Highways Department Tender

... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Civil And Construction
Eprocure
Opening Date16 Sep 2019
Closing Date14 Oct 2019
Tender Amount₹ 5,29,30,009 
Notes
Download

Costs

Summary

Package 62 - Cridp - 2019-20 - Vellore

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Road E

207.67

2697

12.99

... More
Road F

203.75

2646

12.99

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at Optimum Moisture Content in accordance with IS 2720 (part8), carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401) - for grading- III - (drainage layer)

-

-

-

... More
Road C

542.5

789256

1454.85

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at Optimum Moisture Content in accordance with IS 2720 (part8), carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401) - for grading- V (Filter layer)

-

-

-

... More
Road C

868

1187667

1368.28

... More
Wet Mix Macadam (Table 400-13) (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at Optimum Moisture Content in accordance with IS 2720 (part 8) in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, Complete as per clause 406)

-

-

-

... More
Road C

1356.25

2227043

1642.06

... More
Road E

93.45

153450

1642.06

... More
Road F

91.69

150560

1642.06

... More
Prime coat Providing and applying primer coat with bitumen emulsion (SS-I type) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per clause 502) - over WMM/ WBM

-

-

-

... More
Road C

5425

327398

60.35

... More
Road E

623

37598

60.35

... More
Road F

611.25

36907

60.38

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the granular surface treated with primer as per clause 503 - over granular surfaces treated with primer

-

-

-

... More
Road C

5425

63364

11.68

... More
Road E

623

7276

11.68

... More
Road F

611.25

7145

11.69

... More
Advance patch work using 45 mm IRC size HBG metal for making the pot holes and patching using VG10 grade bitumen including mixing at the rate of 44 Kg / Cum of chips after trimming the pot holes or depression to proper shape and depth side painting with tack coat and compacting the layers as directed by Departmental officers etc., complete as per MORTH Rev.-V Specification.

-

-

-

... More
Road B

60.73

172516

2840.71

... More
Road C

52.19

147462

2825.49

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the bituminous surface cleaned with mechanical broom and high pressure air jet,or other means as directed by the Engineer.As per clause 503 - over bituminous surfaces

-

-

-

... More
Road A

23960.63

397506

16.59

... More
Road B

12511.6

207567

16.59

... More
Road C

11625

192858

16.59

... More
Road E

10679

177164

16.59

... More
Road F

4751.95

78882

16.6

... More
Bituminous Macadam (Table - 500-10)(Providing and laying Bituminous Macadam with Hot Mix Plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade - 40) and transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH Rev. V Specification -Grading II

-

-

-

... More
Road A

172.03

1064077

6185.42

... More
Road E

91.94

568687

6185.42

... More
Road F

45.75

282982

6185.42

... More
Dense Graded Bituminous Macadam (Table - 500-10)(Providing and laying dense bituminous macadam with Hot Mix Plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade - 30) at percentage specified by JMF by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No.505) Grading II (50-70mm)

-

-

-

... More
Road C

379.8

2779961

7319.54

... More
Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade - 30) at percentage specified by JMF of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects) - Grading II

-

-

-

... More
Road A

958.44

7568800

7897

... More
Road B

500.46

3952132

7897

... More
Road C

511.5

4039315

7897

... More
Road E

452.08

3570075

7897

... More
Providing and laying Bituminous Concerte to 40 mm thick using 0.13 cum of 19.00 - 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28 Kgs of VG30 / VG40 bitumen and 3.02 Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site. heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Bibratory / Pneumatic roller and all other tools and pland required, including fuel and other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5.

-

-

-

... More
Road F

160.9

1252936

7787.05

... More
Providing and laying of Carted Earth including cost and conveyance of the same to work site including stacking the same to departmental gauge for premeasurement including all labour charges for laying, spreading and as directed by the departmental Engineers. for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer as per MORTH Rev. V Specification For making up of berms

-

-

-

... More
Road B

130

17976

138.28

... More
Road E

506.7

70066

138.28

... More
Road F

300.8

41594

138.28

... More
Excavation for Roadway and drainage Excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer as per MORTH Rev. V Specification d) Formation of embankment using earth available at site by Box Cutting for forming and raising berms.

-

-

-

... More
Road C

310

5542

17.88

... More
Clearing the light jungle with uprooting including labour charges and all other incidental charges, etc., complete as per standard specification.

-

-

-

... More
Road C

4860

18954

3.9

... More
Road E

2880

11232

3.9

... More
Road F

2520

9828

3.9

... More
Provision for hire charges including pay and allowances of Crews for JCB for clearing the ventway of culverts and clearing on either sides, etc., complete as directed by departmental officers.

-

-

-

... More
Road A

8

5600

700

... More
Road B

10

7000

700

... More
Road C

10

7000

700

... More
Road E

18

12600

700

... More
Road F

2

1400

700

... More
Providing RCC M15 grade precast HM Stone of standard design as per IRC: 26 - 1976 and fixing in position including all incidental charges, etc., complete as per MORT&H specification No. 804 and as directed by the Engineer.

-

-

-

... More
Road A

4

1141

285.37

... More
Vibrated Cement Concrete M15 (Nominal mix) using 40mm ISS size HBG graded metal including cost and conveyance of all materials to site, complying to the required standard and specifications including labour charges for formwork, laying,watering,compacting,vibration charges,curing and all other incidental charges etc, complete as per relevant standard specification for repairing the parapet and culvert portion

-

-

-

... More
Road A

3.33

22085

6632.29

... More
Road B

1.66

11691

7042.85

... More
Road C

10.14

68124

6718.35

... More
Road E

4.3

27228

6332.13

... More
Road F

2.05

12598

6145.62

... More
Painting with synthetic Enamel paint over the existing KM, HM Stones, boundary stones, Guide stones, Parapets of Culverts, Tree number back ground, etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road A

8.05

1328

165

... More
Road B

5.98

986

165

... More
Road C

10.1

1666

165

... More
Road E

11.39

1879

165

... More
Road F

3.88

640

165

... More
Painting with synthetic Enamel paint over the existing iron surfaces, etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road A

11.59

1218

105.1

... More
Road B

8.06

847

105.1

... More
Road C

8.82

926

105.1

... More
Road E

26.78

2814

105.1

... More
Road F

22.05

2317

105.1

... More
Whitewashing with white cem over the Culvert parapets, etc., including cost of white cem and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road A

263.98

6071

23

... More
Road B

65.24

1500

23

... More
Road C

150.38

3458

23

... More
Road E

90.36

2078

23

... More
Road F

13.3

305

23

... More
White banding with White cem over the Centre medians, Tree banding, etc., including cost of white cem and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road A

356.56

8200

23

... More
Road B

35

805

23

... More
Road E

101.25

2328

23

... More
Black banding with Japan Black over the Centre medians, Tree banding, etc., including cost of Japan Black and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road A

354.49

42326

119.4

... More
Road B

17.5

2089

119.4

... More
Road E

50.63

6045

119.4

... More
Chiseling the tree for tree numbering of size 0.20 x 0.20 m including cost of tools, labour charges and all other incidental charges, etc., complete as directed by departmental Engineer.

-

-

-

... More
Road A

7

87

12.5

... More
Road B

26

325

12.5

... More
Road E

75

937

12.5

... More
Letterings in KM & HM Stones, Culvert parapets / Bridges and tree numbers including cost of Paint and labour charges and all other incidental charges, etc., complete as directed by departmental Engineer. Lettering 5 to 10 cm. Size

-

-

-

... More
Road A

570

2610

4.58

... More
Road B

602

2757

4.58

... More
Road C

738

3380

4.58

... More
Road E

962

4405

4.58

... More
Road F

242

1108

4.58

... More
Letterings in KM & HM Stones, Culvert parapets / Bridges and tree numbers including cost of Paint and labour charges and all other incidental charges, etc., complete as directed by departmental Engineer. Lettering 10 to 15 cm. Size

-

-

-

... More
Road A

63

480

7.63

... More
Road B

27

206

7.63

... More
Road C

69

526

7.63

... More
Road E

44

335

7.63

... More
Road F

42

320

7.63

... More
Sub Work : Road B - Reconstruction of Box Culvert at Km 120/4 (1x1.50x1.50) 20.00m of Krishnagiri Ranipet Road,Construction of Retaining Wall at Km 120/2 of Krishnagiri Ranipet Road Road C Reconstruction of Box Culvert at Km 11/8 (1x3.00x3.00) 12.00m of Punganur (via) palamathi Road Road D - Reconstruction Culverts across odai at Km 10/6, 116, 11/8 of Arcot Kannamangalam Road and widening of culverts at Km 12/6, 18/10 (SH129) Earth work excavation in all classes of soil except hard rockrequiring blasting and depositing on bank as per SS20B conveying the excavted earth wiht a lead of 5km with all leads and including lifts and all other incidental charges such as bailing out water providing and maintaining necessary cofferdam, sheeting, shoring Rev. V specifications for FOUNDATION OF CULVERT

-

-

-

... More
Road B (91.26+286)

377.26

27577

73.1

... More
Road C

135.27

9888

73.1

... More
Road D (115.44+328.04+64.07+39.29+48.33)

595.17

43506

73.1

... More
Plain Cement Concrete M10 1:3:6 mix using 40mm ISS size hard broken granite metal including cost and conveyance of all materials from approved quarry to worksite including cost of cement which has to be procured by the contractor including cost and labour charges for formwork and centering mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft portable water, working in all depths including hire, running and fuel charges for all tools and plants employed including as per standard specification

-

-

-

... More
Road B

26

109329

4204.98

... More
Plain Cement Concrete in M15 using 40 mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing concrete, etc., complete as per relevant standard specification .

-

-

-

... More
Road B

13.51

63051

4667.02

... More
Road C

19.14

89063

4653.25

... More
Road D (14.00+20.10+8.54+4.94+7.60)

55.18

256412

4646.84

... More
Vibrated Cement Concrete 1:2:4 mix using 40mm ISS size hard broken granite metal including cost and conveyance of all materials from approved quarry to worksite including cost of cement which has to be procured by the contractor including cost and labour charges for formwork and centering mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft portable water, working in all depths including hire, running and fuel charges for all tools and plants employed including as per standard specification.FOR PARAPET

-

-

-

... More
Road B (30.70+388.00)

418.7

2565965

6128.41

... More
Road C

103.78

637650

6144.25

... More
Road D (29.09+40.42+23.91+29.49+21.66)

144.57

904468

6256.27

... More
Vibrated Reinforced Cement Concrete in M25 (Design Mix) using 20 mm ISS HBG metal including coast and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing concrete, etc., complete as per relevant standard specification for Base Slab, Cover Slab and Side walls excluding Cost of Steel.

-

-

-

... More
Road B

60.77

527887

8686.65

... More
Road C

85.18

709654

8331.23

... More
Road D (75.40+151.16+37.91+18.20+39.22)

321.89

2635574

8187.81

... More
Supply and fabrication of Tor steel grade Fe - 500 D steel required for all RCC items of works involved in the schedule including cost of steel, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision for spacing bars, cover blocks and all other incidental charges etc,complete as per MORT&H Rev. V specifications

-

-

-

... More
Road B

4.56

318652

69849.37

... More
Road C

5.85

408618

69849.37

... More
Road D 6.285+11.690+2.817+1.383+2.370)

24.55

1714452

69849.37

... More
Vibrated cement Concrete M30 design mix using ISS size HBG graded metal including cost and conveyance of all materials to worksite and cement at site including all labour charges for fixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges,formwork,cost of premoulded expansion joints and fixing the same in position etc. excluding steel complete for wearing coat of 75mm uniform thickness over deck slab as per MORTH Rev. V Specification.

-

-

-

... More
Road B

40.11

19463

485.25

... More
Road C

42.62

20636

484.2

... More
Road D (42.62+99.55+23.31+8.06+11.90)

185.44

89621

483.29

... More
Supply and fixing of 110mm dia PVC pipe 6 Kg/Sqm for weep holes in Retaining wall including all cost and conveyance of all materials and labour charges etc complete (1.00 mtr Spacing)

-

-

-

... More
Road B

50

12965

259.3

... More
Filling behind Abutments and Wing wall with clean Gritty Gravel including cost and conveyance of Gravel having phi value more that 35 and confirming to appendex-6 of IRC 78-2014 including cost and conveyance of gravel to work site, laying, Handling charges and filling in layers tamping under optimum moisture content to get the Maximum density, including watering with all leads for water and all other incidental charges, etc. complete.

-

-

-

... More
Road B (46.65+112.90)

159.55

39201

245.7

... More
Road C

56.21

13810

245.7

... More
Road D (38.81+24.60+28.89+9.39+9.77)

111.46

27385

245.7

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at Optimum Moisture Content in accordance with IS 2720 (part8), carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401) - for grading- V (Filter layer)

-

-

-

... More
Road B

15.75

21273

1350.68

... More
Road C

8.25

11288

1368.28

... More
Road D (5.25+5.25+5.25)

15.75

22382

1421.08

... More
Wet Mix Macadam (Table 400-13) - (Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, laying in uniform layers with paver in Sub-base / Base course on well prepared surface and compacting with vibratory roller to achieve the desired density etc., complete as per Clause 406 of MORT&H Rev-V).

-

-

-

... More
Road B

26.25

43104

1642.06

... More
Road C

13.75

22578

1642.06

... More
Road D (10.50+10.50+10.50)

31.5

51724

1642.06

... More
Prime Coat - (Providing and applying Primer Coat with Bitumen Emulsion (SS-I Type) on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 7.0 Kg/10sqm using mechanical means as per Clause 502 of MORT&H Rev-V) - Over WMM / WBM.

-

-

-

... More
Road B

105

6336

60.35

... More
Road C

55

3319

60.35

... More
Road D (70.00+70.00+70.00)

210

12673

60.35

... More
Tack Coat -Providing and laying Tack Coat over WMM surface using 2.50 Kg of RS-1 type Bitumen Emulsion per 10 sqm preparatory to another bituminous construction over it - Over Granular surfaces treated with Primer.

-

-

-

... More
Road B

105

1226

11.68

... More
Road C

55

642

11.68

... More
Road D (70.00+700.00+70.00)

210

2452

11.68

... More
Bituminous Macadam (Table - 500-10)(Providing and laying Bituminous Macadam with Hot Mix Plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade - 40) and transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH Rev. V Specification -Grading II

-

-

-

... More
Road D (3.50+3.500+3.50)

10.5

64946

6185.42

... More
Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade - 30) at percentage specified by JMF of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects) - Grading II

-

-

-

... More
Road D (2.80+2.80+2.80)

8.4

66334

7897

... More
UPKEEPING OF ROADS FOR 1 st YEAR Providing and laying of Carted Earth including cost and conveyance of the same to work site including stacking the same to departmental gauge for premeasurement including all labour charges for laying, spreading etc., complete and as directed by the departmental Engineers

-

-

-

... More
Road B

39

5392

138.28

... More
Road C

186

25720

138.28

... More
Road E

152.01

21019

138.28

... More
Road F

90.24

12478

138.28

... More
Clearing the light jungle with uprooting including labour charges and all other incidental charges, etc., complete as per standard specification.

-

-

-

... More
Road C

9720

37908

3.9

... More
Road E

5760

22464

3.9

... More
Road F

5040

19656

3.9

... More
Provision for hire charges including pay and allowances of Crews for JCB for clearing the ventway of culverts and clearing on either sides, etc., complete as directed by departmental officers.

-

-

-

... More
Road A

8

5600

700

... More
Road B

10

7000

700

... More
Road C

12

8400

700

... More
Road E

18

12600

700

... More
Road F

2

1400

700

... More
Supply of Mazdoor Category II for Cleaning around Centre median at 10 numbers per fortnight per KM length, etc., complete as directed by departmental officers.

-

-

-

... More
Road A

240

88320

368

... More
Painting with synthetic Enamel paint over the existing KM, HM Stones, boundary stones, Guide stones, Parapets of Culverts, Tree number back ground, etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road A

8.05

1328

165

... More
Road B

5.98

986

165

... More
Road C

10.1

1666

165

... More
Road E

11.53

1902

165

... More
Road F

3.88

640

165

... More
Painting with synthetic Enamel paint over the existing iron surfaces, etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road A

11.59

1218

105.1

... More
Road B

8.06

847

105.1

... More
Road C

8.82

926

105.1

... More
Road E

26.78

2814

105.1

... More
Road F

22.05

2317

105.1

... More
Whitewashing with white cem over the Culvert parapets, etc., including cost of white cem and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road A

263.98

6071

23

... More
Road B

65.24

1500

23

... More
Road C

150.38

3458

23

... More
Road E

90.36

2078

23

... More
Road F

13.3

305

23

... More
White banding with White cem over the Centre medians, Tree banding, etc.including cost of white cem and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road A

359.11

8259

23

... More
Road B

35

805

23

... More
Road E

101.25

2328

23

... More
Black banding with Japan Black over the Centre medians, Tree banding, etc., including cost of Japan Black and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road A

354.49

42326

119.4

... More
Road B

17.5

2089

119.4

... More
Road E

50.63

6045

119.4

... More
Letterings in KM & HM Stones, Culvert parapets / Bridges and tree numbers including cost of Paint and labour charges and all other incidental charges, etc., complete as directed by departmental Engineer. Lettering 5 to 10 cm. Size

-

-

-

... More
Road A

438

2006

4.58

... More
Road B

442

2024

4.58

... More
Road C

738

3380

4.58

... More
Road E

882

4039

4.58

... More
Road F

242

1108

4.58

... More
Letterings in KM & HM Stones, Culvert parapets / Bridges and tree numbers including cost of Paint and labour charges and all other incidental charges, etc., complete as directed by departmental Engineer. Lettering 10 to 15 cm. Size

-

-

-

... More
Road A

33

251

7.63

... More
Road B

27

206

7.63

... More
Road C

69

526

7.63

... More
Road E

44

335

7.63

... More
Road F

42

320

7.63

... More
UPKEEPING OF ROADS FOR 2nd YEAR Providing and laying of Carted Earth including cost and conveyance of the same to work site including stacking the same to departmental gauge for premeasurement including all labour charges for laying, spreading etc., complete and as directed by the departmental Engineers

-

-

-

... More
Road B

39

5392

138.28

... More
Road C

186

25720

138.28

... More
Road E

152.01

21019

138.28

... More
Road F

90.24

12478

138.28

... More
Clearing the light jungle with uprooting including labour charges and all other incidental charges, etc., complete as per standard specification.

-

-

-

... More
Road C

9720

37908

3.9

... More
Road E

5760

22464

3.9

... More
Road F

5040

19656

3.9

... More
Provision for hire charges including pay and allowances of Crews for JCB for clearing the ventway of culverts and clearing on either sides, etc., complete as directed by departmental officers.

-

-

-

... More
Road A

8

5600

700

... More
Road B

10

7000

700

... More
Road C

12

8400

700

... More
Road E

18

12600

700

... More
Road F

2

1400

700

... More
Supply of Mazdoor Category II for Cleaning around Centre median at 10 numbers per fortnight per KM length, etc., complete as directed by departmental officers.

-

-

-

... More
Road A

240

88320

368

... More
Painting with synthetic Enamel paint over the existing KM, HM Stones, boundary stones, Guide stones, Parapets of Culverts, Tree number back ground, etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road A

8.05

1328

165

... More
Road B

5.98

986

165

... More
Road C

10.1

1666

165

... More
Road E

11.53

1902

165

... More
Road F

3.88

640

165

... More
Painting with synthetic Enamel paint over the existing iron surfaces, etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road A

11.59

1218

105.1

... More
Road B

8.06

847

105.1

... More
Road C

8.82

926

105.1

... More
Road E

26.78

2814

105.1

... More
Road F

22.05

2317

105.1

... More
Whitewashing with white cem over the Culvert parapets, etc., including cost of white cem and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road A

263.98

6071

23

... More
Road B

65.24

1500

23

... More
Road C

150.38

3458

23

... More
Road E

90.36

2078

23

... More
Road F

13.3

305

23

... More
White banding with White cem over the Centre medians, Tree banding, etc.including cost of white cem and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road A

359.11

8259

23

... More
Road B

35

805

23

... More
Road E

101.25

2328

23

... More
Black banding with Japan Black over the Centre medians, Tree banding, etc., including cost of Japan Black and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road A

354.49

42326

119.4

... More
Road B

17.5

2089

119.4

... More
Road E

50.63

6045

119.4

... More
Letterings in KM & HM Stones, Culvert parapets / Bridges and tree numbers including cost of Paint and labour charges and all other incidental charges, etc., complete as directed by departmental Engineer. Lettering 5 to 10 cm. Size

-

-

-

... More
Road A

438

2006

4.58

... More
Road B

442

2024

4.58

... More
Road C

738

3380

4.58

... More
Road E

882

4039

4.58

... More
Road F

242

1108

4.58

... More
Letterings in KM & HM Stones, Culvert parapets / Bridges and tree numbers including cost of Paint and labour charges and all other incidental charges, etc., complete as directed by departmental Engineer. Lettering 10 to 15 cm. Size

-

-

-

... More
Road A

33

251

7.63

... More
Road B

27

206

7.63

... More
Road C

69

526

7.63

... More
Road E

44

335

7.63

... More
Road F

42

320

7.63

... More
Chiseling the tree for tree numbering of size 0.20 x 0.20 m including cost of tools, labour charges and all other incidental charges, etc., complete as directed by departmental Engineer.

-

-

-

... More
Road A

7

87

12.5

... More
Road B

26

325

12.5

... More
Road E

75

937

12.5

... More
UPKEEPING OF ROADS FOR 3rd YEAR Providing and laying of Carted Earth including cost and conveyance of the same to work site including stacking the same to departmental gauge for premeasurement including all labour charges for laying, spreading etc., complete and as directed by the departmental Engineers

-

-

-

... More
Road B

39

5392

138.28

... More
Road C

186

25720

138.28

... More
Road E

152.01

21019

138.28

... More
Road F

90.24

12478

138.28

... More
Clearing the light jungle with uprooting including labour charges and all other incidental charges, etc., complete as per standard specification.

-

-

-

... More
Road C

9720

37908

3.9

... More
Road E

5760

22464

3.9

... More
Road F

5040

19656

3.9

... More
Provision for hire charges including pay and allowances of Crews for JCB for clearing the ventway of culverts and clearing on either sides, etc., complete as directed by departmental officers.

-

-

-

... More
Road A

8

5600

700

... More
Road B

10

7000

700

... More
Road C

12

8400

700

... More
Road E

18

12600

700

... More
Road F

2

1400

700

... More
Supply of Mazdoor Category II for Cleaning around Centre median at 10 numbers per fortnight per KM length, etc., complete as directed by departmental officers.

-

-

-

... More
Road A

240

88320

368

... More
Painting with synthetic Enamel paint over the existing KM, HM Stones, boundary stones, Guide stones, Parapets of Culverts, Tree number back ground, etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road A

8.05

1328

165

... More
Road B

5.98

986

165

... More
Road C

10.1

1666

165

... More
Road E

11.53

1902

165

... More
Road F

3.88

640

165

... More
Painting with synthetic Enamel paint over the existing iron surfaces, etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road A

11.59

1218

105.1

... More
Road B

8.06

847

105.1

... More
Road C

8.82

926

105.1

... More
Road E

26.78

2814

105.1

... More
Road F

22.05

2317

105.1

... More
Whitewashing with white cem over the Culvert parapets, etc., including cost of white cem and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road A

263.98

6071

23

... More
Road B

65.24

1500

23

... More
Road C

150.38

3458

23

... More
Road E

90.36

2078

23

... More
Road F

13.3

305

23

... More
White banding with White cem over the Centre medians, Tree banding, etc.including cost of white cem and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road A

359.11

8259

23

... More
Road B

35

805

23

... More
Road E

101.25

2328

23

... More
Black banding with Japan Black over the Centre medians, Tree banding, etc., including cost of Japan Black and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road A

354.49

42326

119.4

... More
Road B

17.5

2089

119.4

... More
Road E

50.63

6045

119.4

... More
Letterings in KM & HM Stones, Culvert parapets / Bridges and tree numbers including cost of Paint and labour charges and all other incidental charges, etc., complete as directed by departmental Engineer. Lettering 5 to 10 cm. Size

-

-

-

... More
Road A

438

2006

4.58

... More
Road B

442

2024

4.58

... More
Road C

738

3380

4.58

... More
Road E

882

4039

4.58

... More
Road F

242

1108

4.58

... More
Letterings in KM & HM Stones, Culvert parapets / Bridges and tree numbers including cost of Paint and labour charges and all other incidental charges, etc., complete as directed by departmental Engineer. Lettering 10 to 15 cm. Size

-

-

-

... More
Road A

33

251

7.63

... More
Road B

27

206

7.63

... More
Road C

69

526

7.63

... More
Road E

44

335

7.63

... More
Road F

42

320

7.63

... More
UPKEEPING OF ROADS FOR 4th YEAR Providing and laying of Carted Earth including cost and conveyance of the same to work site including stacking the same to departmental gauge for premeasurement including all labour charges for laying, spreading etc., complete and as directed by the departmental Engineers

-

-

-

... More
Road B

39

5392

138.28

... More
Road C

186

25720

138.28

... More
Road E

152.01

21019

138.28

... More
Road F

90.24

12478

138.28

... More
Clearing the light jungle with uprooting including labour charges and all other incidental charges, etc., complete as per standard specification.

-

-

-

... More
Road C

9720

37908

3.9

... More
Road E

5760

22464

3.9

... More
Road F

5040

19656

3.9

... More
Provision for hire charges including pay and allowances of Crews for JCB for clearing the ventway of culverts and clearing on either sides, etc., complete as directed by departmental officers.

-

-

-

... More
Road A

8

5600

700

... More
Road B

10

7000

700

... More
Road C

12

8400

700

... More
Road E

18

12600

700

... More
Road F

2

1400

700

... More
Supply of Mazdoor Category II for Cleaning around Centre median at 10 numbers per fortnight per KM length, etc., complete as directed by departmental officers.

-

-

-

... More
Road A

240

88320

368

... More
Painting with synthetic Enamel paint over the existing KM, HM Stones, boundary stones, Guide stones, Parapets of Culverts, Tree number back ground, etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road A

8.05

1328

165

... More
Road B

5.98

986

165

... More
Road C

10.1

1666

165

... More
Road E

11.53

1902

165

... More
Road F

3.88

640

165

... More
Painting with synthetic Enamel paint over the existing iron surfaces, etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road A

11.59

1218

105.1

... More
Road B

8.06

847

105.1

... More
Road C

8.82

926

105.1

... More
Road E

26.78

2814

105.1

... More
Road F

22.05

2317

105.1

... More
Whitewashing with white cem over the Culvert parapets, etc., including cost of white cem and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road A

263.98

6071

23

... More
Road B

65.24

1500

23

... More
Road C

150.38

3458

23

... More
Road E

90.36

2078

23

... More
Road F

13.3

305

23

... More
White banding with White cem over the Centre medians, Tree banding, etc.including cost of white cem and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road A

359.11

8259

23

... More
Road B

35

805

23

... More
Road E

101.25

2328

23

... More
Black banding with Japan Black over the Centre medians, Tree banding, etc., including cost of Japan Black and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road A

354.49

42326

119.4

... More
Road B

17.5

2089

119.4

... More
Road E

50.63

6045

119.4

... More
Letterings in KM & HM Stones, Culvert parapets / Bridges and tree numbers including cost of Paint and labour charges and all other incidental charges, etc., complete as directed by departmental Engineer. Lettering 5 to 10 cm. Size

-

-

-

... More
Road A

438

2006

4.58

... More
Road B

442

2024

4.58

... More
Road C

738

3380

4.58

... More
Road E

882

4039

4.58

... More
Road F

242

1108

4.58

... More
Letterings in KM & HM Stones, Culvert parapets / Bridges and tree numbers including cost of Paint and labour charges and all other incidental charges, etc., complete as directed by departmental Engineer. Lettering 10 to 15 cm. Size

-

-

-

... More
Road A

33

251

7.63

... More
Road B

27

206

7.63

... More
Road C

69

526

7.63

... More
Road E

44

335

7.63

... More
Road F

42

320

7.63

... More
Chiseling the tree for tree numbering of size 0.20 x 0.20 m including cost of tools, labour charges and all other incidental charges, etc., complete as directed by departmental Engineer.

-

-

-

... More
Road A

7

87

12.5

... More
Road B

26

325

12.5

... More
Road E

75

937

12.5

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom - over bituminous surfaces as per MORTH Rev. V Specification.

-

-

-

... More
Road A

718.75

11924

16.59

... More
Road B

373.5

6196

16.59

... More
Road C

511.67

8488

16.59

... More
Road E

339

5624

16.59

... More
Road F

160.9

2670

16.6

... More
Bituminous Concrete (Table 500-17) (Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade - 30) at percentage specified by JMF of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete in all respectsas per MORTH Rev. V Specification - Grading II

-

-

-

... More
Road A

28.75

221051

7688.75

... More
Road B

14.94

114869

7688.75

... More
Road C

15.35

118022

7688.75

... More
Road E

13.56

104259

7688.75

... More
Road F

4.83

36605

7578.8

... More
UPKEEPING OF ROADS FOR 5th YEAR Providing and laying of Carted Earth including cost and conveyance of the same to work site including stacking the same to departmental gauge for premeasurement including all labour charges for laying, spreading etc., complete and as directed by the departmental Engineers

-

-

-

... More
Road B

39

5392

138.28

... More
Road C

186

25720

138.28

... More
Road E

152.01

21019

138.28

... More
Road F

90.24

12478

138.28

... More
Clearing the light jungle with uprooting including labour charges and all other incidental charges, etc., complete as per standard specification.

