Highways Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Highways Department Tender
Civil And Construction
Bridge Construction
Eprocure
Opening Date12 Aug 2024
Closing Date27 Aug 2024
Tender Amount₹ 1,15,96,798
Costs
EMD
₹ 70,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Tn No 1 2024 25 Sdo Dated 05 08 2024
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_HWAY_472363_1Bid Award Id
ViewTender No
TN No 1 2024 25 SDO Dated 05.08.2024Tender Authority
Highways Department ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Supplying and applying two coats of bonding Epoxy resin over the concrete surface old to new and new to new concrete surface old RCC Portion including cost of epoxy resin and all labour charges for applying etc., complete as per standard specification.
956.4
487764
510
Clean removal of the chemical matters deposited slab portion and rubbing clearing and water washing of existing surface and guniting with cement mortar 1:3 to an average thickness of 40mm under pressure of 3.50 kg / cm2 including cost and conveyance of cement which will be procured and supplied by the contractor himself transporting to site and handing charges at the both ends including hire and fuel charges for all Tools and Plants including cost and conveyance portable water and labour charges for concreting and curing including scaffolding charges for working in all heights and removing the dismantled materials from work site as directed by the departmental officers and all other incidential charges etc., complete as per standard specifications (as per clause 2807 of MoRT&H specification V revision)
956.4
4512295
4718
Sealing of cracks/porous concrete by injection process through nipples/ grouting complete as per technical specificaiton (as per clause 2806 of MoRT&H specification (V revision)
167
369404
2212
Cutting & removing the corroded steel bars and providing and fixing of reinforcement bars whenever the old reinforcemet has reduced to less than 20% of original diameter using binding wires or tack weldings etc..,as per the requirement and site condition.Item rate is inclusive of materials, charges for labours, supervision, tools, tackles, scaffolding, welding electrodes and binding wire etc.., complete as per specification and as directed by the Engineer Incharge
0.13
12714
97805
Providing and laying of polymer modified concrete like Master Emaco S466 of BASF or equivalent material blended with washed, saturated surface - dry (SSD) , graded, low absorption, high density aggregates of size 5mm to 12mm at 50% by weight of micro concrete and water at 3.25 to 3.75 litres per 25kg bag and pouring into the formwork using suitable pumping, device for uniform flow of concrete. The side shuttering can be removed after 3 days and bottom shuttering after 7 days ensuring proper bond between the micro concrete and existing concrete. Item rate of all materials, labour, supervision, tools, tackles, transportation, fixing thin film coated water tight shuttering, drilling of holes for micro concrete and filling after pumping, curing, scaffolding etc., complete as per specifications and as directed.
3.78
309861
81974
Construction of precast RCC railing of M 30 grade in-situ with 20 mm nominal size aggregates, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications.
144
365616
2539
Providing painting two coats using ready mix Plastic Emulsion paint of approved make and colour over the Cement primer area including cost and conveyance of all materials to site all incidental charges etc., complete.
1285.36
362857
282.3
Calculation of SubTotal, GST and Total Amount carried out by system automatically
-
-
-
Basic cost of value put to tender as per estimate
1
-
9827795
Add GST at 18%
1
-
1769003
Total Value put to Tender
1
-
11596798
Negotiated Percentage
1
-
-
Final Negotiated Value
1
-
-
Add GST at 18% of Final Negotiated Value
1
-
-
Total Value of Contract Including 18% of GST
1
-
-
Basic cost of value put to tender as per Estimate
-
9827795
-
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements