Highways Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Highways Department Tender
Civil And Construction
Road Construction
Eprocure
Opening Date21 Sep 2024
Closing Date8 Oct 2024
Tender Amount₹ 1,56,00,000
Costs
EMD
₹ 89,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_HWAY_486578_1Bid Award Id
ViewTender No
TN.No 26/2024-25/HDO, DATED 14.09.2024Tender Authority
Highways Department ViewPurchaser Address
-Website
http://https://tnhighways.gov.in/index.php/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Road C
181.25
3958
21.84
... More
Road D
186.25
4067
21.84
... More
WET MIX MACADAM
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery,fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5 Clause No. 111, 112, 406 & 900.
-
-
-
... More
Road A
91.13
198737
2180.81
... More
Road B
73.13
159482
2180.81
... More
Road C
81.56
177866
2180.81
... More
Road D
83.81
182773
2180.81
... More
Prime coat - Providing and laying PrimeCoat over WBM/ WMM surface using 7Kg of Emulsion Bitumen(SS1) per 10sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5.
-
-
-
... More
Road A
607.5
49632
81.7
... More
Road B
487.5
39833
81.71
... More
Road C
543.75
44429
81.71
... More
Road D
558.75
45655
81.71
... More
Tack coat - Providing and layingTackCoat overWBM/ WMM surface (treated with primer) using 2.50Kg of Bitumen Emulsion(RS1) per 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5
-
-
-
... More
Road A
607.5
11445
18.84
... More
Road B
487.5
9184
18.84
... More
Road C
543.75
10244
18.84
... More
Road D
558.75
10526
18.84
... More
Tack coat - Providing and laying Tack Coat over Existing BT surface using 2Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5
-
-
-
... More
Road A
14966.25
405286
27.08
... More
Road B
3740.9
101303
27.08
... More
Road C
3412.5
92410
27.08
... More
Road D
3669.58
99372
27.08
... More
Bituminous Macadam -Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50 13.20mm, 0.43 cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing the min required temperature using Central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paversite, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks,Paver Finisher,Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5
-
-
-
... More
Road A
124.69
1079294
8655.82
... More
Road B
24.38
211028
8655.82
... More
Road C
29.06
251538
8655.82
... More
Road D
28.13
243488
8655.82
... More
Bituminous Concrete - Bituminous Concrete -rovidingandlaying Bituminous Concrete to 30/40 mm thick using 0.13 cum of 19.009.50mm, 0.17 cum of 9.50-2.36 mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10s qm including cost and conveyance of all materials to CMPsite, heating the bitumen and aggregate to required temperature andmixing themin required temperature incentral hotmixplant20-30toncapacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniformthickness of 40mm with mechanical paver to the specified grades and cross section and consolidated by 8-10 tonne Vibratory to th erequired densityetc., including labour for attending to paver to site etc., including hire charges and fuel charges for20-30tCMPwithbitumenboiler, tipper trucks, Paver Finisher,Vibratory roller and all other tools and plant required, including fuel andall other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
-
-
-
... More
Road A
467.21
5160871
11046.15
... More
Road B
126.85
1401204
11046.15
... More
Road C
118.68
1310957
11046.15
... More
Road D
126.85
1401204
11046.15
... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositingonbankwith all leads and lifts as per SS20B including cost of all labour charges,materials, tools, equipments andall incidental charges, includingcompacting withpower roller, watering, includingall hire and fuel charges for all tools and plants, removal of other deleteriousmatter and obstructions, trimming of bottomof excavationback filling, clearingup the site anddisposal of all surplusmaterials etc., complete as per standard specification. For making up of low berms with conveyance
-
-
-
... More
Road A
829
197343
238.05
... More
Road B
330
78556
238.05
... More
Road C
316.5
75342
238.05
... More
Road D
332
79032
238.05
... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically
-
-
-
... More
Basic cost of value put to tender as per estimate
1
-
13144045
... More
Add GST at 18%
1
-
2365928
... More
Total Value put to Tender
1
-
15509973
... More
Negotiated Percentage
1
-
-
... More
Final Negotiated Value
1
-
-
... More
Add GST at 18% of Final Negotiated Value
1
-
-
... More
Total Value of Contract Including 18% of GST
1
-
-
... More
Basic cost of value put to tender as per Estimate
-
13144045
-
... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements