Highways Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Highways Department Tender
Civil And Construction
Road Construction
Eprocure
Opening Date14 Sep 2024
Closing Date30 Sep 2024
Tender Amount₹ 98,60,000
Costs
EMD
₹ 61,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Mdu No 116 Tn No 23 2024 25 Hdo Dated 06 09 2024
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_HWAY_484310_1Bid Award Id
ViewTender No
MDU No 116 TN No 23 2024 25 HDO Dated 06 09 2024Tender Authority
Highways Department ViewPurchaser Address
-Website
http://https://tnhighways.gov.in/index.php/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
ROAD C
175
3822
21.84
Wet Mix Macadam (Table 400-13) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam 250m thick, including premixing the Material with water at OMC in mechanical mix plant conveyance of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory soil compactor to achieve the desired density including cost of material, labour cherges, rentals for machinery, fuel and all other incidental charegs etc, Complete as per clause 406 of MORTH Rev -5
-
-
-
ROAD A
67.5
149214
2210.59
ROAD B
25.31
55950
2210.59
ROAD C
78.75
174083
2210.59
Prime coat Providing and Laying primer coat over WBM/WMM surface using 7 kg of bitumen emulsion (SS-I ) per 10 sqm for preparetory to another bituminous construction over it, including cost of materials, labour charges, rentals for machinery, fuel and all other incidental charegs etc, complete as per clause 502 of MORTH Rev -5
-
-
-
ROAD A
450
36756
81.68
ROAD B
168.75
13783
81.68
ROAD C
525
42882
81.68
Tack coat Providing and Laying Tack coat over WBM/WMM surface (treated with primer) using 2.50 kg of bitumen emulsion (RS-I ) per 10 sqm for preparetory to another bituminous construction over it, including cost of materials, labour charges, rentals for machinery, fuel and all other incidental charegs etc, complete as per clause 502 of MORTH Rev -5
-
-
-
ROAD A
450
8478
18.84
ROAD B
168.75
3177
18.83
ROAD C
525
9885
18.83
Advance BT patches with Bituminous Premixed chips upto 50 mm thick using Standrad 45 mm IRC size HBG metal premixed with 44 kg of Bitumen per cum of all metal including cost and conveyance of all materials to the site and stacking them to departmental gauge for taking premeasurement inclusive of cost of itumen which will be procured by the contractor etc., complete as per clause 504 MORTH Rev-5 (For Patch Works)
-
-
-
ROAD A
9.98
36329
3640.19
ROAD B
4.23
15194
3592.14
ROAD C
1.7
6237
3669.07
Tack coat Providing and Laying Tack coat over Existing BT surface using 2 kg of bitumen emulsion (RS-I ) per 10 sqm for preparetory to another bituminous construction over it, including cost of materials, labour charges, rentals for machinery, fuel and all other incidental charegs etc, complete as per clause 503 of MORTH Rev -5
-
-
-
ROAD A
7358.13
199184
27.07
ROAD B
7458.75
201908
27.07
ROAD C
2536.88
68673
27.07
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5Grading II
-
-
-
ROAD A
54.38
464362
8539.22
ROAD B
28.13
240208
8539.22
ROAD C
37.5
320220
8539.22
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc, complete as per specification using CMP as per clause 507 of MORTH Rev-5
-
-
-
ROAD A
234.24
2536252
10827.58
ROAD B
228.83
2477675
10827.58
ROAD C
91.85
994513
10827.58
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants,removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For making up of low berms with conveyance Lead for Carted Earth: 2
-
-
-
ROAD A
522
124236
238
ROAD B
486
115668
238
ROAD C
204
48552
238
Calculation of SubTotal, GST and Total Amount carried out by system automatically
-
-
-
Basic cost of value put to tender as per estimate
1
-
8351754
Add GST at 18%
1
-
1503316
Total Value put to Tender
1
-
9855070
Excess/Less Percentage
1
-
-
Final Value
1
-
-
Add GST at 18% of Final Value
1
-
-
Total Value of Contract Including 18% of GST
1
-
-
Basic cost of value put to tender as per Estimate
-
8351754
-
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements