Highways Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Works
Bridge Construction
Civil And Construction
Eprocure

Opening Date

23 Feb 2024

Closing Date

30 Apr 2024

Tender Amount

₹ 22,67,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
For 3 to 4 m

414

-

-

... More
For 4 to 5 m

99

-

-

... More
For 5 to 6 m

52

-

-

... More
For 6 to 7 m

4

-

-

... More
Vibrated Cement Concrete of grade M15 (Nominal mix ) using 40 mm ISS metal including Cost and Conveyance of all materials to site and cost of Cement at site including soft water, labour charges for mixing, transporting, laying compacting, curing concrete, Tools and Plants and incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specification

-

-

-

... More
A) Main ROB - for LEVELING COURSE BELOW FOUNDATION OF ABUTMENT PIERS AND PIERS = 88.00 Cu.m. B) Safety Kerb - for LEVELLING COURSE BELOW FOUNDATION for fencing = 51.00 Cu.m.

139

-

-

... More
Vibrated reinforced cement concrete M-35 Grade, Design Mix, using ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for FOUNDATION OF ABUTMENT PIERS AND PIERS.

1023

-

-

... More
Vibrated Reinforced Cement Concrete of grade M35 (Design mix) using 20mm ISS graded metal including Cost and Conveyance of all materials to site and Cost of cement at site but excluding cost and fabrication of steel but including cost ofsoft water, labour charges for mixing, transporting, laying and curing concrete, working at depths hire charges for Tools and Plants including all other incidental charges etc., complete for COLUMN PIERS 1600MM DIA ( BELOW GROUND LEVEL)

67

-

-

... More
Vibrated reinforced cement concrete M35 grade, Design Mix, using ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for COLUMN PIERS 1600MM DIA ABOVE GROUND LEVEL.

196

-

-

... More
Vibrated Reinforced Cement Concrete of grade M35 (Design mix) using 20mm ISS metal including Cost and Conveyance of all materials to site and Cost of cement at site but excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, soft water, hire charges for Tools and Plants including all other incidental charges etc., complete for DIRT WALL CUM BRACKET OVER ABUTMENT PIERS.

12

-

-

... More
Vibrated Reinforced Cement Concrete of grade M35 (Design mix) using 20mm ISS metal including Cost and Conveyance of all materials to site and Cost of cement at site but excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, soft water, hire charges for Tools and Plants including all other incidental charges etc., complete as per standard specifications for CAPPING BEAMS OVER ABUTMENT PIERS AND PIERS.

197

-

-

... More
Vibrated Reinforced Cement Concrete of grade M35 (Design mix) using 20mm ISSgraded metal including Cost and Conveyance of all materials to site and Cost of cement to site but excluding cost and fabrication of steel but including soft water labour charges for mixing, transporting, laying and curing concrete, working at depths hire charges for Tools and Plants including all other incidental charges etc., complete , for PEDESTALS.

13

-

-

... More
Vibrated reinforced cement concrete M-35, Grade, Design Mix using ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges etc., complete for DECK SLAB.

612

-

-

... More
Vibrated reinforced cement concrete M-35, Grade, Design Mix using ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for T-BEAMS AND CROSS BEAMS.

685

-

-

... More
Supply and fixing of Elastomeric bearing of size 40 x 36 x 8cm including cost and conveyance to work site, labour for fixing the same in correct position and all other incidental charges etc., complete as per standard specifications.

1044480

-

-

... More
Supplying and installation of STRIP SEAL EXPANSION JOINT system conforming to specification for road and bridge works Vth revision 2013 published by ministry of surface transport (roads wing ) in the 40mm wide expansion gap provided in between decks over piers and in betweeden deck and dirt wall over abutment with fatigue tested conveyance of all materials cost of testing as per the MOST specification including labour equipment and incidental charges for fixing the joints complete in all respects as per specifications

171

-

-

... More
Providing and fixing of Galvanized steel drainage spouts 100mm dia as per GOI drawing with grating arrangements at top as shown in the drawing and 100mm dia drainage spout projecting at least 300mm beyond the bottom of deck slab as shown in the drawing, including cost and conveyance of Galvanised Steel Pipes and flats and fixing them in position, etc., complete.

97

-

-

... More
Vibrated reinforced Concrete M-40, Grade, Design Mix, using ISS 20mm size hard granite broken graded metal including cost and conveyance of all materials to site including cement at site including labour charges for mixing, transporting, laying, and curing concrete,working at heights,hire charges for tools and plants,including all other incidental charges,etc, complete for CRASH BARRIERS .

217

-

-

... More
Vibrated Cement Concrete M-30, Grade, Design Mix, using 25mm, 12mm and 6mm ISS HBG graded metal including cost and conveyance of all materials to worksite and cement at site including all labour charges for fixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges,formwork,cost of premoulded expansion joints and fixing the same in position etc., complete FOR WEARING COAT OVER DECK SLAB AND APPROACH SLAB.(as per section 2702.2 of MORT&H-Rev-5)

2684

-

-

... More
Vibrated Cement Concrete M15, Grade, Nominal Mix, 1:2:4 using 40mm ISS hard granite broken metal including cost and conveyance of all materials to site and cement at site including cost of formwork,lead for soft water, labour charges for mixing , transporting, laying, and curing concrete working in heights and hire charges for tools and plants, and all other incidental charges etc complete as per relevant specification for BASE COURSE BELOW APPROACH SLAB.

8

-

-

... More
Vibrated Reinforced Cement Concrete M-30, Grade, Design Mix, using ISS graded hard granite broken metal including cost and conveyance of all materials to site including cement at site including labour charges for mixing, laying, curing concrete, working at heights,hire charges for tools and plants, including all other incidental chages etc., complete for APPROACH SLAB.

19

-

-

... More
SUPPLY AND FABRICATION of High Yield Strength Deformed Bar with Grade Designation Fe-500(HSD) , steel required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlaping to the required length wherever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc, complete,Fe-500 grade.

-

-

-

... More
A) Main ROB = 374 MT B) Foot path cum Drain = 12.50 MT C) Double Cell RCC Box Culvert of size 3m x 2m on NH Side for a width of 16.50m @ CH 103.00m = 11.00 MT D) Widening of existing culvert of Triple Cell RCC Box Culvert of size 3m x 3m on Periakalakadi Side @ 0/8 for a width of 3.75 m = 5.00 MT E) Single Cell RCC Box Culvert of size 2m x 2m on NH Side for a width of 16.50m @ Junction = 5.00 MT F) Widening the Double Cell RCC Box Culvert of size 5m x 2m onNH Side @ Acceleration lane = 5.00 MT G) Reinforced Earth Wall = 80.00 MT

492.5

-

-

... More
Supply and fabrication of Fe-240 steel required for all RCC items of works involved in the schedule cost of steel at site fabrication,labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings,including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc,complete, Fe-240 grade

17

-

-

... More
NAME OF SUB-WORK: FORMATION OF APPROACH ROADS

-

-

-

... More
Picking the existing B.T surface upto 50mm depth as directed by the departmental officers and collecting the picked up salvaged metal and stacking the same for reuse and deposting the debris excluding cost of materials including all labour charges for picking and all other tools and plants employed of the work and including all other incidental charges etc., complete as per standard specifications.

160

-

-

... More
EARTHWORK EXCAVATION (HGS- SS.20B) in all classes of soils including weathered rock not requiring blasting and dopsiting on bank with initial leads and lifts including cost of all labour, equipments and all incidental charges backfilling and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for Preparation of Bed

-

-

-

... More
A) Approach Road - for Preparation of Bed = 1339.00 Cu.m. B) Service Road - for BOX CUTTING = 3297.00 Cu.m.

4636

-

-

... More
Forming the embankment using carted earth having soaked CBR value not less than 8 including cost and conveyance of earth from the approved source to site, spreading the earth uniformly to the entire formation width as directed by the departmental officers, including labour for breaking clods, sectioning, laying in layers not exceeding 250mm in loose thickness and compacting each layer to the required density in accordance with IS 2720 Part IV to 95% proctor density to the specified depth below the sub grade level, keeping the moisture content of the earth at the time of compaction within the range of 1% above and 2% below the optimum moisture content determined in accordance with IS 2720 using 80-100 Kn power roller rolling to achieve the required maximum dry density including labour charges for sectioning, watering with all leads for water, including fuel and hire charges for power roller, water sprinkler and other tools and plants employed, etc. complete as per clause 305 of MORT&H Specifications

-

-

-

... More
95% Compaction A) Approach Road = 12074.00 Cu.m. B) Service Road = 1409.00 Cu.m.

13483

-

-

... More
Forming the embankment using carted earth having soaked CBR value not less than 8 including cost and conveyance of earth from the approved source to site, spreading the earth uniformly to the entire formation width as directed by the departmental officers, including labour for breaking clods, sectioning, laying in layers not exceeding 250mm in loose thickness and compacting each layer to the required density in accordance with IS 2720 Part IV to 97% proctor density to the specified depth below the sub grade level, keeping the moisture content of the earth at the time of compaction within the range of 1% above and 2% below the optimum moisture content determined in accordance with IS 2720 using 80-100 Kn power roller rolling to achieve the required maximum dry density including labour charges for sectioning, watering with all leads for water, including fuel and hire charges for power roller, water sprinkler and other tools and plants employed, etc. complete as per clause 305 of MORT&H Specifications

-

-

-

... More
97% Compaction A) Approach Road = 5287.00 Cu.m. B) Service Road = 1409.00 Cu.m.

6696

-

-

... More
Providing and laying Granular Sub-Base Grade- V consisting of well graded Material confirming to the grading given in Table No.400-1, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory roller to achieve the desired density, etc., complete as directed by the Engineer. as per MORTH No. 111, 112, 401, 900.

-

-

-

... More
A) Approach Road = 1090.00 Cu.m. B) Service Road = 423.00 Cu.m.

1513

-

-

... More
Providing and laying Granular Sub-Base Grade- III consisting of well graded Material confirming to the grading given in Table No.400-1, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory roller to achieve the desired density, etc., complete as directed by the Engineer. as per MORTH No. 111, 112, 401, 900.

885

-

-

... More
Provding and laying Wet Mix Macadam consisting of clean crushed aggregates confirming to the grading given in Table No.400-13, including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver on well prepared surface and compacting with vibratory roller to achieve the desired density, etc., complete as directed by the Engineer. as per MORTH No. 111, 112, 406, 900.

-

-

-

... More
A) Approach Road = 2271.00 Cu.m. B) Service Road = 705.00 Cu.m.

2976

-

-

... More
Providing and applying Prime Coat over granular Base with bitumen emulsion (SS-I type) on prepared surface including preparing the road surface and spraying the primer at the rate of 0.70 kg/sqm using bitumen sprayer as directed by the Engineer - over WMM as per MORTH No. 111, 112, 502.

9216

-

-

... More
Providing and applying Tack Coat over Granular surface treated with primer using Bitumen Emulsion (RS-I type) with mechanical sprayer at the rate of 0.25 kg per sqm as directed by the Engineer as per MORTH No.111,112,503,900.

9216

-

-

... More
Providing and laying Dense Bituminous Macadam 60mm thickness which work shall consist of construction, using crushed aggregates, premixed with VG 30 Grade Bitumen at the rate of 4.00% by weight of the total mix confirming to the aggregates and binder as per the job mix formula in the Hot mix plant, transporiting the mix to the worksite, laying with paver finisher and compaction with smooth wheeld and vibratory roller in accordance with the requirements of the specification and in confirmity with the drawing as directed by the Engineer for DBM (Grade-II) . as per MORTH No. 111, 112, 505, 900.

784

-

-

... More
Providing and laying Bituminous Concrete 30 mm thickness which work shall consist of construction using coarse aggregates premixed with VG 30 Grade Bitumen at the rate of 5.40% by weight of the total mix confirming to the aggregates and binder as per the job mix formula in the Hot mix plant, transporiting the mix to the worksite, laying with paver finisher and compaction with smooth wheeld and vibratory roller in accordance with the requirements of the specification and in confirmity with the drawing as directed by the Engineer for BC (Grade-II) as per MORTH No. 111, 112, 507, 900.

-

-

-

... More
A) Approach Road = 278.00 Cu.m. B) Service Road = 87.00 Cu.m.

365

-

-

... More
Providing Filter media inbetween the retaining walls for 600mm thickness using filter materials well packed with smaller sized towards the soil and bigger size towards the wall including cost and conveyance to work site including all labours and other incidental charges including hire charges for tools and plants employed etc. complete.as per CI.

398

-

-

... More
Name of Sub Work : Formation of Service Road

-

-

-

... More
Providing and laying of PRIME COAT over WMM surface using 7.00 Kg Bitumen Emulsion (SSI) per 10 Sq M for preparatory to to another bituminous construction over it including cost of material ,labour charges,rentals for machinary,fuel and all other incidental charges etc complete as per Clause 502 of MORTH Rev-5.

2817

-

-

... More
Providing and laying of TACK COAT over WMM surface (treated with primer) using 2.50 Kg Bitumen Emulsion (RSI) per 10 Sq M for preparatory to to another bituminous construction over it including cost of material ,labour charges,rentals for machinary,fuel and all other incidental charges etc complete as per Clause 503 of MORTH Rev-5.

2817

-

-

... More
Providing and laying 50mm consolidated thick BITUMINOUS MACADAM (BM) using 0.4cum of 37.50-13.20mm,0.35cum of 13.20-2.36mm and 0.36cum of 2.36mm & below size IRC metal with 71.30Kgs of VG 30/VG40 bitumen for premixing per 10 sqm including cost andconveyance of all materials to CMP site,heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix plant 20-30 ton capacity,conveying the mix by tipper trucks to work site spreading the mix to uniform thickness of 50mm with paver to the required density etc including labour for attending to paver at site etc including hire charges and fuel charges for 20-30 ton CMP with bitumen boiler tipper trucks,paver finisher/9m paver finisher,Vibratory/Pneumatic rollers and all other tools and plants required,including fuel and all other incidental chargesetc complete as per Specification using CMP as per Clause 505 MORTH Rev-5.

141

-

-

... More
Name of Sub work :- Providing Footpath cum Drain on sides of the Road Over Bridge

-

-

-

... More
EARTHWORK EXCAVATION in all classes of soil except soft disintegrated rock not requiring blasting and hardrock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidential charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for Footpath cum Drain.

746

-

-

... More
Plain Cement Concrete of grade M15 (Design mix 1:2:4) using 40 mm ISS metal including Cost and Conveyance of all materials to site and cost of Cement at site including soft water, labour charges for mixing, transporting, laying compacting, curing concrete, Tools and Plants and incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specification for LEVELLING COURSE BELOW FOUNDATION.

75

-

-

... More
Vibrated reinforced cement concrete M-25 Grade, (Design mix) using 20mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for DRAIN BOTTOM SLAB

114

-

-

... More
Plain cement concrete M-25 Grade, (Design mix) using 20mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for DRAIN BODY WALL

225

-

-

... More
Vibrated reinforced cement concrete M-25 Grade, Design Mix, using 20mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for COVER SLAB DRAIN

112

-

-

... More
Supplying and fixing of fiber reinforced concrete MANHOLES with frame 0.6m and dia as per IRC : SP50 - 1999 and as directed by the departmental officers at every 10m intervals along the drain cover slab. For storm water drain portion.

48

-

-

... More
Providing and fixing of drain pipes 100mm dia asper GOI drawing SD/205 with grating arrangements at top as shown in the drawing and 100mm dia drainage spout projecting atleast 300mm beyond the bottom of deck slab as shown in the drawing, including cost and conveyance of Galvanised Iron pipes and flats and fixing them in position, etc., complete as per section 2705 of MORT&H Specifications (V Revision).

101

-

-

... More
Name of Sub work :- Construction of Double Cell RCC Box Culvert of size 3m x 2m on NH Side for a width of 16.50m @ CH 103.00m

-

-

-

... More
Earthwork excavation in all classes of soil except soft disintegrated rock not requiring blasting and hardrock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidential charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF BOX CULVERT.

-

-

-

... More
A) Double Cell RCC Box Culvert of size 3m x 2m on NH Side for a width of 16.50m @ CH 103.00m = 144.00 Cu.m. B) Widening of existing culvert of Triple Cell RCC Box Culvert of size 3m x 3m on Periakalakadi Side @ 0/8 for a width of 3.75 m = 87.00 Cu.m. C) Single Cell RCC Box Culvert of size 2m x 2m on NH Side for a width of 16.50m @ Junction = 56.00 Cu.m. D) Widening the Double Cell RCC Box Culvert of size 5m x 2m onNH Side @ Acceleration lane = 62.00 Cu.m.

349

-

-

... More
Vibrated Cement Concrete of grade M15 (Nominal mix 1:2:4) using 40 mm ISS metal including Cost and Conveyance of all materials to site and cost of Cement at site including soft water, labour charges for mixing, transporting, laying compacting, curing concrete, Tools and Plants and incidental charges such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specification for LEVELLING COURSE BELOW FOUNDATION.

-

-

-

... More
A) Double Cell RCC Box Culvert of size 3m x 2m on NH Side for a width of 16.50m @ CH 103.00m = 20.00 Cu.m. B) Widening of existing culvert of Triple Cell RCC Box Culvert of size 3m x 3m on Periakalakadi Side @ 0/8 for a width of 3.75 m = 7.00 Cu.m. C) Single Cell RCC Box Culvert of size 2m x 2m on NH Side for a width of 16.50m @ Junction = 10.00 Cu.m. D) Widening the Double Cell RCC Box Culvert of size 5m x 2m onNH Side @ Acceleration lane = 8.00 Cu.m.

45

-

-

... More
Vibrated reinforced cement concrete M-25 Grade, Design Mix, using ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for BASE SLAB, VERTICAL WALL AND DECK SLAB.

148

-

-

... More
Name of Sub work :- Widening of existing culvert of Triple Cell RCC Box Culvert of size 3m x 3m on Periakalakadi Side @ 0/8 for a width of 3.75 m

-

-

-

... More
Dismantling the Cement concrete in the existing culvert and clearing away from the work site and carefully stacking the useful materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc complete.

39

-

-

... More
Dismantling the existing RCC Pipes in the existing culvert and clearing away from the work site and carefully stacking the useful materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc complete.

21

-

-

... More
Vibrated reinforced cement concrete M-25 Grade, Design Mix, using ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for BASE SLAB, VERTICAL WALL AND DECK SLAB.

60

-

-

... More
Vibrated Concrete M-15, Grade, Design Mix, using ISS 20mm size hard granite broken graded metal including cost and conveyance of all materials to site including cement at site including labour charges for mixing, transporting, laying, and curing concrete,working at heights,hire charges for tools and plants,including all other incidental charges,etc, complete for CC PARAPET.

3

-

-

... More
Name of Sub work :- Construction of Single Cell RCC Box Culvert of size 2m x 2m on NH Side for a width of 16.50m @ Junction

-

-

-

... More
Vibrated reinforced cement concrete M-25 Grade, Design Mix, using ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for BASE SLAB, VERTICAL WALL AND DECK SLAB.

59

-

-

... More
Vibrated Concrete M-15, Grade, Design Mix, using ISS 20mm size hard granite broken graded metal including cost and conveyance of all materials to site including cement at site including labour charges for mixing, transporting, laying, and curing concrete,working at heights,hire charges for tools and plants,including all other incidental charges,etc, complete for CC PARAPET.

1.5

-

-

... More
Name of Sub work :- Widening the Double Cell RCC Box Culvert of size 5m x 2m onNH Side @ Acceleration lane

-

-

-

... More
Vibrated reinforced cement concrete M-25 Grade, Design Mix, using ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for BASE SLAB, VERTICAL WALL AND DECK SLAB.

65

-

-

... More
Vibrated Concrete M-15, Grade, Design Mix, using ISS 20mm size hard granite broken graded metal including cost and conveyance of all materials to site including cement at site including labour charges for mixing, transporting, laying, and curing concrete,working at heights,hire charges for tools and plants,including all other incidental charges,etc, complete for CC PARAPET.

2

-

-

... More
Sub work :Providing Safety kerb

-

-

-

... More
Earth work excavation in all classes of soils including wheathered rock not requiring blasting and depositing on bank with initial leads and lifts as per SS20B including cost of all labour, equipments and all incidental charges back filling and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for foundation of Safety Kerb & Fencing under Trestle Portion

180

-

-

... More
Vibrated Cement Concrete M-20 Grade, Nominal Mix, 1:2:4 using 20mm ISS size hard granite broken metal including cost and conveyance of all materials to site and cement at site including labour charges for mixing,transporting, laying, and curing concrete,working at heights,hire charges for tools and plants, including all other incidental charges,etc.,complete as per standard specification for Safety Kerb

238

-

-

... More
Supplying and fixing the M S Grill of approved design including prime coat and two coats of synthetic enamel paint etc., complete. for Fencing arrangement

736

-

-

... More
Filling between Kerb of Fencing with excavated soil including cost of all labour, equipments and all other incidental charges etc complete.

714

-

-

... More
Name of Sub work :- Providing colour washing.

-

-

-

... More
Painting two coat with ready mixed plastic EMULSION PAINT and approved priming coat over the cement surface complete including scrapping clean removal of dirt parts and for zebra marking . with approved quality and colour including cost and conveyance of all materials to site , labour charges etc. complete as per standard specifications

15624

-

-

... More
Name of Sub Work: Providing Deck Drainage and Rain Water Harvesting system

-

-

-

... More
Providing and fixing 160 mm dia PVC pipes of approved class not less than 4kg/sqcm of 160mm dia connecting the drainage spouts of the deck slab along both the sides of the deckslab connected to the Rainwater harvesting system below for 2 consecutive span with all bends tees clamps and all other accessories and fixtures complete including tools and plants ,transportation etc.,

694

-

-

... More
Earthwork excavation in all classes of soil including kankar except hard rock not requiring blasting and depositing on bank with all leads and lifts as per SS20B and all other incidental charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and other obstructions, trimming bottom of excavations, backfilling, and clearing the site and disposal of all other surplus materials etc., complete as per relevant standard specification for Rain water Harvesting system .

-

-

-

... More
Up to 2m

26

-

-

... More
2m-3m

7

-

-

... More
Filling with 40mm size ISS HBG metal in the rain water harvesting system including cost and conveyance of all material and labour charges for filling complete as directed by the Engineer .

5

-

-

... More
Filling with 20 mm size ISS HBG metal complying with standard specifications including cost and conveyance of all materials and including labour charges for laying, handling and filling in layers of not more than 100 mm thick complete for rainwater harvesting.

5

-

-

... More
Filling with 12mm size ISS HBG metal complying with standard specifications including cost and conveyance of all materials and including labour charges for laying, handling and filling in layers of not more than 100 mm thick complete for rainwater harvesting.

5

-

-

... More
Filling with 6 mm size metal complying with standard specifications including cost and conveyance of all materials and including labour charges for laying, handling and filling in layers of not more than 100 mm thick complete for rainwater harvesting.

5

-

-

... More
Filling with river sand including cost and conveyance of all materials and stacking at site to departmental guage for premeasurements, labour charges for laying, handling and filling in layers not more than 15 cm thick including watering with all leads for good soft water and all other incidental charges, tamping, compacting under optimum moisture content to get the maximum density for the pit and Rain water harvesting well

5

-

-

... More
Providing and laying of ISI Class NP 3 pipe of best quality of 1200mm dia. in the rain water harvesting system with all required specials including cost and conveyance of pipes and specials , labour charges for in position and all other incidental charges etc., complete for pipes as directed by the Engineer

20

-

-

... More
Supplying and fixing of Reinforced concrete Manholes cover 1200mm dia as directed by the departmental officers For cover over rain water harvesting pit.

8

-

-

... More
Name of Sub work:- : Providing Lane marking and providing Road furniture’s to the ROB

-

-

-

... More
Providing and laying of hot applied THERMOPLASTIC COMPOUND 2.5 mm including reflectorising glass beads at 250 gms/ sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC - 35. The finished surface to be level, uniform and free from streaks and holes etc., complete (as per MORT&H specification no 803)

825

-

-

... More
Providing and fixing of retro - reflectorised cautionary, mandatory and informatory signs (WITHOUT DEFINITION BOARDS) made ot of high intensity prismatic grade sheeting conforming to Type- IV as per IRC 67-2012 and ASTM D 4956-09, speccification and fixed 2 mm thick aluminium sheet fixed over a back supporting frame of 25mm x 25mm x 3mm MS angle and supported on a mild steel angle post 75x75x6mm with a clear height not less than 2.1 m firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45x45x60cm. 60 cm below ground level etc., complete and in the bridge locations, the height of the post mentioned above is only tentative and it may be provided according to the site conditions and it has to be fixed to the crash barrier with necessary steel brackets or clamps and fixing with necessary joinaries and concrete. High intensity retro reflectro sheet shall consist of minimum coeff of retro reflection as per table 6.6 of IRC 67-2012. the retro reflective sheeting shall be covered under 7 year warranty issued and a certified copy of three years outdoor exposure report shall be obtained as per IRC67-2012. The cost is inclusive of all the above items, labout, material charges etc., for providing and fixing as per MORT&H specification No. 801

-

-

-

... More
60cm circular

7

-

-

... More
60 x 45 cm rectangular

38

-

-

... More
60 cm equilateral triangle

25

-

-

... More
Providing and fixing of retro - reflectorised Direction and Place identification signs (WITH AREA MORE THAN 0.9 SQM) made of high intensity prismatic grade sheeting conforming to Type- IV as per IRC 67-2012 and ASTM D 4956-09, speccification and fixed 2 mm thick aluminium sheet fixed over a back supporting frame of 25mm x 25mm x 3mm MS angle and supported on a mild steel angle post 75x75x6mm with a clear height not less than 2.1 m firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45x45x60cm. 60 cm below ground level etc., complete and in the bridge locations, the height of the post mentioned above is only tentative and it may be provided according to the site conditions and it has to be fixed to the crash barrier with necessary steel brackets or clamps and fixing with necessary joinaries and concrete. High intensity retro reflectro sheet shall consist of minimum coeff of retro reflection as per table 6.6 of IRC 67-2012. the retro reflective sheeting shall be covered under 7 year warranty issued and a certified copy of three years outdoor exposure report shall be obtained as per IRC67-2012. The cost is inclusive of all the above items, labout, material charges etc., for providing and fixing as per MORT&H specification No. 801.

5.4

-

-

... More
Providing and fixing unidirectional or bi directional reflective pavement marker (RPM) or ROAD STUD bonded to or anchored within the road surface for lane marking and delineation for night time visibility with plastic body of RPM / Road studs moulded from ASA (acrylic strene acrylonitrite) of HIPS (high impact polystyrene). The marker shall support a load of 13635 kg tested in accordance with ASTM D 4280. Reflective panels shall consist of number of lanes containing single or dual prismatic cube capable of providing total internal reflection of the light entering the lens face. Lenses shall be moulded of methyl methecrylate conforming to ASTM D 788 or equivalent etc., complete (As per technical specification of NHAI clause A-8)

730

-

-

... More
Providing and Erecting of Retro - Reflectorised Hazard Marker Traffic Sign made out of High Intensity Prismatic Grade Sheeting confirming to Type-IV standards of IRC-67: 2012 and ASTM D 4956 —09, specification and fixed over 2mm thick Aluminium sheet fixed over a back supporting frame of 25mmx25mmx3mm Mild Steel angle and supported on a mild steel angle post 75X75X6mm and 0.60m below ground level. The sign post should be painted as per IRC 67-2012 and firmly fixed to the ground by means of properly designed foundation with MIS grade cement concrete 45cmX45cmX60cm size including cost and conveyance of all materials, equipment, Machinery and labour with all leads and lifts, loading charges necessary for satisfactory completion of the work as directed by the engineer in charge. High intensity Retro - Reflectro sheet shall consist of minimum coefficient of Retro-reflection as per Table 6.6 of IRC 67-2012. The retro- reflective sheeting shall be covered under 7 year warranty issued for field performance and a certified copy of three years outdoor exposure report shall be obtained as per IRC 67:2012. (as per MORT&H Specification No.801)

22

-

-

... More
Providing fixing of Median marker double sided made of polycarbonate for impact resistance and good weather ability. Polycarbonate used for molding the median marker shall have a minimum Izod impact strength value of 600 J/m at room temperature. The impact strength of the polycarbonate should not decrease to less than 70% of its initial value on being subjected to UV weathering as per ASTM G 155 for 1000 hours or exposure to 2 years of natural weathering. The body of the median marker shall be in the form of an isosceles trapezoidal structure of length 15 cm height and width of 10 X 10 cm. the median marker shall have flourescent yellow reto reflective sheeting confirming to type XI specifications as per ASTM D 4956. Area of reflective sheeting should not be less then 70 cm2. Edge of retro reflective shall be concealed using a grill/ mesh/ similar mechanism to prevent vandalism and sheeting pilferage. The logo og the manufacturer shall be embossed and painted in contrasting colour on both side of the median marker for distinct identification.

278

-

-

... More
Supplying and installation of DELINATORS (road way indicators, Hazard markers, object markers), 80-100 cm above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75mm dia circular reflectorised panels at the top, burried or pressed in to the ground conforming to IRC 79 etc., complete( as per MoRT&H Sp, No.805)

40

-

-

... More
Name of Sub-Work: Construction of Reinforced Earth Wall

-

-

-

... More
Construction of Reinforced Earth Wall, Facia Works (left & right) including Earth work excavation for entire approach, necessary ground improvement, Casting of precast facia elements of 180 mm thick in RCC M35 grade concrete as per specifications given including positive connections , joints, fittings, soil reinforcing elements , geostrips, erection of facia and laying of soil reinforcing element, along with necessary insitu concrete works for foundation pad as well as coping and providing Half perforated drain pipes wrapped with Geotextiles and including filter media and filling materials for the entire approaches using quarry fines with material whose effective angle of friction not less than 30 degree behind the wall as needed for necessary drainage arrangement with outlets including transporting from casting yard to site, design and proof checking, Supervision charges and other incidental charges complete as specified /manufacturer's requirement and as per the MORT&H - V revision Specifications 3100, BS 8006 (Latest Version) and the system supplier shall provide performance bond and same shall be valid for atleast 20 years as per MORT&H - V revision Specifications 3108.

2950

-

-

... More
Plain Cement concrete M15 Grade using 20mm ISS size hard broken granite metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges for compacting, curing and all incidental charges etc., complete as per standard specification for kerb for RE wall as per the MORT&H - V revision Specifications Clause 1000 & 2100 for levelling Course below Friction slab.

112

-

-

... More
Vibrated Reinforced Cement Concrete M 40 grade design mix using ISS HBG metal including cost and conveyance of all materials to site and cement but excluding cost and conveyance and fabrication of steel including labour charges for mixing, laying, transporting and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges etc., complete for Friction Slab as per relevant MORT&H - V revision specification Clauses 1000,1500,1700 & 2300

631

-

-

... More
Earth work excavation in all classes of soils including wheathered rock not requiring blasting and depositing on bank with initial leads and lifts as per SS20B including cost of all labour, equipments and all incidental charges back filling and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for foundation of PCC Wall

1528

-

-

... More
Vibrated Cement Concrete M-20 Grade, Nominal Mix, 1:2:4 using 20mm ISS size hard granite broken metal including cost and conveyance of all materials to site and cement at site including labour charges for mixing,transporting, laying, and curing concrete,working at heights,hire charges for tools and plants, including all other incidental charges,etc.,complete as per standard specification for Footing

688

-

-

... More
Vibrated Cement Concrete M-20 Grade, Nominal Mix, 1:2:4 using 20mm ISS size hard granite broken metal including cost and conveyance of all materials to site and cement at site including labour charges for mixing,transporting, laying, and curing concrete,working at heights,hire charges for tools and plants, including all other incidental charges,etc.,complete as per standard specification for Stem wall and Parapet

992

-

-

... More
Providing and fixing pipes of 100mm dia of requied lengths for abutments and wings including cost and conveyance of all materials to work site and for labour charges for fixing, etc.,to drain of the backfill as per section 2706 of MORT@H specifications (V Revisions) for Weep holes in Retaining Wall

105

-

-

... More
Sub Total Amount for above all items

-

-

-

... More
GST 18% for the above SubTotal Amount

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.