40cum of 37.50-13.20mm, 0.35cum of 13.20-2.36mm and 0.36cum of 2.36mm & below size IRC metal with 71.30kgs of VG40 grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to site, spreading the mix to uniform thickness of 75mm with mechanical paver to the specified grades and cross sections and consolidated by Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 505 of MORTH rev-5.

-

-

-

... More
Road A (For Road Work)

381.61

3498600

9168

... More
Providing and Laying 50mm thick Bituminous Macadam using course aggregate and VG30 bitumen which shall consist of construction in a single course base/binder course confirming to the specification on a previously prepared base, (using Mini Hot Mix Plant and Power Roller) including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 504 MORTH Rev-5 (For Patch Works)

-

-

-

... More
Road A (For Road Work)

42.65

338124

7927.89

... More
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG40 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5

-

-

-

... More
Road A (For Road Work)

428.02

3619294

8455.9

... More
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5

-

-

-

... More
Road A (For Road Work)

506.75

5446184

10747.28

... More
Providing compaction for embankment /making up of low berms using the available box cut earth including all hire and fuel charges for power roller for compaction, water sprinkler, including all labour charges for laying, spreading, watering etc., complete and as directed by the departmental engineers.

-

-

-

... More
Road A (For Road Work)

476.55

12685

26.62

... More
Sub-Estimates Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of walls in Brick / Stone Masonry in Lime mortar walls under 3m high etc., complete.

-

-

-

... More
Road A (For Culvert Work)

54.48

12584

231

... More
Earth work Excavation in all classes of soils except hard rock not requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion, backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification for Foundation of Culvert.

-

-

-

... More
Road A (For Culvert Work)

815.75

236053

289.37

... More
Plain Cement Concrete of grade M15 (Nominal mix) using 40mm ISS hard broken granite metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges for compacting, curing and all incidental charges etc., complete as per standard specification for LEVELLING COURSE BELOW Box Culvert and Wing wall.

-

-

-

... More
Road A (For Culvert Work)

38.46

227903

5925.72

... More
Vibrated Reinforced Cement Concrete of grade M25 (Design mix) using 20mm ISShard broken granite metal including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete for Box culvert.

-

-

-

... More
Road A (For Culvert Work)

215.9

2455225

11372.05

... More
Vibrated cement concrete M20 (Nominal mix) using 40mm ISS size hard broken granite metal including cost and conveyance of all materials to site including cost and labour charges for formwork, centering, labour charges for laying, compacting, curing all incidental charges etc., complete for Wing wall and Parapet.

-

-

-

... More
Road A (For Culvert Work)

190.22

1554310

8171.12

... More
Supply and fabrication of STEEL grade Fe500D with suitable anticorrsive measure required for all the reinforced cement concrete items of work involved in the shedule including cost of steel, cost of fabrication, labour charges for cleaning the rods, straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawing including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete.

-

-

-

... More
Road A (For Culvert Work)

14.74

1409280

95609.27

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation backfilling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For making up of low berms using Carted with an average lead of 5km.

-

-

-

... More
Road A (For Culvert Work)

936.82

222944

237.98

... More
Supply of NP 3 class RCC 1000 mm dia. pipes supplied by the Contractor at his own cost specified below confirming to IS 458 / 1989 cost of pipe as a finished work including all other incidental charges, testing charges including loading and unloading transport and delivery in good condition at work site as directed by the departmental officers etc., complete for Culvert

-

-

-

... More
Road A (For Culvert Work)

30

128304

4276.8

... More
Hoisting and Fixing of NP3 class RCC 1000 mm dia. pipes and Collars in proper gradient including all labour charges and all other incidental charges etc., complete, as directed by the departmental Officers, as per Standard Specifications.

-

-

-

... More
Road A (For Culvert Work)

30

7986

266.2

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

24019256

... More
Add GST at 18%

1

-

4323466

... More
Total Value put to Tender

1

-

28342722

... More
Quoted value

1

-

-

... More
Final Quoted Value

1

-

-

... More
Add GST at 18% of Final Quoted Value

1

-

-

... More
Total Value of Contract Including 18% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

24019256

-

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.