-

-

-

... More
Road C

9720

37908

3.9

... More
Road E

5760

22464

3.9

... More
Road F

5040

19656

3.9

... More
Provision for hire charges including pay and allowances of Crews for JCB for clearing the ventway of culverts and clearing on either sides, etc., complete as directed by departmental officers.

-

-

-

... More
Road A

8

5600

700

... More
Road B

10

7000

700

... More
Road C

12

8400

700

... More
Road E

18

12600

700

... More
Road F

2

1400

700

... More
Supply of Mazdoor Category II for Cleaning around Centre median at 10 numbers per fortnight per KM length, etc., complete as directed by departmental officers.

-

-

-

... More
Road A

240

88320

368

... More
Painting with synthetic Enamel paint over the existing KM, HM Stones, boundary stones, Guide stones, Parapets of Culverts, Tree number back ground, etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road A

8.05

1328

165

... More
Road B

5.98

986

165

... More
Road C

10.1

1666

165

... More
Road E

11.53

1902

165

... More
Road F

3.88

640

165

... More
Painting with synthetic Enamel paint over the existing iron surfaces, etc., including cost of paint and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road A

11.59

1218

105.1

... More
Road B

8.06

847

105.1

... More
Road C

8.82

926

105.1

... More
Road E

26.78

2814

105.1

... More
Road F

22.05

2317

105.1

... More
Whitewashing with white cem over the Culvert parapets, etc., including cost of white cem and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road A

263.98

6071

23

... More
Road B

65.24

1500

23

... More
Road C

150.38

3458

23

... More
Road E

90.36

2078

23

... More
Road F

13.3

305

23

... More
White banding with White cem over the Centre medians, Tree banding, etc.including cost of white cem and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road A

359.11

8259

23

... More
Road B

35

805

23

... More
Road E

101.25

2328

23

... More
Black banding with Japan Black over the Centre medians, Tree banding, etc., including cost of Japan Black and labour charges, etc., including all other incidental charges as directed by departmental officers.

-

-

-

... More
Road A

354.49

42326

119.4

... More
Road B

17.5

2089

119.4

... More
Road E

50.63

6045

119.4

... More
Letterings in KM & HM Stones, Culvert parapets / Bridges and tree numbers including cost of Paint and labour charges and all other incidental charges, etc., complete as directed by departmental Engineer. Lettering 5 to 10 cm. Size

-

-

-

... More
Road A

438

2006

4.58

... More
Road B

442

2024

4.58

... More
Road C

738

3380

4.58

... More
Road E

882

4039

4.58

... More
Road F

242

1108

4.58

... More
Letterings in KM & HM Stones, Culvert parapets / Bridges and tree numbers including cost of Paint and labour charges and all other incidental charges, etc., complete as directed by departmental Engineer. Lettering 10 to 15 cm. Size

-

-

-

... More
Road A

33

251

7.63

... More
Road B

27

206

7.63

... More
Road C

69

526

7.63

... More
Road E

44

335

7.63

... More
Road F

42

320

7.63

... More
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom - over bituminous surfaces as per MORTH Rev. V Specification.

-

-

-

... More
Road A

1198

19874

16.59

... More
Road B

622.5

10327

16.59

... More
Road C

852.67

14145

16.59

... More
Road E

565

9373

16.59

... More
Road F

268.17

4451

16.6

... More
Bituminous Concrete (Table 500-17) (Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade - 30) at percentage specified by JMF of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete in all respectsas per MORTH Rev. V Specification - Grading II

-

-

-

... More
Road A

47.92

368444

7688.75

... More
Road B

24.9

191449

7688.75

... More
Road C

25.58

196678

7688.75

... More
Road E

22.6

173765

7688.75

... More
Road F

8.05

61009

7578.8

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

47258937

... More
Add GST at 12%

1

-

5671072

... More
Total Value put to Tender

1

-

52930009

... More
Quoted value

1

-

-

... More
Final Quoted Value

1

-

-

... More
Add GST at 12% of Final Quoted Value

1

-

-

... More
Total Value of Contract Including 12% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

47258937

-

... More
Quoted Rate in Figures (Total Value of Contract Including 12% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.