Highways Department Tender

... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Civil Works Roads
Eprocure
Opening Date10 Jun 2020
Closing Date7 Jul 2020
Tender Amount₹ 6,02,53,000 
Notes
Download

Costs

Summary

Package 36 Widening Improvements To Government Roads In Palayamkottai H Candm Subdivision

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

408.33

-

15.31

... More
Providing Junction Improvement at Km 5/4 of Tirunelveli - Pottalpudur Road (SH41A)

10

-

15.31

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

200

-

15.31

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials tool and equipments and all other incidental charges such as baling our water,sheeting, shoring, bracing and their subsequent removal, removal and obstructions, trimming bottom of excavation backfilling and clearing the site and disposal of all surplus materials etc., indicated by the Engineer as per Box Cutting

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

1067.8

-

84

... More
Junction improvement at km 1/6 of Palayamkottai - Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A)

246.4

-

84

... More
Providing Junction Improvement at Km 5/4 of Tirunelveli - Pottalpudur Road (SH41A)

834.9

-

84

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 ) - for grading-V Material for widening portion.

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

497.16

-

1319.27

... More
Junction improvement at km 1/6 of Palayamkottai - Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A)

96

-

1319.27

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

1.26

-

1319.27

... More
Providing Junction Improvement at Km 5/4 of Tirunelveli - Pottalpudur Road (SH41A)

250

-

1319.27

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 ) - for grading-III Material for widening portion.

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

323.15

-

1407.88

... More
Junction improvement at km 1/6 of Palayamkottai - Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A)

62.4

-

1407.88

... More
Providing Junction Improvement at Km 5/4 of Tirunelveli - Pottalpudur Road (SH41A)

162.5

-

1407.88

... More
Wet Mix Macadam (Table 400-13) (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, Complete as per clause 406) as per MORTH Rev. V Clause No. 111, 112, 406 & 900.

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

1665.45

-

1655.57

... More
Junction improvement at km 1/6 of Palayamkottai - Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A)

325

-

1655.57

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

245

-

1655.57

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

28

-

1655.57

... More
Providing Junction Improvement at Km 5/4 of Tirunelveli - Pottalpudur Road (SH41A)

312.5

-

1655.57

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

120

-

1655.57

... More
Prime Coat (Providing and applying primer coat with bitumen emulsion (SS-I type) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per clause 502) - over WMM/ WBM as per MORTH Rev. V Clause No. 111, 112,501,502 &900 .

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

9201.8

-

51.25

... More
Junction improvement at km 1/6 of Palayamkottai - Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A)

1700

-

51.25

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

1225

-

51.25

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

140

-

51.25

... More
Providing Junction Improvement at Km 5/4 of Tirunelveli - Pottalpudur Road (SH41A)

1250

-

51.25

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

600

-

51.25

... More
Tack Coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 - over granular surfaces treated with primer as per MORTH Rev. V Clause No. 111, 112,501, 503 & 900.

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

9201.8

-

10.94

... More
Junction improvement at km 1/6 of Palayamkottai - Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A)

1700

-

10.94

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

1225

-

10.94

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

140

-

10.95

... More
Providing Junction Improvement at Km 5/4 of Tirunelveli - Pottalpudur Road (SH41A)

1250

-

10.94

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

600

-

10.95

... More
Filling quarry dust from approved quarry including cost and conveyance of quarry dust and labour charges for filling the quarry dust etc., complete.

-

-

-

... More
Junction improvement at km 1/6 of Palayamkottai - Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A)

3

-

192.24

... More
Providing colour designed concrete paver block floor finish used with concrete block of 40mm which has a compressive strength of 16.00 Mt/sqm. The rate including the cost concrete concrete block loading and conveyance to site and cost of labour for fixing in position the joints should be filled with sand including compacting by using power compactor etc.,complete complying with standard specification and also the rate including the labour charges for clearing the heavy and scrub,jungle,levelling the sites, diversion of water and sanitary pipe lines,dismantling the existing masonry structures etc.,complete complying as directed by the departmental officers.

-

-

-

... More
Junction improvement at km 1/6 of Palayamkottai - Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A)

100

-

825.84

... More
Vibrated Cement Concrete of Grade M20 1:1.5:3Nominal mix using 40mm ISS HBG graded metal including cost and conveyance of all materials to site but excluding cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing and compacting concrete, working at heights, hire charges for Tools and Plants and incidental Charges etc., complete as per standard specifications for side wall

-

-

-

... More
Junction improvement at km 1/6 of Palayamkottai - Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A)

6.6

-

5096.98

... More
Vibrated Cement concrete of grade M20 Nominal Mix 1:1 1/2: 3 using 40mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, softwater, labour charges for mixing, transporting, laying and curing concrete, working at depths tools and plants and maintaining of protective bunds cofferdams, shoring strutting etc., complete as per relevant standard specifications for Foundation (Center Median)

-

-

-

... More
Junction improvement at km 1/6 of Palayamkottai - Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A)

12

-

5488.98

... More
Providing Junction Improvement at Km 5/4 of Tirunelveli - Pottalpudur Road (SH41A)

12

-

5460.9

... More
Painting two coats with approved cement paint including priming coat over cement plastered wall surfaces and ceiling including cleaning, preparing the surface, curing etc. complete (Centre median)

-

-

-

... More
Junction improvement at km 1/6 of Palayamkottai - Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A)

79.2

-

181.55

... More
Providing Junction Improvement at Km 5/4 of Tirunelveli - Pottalpudur Road (SH41A)

79.2

-

181.55

... More
Tack Coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 - over bituminous surfaces as per MORTH Rev. V Clause No. 111, 112, 503 & 900.

-

-

-

... More
Junction improvement at km 1/6 of Palayamkottai - Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A)

130

-

17.12

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

7175

-

17.12

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

2914.8

-

17.12

... More
Providing Junction Improvement at Km 5/4 of Tirunelveli - Pottalpudur Road (SH41A)

1680

-

17.12

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

5500

-

17.12

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

9556.88

-

17.12

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

14000

-

17.12

... More
Bituminous Macadam (Providing and laying 50mm bituminous macadam with hot mix plant using crushed aggregates of specified grading premixed with bituminous binder (Viscosity Grade 30), transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction, complete as directed by the Engineeper clause 504) - as per MORTH Rev. V Clause No. 111, 112, 501, 504 & 900.

-

-

-

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

166.49

-

5512.56

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

55

-

5512.56

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

100.33

-

5512.56

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

140

-

5512.56

... More
Dense Graded Bituminous Macadam (Table - 500-10) (Providing and laying dense bituminous macadam with Hot Mix Plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade 30) at percentage specified by JMF by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No.505) Grading II as per MORTH Rev. V Clause No. 111, 112, 501, 502, 503, 505 & 900.

-

-

-

... More
Providing Junction Improvement at Km 5/4 of Tirunelveli - Pottalpudur Road (SH41A)

228.8

-

5962.68

... More
Dense Graded Bituminous Macadam (Table - 500-10) (Providing and laying dense bituminous macadam with Hot Mix Plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade 30) at percentage specified by JMF by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No.505) Grading II as per MORTH Rev. V Clause No. 111, 112, 501, 502, 503, 505 & 900.

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

552.11

-

6423.5

... More
Junction improvement at km 1/6 of Palayamkottai - Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A)

99.6

-

6423.5

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

420

-

6423.5

... More
Bituminous Concrete (Table 500-17) (Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects) - Grading II as per MORTH Rev. V Clause No. 111, 112, 501, 507 & 900.

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

368.07

-

6885.75

... More
Junction improvement at km 1/6 of Palayamkottai - Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A)

73.2

-

6885.75

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

336

-

6885.75

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

110.99

-

6885.75

... More
Providing Junction Improvement at Km 5/4 of Tirunelveli - Pottalpudur Road (SH41A)

68.5

-

6885.75

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

165

-

6885.75

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

304.71

-

6885.75

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

560

-

6885.75

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer. a. Formation of embankment using Box Cut Earth including compaction by Power Roller as per MORTH Rev. V Clause No. 111, 112, 301 to 305, 900

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

585

-

11.34

... More
Junction improvement at km 1/6 of Palayamkottai - Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A)

26

-

11.34

... More
Providing Junction Improvement at Km 5/4 of Tirunelveli - Pottalpudur Road (SH41A)

106

-

11.34

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer. a. Formation of embankment using Side Earth including compaction by Power Roller as per MORTH Rev. V Clause No. 111, 112, 301 to 305, 900

-

-

-

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

240

-

103.7

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

80

-

103.7

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

300

-

103.7

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

807

-

103.7

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

400

-

103.7

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectoring glass beads @ 250 gms per sqm area thickness of 2.5 mm exclusive of surface applied glass beads as per IRC:35. The finished surface to be level uniform and free from streaks and holes

-

-

-

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

372.6

-

841

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

47.2

-

841

... More
Providing Junction Improvement at Km 5/4 of Tirunelveli - Pottalpudur Road (SH41A)

31.34

-

841

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

606

-

841

... More
Dismantling of existing Parapet wall in Cement mortar of RR Masonry simultaneously including cost and conveyance of all materials to site all labour charges for mixing watering and all other works etc., complete. (S.l.14)

-

-

-

... More
Widening For Pipe culvert at Km 1/8 of Palayamkottai - Thoothukudi Road

5.13

-

193

... More
Reconstruction Of Box Culvert at Km 60/10 of Tiruchendur - Palayamkottai Ambasamudram - Tenkasi - Courtallam - Shencottai Road

14.75

-

193

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials tool and equipments and all other incidental charges such as baling our water,sheeting, shoring, bracing and their subsequent removal, removal and obstructions, trimming bottom of excavation backfilling and clearing the site and disposal of all surplus materials etc., indicated by the Engineer for Foundation of Retaining Wall

-

-

-

... More
Widening For Pipe culvert at Km 1/8 of Palayamkottai - Thoothukudi Road

10.59

-

126

... More
Reconstruction Of Box Culvert at Km 60/10 of Tiruchendur - Palayamkottai Ambasamudram - Tenkasi - Courtallam - Shencottai Road

145.32

-

126

... More
Construction of Retaining wall at Km 9/2, 9/8, 10/6 & 11/0-11/8 of Udaiyarpatti - Seevalaperi Road.

1221

-

126

... More
Cement Concrete of Grade M15 1:2:4 Nominal mix using 40mm ISS HBG graded metal including cost and conveyance of all materials to site but excluding cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing and compacting concrete, working at heights, hire charges for Tools and Plants and incidental Charges etc., complete as per standard specifications for foundation

-

-

-

... More
Widening For Pipe culvert at Km 1/8 of Palayamkottai - Thoothukudi Road

1.9

-

4935.17

... More
Reconstruction Of Box Culvert at Km 60/10 of Tiruchendur - Palayamkottai Ambasamudram - Tenkasi - Courtallam - Shencottai Road

30.63

-

4949.21

... More
Construction of Retaining wall at Km 9/2, 9/8, 10/6 & 11/0-11/8 of Udaiyarpatti - Seevalaperi Road.

305.25

-

4935.17

... More
Vibrated Cement Concrete of Grade M20 1:1.5:3 Nominal mix using 40mm ISS HBG graded metal including cost and conveyance of all materials to site but excluding cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing and compacting concrete, working at heights, hire charges for Tools and Plants and incidental Charges etc., complete as per standard specifications below sill level

-

-

-

... More
Widening For Pipe culvert at Km 1/8 of Palayamkottai - Thoothukudi Road

5.83

-

5488.98

... More
Reconstruction Of Box Culvert at Km 60/10 of Tiruchendur - Palayamkottai Ambasamudram - Tenkasi - Courtallam - Shencottai Road

44.21

-

6178.34

... More
Construction of Retaining wall at Km 9/2, 9/8, 10/6 & 11/0-11/8 of Udaiyarpatti - Seevalaperi Road.

667.68

-

5900.7

... More
Vibrated Cement Concrete of Grade M20 1:1.5:3 Nominal mix using 40mm ISS HBG graded metal including cost and conveyance of all materials to site but excluding cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing and compacting concrete, working at heights, hire charges for Tools and Plants and incidental Charges etc., complete as per standard specifications - Above sill level

-

-

-

... More
Widening For Pipe culvert at Km 1/8 of Palayamkottai - Thoothukudi Road

4.08

-

5488.98

... More
Reconstruction Of Box Culvert at Km 60/10 of Tiruchendur - Palayamkottai Ambasamudram - Tenkasi - Courtallam - Shencottai Road

47.17

-

7388.8

... More
Construction of Retaining wall at Km 9/2, 9/8, 10/6 & 11/0-11/8 of Udaiyarpatti - Seevalaperi Road.

1114.44

-

6882.4

... More
Laying jointing and fixing of in position RCC Home pipes NP3 class 1000mm dia with suitable collars with cement 1:2 excluding cost and conveyance of pipe and collars which will be supplied by the contractor at site, including all labour for laying and cost of joints for the work of reconstruction of culverts.

-

-

-

... More
Widening For Pipe culvert at Km 1/8 of Palayamkottai - Thoothukudi Road

5

-

3938

... More
FILLING in between body wall with Quarry Dust including cost and conveyance to the site including labour charges for filling in layers, watering, tamping under optimum moisture content to get the maximum density and all incidental charges etc. complete.

-

-

-

... More
Widening For Pipe culvert at Km 1/8 of Palayamkottai - Thoothukudi Road

5.93

-

192.24

... More
Reconstruction Of Box Culvert at Km 60/10 of Tiruchendur - Palayamkottai Ambasamudram - Tenkasi - Courtallam - Shencottai Road

32.66

-

199.38

... More
.Providing and fixing PVC seepage pipes of 110mm of required lengths for abutments and wings including cost and conveyance of all materials to worksite and labour for 900mm dia semipherical backfill arrangements with 100cm size broken granite chips at the periphery and labour charges for fixing etc., complete to drain the backfill.

-

-

-

... More
Construction of Retaining wall at Km 9/2, 9/8, 10/6 & 11/0-11/8 of Udaiyarpatti - Seevalaperi Road.

366

-

172.8

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer. a. Formation of embankment using Available Earth Refilling Behind the Retaining wall as per MORTH Rev. V Clause No. 111, 112, 301 to 305, 900

-

-

-

... More
Construction of Retaining wall at Km 9/2, 9/8, 10/6 & 11/0-11/8 of Udaiyarpatti - Seevalaperi Road.

1221

-

11.34

... More
Providing and Laying of Carted Earth including cost and conveyance of the same to work site with an average lead of 1 km including stacking the same to departmental gauge for premeasurement including all labour charges for laying spreading etc complete and as directed by departmental engineers for filling the earth behind the retaining wall per MORTH Rev. V Clause No. 111, 112,202, 301 to 305, 900

-

-

-

... More
Construction of Retaining wall at Km 9/2, 9/8, 10/6 & 11/0-11/8 of Udaiyarpatti - Seevalaperi Road.

710.4

-

95.34

... More
Vibrated Reinforced Cement concree of grade M30 (Design mix) using graded metal including cost and conveyance of all materials to site inclduing cost of cement at site but excluding cost and fabrication of steel including cost of formwork, softwater, labour charges for mixing transporting, laying and curing concrete, working at depths, tools and plants including all other incidental charges etc., complete as per relevant standard specifiction for Box culvert. Below Sill

-

-

-

... More
Reconstruction Of Box Culvert at Km 60/10 of Tiruchendur - Palayamkottai Ambasamudram - Tenkasi - Courtallam - Shencottai Road

20.52

-

7713.41

... More
Vibrated Reinforced Cement concree of grade M 30 (Design mix) using graded metal including cost and conveyance of all materials to site inclduing cost of cement at site but excluding cost and fabrication of steel including cost of formwork, softwater, labour charges for mixing transporting, laying and curing concrete, working at depths, tools and plants including all other incidental charges etc., complete as per relevant standard specifiction for Box culvert. Above Sill

-

-

-

... More
Reconstruction Of Box Culvert at Km 60/10 of Tiruchendur - Palayamkottai Ambasamudram - Tenkasi - Courtallam - Shencottai Road

32.37

-

11048.38

... More
Supply and fabrication of Fe-500 steel required for all RCC items of works involved in the schedule cost of steel at site fabrication labour charges for cleaning the rods straightening cutting, bending tying grills, including overlapping to the required lenght whenever necessry and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental chrges etc., complete as per standard specifications Fe-500 grade.

-

-

-

... More
Reconstruction Of Box Culvert at Km 60/10 of Tiruchendur - Palayamkottai Ambasamudram - Tenkasi - Courtallam - Shencottai Road

3.15

-

73382.79

... More
Vibrated cement concrete M15 Grade Nominal Mix (1:2:4) using 20mm ISS size hard granite broken metal including cost and conveyance of all materials to site and cement at site including labour charges for mixing transporting laying and curing concrete, working at heights hire charges for tools and plants, including all other incidental charges etc., complete as per standard specification for Parapet

-

-

-

... More
Reconstruction Of Box Culvert at Km 60/10 of Tiruchendur - Palayamkottai Ambasamudram - Tenkasi - Courtallam - Shencottai Road

1.17

-

6766.02

... More
Vibrated Cement concrete M30 Design Mix using ISS size HBG graded metal including cost and conveyance of all materaisl to worksite and cement at site including all labour charges for fixing concrete layng vibrating, hire charges for tools and plants, compacting curing with all leads for soft water, including all other incidental charges, formwork, cost of premoulded expansion joints and fixing the same in position etc., complete for wearing coat of 75mm uniform thickness.

-

-

-

... More
Reconstruction Of Box Culvert at Km 60/10 of Tiruchendur - Palayamkottai Ambasamudram - Tenkasi - Courtallam - Shencottai Road

36.66

-

526.12

... More
Providing RCC Centre Median of size 0.610 m at bottom 0.250m at Middle 0.150m at top and to height of 1.05m from the road level inclduing cost and conveyance of all materials to work site including Picking the existing BT surface if necessary and prviding form work for shuttering on both side sides and chamfered edges at top , including cost of steel reinforcements as per the bar bending schedule appended here with, fabrication and placing in position of steel grills inclduing cost of binding wire, alying of RCC M25 concrete using ISS HBG Graded metal inclduing cost and conveyance of all matreials to work site from the approved sources including labour charges for mixing , laying curing etc., and cost and laying of 10mm dia PVC pipes (For Service Utilities) at the middle of the median as direct by the departmental officers, rendering smoothness over the CC surface with 10kg of cement for 10m2 area and painting two coats over the CC surface with best approved Quality of cement paint including primer etc, including all labour charges , hire and fuel charges for the Tools and Plants employed and as per the standard spcification and in accordance withe the drawings appended here with and as direct by the departmental officer etc., Complete

-

-

-

... More
Providing & Fixing Centre Median for Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit -NH 7A) (SHU 95) at KM 1/2-2/0

400

-

5549.78

... More
Sub - Estimate for Upkeeping

-

-

-

... More
Clearing the Light jungles including weeding out shrubs, bushes, vegetable growth, etc. as per specifications & directions of Engineer-in-charge

-

-

-

... More
I Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

72

-

4.4

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

1080

-

4.4

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

108

-

4.4

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

1992

-

4.4

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

1528.8

-

4.4

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

7228.8

-

4.4

... More
II Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

72

-

4.4

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

1080

-

4.4

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

108

-

4.4

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

1992

-

4.4

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

1528.8

-

4.4

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

7228.8

-

4.4

... More
III Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

72

-

4.4

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

1080

-

4.4

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

108

-

4.4

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

1992

-

4.4

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

1528.8

-

4.4

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

7228.8

-

4.4

... More
IV Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

72

-

4.4

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

1080

-

4.4

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

108

-

4.4

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

1992

-

4.4

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

1528.8

-

4.4

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

7228.8

-

4.4

... More
V Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

72

-

4.4

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

1080

-

4.4

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

108

-

4.4

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

1992

-

4.4

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

1528.8

-

4.4

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

7228.8

-

4.4

... More
Forming and raising the Berms with side earth with side earth with a lead of 1 km from the approved source to work site including cost of earth, conveyance charges and filling levelling to the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for making up the berms (Yearly two times) as directed by the dept. officers (during South west & North east monsoon) as per MORT&H Rev. V specifications No. 100, 111, 112, 202, 301, to 305, 900

-

-

-

... More
I Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

157.5

-

103.7

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

180

-

103.7

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

90

-

103.7

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

300

-

103.7

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

300

-

103.7

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

807

-

103.7

... More
II Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

157.5

-

103.7

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

180

-

103.7

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

90

-

103.7

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

300

-

103.7

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

300

-

103.7

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

807

-

103.7

... More
III Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

157.5

-

103.7

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

180

-

103.7

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

90

-

103.7

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

300

-

103.7

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

300

-

103.7

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

807

-

103.7

... More
IV Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

157.5

-

103.7

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

180

-

103.7

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

90

-

103.7

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

300

-

103.7

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

300

-

103.7

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

807

-

103.7

... More
V Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

157.5

-

103.7

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

180

-

103.7

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

90

-

103.7

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

300

-

103.7

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

300

-

103.7

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

807

-

103.7

... More
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines , grades and cross sections shown in the drawings or as indicated by the Engineer for Clearing the vent way of CD works as per MORT&H Rev. V specifications No. 100, 111, 112, 301 to 305 (One time per year)

-

-

-

... More
I Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

4

-

700

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

4

-

700

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

2

-

700

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

10

-

700

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

4

-

700

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

4

-

700

... More
II Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

4

-

700

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

4

-

700

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

2

-

700

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

10

-

700

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

4

-

700

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

4

-

700

... More
III Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

4

-

700

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

4

-

700

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

2

-

700

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

10

-

700

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

4

-

700

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

4

-

700

... More
IV Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

4

-

700

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

4

-

700

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

2

-

700

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

10

-

700

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

4

-

700

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

4

-

700

... More
V Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

4

-

700

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

4

-

700

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

2

-

700

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

10

-

700

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

4

-

700

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

4

-

700

... More
Painting the existing KM stone as per IRC standard including the cost of labour charges and Materials etc., complete

-

-

-

... More
I Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

1

-

90.2

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

2

-

90.2

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

1

-

90.2

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

2

-

90.2

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

2

-

90.2

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

3

-

90.2

... More
II Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

1

-

90.2

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

2

-

90.2

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

1

-

90.2

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

2

-

90.2

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

2

-

90.2

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

3

-

90.2

... More
III Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

1

-

90.2

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

2

-

90.2

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

1

-

90.2

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

2

-

90.2

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

2

-

90.2

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

3

-

90.2

... More
IV Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

1

-

90.2

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

2

-

90.2

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

1

-

90.2

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

2

-

90.2

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

2

-

90.2

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

3

-

90.2

... More
V Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

1

-

90.2

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

2

-

90.2

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

1

-

90.2

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

2

-

90.2

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

2

-

90.2

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

3

-

90.2

... More
Painting the existing HM stone as per IRC standard including the cost of labour charges and Materials etc., complete

-

-

-

... More
I Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

4

-

18.48

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

5

-

18.48

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

2

-

18.48

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

8

-

18.48

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

4

-

18.48

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

11

-

18.48

... More
II Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

4

-

18.48

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

5

-

18.48

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

2

-

18.48

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

8

-

18.48

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

4

-

18.48

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

11

-

18.48

... More
III Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

4

-

18.48

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

5

-

18.48

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

2

-

18.48

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

8

-

18.48

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

4

-

18.48

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

11

-

18.48

... More
IV Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

4

-

18.48

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

5

-

18.48

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

2

-

18.48

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

8

-

18.48

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

4

-

18.48

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

11

-

18.48

... More
V Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

4

-

18.48

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

5

-

18.48

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

2

-

18.48

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

8

-

18.48

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

4

-

18.48

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

11

-

18.48

... More
Lettering the existing KM stone as per IRC standard including the cost of labour charges and Materials etc., complete.,

