Highways Department Tender

... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date24 Aug 2024
Closing Date23 Sep 2024
Tender Amount₹ 5,95,65,000 
Notes
Download

Costs

Summary

Mdu No 007 Tn No 05 2024 25 Hdo Dated 14 08 2024

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 of MORTH Specification no.111, 112, 401,900 - for grading- V Material

-

-

-

... More
Road A

1362.95

2522970

1851.11

... More
Road B

1132.57

2141361

1890.71

... More
Road C Box culvert at Km 3/2

24.75

43854

1771.91

... More
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 of MORTH Specification no.111, 112, 401,900 - for grading- III Material

-

-

-

... More
Road A

556.31

1079057

1939.67

... More
Road B

444.14

879072

1979.27

... More
Picking the existing BT surface upto 50mm depth as directed by the departmental officers and levelling the surface including all labour charges for pickig and all other tools and plants employed of the work and including all other incidental charges etc., complete as per standard specifications.

-

-

-

... More
Road A

550

12012

21.84

... More
Road B

187.5

4095

21.84

... More
Road D

173.25

3783

21.84

... More
Advance B.T. Patches with bituminous premix chips upto 50mm thick using standard 45mm IRC size HBG metal cum of metal premix with 44Kgs of 80/100 grade bitumen per cum of metal in accordance with the requirement of the specifications to serve as base course and in conformity with the drawing or as directed by the Engineer.

-

-

-

... More
Road B

35.68

131895

3696.63

... More
Road D

16.1

60263

3743.09

... More
Providing and Laying 50mm thick Bituminous Macadam using course aggregate and VG30 bitumen which shall consist of construction in a single course base/binder course confirming to the specfication on a previously prepared base. (using Mini Hot Mix Plant and Power Roller) including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,complete as per clause 111,112,504,900 MORTH Rev-5 (Mix-in-place method) (For Patch Works)

-

-

-

... More
Road A

80.53

668645

8303.06

... More
Wet Mix Macadam (Table 400-13) Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5 Specification no.111,112,406,900

-

-

-

... More
Road A

1622.08

3358549

2070.52

... More
Road B

1188.17

2460129

2070.52

... More
Road C Box culvert at Km 3/2

41.25

85408

2070.52

... More
Road D

55.46

114831

2070.52

... More
Prime coat Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 502 of MORTH Rev-5 Specification no. 111, 112, 501,502,900- over WMM

-

-

-

... More
Road A

7173.9

585820

81.66

... More
Road B

4998.31

408162

81.66

... More
Road C Box culvert at Km 3/2

165

13473

81.66

... More
Road D

519.75

42442

81.66

... More
Tack coat - Providing and laying Tack Coat over WBM/ WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5 Specification no.111,112,501, 503,900

-

-

-

... More
Road A

7173.9

135084

18.83

... More
Road B

4998.31

94118

18.83

... More
Road C Box culvert at Km 3/2

165

3106

18.83

... More
Road D

519.75

9786

18.83

... More
Tack coat - Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5 Specification no.111,112,501, 503,900

-

-

-

... More
Road A

16954.3

458952

27.07

... More
Road B

7999.95

216478

27.06

... More
Road D

3247.5

87909

27.07

... More
Tack coat - Providing and laying Tack Coat over Dry Lean Cement Concrete surface using 3.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 Specification no.111,112,501, 503,900

-

-

-

... More
Road A

121.8

2595

21.31

... More
Road B

311.74

6643

21.31

... More
Bituminous Macadam :Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50-13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5 Specification no.111,112,501,503,900 - Grading II

-

-

-

... More
Road A

358.73

3058474

8525.84

... More
Road B

274.93

2344009

8525.84

... More
Road C Box culvert at Km 3/2

8.25

70338

8525.84

... More
Road D

25.99

221586

8525.84

... More
Bituminous Concrete (Table 500-17) Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 Specification no. 111, 112, 507, 900 complete in all respects - Grading II

-

-

-

... More
Road A

727.5

7885394

10839.03

... More
Road B

399.32

4328241

10839.03

... More
Road C Box culvert at Km 3/2

4.95

53653

10839.03

... More
Road D

113.02

1225027

10839.03

... More
Providing compaction for embankment / making up of low berms using the available box cut earth including all hire and fuel charges for power roller for compaction, water sprinkler, including all labour charges for laying, spreading, watering etc., complete and as directed by the departmental engineers (Earth work compaction only)

-

-

-

... More
Road A for Berms

2306.29

61439

26.64

... More
Road B For Berms

797

21232

26.64

... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For making up of low berms with conveyance (Conveyed earth avg lead 2km)

-

-

-

... More
Road D For Berms

256.5

50522

196.97

... More
Disposal of box cut earth away from the work site for average lead 2km (conveyance only)

-

-

-

... More
Road A

1790.98

42231

23.58

... More
Road B

2151.26

50726

23.58

... More
Dismantling Dismantling the existing RR masonry with cement mortor / PCC / RCC / Cut Stone Slab salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc,as per MORTH Specification no.111,112,202

-

-

-

... More
RR Masonry

-

-

-

... More
Road A Box culvert at Km 4/4

9.66

2735

283.14

... More
Road A Box culvert at Km 4/6 (I)

14.82

4196

283.14

... More
Road A Box culvert at Km 4/6 (II)

9.66

2735

283.14

... More
Road A Box culvert at Km 6/8 (I)

14.82

4196

283.14

... More
Road A Box culvert at Km 6/8 (II)

14.78

4184

283.14

... More
Road B Box culvert at Km 1/8

15.11

4278

283.14

... More
Cut Stone slab

-

-

-

... More
Road B Box culvert at Km 1/8

28

14362

512.93

-

-

-

... More
Road B Slab culvert at Km 0/6

37.8

18378

486.2

... More
Road C Box culvert at Km 3/2

61.25

29779

486.2

... More
Earth work excavation in all classes of soil except hard rock requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as bailing out water shoring, strutting, walling and forming protective bunds wherever necessary etc., complete as per relevant standard specification for Paver Block portion, Foundation of Retaing wall, Drain and dressing the bed up to sill level for Culverts. etc, complete as per standard specification 111,112,304

-

-

-

... More
Road A Box culvert at Km 4/4

18

2218

123.26

... More
Road A Box culvert at Km 4/6 (I)

22.8

2810

123.26

... More
Road A Box culvert at Km 4/6 (II)

18

2218

123.26

... More
Road A Box culvert at Km 6/8 (I)

22.8

2810

123.26

... More
Road A Box culvert at Km 6/8 (II)

22.8

2810

123.26

... More
Road B Box culvert at Km 1/8

15

1848

123.26

... More
Road C Box culvert at Km 3/2

57.7

7112

123.26

... More
Earth work Excavation in all classes of soils except hard rock not requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion, backfilling, and clearing the site and disposal of all surplus materials etc. complete as per standard specification no 111,112,304

-

-

-

... More
Road A Box culvert at Km 4/4

115.37

33384

289.37

... More
Road A Box culvert at Km 4/6 (I)

128.89

37296

289.37

... More
Road A Box culvert at Km 4/6 (II)

110.56

31992

289.37

... More
Road A Box culvert at Km 6/8 (I)

118.47

34281

289.37

... More
Road A Box culvert at Km 6/8 (II)

182.62

52844

289.37

... More
Road B Box culvert at Km 1/8

96.75

27996

289.37

... More
Road C Box culvert at Km 3/2

165.91

48009

289.37

... More
Earthwork excacation in soft distegrade rock not requiring blasting expect hardrock requiring blasting and deposting on bank with all leads and lifts as per SS20B,including cost of al labour, equipments and all incidental charges such as bailing our water,providing and maintaining necessary cofferdams, sheeting, shoring bracing and their sudsequent removal,removal of all logs, stumps, grups and other deleterious matter and obstructions, trimming bottom of excavation backfilling,, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF ABUTMENTS WALLS,AND PIER FOOTINS.

-

-

-

... More
Road B Slab culvert at Km 0/6

68.87

26633

386.72

... More
Vibrated Cement Concrete M15 using 40mm ISS size HBG graded metal crushed stone including cost and conveyance of all materials to site including cost and labour charges for formwork and centering, labour charges, compacting, finishing and curing, including all incidental charges etc., complete as per MORTH Specification no.111, 112, 1000, 1500, 1700, 2200, 900 For Leveling Course and Foundation and FOOTINGS OF PCC RETAINING WALL

-

-

-

... More
Road A Box culvert at Km 4/4

17.55

106963

6094.78

... More
Road A Box culvert at Km 4/6 (I)

19.79

120615

6094.78

... More
Road A Box culvert at Km 4/6 (II)

17.01

103672

6094.78

... More
Road A Box culvert at Km 6/8 (I)

18.63

113686

6102.32

... More
Road A Box culvert at Km 6/8 (II)

25.76

157195

6102.32

... More
Road B Box culvert at Km 1/8

14.59

89114

6107.89

... More
Road C Box culvert at Km 3/2

22.55

136105

6035.73

... More
Vibrated cement concrete of grade M20 Nominal mix 1:1.5:3 using 40mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing,transporting, laying and curing cobncrete, working at depths ,tool,s and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specification, for ABUTMENTS, WINGS, RETAINING WALL AND RIVER TRAINING WALL FOR BELOW SILL LEVEL.

-

-

-

... More
Road B Slab culvert at Km 0/6

56.23

396611

7053.37

... More
Vibrated cement concrete of grade M20 Nominal mix 1:1.5:3 using 40mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing,transporting, laying and curing cobncrete, working at depths ,tool,s and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specification, for ABUTMENTS, WINGS, RETAINING WALL AND RIVER TRAINING WALL FOR Above SILL LEVEL.

-

-

-

... More
Road B Slab culvert at Km 0/6

55.51

543221

9786.01

... More
Vibrated reinforced cement concrete of grade M25 design mix using crushed ISS size HBG graded metal of including cost and conveyance of all materials to site but excluding cost and fabrication of steel but including cost and labour charges for formwork and centering, labour charges for formwork and centering, labour charges compacting, finishing and curing including all incidental charges etc., completed as per MORTH Specification no.1000,1500,1600,1700,2300, 900 for BED BLOCK CUM DIRT WALL OVER PIER AND ABUTMENTS.

-

-

-

... More
Road B Slab culvert at Km 0/6

0.64

7690

12016.77

... More
Providing and fixing KRAFT PAPER for full width of seating of deck slab and including cost and conveyence to worksite, labour for fixing the same in correct position and all other incidental charges etc., complete - sqm

-

-

-

... More
Road B Slab culvert at Km 0/6

4.25

467

110

... More
Vibrated reinforced cement concrete of grade M25 design using crushed ISS size HBG graded metal of including cost and conveyance of all materials to site but excluding cost and fabrication of steel but including cost and labour charges for formwork and centering, labour charges for formwork and centering, labour charges compacting, finishing and curing including all incidental charges etc., completed as per MORTH Specification no.1000,1500,1600,1700,2300, 900 for Deck slab

-

-

-

... More
Road B Slab culvert at Km 0/6

8.47

76802

9067.57

... More
Vibrated Reinforced Cement Concrete M25 (Design Mix) using crushed ISS size HBG graded metal of including cost and conveyance of all materials to site but excluding cost and fabrication of steel but including cost and labour charges for formwork and centering, labour charges for formwork and centering, labour charges compacting, finishing and curing including all incidental charges etc., completed as per MORTH Specification no.1000,1500,1600,1700,2300, 900 for BOX CULVERT

-

-

-

... More
Road A Box culvert at Km 4/4

24.95

332109

13311

... More
Road A Box culvert at Km 4/6 (I)

38.68

466773

12067.56

... More
Road A Box culvert at Km 4/6 (II)

24.95

332109

13311

... More
Road A Box culvert at Km 6/8 (I)

38.68

467064

12075.09

... More
Road A Box culvert at Km 6/8 (II)

38.68

467064

12075.09

... More
Road B Box culvert at Km 1/8

20.79

277670

13355.98

... More
Road C Box culvert at Km 3/2

132.48

1452906

10966.99

... More
Supply and fabrication of steel Grade Fe-500 required for all RCC items of works involved in the schedule including cost of steel cost of fabrication labour charges for cleaning the bars straightening cutting bending tying grills hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire provision of spacer bars, cover blocks and all other incidental charges etc. complete as per MORTH Vth Revision Specification No. 1000, 1500, 1600, 900

-

-

-

... More
Road A Box culvert at Km 4/4

1.82

173913

95609.27

... More
Road A Box culvert at Km 4/6 (I)

2.2

210244

95609.27

... More
Road A Box culvert at Km 4/6 (II)

1.82

173913

95609.27

... More
Road A Box culvert at Km 6/8 (I)

2.2

210244

95609.27

... More
Road A Box culvert at Km 6/8 (II)

2.2

210244

95609.27

... More
Road B Box culvert at Km 1/8

1.52

145326

95609.27

... More
Road B Slab culvert at Km 0/6

0.84

80311

95609.27

... More
Road C Box culvert at Km 3/2

13.33

1274758

95609.27

... More
Providing and fixing of G.I. Drainage spouts 100mm dia as per MOST drawing No.SD/205 with grating arrangements at top as shown in the drawing including cost and conveyance of GI pipes and flats and fixing them in position etc., complete

-

-

-

... More
Road C Box culvert at Km 3/2

6

14988

2498.1

... More
Vibrated Cement Concrete M30 Grade (Design mix) Using IRC size hard granite metal including cost and conveyance of all materials to site cost of premoulded expansion joints and fixing the same in position including cost and labour charges for formwork, labour charges for laying compacting curing, including all incidental charges etc., complete standard specification 1000,1500,1600,1700,2702 & 900 for WEARING COAT 75MM uniform thickness OVER DECK SLAB AND APPROACH SLAB

-

-

-

... More
Road B Slab culvert at Km 0/6

14.08

9015

640.29

... More
Road C Box culvert at Km 3/2

97.73

61505

629.34

... More
Vibrated Cement Concrete M20 Nominal mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, complying to the required standard and specifications including cost and formwork, mixing, laying, compacting using vibrator including hire and fuel charges for all tools and plants engaged in curing and all other incidental charges such as bailing out water wherever necessary forming protective bunds coffer dams etc., complete for for Wings walls, & parapet wall.. as per MORTH Specification no. 111,112,1000, 1500, 1700,2200,900

-

-

-

... More
Road A Box culvert at Km 4/4

108.17

842235

7786.22

... More
Road A Box culvert at Km 4/6 (I)

117.17

912311

7786.22

... More
Road A Box culvert at Km 4/6 (II)

103.01

802979

7795.16

... More
Road A Box culvert at Km 6/8 (I)

105.64

825221

7811.64

... More
Road A Box culvert at Km 6/8 (II)

176.58

1366746

7740.1

... More
Road B Box culvert at Km 1/8

90.97

712758

7835.09

... More
Road C Box culvert at Km 3/2

51.55

441205

8558.78

... More
Earthwork excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains inaccordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer. Formation of embankment using carted earth with a lead of 2 km. for Diversion Road

-

-

-

... More
Road C Box culvert at Km 3/2

180

35454

196.97

... More
Providing and fixing 110mm dia PVC Seepage pipes (working pressure 4Kg/1sq.cm) of required length for abutment and wing, retaining wall including cost and conveyance of all materials to worksite cost and labour for semi-sperical back fill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., complete to drain the back fill as per standard specifications as per MORTH specification no.2700, 900

-

-

-

... More
Road B Slab culvert at Km 0/6

18.8

4100

218.1

... More
Providing and fixing PVC EXPANSION JOINT 20mm thick confiriming to specification between deck slabs and dirt wall over abutment and in between decks and dirt wall including cost and conveyance of expansion joints to site including cost of testing as per MORT&H specification, including charges for fixing in all respect etc., Complete.

-

-

-

... More
Road B Slab culvert at Km 0/6

5

3267

653.4

... More
Gravel filling behind Abutments and Wings with clean good gritty gravel including cost and conveyance to site including labour charges for filling in layers, watering, tamping under OMC to get the maximum density, all incidental charges etc., complete

-

-

-

... More
Road B Slab culvert at Km 0/6

11.85

3234

272.92

... More
Providing filter media behind the abutments and wings for 600mm thickness using filter materials as per appendix - 6 of IRC 78 - 2014 well packed with smaller size towards the soil and bigger size towards the wall including cost and conveyance to worksite including all other incidental charges etc., complete.

-

-

-

... More
Road B Slab culvert at Km 0/6

3.6

5078

1410.7

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

50477836

... More
Add GST at 18%

1

-

9086010

... More
Total Value put to Tender

1

-

59563846

... More
Excess/Less Percentage

1

-

-

... More
Final Value

1

-

-

... More
Add GST at 18% of Final Value

1

-

-

... More
Total Value of Contract Including 18% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

50477836

-

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.