-

-

-

... More
I Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

1

-

10.65

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

2

-

10.65

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

1

-

10.65

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

2

-

10.65

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

2

-

10.65

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

3

-

10.65

... More
II Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

1

-

10.65

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

2

-

10.65

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

1

-

10.65

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

2

-

10.65

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

2

-

10.65

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

3

-

10.65

... More
III Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

1

-

10.65

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

2

-

10.65

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

1

-

10.65

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

2

-

10.65

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

2

-

10.65

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

3

-

10.65

... More
IV Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

1

-

10.65

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

2

-

10.65

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

1

-

10.65

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

2

-

10.65

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

2

-

10.65

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

3

-

10.65

... More
V Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

1

-

10.65

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

2

-

10.65

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

1

-

10.65

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

2

-

10.65

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

2

-

10.65

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

3

-

10.65

... More
Lettering the existing HM stone as per IRC standard including the cost of labour charges and Materials etc., complete.,

-

-

-

... More
I Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

4

-

7.07

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

5

-

7.07

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

2

-

7.07

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

8

-

7.07

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

4

-

7.07

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

11

-

7.07

... More
II Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

4

-

7.07

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

5

-

7.07

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

2

-

7.07

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

8

-

7.07

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

4

-

7.07

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

11

-

7.07

... More
III Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

4

-

7.07

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

5

-

7.07

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

2

-

7.07

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

8

-

7.07

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

4

-

7.07

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

11

-

7.07

... More
IV Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

4

-

7.07

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

5

-

7.07

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

2

-

7.07

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

8

-

7.07

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

4

-

7.07

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

11

-

7.07

... More
V Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

4

-

7.07

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

5

-

7.07

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

2

-

7.07

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

8

-

7.07

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

4

-

7.07

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

11

-

7.07

... More
Numbering of avenues including cutting of space for numbering including cost of Materials and Labour charges etc., complete

-

-

-

... More
I Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

76

-

7.07

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

218

-

7.07

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

46

-

7.07

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

226

-

7.07

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

13

-

7.07

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

11

-

7.07

... More
II Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

76

-

7.07

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

218

-

7.07

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

46

-

7.07

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

226

-

7.07

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

13

-

7.07

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

11

-

7.07

... More
III Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

76

-

7.07

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

218

-

7.07

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

46

-

7.07

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

226

-

7.07

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

13

-

7.07

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

11

-

7.07

... More
IV Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

76

-

7.07

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

218

-

7.07

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

46

-

7.07

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

226

-

7.07

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

13

-

7.07

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

11

-

7.07

... More
V Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

76

-

7.07

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

218

-

7.07

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

46

-

7.07

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

226

-

7.07

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

13

-

7.07

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

11

-

7.07

... More
White washing over the existing Culverts, parapets, avenues and Guide post including cost of Materials and Labour charges etc., complete

-

-

-

... More
I Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

48.83

-

26.1

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

76.1

-

26.1

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

27.2

-

26.1

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

110.86

-

26.1

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

36.2

-

26.1

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

24.69

-

26.1

... More
II Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

48.83

-

26.1

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

76.1

-

26.1

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

27.2

-

26.1

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

110.86

-

26.1

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

36.2

-

26.1

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

24.69

-

26.1

... More
III Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

48.83

-

26.1

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

76.1

-

26.1

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

27.2

-

26.1

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

110.86

-

26.1

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

36.2

-

26.1

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

24.69

-

26.1

... More
IV Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

48.83

-

26.1

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

76.1

-

26.1

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

27.2

-

26.1

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

110.86

-

26.1

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

36.2

-

26.1

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

24.69

-

26.1

... More
V Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

48.83

-

26.1

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

76.1

-

26.1

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

27.2

-

26.1

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

110.86

-

26.1

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

36.2

-

26.1

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

24.69

-

26.1

... More
Black banding over the existing Culverts, parapets, avenues and Guide post including cost of Materials and Labour charges etc., complete

-

-

-

... More
I Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

9.92

-

97.08

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

27.01

-

97.08

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

6.34

-

97.08

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

27.82

-

97.08

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

1.98

-

97.08

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

1.52

-

97.08

... More
II Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

9.92

-

97.08

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

27.01

-

97.08

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

6.34

-

97.08

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

27.82

-

97.08

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

1.98

-

97.08

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

1.52

-

97.08

... More
III Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

9.92

-

97.08

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

27.01

-

97.08

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

6.34

-

97.08

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

27.82

-

97.08

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

1.98

-

97.08

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

1.52

-

97.08

... More
IV Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

9.92

-

97.08

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

27.01

-

97.08

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

6.34

-

97.08

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

27.82

-

97.08

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

1.98

-

97.08

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

1.52

-

97.08

... More
V Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

9.92

-

97.08

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

27.01

-

97.08

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

6.34

-

97.08

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

27.82

-

97.08

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

1.98

-

97.08

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

1.52

-

97.08

... More
Tack Coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 - over bituminous surfaces as per MORTH Rev. V Clause No. 111, 112, 503 & 900.

-

-

-

... More
IV Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

276.05

-

17.12

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

252

-

17.12

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

83.24

-

17.12

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

420

-

17.12

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

165

-

17.12

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

304.71

-

17.12

... More
V Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

460.09

-

17.12

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

420

-

17.12

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

138.74

-

17.12

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

700

-

17.12

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

275

-

17.12

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

507.84

-

17.12

... More
Bituminous Concrete (Table 500-17) (Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects) - Grading II as per MORTH Rev. V Clause No. 111, 112, 507 & 900.

-

-

-

... More
IV Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

11.04

-

6885.75

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

10.08

-

6885.75

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

3.33

-

6885.75

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

16.8

-

6885.75

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

4.95

-

6885.75

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

9.14

-

6885.75

... More
V Year

-

-

-

... More
Widening From Two lane to Multi lane and Improvements of Palayamkottai -Thoothukudi Road (Tirunelveli Town Limit) (Abandoned NH 7A) at KM 1/2-2/100 with Centre Median and Junction Improvements, Paver block Including CD works including upkeeping for a period of 60 months

18.4

-

6885.75

... More
Improvements of Tirunelveli - Pottalpudur Road at at Km 3/8 - 5/0 (SH41A) including upkeeping for a period of 60 months

16.8

-

6885.75

... More
Improvements of Tiruchanthur - Palayankottai -Ambasamuthiram -Tenkasi - Courtallam - Shenkottai road at Km 60/6 - 61/0 Including CD Works (SH40) including upkeeping for a period of 60 months

5.55

-

6885.75

... More
Improvements to Riding Quality at Km 6/0-8/0 of Tirunelveli - Pottalpudur Road at km (SH41A) including upkeeping for a period of 60 months

28

-

6885.75

... More
Improvements to Riding Qulaity at KM 1/0-2/0 of Road Branching from Km 6/2 of Tirunelveli - Pottalpudur Road To Gopalasamudram Road. (MD 921) Including Upkeeping for a period of 60 months

8.25

-

6885.75

... More
Improvements to Riding Qulaity at Km 2/0 -4/690 of Palamadai - Gangaikondan Railway Station Road including upkeeping for a period of 60 months

15.24

-

6885.75

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

53794073

... More
Add GST at 12%

1

-

6455289

... More
Total Value put to Tender

1

-

60249362

... More
Negotiated Percentage

1

-

-

... More
Final Negotiated Value

1

-

-

... More
Add GST at 12% of Final Negotiated Value

1

-

-

... More
Total Value of Contract Including 12% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

-

-

... More
Quoted Rate in Figures (Total Value of Contract Including 12% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.